Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

Technical Reports (NI 43-101)

200 shown · 3904 matching · 3904 reports from 5631 items
Ticker Company Date Report Project Status Dates Authors and headline numbers View
EMM.V Giyani Metals Corp 2026-07-10 FS K.Hill Battery-Grade Manganese Projectmanganese Filed filed 2026-07-10 NPV8 US$482M after-tax · IRR 20.3%5 items since 2024-11-14 View ↗
STMN.CN UraniumX Discovery Corp. 2026-07-10 — Dieter Lake Uranium Projecturanium“Technical Report on the Dieter Lake Property, Quebec, Canada” Commissioned — Dahrouge Geological Consulting View ↗
FVI.TO Fortuna Mining Corp. 2026-07-09 — Séguéla Minegold Commissioned — Lycopodium View ↗
AMCO.V Americore Resources Corp 2026-07-09 Property Trinity Silver Projectsilver“Technical Report on the Trinity Project,” Commissioned effective 2025-10-16 RESPECQPs: Jeffery Bickel2 items since 2025-11-18 View ↗
LOD.V Lode Gold Resources Inc 2026-07-08 Resource Fremont Gold Minegold Filed filed 2026-07-08 2 items since 2026-02-17 View ↗
TIGR.V Tiger Gold Corp 2026-07-08 Resource Quinchía Gold Projectgold Commissionedexpected in Q1 of 2027 — View ↗
TXG.TO Torex Gold 2026-07-07 PEA Los Reyes Projectgold Filed effective 2026-04-25filed 2026-07-07 NPV5 US$1.49B after-tax · IRR 37.3% · capex US$515M View ↗
MKO.V Mako Mining Corp. 2026-07-07 Resource Moss Minegold, silver“NI 43-101 Technical Report for the 2025 Mineral Resource Estimate for the Moss Mine Project, Oatman Mining...” Commissionedexpected within 45 days effective 2025-12-18 Micon International; PDM Technical Services; CGK ConsultingQPs: Mohsin HashmiProven & Probable 56.8 Mt @ 0.327 g/t Au3 items since 2026-01-26 View ↗
FRED.V Fredonia Mining Inc 2026-07-07 Resource El Dorado Monserrat Projectgold, silver“Maiden Mineral Resource Estimate on the El Dorado Monserrat Property, Gold and Silver Project, Santa Cruz...” Commissioned — QPs: Mario Alfaro; Fernando Ganem View ↗
AUEX.CN Advanced Gold Exploration Inc. 2026-07-07 — Silver Belle Projectgold, silver Commissioned — View ↗
BAU.V Blue Star Gold Corp 2026-07-06 Resource Ulu Gold Projectgold“Updated Mineral Resource Estimate and Technical Report on the Ulu Gold Project, Nunavut, Canada” Filed filed 2026-07-06 2 items since 2026-05-21 View ↗
RUU.CN Refined Energy Corp. 2026-07-06 — Golden Goose Projectgold, antimony Commissioned — View ↗
ZIGY.CN Stardust Metal Corp. 2026-07-06 Resource Omega Projectgold Commissionedexpected in the third quarter — Indicated 4.9 Mt @ 1.39 g/t · Inferred 4.7 Mt @ 2.43 g/t2 items since 2026-05-13 View ↗
ARIC.V Awalé Resources Limited 2026-07-03 Resource Odienné Projectgold“Technical Report - Odienné Gold Project, Côte d'Ivoire - Report for NI 43-101.” Filed effective 2026-04-01filed 2026-07-03 Bara Consulting; RynnGeo ConsultingQPs: Andrew Bamber; Neal ReynoldsInferred 1.39 Moz Au View ↗
MM.CN Maximus Metals Inc. 2026-07-01 Property Gaspard Projectgold“NI 43-101 Technical Report on the Gaspard Project, British Columbia, NTS 93O/10, 51.62° North, -122.55° West” Filed effective 2025-10-24filed 2026-06-30 QPs: Derrick Strickland View ↗
TSLV.V Tier One Silver Inc 2026-06-30 Resource Holder of Copper-Molybdenum Projectsilver, copper, molybdenum Commissioned — SRK Consulting View ↗
YGT.V Gold Terra Resource Corp 2026-06-30 Property Yellowknife Projectgold“NI 43-101 Technical Report, Yellowknife Project, Yellowknife, Northwest Territories, Canada, Gold Terra...” Filed effective 2026-04-30filed 2026-06-30 SLR Consulting View ↗
EMO.V Emerita Resources Corp. 2026-06-30 PFS Ibw Projectgold, silver, copper Commissionedexpected during the third quarter of 2026 — SLR3 items since 2026-01-12 View ↗
ERD.TO Erdene Resource Development Corporation 2026-06-30 PEA Khuvyn Khar Projectgold, silver, copper Commissionedexpected in mid-H2 2026 — 2 items since 2026-03-31 View ↗
REG.V Regulus Resources Inc. 2026-06-30 Resource Integrated Coimolache Sulphide/AntaKori Copper-Gold Projectgold, copper Commissioned — SRKIndicated 250.0 Mt @ 0.48 % Cu · Inferred 267.0 Mt @ 0.41 % Cu View ↗
NILI.V Surge Battery Metals Inc. 2026-06-30 Resource Nevada North Lithium Projectlithium“) for the Company's flagship Nevada North Lithium Project has now been filed on SEDAR+ and is available on...” Filed effective 2024-10-09filed 2026-06-30 RESPEC CompanyInferred 271.3 Mt @ 2.16e+03 ppm Li · Measured & Indicated 657.5 Mt @ 3.01e+03 ppm Li4 items since 2024-11-11 View ↗
EMNT.V Eminent Gold Corp 2026-06-30 Property Springpole Gold Projectgold Filed effective 2026-08-01filed 2026-06-30 View ↗
EMN.V Euro Manganese Inc 2026-06-29 PEA Chvaletice Manganese Projectmanganese“Technical Report and Mineral Resource Estimate for the Chvaletice Manganese Project, Chvaletice, Czech Republic” Filed effective 2026-05-14filed 2026-06-29 Tetra Tech CanadaQPs: ECONOMIC ANALYSIS TheNPV8 US$492M after-tax · IRR 13.8% · capex US$627.5MMeasured & Indicated 27.0 Mt @ 7.33 % Mn2 items since 2026-05-14 View ↗
LRA.V Lara Exploration Ltd. 2026-06-29 PEA Planalto Projectgold, copper“NI 43.101 Preliminary Economic Assessment for the Planalto Copper - Gold Project, Brazil” Commissioned effective 2025-10-15 SRK Consulting; Limited and SRK Consultores do BrasilNPV8 US$378M after-tax · IRR 21.0% · capex US$546MInferred 154.0 Mt @ 0.36 % Cu · Indicated 47.7 Mt @ 0.53 % Cu3 items since 2025-10-21 View ↗
