| EMM.V |
Giyani Metals Corp |
2026-07-10 |
FS |
K.Hill Battery-Grade Manganese Projectmanganese |
Filed |
filed 2026-07-10 |
NPV8 US$482M after-tax · IRR 20.3%5 items since 2024-11-14 |
View ↗
|
| STMN.CN |
UraniumX Discovery Corp. |
2026-07-10 |
— |
Dieter Lake Uranium Projecturanium“Technical Report on the Dieter Lake Property, Quebec, Canada” |
Commissioned |
— |
Dahrouge Geological Consulting |
View ↗
|
| FVI.TO |
Fortuna Mining Corp. |
2026-07-09 |
— |
Séguéla Minegold |
Commissioned |
— |
Lycopodium |
View ↗
|
| AMCO.V |
Americore Resources Corp |
2026-07-09 |
Property |
Trinity Silver Projectsilver“Technical Report on the Trinity Project,” |
Commissioned |
effective 2025-10-16 |
RESPECQPs: Jeffery Bickel2 items since 2025-11-18 |
View ↗
|
| LOD.V |
Lode Gold Resources Inc |
2026-07-08 |
Resource |
Fremont Gold Minegold |
Filed |
filed 2026-07-08 |
2 items since 2026-02-17 |
View ↗
|
| TIGR.V |
Tiger Gold Corp |
2026-07-08 |
Resource |
Quinchía Gold Projectgold |
Commissionedexpected in Q1 of 2027 |
— |
|
View ↗
|
| TXG.TO |
Torex Gold |
2026-07-07 |
PEA |
Los Reyes Projectgold |
Filed |
effective 2026-04-25filed 2026-07-07 |
NPV5 US$1.49B after-tax · IRR 37.3% · capex US$515M |
View ↗
|
| MKO.V |
Mako Mining Corp. |
2026-07-07 |
Resource |
Moss Minegold, silver“NI 43-101 Technical Report for the 2025 Mineral Resource Estimate for the Moss Mine Project, Oatman Mining...” |
Commissionedexpected within 45 days |
effective 2025-12-18 |
Micon International; PDM Technical Services; CGK ConsultingQPs: Mohsin HashmiProven & Probable 56.8 Mt @ 0.327 g/t Au3 items since 2026-01-26 |
View ↗
|
| FRED.V |
Fredonia Mining Inc |
2026-07-07 |
Resource |
El Dorado Monserrat Projectgold, silver“Maiden Mineral Resource Estimate on the El Dorado Monserrat Property, Gold and Silver Project, Santa Cruz...” |
Commissioned |
— |
QPs: Mario Alfaro; Fernando Ganem |
View ↗
|
| AUEX.CN |
Advanced Gold Exploration Inc. |
2026-07-07 |
— |
Silver Belle Projectgold, silver |
Commissioned |
— |
|
View ↗
|
| BAU.V |
Blue Star Gold Corp |
2026-07-06 |
Resource |
Ulu Gold Projectgold“Updated Mineral Resource Estimate and Technical Report on the Ulu Gold Project, Nunavut, Canada” |
Filed |
filed 2026-07-06 |
2 items since 2026-05-21 |
View ↗
|
| RUU.CN |
Refined Energy Corp. |
2026-07-06 |
— |
Golden Goose Projectgold, antimony |
Commissioned |
— |
|
View ↗
|
| ZIGY.CN |
Stardust Metal Corp. |
2026-07-06 |
Resource |
Omega Projectgold |
Commissionedexpected in the third quarter |
— |
Indicated 4.9 Mt @ 1.39 g/t · Inferred 4.7 Mt @ 2.43 g/t2 items since 2026-05-13 |
View ↗
|
| ARIC.V |
Awalé Resources Limited |
2026-07-03 |
Resource |
Odienné Projectgold“Technical Report - Odienné Gold Project, Côte d'Ivoire - Report for NI 43-101.” |
Filed |
effective 2026-04-01filed 2026-07-03 |
Bara Consulting; RynnGeo ConsultingQPs: Andrew Bamber; Neal ReynoldsInferred 1.39 Moz Au |
View ↗
|
| MM.CN |
Maximus Metals Inc. |
2026-07-01 |
Property |
Gaspard Projectgold“NI 43-101 Technical Report on the Gaspard Project, British Columbia, NTS 93O/10, 51.62° North, -122.55° West” |
Filed |
effective 2025-10-24filed 2026-06-30 |
QPs: Derrick Strickland |
View ↗
|
| TSLV.V |
Tier One Silver Inc |
2026-06-30 |
Resource |
Holder of Copper-Molybdenum Projectsilver, copper, molybdenum |
Commissioned |
— |
SRK Consulting |
View ↗
|
| YGT.V |
Gold Terra Resource Corp |
2026-06-30 |
Property |
Yellowknife Projectgold“NI 43-101 Technical Report, Yellowknife Project, Yellowknife, Northwest Territories, Canada, Gold Terra...” |
Filed |
effective 2026-04-30filed 2026-06-30 |
SLR Consulting |
View ↗
|
| EMO.V |
Emerita Resources Corp. |
2026-06-30 |
PFS |
Ibw Projectgold, silver, copper |
Commissionedexpected during the third quarter of 2026 |
— |
SLR3 items since 2026-01-12 |
View ↗
|
| ERD.TO |