NICU.TO NICU.TO 2026-06-29 PEA Levack Minecopper Commissionedexpected in Q3 2026 — View ↗
TSK.TO Talisker Resources Ltd 2026-06-26 Resource Previously Announced Bralorne Gold Projectgold“Mineral Resource Estimate for the Bralorne Gold Project, British Columbia, Canada” Filed filed 2026-06-26 View ↗
BYN.V Banyan Gold Corp. 2026-06-26 Resource AurMac Projectgold Filed effective 2025-09-01filed 2025-10-27 Ginto Consulting; JDS Energy & Mining; Wright ConsultingQPs: Marc Jutras; Tysen Hantelmann; Frank Wright View ↗
TWO.V T2 Metals Corp 2026-06-26 Resource Sherridon Copper-Zinc-Gold-Silver Projectgold, silver, copper“Mineral Resource Estimates for the Sherridon Copper-Gold-Zinc-Silver Project, North Central Manitoba, Canada” Filed effective 2026-04-22filed 2026-06-26 ReedLeyton Consulting; Hogrelius Geological Consultants; Arundon Mining SolutionsQPs: Geoffrey ReedInferred 18.1 Mt @ 1.08 % Cu · Indicated 10.0 Mt @ 0.39 % Cu3 items since 2026-02-10 View ↗
NATB.CN NATB.CN 2026-06-26 Property Cahuilla Gold Projectgold“NI 43-101 Technical Report on the Cahuilla Gold Project, Imperial County, California.” Filed effective 2026-06-15filed 2026-06-26 APEX Geoscience; Capps GeoscienceQPs: Richard C. Capps; Michael B. Dufresne2 items since 2026-03-10 View ↗
OSM.V Osiris One Metals Ltd 2026-06-25 Property Western Range Silver Copper Projectsilver, copper“NI 43-101 Technical Report on the Western Range Project Western Australia” Filed effective 2026-06-22filed 2026-06-25 View ↗
QTWO.V Q2 Metals Corp. 2026-06-25 PEA Cisco Lithium Projectlithium Commissionedexpected in the coming months — BBAQPs: Todd McCrackenInferred 270.0 Mt @ 1.36 % Li2O · Inferred 295.0 Mt @ 1.36 % Li2O · Inferred 24.0 Mt2 items since 2026-05-27 View ↗
TN.CN Tartisan Nickel Corp. 2026-06-25 PFS Kenbridge Nickel-Copper Projectcopper, nickel Commissioned — View ↗
WDO.TO Wesdome Gold Mines Ltd 2026-06-24 — Eagle River Minegold Commissionedexpected within the next 45 days — SRK Consulting; Norda SteloQPs: Benny Zhang; Eric Lecomte2 items since 2026-01-20 View ↗
BAY.V Aston Bay Holdings Ltd. 2026-06-24 FS Storm Copper Projectcopper Commissioned — Ausenco; Nuna Group View ↗
MMX.V Mustang Minerals Limited 2026-06-24 Property El Cobre Copper-Gold Porphyry Projectgold, copper Filed filed 2026-06-24 View ↗
NEXM.V NexMetals Mining Corp 2026-06-24 Resource Selkirk Projectcopper“NI 43-101 Technical Report Selkirk Nickel Project, North East District, Republic of Botswana” Commissionedexpected within 45 days effective 2024-11-01 MSAInferred 15.1 Mt @ 0.6 % CuEq · Indicated 78.2 Mt @ 0.66 % CuEq · Inferred 44.2 Mt @ 0.81 % CuEq4 items since 2024-11-27 View ↗
VM.V VM.V 2026-06-23 — Iodine Project Commissioned — Fluor View ↗
RIO.TO Rio2 Limited 2026-06-23 Resource Condestable Minegold, silver, copper“NI 43- 101 Technical Report on the Condestable Mine, Lima Department, Peru, dated April 12, 2024,...” Commissionedexpected within 45 days effective 2022-12-31 SLR Consulting2 items since 2026-05-15 View ↗
ABRA.TO AbraSilver Resource Corp 2026-06-22 FS Premier Undeveloped Silver-Gold Projectsgold, silver Commissionedexpected within 45 days — QPs: Miguel FuentealbaNPV5 C$4.2B after-tax · IRR 42.0% · capex C$722MProven & Probable 77.9 Mt @ 146 g/t AgEq View ↗
RMI.V Ridgestone Mining Inc 2026-06-22 — Las Pilas Rare Earth Element Prospectlithium, rare earth Commissioned — View ↗
FMS.V Focus Graphite Inc 2026-06-22 Resource Lac Tetepisca Projectgraphite Filed effective 2026-04-30filed 2026-06-22 DRA America's; DRA GlobalIndicated 120.2 Mt @ 10.3 % · Inferred 24.1 Mt @ 9.88 %3 items since 2025-12-18 View ↗
RUA.TO Rua Gold Inc 2026-06-19 PEA Auld Creek Projectgold Filed effective 2026-02-27filed 2026-06-19 View ↗
ABRA.TO AbraSilver Resource Corp 2026-06-19 Resource Diablillos Projectgold, silver“NI 43-101 Mineral Resource Estimate, Diablillos Silver-Gold Project” Filed effective 2026-05-06filed 2026-06-19 Measured & Indicated 102.0 Mt @ 65 g/t Ag View ↗
MRZL.V Mont Royal Resources Limited 2026-06-19 PEA Ashram Projectrare earth“NI 43 -101 Technical Report, Preliminary Economic Assessment for the Ashram Rare Earths Project, Nunavik,...” Filed effective 2026-05-29filed 2026-06-19 Indicated 73.2 Mt @ 1.89 %3 items since 2026-04-07 View ↗
SVM.TO Silvercorp Metals Inc. 2026-06-18 Resource Ying Property“NI 43-101 Technical Report Update on the Ying Ag-Pb-Zn-Au Property in Henan Province, People's Republic of China” Filed effective 2025-12-31filed 2026-06-18 AMC Mining Consultants View ↗
AEC.V Anfield Energy Inc. 2026-06-18 PEA Velvet-Wood Projecturanium, vanadium“The Shootaring Canyon Mill and Tributary Mines, Utah and Colorado, USA, Preliminary Economic Assessment” Filed effective 2022-04-10filed 2026-06-18 Wood; BRSNPV8 US$606M after-tax · IRR 97.0%Inferred 145,150 t @ 0.24 % U3O8 · Inferred 2.0 Mt @ 0.2 % U3O8 · Measured & Indicated 571,526 t @ 0.34 % View ↗
RUA.TO Rua Gold Inc 2026-06-18 PFS Auld Creek Gold-Antimony Projectgold, antimony“Technical Report on the Reefton Project, New Zealand” Commissionedexpected in Q4 2026 effective 2026-02-27 Minerals Security PartnersNPV5 US$42M after-tax · IRR 36.0% · capex US$132.6M3 items since 2026-05-05 View ↗
NVRO.V NVRO.V 2026-06-18 Resource —silver, copper, nickel Commissionedexpected within 45 days — Measured GroupMeasured 77.6 Mt View ↗
APXC.CN Apex Critical Metals Corp. 2026-06-16 Property Rift Rare Earth Projectrare earth Filed filed 2026-06-16 View ↗
MTTA.CN Meta Critical Minerals Inc. 2026-06-16 PFS Table Mountain Projectvanadium, rare earth, titanium Filed filed 2026-06-16 View ↗
FCI.V First Canadian Graphite Inc. 2026-06-16 Resource Lac Guéret South Projectgraphite Filed effective 2019-06-30filed 2026-06-16 Indicated 1.8 Mt @ 17 % · Inferred 1.5 Mt @ 16.4 %2 items since 2026-05-20 View ↗
FCI.V Resource Berkwood Projectgraphite Filed effective 2019-06-30filed 2026-06-16 Indicated 1.8 Mt @ 17 % · Inferred 1.5 Mt @ 16.4 %2 items since 2026-05-20
YGT.V Gold Terra Resource Corp 2026-06-15 PEA Con Minegold Commissioned — SLR Consulting; Nordmin Engineering View ↗
ABRA.TO AbraSilver Resource Corp 2026-06-15 Resource La Coipita Projectgold, copper, molybdenum Commissionedexpected within 45 days — Measured & Indicated 102.0 Mt @ 65 g/t Ag View ↗
WGO.V White Gold Corp. 2026-06-15 — Bridget Propertygold Commissioned — View ↗
RSM.V Resouro Strategic Metals Inc. 2026-06-14 PEA Tiros Projectrare earth, titanium Commissionedexpected within 45 days — Tecnologia Ambiental; Atticus Geoscience CoNPV8 US$714.9M after-tax · IRR 44.2% · capex US$191MMeasured & Indicated 1400.0 Mt View ↗
SCM.CN Steadright Critical Minerals Inc. 2026-06-12 Property TitanBeach One (1) Project“NI 43-101 Technical Report on the TitanBeach One (1) Project, Kingdom of Morocco” Withdrawn — View ↗
SCM.CN Propertyamended TitanBeach One (1) Project Commissioned —
MGM.V Maple Gold Mines Ltd 2026-06-11 Resource Douay Gold Projectgold“NI 43-101 Technical Report, Douay/Joutel Gold Project, Northwestern Quebec, Canada” Filed effective 2026-04-24filed 2026-06-11 SLR ConsultingQPs: Denis DecharteIndicated 900,000 t @ 1.66 g/t Au · Indicated 19.1 Mt @ 1.48 g/t Au · Inferred 11.7 Mt @ 1.5 g/t Au View ↗
MGM.V Resource Joutel Gold Projectgold“NI 43-101 Technical Report, Douay/Joutel Gold Project, Northwestern Quebec, Canada” Filed effective 2026-04-24filed 2026-06-11 SLR ConsultingQPs: Denis DecharteIndicated 900,000 t @ 1.66 g/t Au · Indicated 19.1 Mt @ 1.48 g/t Au · Inferred 11.7 Mt @ 1.5 g/t Au
WRR.V Walker River Resources Corp 2026-06-11 Resource Lapon Canyon Gold Projectgold Commissioned — 4 items since 2026-05-27 View ↗
ERO.TO Ero Copper Corp. 2026-06-10 PFS Furnas Projectgold, silver, copper“Preliminary Economic Assessment for the Furnas Project — Para State, Brazil — NI 43-101 Technical Report” Commissionedexpected in mid-2026 effective 2026-02-23 View ↗
TCEC.CN Terra Clean Energy Corp. 2026-06-10 Property Marysvale Uranium Mines Projecturanium Commissionedexpected shortly — View ↗
ARA.TO Aclara Resources Inc. 2026-06-09 FS Penco Module Project Commissionedexpected during the fourth quarter of 2026 — View ↗
FURY.TO Fury Gold Mines Limited 2026-06-09 PFS Eau Claire Gold Projectgold Commissioned — SGS Geological Services; BBA Consultants View ↗
GPAC.V Great Pacific Gold Corp 2026-06-09 Resource Belltopper Gold Projectgold Commissionedexpected within 45 days — Inferred 760,000 t @ 3.6 g/t Au View ↗
NQC.V Nordique Critical Metals Inc. 2026-06-08 PEA Augustus Lithium Projectlithium Commissioned — View ↗
EVR.CN Evolve Royalties Ltd. 2026-06-05 Resource HVC Minecopper, tin Commissionedexpected in the second half of 2026 — View ↗
SAGE.V Sage Potash Corp 2026-06-04 Resource Sage Plain Potash Projectpotash Commissioned — View ↗
NOBL.V Noble Plains Uranium Corp 2026-06-04 Resource Duck Creek Uranium Projecturanium“NI 43-101 Technical Report, Duck Creek Uranium Project, Converse County, Wyoming, USA” Filed filed 2026-06-04 WWC EngineeringIndicated 3.9 Mt @ 0.062 % U3O8 · Inferred 761,128 t @ 0.09 % U3O82 items since 2026-04-23 View ↗
QTWO.V Q2 Metals Corp. 2026-06-04 Resource Cisco Lithium Projectlithium“Mineral Resource Estimate for the Cisco Lithium Project” Filed effective 2026-04-20filed 2026-06-04 BBAInferred 270.0 Mt @ 1.36 % Li2O5 items since 2025-11-17 View ↗
BRO.V Barksdale Resources Corp 2026-06-03 Property Sunnyside Project Filed effective 2026-02-02filed 2026-06-03 APEX GeoscienceQPs: Andrew J. Turner View ↗
CMT.CN CMT.CN 2026-06-02 Property Burnt Pond NL VMS Project“NI 43-101 Technical Report on the Burnt Pond Volcanic Massive Sulphide (VMS) Project in Newfoundland and Labrador” Filed effective 2026-05-29filed 2026-06-02 View ↗
AURR.CN Aurbis Resources Corp. 2026-06-02 Property Ecru Projectgold Commissioned — Rangefront Mining ServicesQPs: Person Johan Lambrechts View ↗
TRAC.CN Traction Uranium Corp 2026-06-02 Property Aurora Uranium Projecturanium“Technical Report on the Aurora Property, Athabasca Basin, Saskatchewan, Canada” Filed effective 2026-05-21filed 2026-06-02 View ↗
RM.TO Roxmore Resources Inc 2026-06-01 PEA Converse Gold Projectgold“NI 43-101 Technical Report on the Preliminary Economic Assessment for the Converse Project, Nevada, USA” Filed filed 2026-06-01 SLR Consulting; Kappes, Cassiday View ↗
IDEX.V IDEX Metals Corp. 2026-06-01 Property Freeze Property“Technical Report for the Freeze Property” Filed filed 2026-06-01 QPs: David Hladky View ↗
NEXM.V NexMetals Mining Corp 2026-06-01 Resource Selebi Mines“Technical Report, Selebi Mines, Central District, Republic of Botswana” Commissionedexpected in the second half of 2026 effective 2024-06-30 SLR ConsultingIndicated 3.0 Mt @ 2.92 % CuEq · Inferred 24.7 Mt @ 3.4 % CuEq2 items since 2026-05-07 View ↗
IMG.TO IAMGOLD Corporation 2026-06-01 Resource Côté Gold Minegold Commissionedexpected in the fourth quarter of 2026 — SLR Consulting View ↗
EDDY.V Edison Lithium Corp 2026-06-01 — Edison Lithium Locates Historical Drill Core During Propertygold, lithium Commissionedexpected in early June — View ↗
OM.TO Osisko Metals Incorporated 2026-05-29 Resource Gaspé Copper Projectcopper“NI 43-101 Technical Report on the Gaspé Copper Project with an Updated Mineral Resource Estimate for the...” Filed effective 2026-01-17filed 2026-05-29 PLR Resources; G Mining; SynectiqQPs: Christian LarocheInferred 980,000 t 2200.00 Mlb Cu · Measured & Indicated 834.0 Mt @ 0.27 % Cu · Inferred 240.0 Mt @ 0.41 % Cu5 items since 2024-05-06 View ↗
AMX.V Amex Exploration Inc 2026-05-29 FS Perron Gold Minegold“NI 43-101 Technical Report and Feasibility Study for the Perron Mine, Québec, Canada” Filed effective 2026-03-31filed 2026-05-28 P&E Mining Consultants; Evomine Consulting; Hydro-Ressources; Soutex; Norda SteloQPs: Antoine YassaNPV5 C$1.13B after-tax · IRR 114.6% · capex C$193.9MProven & Probable 2.0 Mt @ 12.1 g/t Au View ↗
SOO.P.V SOO.P.V 2026-05-28 — Nabisipi REE Projectrare earth Commissioned — View ↗
NAU.V NevGold Corp 2026-05-28 Resource Lage Antimony Prospectantimony Commissioned — View ↗
LIFT.V Li-FT Power Ltd. 2026-05-28 Resource Adina-Galinée Lithium Projectlithium Filed effective 2026-05-07filed 2026-05-28 SGS Geological ServicesQPs: Marc-Antoine Laporte View ↗
NICU.V Magna Mining Inc 2026-05-27 PFS Levack Minecopper, nickel Commissionedexpected in Q3 2026 — 3 items since 2025-12-16 View ↗
MAI.V Mining Americas Inc. 2026-05-27 PFS Copperstone Gold Projectgold Commissionedexpected within 45 days — NPV5 US$374M after-tax · IRR 108.0% · capex US$58MProven & Probable 1.9 Mt @ 4.87 g/t Au View ↗
NAU.V NevGold Corp 2026-05-27 Resource Limousine Butte Projectantimony Commissioned — View ↗
AXO.V AXO Metals Corp. 2026-05-26 PEA San Antonio Project Commissioned — P&E Mining Consultants View ↗
UPPR.CN Union Power Metals Corp. 2026-05-26 Resource Michalova Manganese Projectmanganese Commissioned — SLR View ↗
QGR.V Q-Gold Resources Ltd. 2026-05-25 PEA Quartz Mountain Gold Projectgold Filed filed 2026-05-25 NPV5 US$1.71B after-tax · IRR 55.2% · capex US$290M2 items since 2025-11-21 View ↗
MILI.CN Military Metals Corp. 2026-05-22 Resource Trojarova Projectgold, antimony Filed effective 2026-04-06filed 2026-05-22 SLR ConsultingQPs: Luke Evans; Amanda KuheljInferred @ 1.02 % Sb4 items since 2026-01-07 View ↗
BOOM.CN Galloper Gold Corp. 2026-05-22 Resource Glover Island Gold Propertygold“Technical Report, and Updated Mineral Resource Estimate of the Glover Island Gold Property, Grand Lake...” Filed effective 2026-04-06filed 2026-05-22 P&E Mining ConsultantsInferred 6.7 Mt @ 1.02 g/t Au · Indicated 3.1 Mt @ 1.2 g/t Au3 items since 2026-02-17 View ↗
ACM.CN Allied Critical Metals Inc. 2026-05-20 PEA Borralha Tungsten Projecttungsten“Preliminary Economic Assessment – Borralha Tungsten Project, Parish of Salto, District of Vila Real, Portugal” Filed effective 2026-04-14filed 2026-05-20 Diamond Equity ResearchNPV8 $473.4M after-tax · IRR 48.8%2 items since 2026-04-14 View ↗
LG.V Lahontan Gold Corp. 2026-05-20 PEA Santa Fe Minegold“Preliminary Economic Assessment, NI 43-101 Technical Report, Santa Fe Project,” Commissioned effective 2024-12-10 Kappes, Cassiday; RESPEC Company; Equity Exploration ConsultantsQPs: Trevor Rabb; Kenji UmenoNPV5 US$8.7M after-tax · IRR 47.8% · capex US$135.1M4 items since 2024-07-16 View ↗
DBG.V Doubleview Gold Corp 2026-05-20 PEA Hat Polymetallic Projectgold“Preliminary Economic Assessment of the Hat Polymetallic Project, British Columbia, Canada.” Filed filed 2026-05-20 NPV5 C$6.73B after-tax · IRR 23.0%Measured & Indicated 609.0 Mt @ 0.43 % Au · Inferred 503.0 Mt @ 0.41 % Au5 items since 2025-07-16 View ↗
ALAR.CN Alaros Exploration Inc. 2026-05-20 — Toy Propertytungsten Commissioned — View ↗
RSG.CN Rocky Shore Gold Ltd. 2026-05-19 Property Mosquito Hill and Reid Gold Depositsgold Filed filed 2026-05-19 View ↗
BYN.V Banyan Gold Corp. 2026-05-19 Resource AurMac Projectgold“Technical Report, AurMac Property, Mayo Mining District, Yukon Territory, Canada” Commissionedexpected within 45 days effective 2023-07-07 Ginto ConsultingQPs: Marc JutrasIndicated 37.7 Mt @ 0.69 g/t Au · Inferred 15.1 Mt @ 0.84 g/t Au6 items since 2023-07-31 View ↗
AVL.TO Avalon Advanced Materials Inc 2026-05-19 PEA Nechalacho Rare Earths Projectrare earth Commissioned — View ↗
BTR.V Bonterra Resources Inc 2026-05-19 Resource Desmaraisville South Project“Updated Mineral Resource Estimate and Technical Report of The Bachelor and Moroy Deposits, Desmaraisville...” Filed effective 2026-02-18filed 2026-05-19 P&E Mining ConsultantsQPs: Antoine YassaMeasured & Indicated 16.8 Mt @ 3.02 g/t Au · Inferred 15.6 Mt @ 4.32 g/t Au View ↗
STGO.TO Steppe Gold Ltd. 2026-05-14 FS Boroo Gold Minegold Commissionedexpected in the second half of 2026 — View ↗
SIG.V Sitka Gold Corp 2026-05-14 Resource RC Gold Projectgold, silver, tungsten“RC Gold Project, NI 43-101 Technical Report, Dawson Mining District, Yukon Territory” Commissionedexpected within 45 days effective 2026-02-25 GeoSim ServicesQPs: Ronald G. SimpsonMeasured & Indicated @ 0.05 % WO32 items since 2026-03-31 View ↗
TSK.TO Talisker Resources Ltd 2026-05-14 Resource Bralorne Gold Projectgold Commissionedexpected within 45 days — Inferred 11.2 Mt @ 8.73 g/t Au · Measured & Indicated 720,000 t @ 8.91 g/t Au View ↗
RVG.V Revival Gold Inc 2026-05-14 Resource Mercur Projectgold Commissioned — View ↗
TNGD.V Tiernan Gold Corp 2026-05-14 PFS Volcan Gold Projectgold Commissioned — Mining Metallurgy Environmental; Ausenco; SLR; SGS View ↗
TNGD.V Resource Volcan Gold Projectgold Commissioned — SLR
MAU.TO Montage Gold Corp 2026-05-14 Resource Koné Projectgold Commissionedexpected in the coming months — 3 items since 2024-02-22 View ↗
NSG.CN Northstar Gold Corp. 2026-05-14 Resource Dual Gold and Copper Projectsgold, copper Commissioned — View ↗
BRC.V Blackrock Silver Corp 2026-05-13 PEA Tonopah West Silver-Gold Projectgold, silver“Updated Preliminary Economic Assessment of Mineral Resource Estimate - Tonopah West Silver-Gold Project,...” Filed effective 2026-03-25filed 2026-05-13 View ↗
IAU.TO i-80 Gold Corp. 2026-05-12 FS Ruby Hill Propertygold Commissionedexpected in the second quarter of 2026 — Professional EngineersQPs: Paul Chawrun; Tyler Hill2 items since 2025-07-08 View ↗
IAU.TO FS Cove Underground Projectgold Commissionedexpected During the first quarter —
FM.TO First Quantum Minerals 2026-05-11 Resource La Granja Projectcopper Filed effective 2025-12-31filed 2026-05-11 Measured & Indicated 5206.0 Mt @ 0.48 % Cu · Inferred @ 0.4 % Cu View ↗
GGA.V Goldgroup Mining Inc. 2026-05-11 Resource San Francisco Gold Projectgold“NI 43-101 Technical Report for the San Francisco Project, Sonora, Mexico” Filed effective 2026-04-30filed 2026-05-11 Micon InternationalQPs: William J. Lewis; Richard M. Gowans; Tudorel Ciuculescu; William Lewis View ↗
APGO.V Apollo Silver Corp. 2026-05-11 PEA Mule Propertygold, silver Commissionedexpected in Q3 2026 — Indicated 36.0 Mt @ 7.4 % BaSO4 · Inferred 17.0 Mt @ 3.9 % BaSO4 View ↗
ABX.TO Barrick Mining Corporation 2026-05-11 PFS —gold, copper Commissionedexpected in Q1 — View ↗
KRY.V.TO KRY.V.TO 2026-05-08 Resource Haib Copper Projectcopper“NI 43-101 Technical Report – March 2026 Mineral Resource Estimate Haib Copper Project, Namibia” Filed effective 2026-03-16filed 2026-05-08 MSAQPs: Jeremy C. Witley View ↗
KRY.V.TO PEA Haib Copper Projectcopper Commissionedexpected by late Q2 2026 —
LMR.V Lomiko Metals Inc 2026-05-08 PFS La Loutre Graphite Projectgraphite Filed effective 2026-03-24filed 2026-05-08 DRAQPs: Gordana SlepcevNPV8 C$617.4M after-tax · IRR 24.7% · capex C$504.6MProbable 46.8 Mt @ 4.79 % · Measured 215,000 t @ 4.47 % C · Indicated 69.7 Mt @ 4.41 % C2 items since 2026-04-13 View ↗
ERKA.CN Eureka Lithium Corp. 2026-05-08 Property Cabin Lake Polymetallic Projectlithium“NI 43-101 Technical Report on the Cabin Lake Property, Omineca Mining District British Columbia” Filed effective 2026-05-05filed 2026-05-08 QPs: Jeremy Hanson View ↗
WHN.V Westhaven Gold Corp 2026-05-07 PFS Shovelnose Gold and Silver Projectgold, silver Commissionedexpected in H2 2027 — NPV6 C$454M after-tax · IRR 43.2% View ↗
HSTR.V Heliostar Metals Ltd 2026-05-07 Property Goldstrike Projectlead“NI 43-101 Technical Report Goldstrike Project, Utah, USA” Filed effective 2026-03-23filed 2026-05-07 View ↗
DC.A.TO DC.A.TO 2026-05-07 PFS In-Fillgold, silver Commissionedexpected in H2 2027 — View ↗
ABRA.TO AbraSilver Resource Corp 2026-05-06 Resource Diablillos Projectgold, silver“NI 43-101 Technical Report, Mineral Resource Estimate, Diablillos Ag-Au Project” Commissionedexpected within 45 days effective 2025-07-29 QPs: Luis Rodrigo PeraltaInferred 14.4 Mt @ 25 g/t Ag · Measured & Indicated 102.0 Mt @ 65 g/t Ag · Measured & Indicated 232.0 Mt 248.00 Moz Ag2 items since 2025-09-12 View ↗
IVN.TO Ivanhoe Mines 2026-05-06 Resource Kamoa-Kakula Copper Complexcopper“Kamoa-Kakula Mineral Reserve and Mineral Resource Technical Report” Commissionedexpected in early Q3 2026 effective 2025-12-31 AMC Mining Consultants; South Africa (Pty) Ltd and MSAIndicated 1270.0 Mt @ 2.65 % Cu · Inferred 336.0 Mt @ 1.82 % Cu2 items since 2026-03-31 View ↗
NAU.V NevGold Corp 2026-05-06 PFS Auld Creek Gold-Antimony Projectgold, antimony Commissionedexpected Within 45 days — QPs: INDEPENDENT QUALIFIED; PERSONS TheNPV5 US$42M after-tax · IRR 17.0% · capex US$132.6MIndicated 300,000 t @ 5.67 g/t AuEq · Inferred 1.3 Mt @ 3.66 g/t AuEq View ↗
NFG.V New Found Gold Corp 2026-05-06 PEA Auld Creek Gold-Antimony Projectgold, antimony Commissionedexpected within 45 days — NPV5 US$42M after-tax · IRR 17.0% · capex US$132.6MIndicated 300,000 t @ 5.67 g/t AuEq · Inferred 1.3 Mt @ 3.66 g/t AuEq View ↗
R.P.V R.P.V 2026-05-06 — Genesis Project Commissioned — View ↗
PAAS.TO Pan American Silver Corp 2026-05-05 Other Strong Minesilver, lead Commissionedexpected within 45 days — View ↗
TFPM.TO Triple Flag Precious Metals Corp. 2026-05-05 PFS Gunnison Projectgold, silver, copper Commissionedexpected during the fourth quarter of 2025 — Measured & Indicated 1.8 Mt @ 7.52 g/t Au · Measured & Indicated 5.2 Mt @ 23.8 g/t Ag · Measured & Indicated 29.0 Mt @ 7.2 g/t Au View ↗
TFPM.TO FS Gunnison Projectgold, silver, copper Commissionedexpected in the second quarter of 2026 —
NOAL.V NOA Lithium Brines Inc. 2026-05-05 PFS Rio Grande Projectlead Commissioned — View ↗
VIPR.V Silver Viper Minerals Corp 2026-05-04 Property Coneto Silver-Gold Projectgold, silver“Independent Technical Report for the Coneto Gold-Silver Project, Durango, Mexico” Filed effective 2026-01-31filed 2026-05-04 View ↗
GAL.V Galantas Gold Corporation 2026-05-04 Resource Andacollo Projectgold“Mineral Resource Estimate Update, Andacollo Oro Gold Project, Coquimbo Region, Chile” Filed effective 2026-02-01filed 2026-05-04 DRA AmericasQPs: Ryan Wilson; Matthew Halliday; David FrostIndicated 102.4 Mt 1.47 Moz Au · Inferred 347.9 Mt @ 0.41 g/t Au View ↗
MUX.TO McEwen Mining Inc. (dual-listed NYSE/TSX; note some sources now show "McEwen Inc.") 2026-05-04 Resource Tartan Minegold“Mineral Resource Estimate NI 43-101 Technical Report Tartan Mine Project, Manitoba, Canada” Filed effective 2025-12-31filed 2026-05-04 Global Resource Engineering; GREQPs: Terre Lane; Hamid Samari; Larry BreckenridgeIndicated 2.6 Mt @ 3.67 g/t Au · Inferred 2.8 Mt @ 3.32 g/t Au View ↗
AEC.V Anfield Energy Inc. 2026-05-04 PEA Velvet-Wood and Slick Rock Uranium Projectsuranium, vanadium“The Shootaring Canyon Mill and Velvet-Wood and Slick Rock Uranium Projects, Preliminary Economic Assessment” Commissionedexpected within 45 days — WoodNPV8 US$606M after-tax · IRR 97.0%Inferred 145,150 t @ 0.24 % U3O8 · Inferred 2.0 Mt @ 0.2 % U3O8 · Measured & Indicated 571,526 t @ 0.34 % View ↗
ONAU.V ONGold Resources Ltd 2026-05-04 Resource Monument Bay Projectgold“Technical Report on the Monument Bay Project, Manitoba” Commissioned — SRKIndicated 24.4 Mt @ 0.92 g/t Au View ↗
NGC.V Northern Graphite Corporation 2026-05-01 — Lac des Iles Minegraphite Commissioned — View ↗
NCAU.V Newcore Gold Ltd. 2026-05-01 Resource Enchi Gold Projectgold“Technical Report Mineral Resource Estimate Update, Enchi Gold Project, Ghana” Filed effective 2025-10-06filed 2026-05-01 DRA AmericasQPs: Ryan Wilson; Matthew Halliday; Schadrac IbrangoInferred 40.1 Mt @ 0.48 g/t Au · Indicated 83.6 Mt 1.50 Moz Au2 items since 2026-04-08 View ↗
NCAU.V PFS Enchi Gold Projectgold“NI 43 -101 Technical Report, Preliminary Economic Assessment on the Enchi Gold Project, Ghana” Commissioned effective 2024-04-24 DRA GlobalQPs: Ryan Wilson; Matthew Halliday; Schadrac IbrangoIndicated 83.6 Mt @ 0.56 g/t Au · Inferred 40.1 Mt @ 0.49 g/t Au3 items since 2026-02-05
RLYG.V Riley Gold Corp 2026-05-01 Property PWC Gold Projectgold“NI 43-101 Technical Report, Pipeline West/Clipper Property, Lander County, Nevada, U.S.A” Filed effective 2026-02-11filed 2026-05-01 QPs: Matthew Dumula View ↗
GLDC.V Cassiar Gold Corp 2026-05-01 PEA Cassiar North Projectgold Commissioned — Ausenco View ↗
TLO.TO Talon Metals Corp 2026-04-30 Property Eagle Mine“NI 43-101 Technical Report on the Eagle Mine, Michigan, USA,” Filed effective 2026-02-28filed 2026-04-30 WSP CanadaQPs: Bill Bagnell View ↗
AZT.V Aztec Minerals Corp 2026-04-30 Resource Tombstone and Cervantes Projectsgold Commissioned — View ↗
OR.TO OR Royalties Inc. 2026-04-30 PEA Dalgaranga Minegold Commissionedexpected during the second quarter of 2026 — Proven & Probable 15.0 Mt @ 10.6 g/t Au View ↗
AMC.TO Arizona Metals Corp 2026-04-30 PEA Kay Minecopper Commissionedexpected within 45 days — G Mining ServicesQPs: Highlights Description Unit; Initial CA; PEX Sensitivity CANPV5 -US$6M after-tax · IRR 4.9%Indicated 9.3 Mt @ 3.18 % CuEq · Inferred 860,000 t @ 2.44 % CuEq2 items since 2025-06-30 View ↗
PGLD.V P2 Gold Inc 2026-04-29 Resource Gabbs Projectgold“NI 43-101 Technical Report, Preliminary Economic Assessment, Gabbs Heap Leach and Mill Project, Nye...” Commissionedexpected in the third quarter effective 2025-10-07 9 items since 2025-12-16 View ↗
ITR.V Integra Resources Corp 2026-04-29 PFS Nevada North Projectgold Commissionedexpected in H2 2027 — View ↗
EMET.CN Canamera Energy Metals Corp. 2026-04-28 Property Schryburt Lake Carbonatite Complexrare earth, niobium“Technical Report “) on the Schryburt Lake rare earth element (“ REE “) and niobium project (the “ Project” Filed effective 2026-04-15filed 2026-04-28 Clark Exploration ConsultingQPs: Garry Clark View ↗
FM.TO First Quantum Minerals 2026-04-28 Property Taca Taca Projectcopper Filed effective 2025-12-31filed 2026-04-28 2 items since 2026-02-19 View ↗
GOLD.TO GoldMining Inc 2026-04-28 PEA La Mina Projectgold, silver, copper“NI 43-101 Technical Report and Preliminary Economic Assessment For The La Mina Project, Antioquia,...” Commissionedexpected within 45 days effective 2023-07-24 QPs: La Mina; PEA Summary The; Scott Wilson; Scott E. Wilson; Zeke Blakeley; Rick JordanNPV5 US$1B after-tax · IRR 32.0% · capex US$523M View ↗
BRAU.V Big Ridge Gold Corp 2026-04-28 PEA Hope Brook Gold Projectgold Commissioned — SGS Geological ServicesInferred 231,000 oz Au3 items since 2025-09-16 View ↗
SBI.TO Serabi Gold plc 2026-04-28 Resource Palito Complexgold“Palito Mining Complex , NI 43-101 Technical Report, Pará State, Brazil” Commissionedexpected within 45 days effective 2025-03-31 Inferred 2.5 Mt2 items since 2025-09-12 View ↗
GSVR.V Guanajuato Silver Company Ltd. 2026-04-27 Resource Bolanitos Minesilver“NI 43 -101 Technical Report: Updated Mineral Resource and Reserve Estimates for the Bolañitos Project,...” Filed effective 2026-03-19filed 2026-04-27 Hard Rock ConsultingQPs: Brian Arthur3 items since 2025-11-24 View ↗
MGM.V Maple Gold Mines Ltd 2026-04-27 Resource Douay/Joutel Gold Projectgold Commissionedexpected within 45 days — SLRInferred 111.1 Mt @ 0.77 g/t Au · Inferred 11.7 Mt @ 1.5 g/t Au · Inferred 7.5 Mt @ 4.11 g/t Au2 items since 2025-11-19 View ↗
ZIGY.CN Stardust Metal Corp. 2026-04-27 Property McGarry Projectgold Filed filed 2026-04-27 2 items since 2026-04-27 View ↗
LVG.V Lake Victoria Gold Ltd 2026-04-23 FS Blanket Minegold Commissionedexpected in H2 2027 — NPV5 US$908M pre-tax · IRR 73.0% · capex US$254M View ↗
LCE.V Century Lithium Corp 2026-04-23 Property Angel Island Depositlithium Filed filed 2026-04-23 Mineral Property Development; Global Resource Engineering View ↗
EDV.TO Endeavour Mining plc 2026-04-23 FS Assafou Projectgold, lead Commissionedexpected within 45 days — Lycopodium Minerals Canada; Knight Piésold; SRK Consulting; Digby Wells Environmental; Holding; ECG EngineeringNPV5 $2.1B after-tax · IRR 28.0% · capex $1.06BMeasured & Indicated 4.7 Mt @ 1.55 g/t View ↗
ASM.TO Avino Silver & Gold Mines Ltd. 2026-04-23 Resource Avino Propertygold, silver, copper Commissionedexpected within 45 days — Tetra Tech CanadaQPs: Michael O'Brien; Peter LattaProven & Probable 27.0 Mt @ 109 g/t Ag2 items since 2026-04-16 View ↗
PUMA.V Puma Exploration Inc 2026-04-22 Resource Legacy Projectsilver, copper Commissioned — SRK ConsultingQPs: Stull Lake QUALIFIEDInferred 930,000 t @ 0.66 % Cu View ↗
SKEL.V Skeleton Coast Uranium Corp 2026-04-22 — Langer Heinrich Mineuranium Commissioned — View ↗
ELO.TO Eloro Resources Ltd 2026-04-22 Resource Iska Iska Projectgold, silver, zinc Commissionedexpected within 45 days — Micon InternationalQPs: Charley Murahwi; Richard GowansInferred 13.8 Mt @ 15 g/t Ag · Inferred 722.6 Mt @ 7 g/t Ag · Inferred 945.4 Mt 248.60 Moz Ag View ↗
GPG.V Grande Portage Resources Ltd 2026-04-21 PEA Amalga Gold Projectgold“PRELIMINARY ECONOMIC ASSESSMENT FOR THE NEW AMALGA GOLD PROJECT” Filed effective 2026-02-11filed 2026-04-21 SRK Consulting; Core Geoscience; OreLogic; DRW Geological Consultants; RESPECQPs: Sustaining CA; PEX Sustaining CA; Total Sustaining CA; MINERAL RESOURCES TheNPV5 US$721M after-tax · IRR 56.0% · capex US$254.8MIndicated 4.7 Mt @ 9.47 g/t Au · Inferred 1.8 Mt @ 8.58 g/t Au2 items since 2026-04-15 View ↗
SMN.V Sun Summit Minerals Corp 2026-04-21 Property JD Project“NI 43-101 Technical Report on the JD Property, Toodoggone Region, BC” Filed effective 2026-01-23filed 2026-04-21 View ↗
RSH.CN RSH.CN 2026-04-20 Property Copper Mountain Uranium Projectcopper, uranium Filed effective 2026-03-31filed 2026-04-20 View ↗
AZEM.V Arizona Eagle Mining Corp 2026-04-20 Resource Consolidate Eagle Silver Projectsilver Commissioned — View ↗
RUA.TO Rua Gold Inc 2026-04-20 PFS Auld Creek Projectgold Commissioned — View ↗
ETL.V E3 LITHIUM LTD 2026-04-20 FS Clearwater Projectlithium Commissioned — 2 items since 2025-12-08 View ↗
M.CN Myriad Uranium Corp. 2026-04-20 Property Copper Mountain Uranium Projectcopper, uranium Filed effective 2026-03-31filed 2026-04-20 View ↗
WLF.V Wolfden Resources Corporation 2026-04-16 Resource Large Polymetallic VMS Deposit Filed effective 2026-02-15filed 2026-04-16 View ↗
ALDE.V Aldebaran Resources Inc. 2026-04-16 Resource Rio Grande Gold-Copper Projectgold, copper“Rio Grande Project Mineral Resource Estimate, Salta Province, Argentina” Filed effective 2026-04-13filed 2026-04-16 SLRQPs: Benjamin Sanfurgo2 items since 2026-03-02 View ↗
ROS.V Roscan Gold Corporation 2026-04-16 PEA Kandiole Gold Projectgold“Preliminary Economic Assessment of the Kandiole Project, Mali, West Africa” Filed effective 2026-02-20filed 2026-04-16 NPV5 US$498M after-tax · IRR 43.0% · capex US$218.7MIndicated 58.2 Mt @ 0.68 g/t Au · Inferred 5.6 Mt @ 0.52 g/t Au2 items since 2026-03-02 View ↗
SVM.TO Silvercorp Metals Inc. 2026-04-16 — GC Minegold, silver, zinc Commissionedexpected in the coming weeks — View ↗
MOON.V Blue Moon Metals Inc 2026-04-16 FS Nussir Projectgold, silver, copper“Report 43-101 Technical Report On The Mineral Resources Of The Nussir And Ulveryggen Projects, Norway” Commissionedexpected within 45 days effective 2026-04-14 Worley EuropeQPs: Adam WheelerNPV8 US$235M after-tax · IRR 2028.0% · capex US$184MProven & Probable 25.0 Mt @ 0.99 % CuEq · Measured & Indicated 28.7 Mt @ 1.2 % CuEq2 items since 2025-07-07 View ↗
FTZ.V Fitzroy Minerals Inc. 2026-04-16 Resource Buen Retiro Copper Projectcopper Commissioned — View ↗
FTZ.V PFS Buen Retiro Copper Projectcopper Commissioned —
FAN.V First Atlantic Nickel & Cobalt Corp 2026-04-15 — Lucky Mike Copper-Silver-Tungsten Projectsilver, copper, nickel Commissioned — Professional Engineers2 items since 2026-02-19 View ↗
SGO.V Sonoro Gold Corp. 2026-04-15 PEA Cerro Caliche Projectgold“Updated Mineral Resource Estimate and Preliminary Economic Assessment on the Cerro Caliche Gold Project,...” Filed effective 2025-12-04filed 2026-04-15 P&E Mining ConsultantsNPV8 $224M after-tax · IRR 50.0% · capex $83M2 items since 2026-01-14 View ↗
TRX.TO TRX Gold Corporation 2026-04-15 PEA Strategic Minegold Commissionedexpected in Q4 2026 — View ↗
HMMC.V Hemlo Mining Corp 2026-04-15 — Hemlo Gold Minegold“NI 43-101 Technical Report Hemlo Mine, Ontario, Canada” Commissionedexpected in the second half of 2027 effective 2024-12-31 2 items since 2026-01-29 View ↗
ITR.V Integra Resources Corp 2026-04-14 FS Highlighting Near-Mine Growth Minegold Commissionedexpected in the third quarter of 2026 — View ↗
UCU.V UCU.V 2026-04-14 Resource Bokan Dotson-Ridge Rare Earth Propertyrare earth Commissionedexpected within 45 days — Aurora Geoscience View ↗
MSR.V Minsud Resources Corp 2026-04-14 Resource Chita Valley Projectcopper“NI 43- 101 Technical Report Mineral Resource Estimate On Chita Valley Project, Iglesia Department, San...” Filed filed 2026-04-14 GeoEstima Spa. and Cube ConsultingQPs: Michael JobInferred 3.33 Mt Cu · Indicated @ 0.3 % Cu3 items since 2025-02-14 View ↗
ARA.TO Aclara Resources Inc. 2026-04-13 FS Carina Project“NI 43-101 Technical Report & Feasibility Study on the Carina Project, Goiás, Brazil” Filed effective 2026-03-20filed 2026-04-13 Hatch Consultoria; ProjetosNPV8 US$1.7B after-tax · IRR 26.9% · capex US$678.2M4 items since 2024-05-06 View ↗
AURO.V Auro Metals Inc 2026-04-09 Resource Santa Barbara Projectgold, copper“Independent Technical Report for the Santa Barbara Gold and Copper Project, Ecuador” Filed effective 2026-03-23filed 2026-04-09 SRK ConsultingInferred 205.7 Mt @ 0.52 g/t Au · Indicated 29.8 Mt @ 0.1 % Cu View ↗
BTR.V Bonterra Resources Inc 2026-04-09 Resource Barry and Gladiator Gold Propertiesgold“Updated Mineral Resource Estimate and Technical Report on the Barry and Gladiator Gold Properties, Phoenix...” Filed effective 2026-02-18filed 2026-04-09 P&E Mining ConsultantsQPs: Antoine YassaMeasured & Indicated 16.8 Mt @ 3.02 g/t Au · Inferred 15.6 Mt @ 4.32 g/t Au View ↗
ALDE.V Aldebaran Resources Inc. 2026-04-09 Resource Altar Copper-Gold Projectgold, copper“Technical Report Estimated Mineral Resources, Altar Project, San Juan Province, Argentina” Commissionedexpected in Q2 effective 2024-12-31 Whittle ConsultingQPs: Jacob Richey4 items since 2024-11-07 View ↗
ALDE.V PFS Altar Copper-Gold Projectgold, copper Commissionedexpected in Q2 — 3 items since 2024-11-07
VLTA.CN Volta Metals Ltd. 2026-04-09 Resource Springer Projectrare earth Filed effective 2025-12-31filed 2026-04-09 SLR ConsultingIndicated 56.6 Mt @ 346 ppm TREO · Inferred 119.5 Mt @ 0.58 % TREO2 items since 2026-02-23 View ↗
IAU.TO i-80 Gold Corp. 2026-04-08 FS Archimedes Underground Projectgold Commissionedexpected in the first quarter of 2027 — NPV5 $127M after-tax · IRR 23.0% View ↗
QGR.V Q-Gold Resources Ltd. 2026-04-08 Resource Quartz Mountain Gold Projectgold“National Instrument 43-101 Technical Report and Mineral Resource Estimate of the Quartz Mountain Project,...” Commissionedexpected within 45 days effective 2025-09-26 Kappes, CassidayQPs: Fred BrownIndicated 6.0 Mt @ 0.77 g/t Au5 items since 2025-07-21 View ↗
TALA.V Talamore Mining Corp. 2026-04-08 PEA Coffee Gold Projectgold“NI 43-101 Technical Report for the 2026 Preliminary Economic Assessment on the Coffee Gold Project, Yukon, Canada” Filed effective 2026-03-27filed 2026-04-08 WSP Canada; Micon; SRK; LoraxNPV5 C$3B after-tax · IRR 43.5%2 items since 2025-12-15 View ↗
EXN.V Excellon Resources Inc 2026-04-08 Resource Mallay Silver-Lead-Zinc Minesilver, zinc, lead Filed effective 2026-02-18filed 2026-04-08 SGSInferred 362,000 t @ 149 g/t Ag · Indicated 5.57 Moz Ag · Inferred 1.74 Moz Ag3 items since 2025-08-06 View ↗
PGLD.V P2 Gold Inc 2026-04-08 FS Gabbs Projectgold, copper Commissionedexpected in the fourth quarter of 2026 — 6 items since 2025-12-16 View ↗
TRX.TO TRX Gold Corporation 2026-04-08 PEA Buckreef Gold Projectgold Commissionedexpected in Q4 2026 effective 2025-04-15 P&E Mining ConsultantsQPs: PEA Authors TheNPV5 US$701M after-tax · capex US$89MMeasured & Indicated 10.8 Mt 893,000 oz Au · Inferred 9.1 Mt @ 2.47 g/t Au3 items since 2025-04-22 View ↗
NBY.V Niobay Metals Inc. 2026-04-08 Resource Crevier Projectniobium, tantalum“NI 43 ‐101 Technical Report – Mineral Resource Estimate Update for the Crevier Project” Filed effective 2026-02-25filed 2026-04-08 IOS Geoscientific Services2 items since 2026-02-25 View ↗
EDM.V EDM Resources Inc. 2026-04-08 Resource Scotia Mine Commissionedexpected in Q2 2026 — View ↗
PNGC.CN Loyalist Exploration Limited 2026-04-08 Property Loveland Polymetallic Projectgold, copper, nickel“National Instrument 43-101 Technical Report on the Loveland Polymetallic Project” Filed effective 2026-04-06filed 2026-04-08 Caracle Creek International Consulting View ↗
MRZL.V Mont Royal Resources Limited 2026-04-07 PEA MRZL Ashram Projectrare earth, fluorspar Commissioned — Indicated 73.2 Mt @ 1.89 % View ↗