Erdene Resource Development Corporation |
2026-06-30 |
PEA |
Khuvyn Khar Projectgold, silver, copper |
Commissionedexpected in mid-H2 2026 |
— |
2 items since 2026-03-31 |
View ↗
|
| REG.V |
Regulus Resources Inc. |
2026-06-30 |
Resource |
Integrated Coimolache Sulphide/AntaKori Copper-Gold Projectgold, copper |
Commissioned |
— |
SRKIndicated 250.0 Mt @ 0.48 % Cu · Inferred 267.0 Mt @ 0.41 % Cu |
View ↗
|
| NILI.V |
Surge Battery Metals Inc. |
2026-06-30 |
Resource |
Nevada North Lithium Projectlithium“) for the Company's flagship Nevada North Lithium Project has now been filed on SEDAR+ and is available on...” |
Filed |
effective 2024-10-09filed 2026-06-30 |
RESPEC CompanyInferred 271.3 Mt @ 2.16e+03 ppm Li · Measured & Indicated 657.5 Mt @ 3.01e+03 ppm Li4 items since 2024-11-11 |
View ↗
|
| EMNT.V |
Eminent Gold Corp |
2026-06-30 |
Property |
Springpole Gold Projectgold |
Filed |
effective 2026-08-01filed 2026-06-30 |
|
View ↗
|
| EMN.V |
Euro Manganese Inc |
2026-06-29 |
PEA |
Chvaletice Manganese Projectmanganese“Technical Report and Mineral Resource Estimate for the Chvaletice Manganese Project, Chvaletice, Czech Republic” |
Filed |
effective 2026-05-14filed 2026-06-29 |
Tetra Tech CanadaQPs: ECONOMIC ANALYSIS TheNPV8 US$492M after-tax · IRR 13.8% · capex US$627.5MMeasured & Indicated 27.0 Mt @ 7.33 % Mn2 items since 2026-05-14 |
View ↗
|
| LRA.V |
Lara Exploration Ltd. |
2026-06-29 |
PEA |
Planalto Projectgold, copper“NI 43.101 Preliminary Economic Assessment for the Planalto Copper - Gold Project, Brazil” |
Commissioned |
effective 2025-10-15 |
SRK Consulting; Limited and SRK Consultores do BrasilNPV8 US$378M after-tax · IRR 21.0% · capex US$546MInferred 154.0 Mt @ 0.36 % Cu · Indicated 47.7 Mt @ 0.53 % Cu3 items since 2025-10-21 |
View ↗
|
| NICU.TO |
NICU.TO |
2026-06-29 |
PEA |
Levack Minecopper |
Commissionedexpected in Q3 2026 |
— |
|
View ↗
|
| TSK.TO |
Talisker Resources Ltd |
2026-06-26 |
Resource |
Previously Announced Bralorne Gold Projectgold“Mineral Resource Estimate for the Bralorne Gold Project, British Columbia, Canada” |
Filed |
filed 2026-06-26 |
|
View ↗
|
| BYN.V |
Banyan Gold Corp. |
2026-06-26 |
Resource |
AurMac Projectgold |
Filed |
effective 2025-09-01filed 2025-10-27 |
Ginto Consulting; JDS Energy & Mining; Wright ConsultingQPs: Marc Jutras; Tysen Hantelmann; Frank Wright |
View ↗
|
| TWO.V |
T2 Metals Corp |
2026-06-26 |
Resource |
Sherridon Copper-Zinc-Gold-Silver Projectgold, silver, copper“Mineral Resource Estimates for the Sherridon Copper-Gold-Zinc-Silver Project, North Central Manitoba, Canada” |
Filed |
effective 2026-04-22filed 2026-06-26 |
ReedLeyton Consulting; Hogrelius Geological Consultants; Arundon Mining SolutionsQPs: Geoffrey ReedInferred 18.1 Mt @ 1.08 % Cu · Indicated 10.0 Mt @ 0.39 % Cu3 items since 2026-02-10 |
View ↗
|
| NATB.CN |
NATB.CN |
2026-06-26 |
Property |
Cahuilla Gold Projectgold“NI 43-101 Technical Report on the Cahuilla Gold Project, Imperial County, California.” |
Filed |
effective 2026-06-15filed 2026-06-26 |
APEX Geoscience; Capps GeoscienceQPs: Richard C. Capps; Michael B. Dufresne2 items since 2026-03-10 |
View ↗
|
| OSM.V |
Osiris One Metals Ltd |
2026-06-25 |
Property |
Western Range Silver Copper Projectsilver, copper“NI 43-101 Technical Report on the Western Range Project Western Australia” |
Filed |
effective 2026-06-22filed 2026-06-25 |
|
View ↗
|
| QTWO.V |
Q2 Metals Corp. |
2026-06-25 |
PEA |
Cisco Lithium Projectlithium |
Commissionedexpected in the coming months |
— |
BBAQPs: Todd McCrackenInferred 270.0 Mt @ 1.36 % Li2O · Inferred 295.0 Mt @ 1.36 % Li2O · Inferred 24.0 Mt2 items since 2026-05-27 |
View ↗
|
| TN.CN |
Tartisan Nickel Corp. |
2026-06-25 |
PFS |
Kenbridge Nickel-Copper Projectcopper, nickel |
Commissioned |
— |
|
View ↗
|
| WDO.TO |
Wesdome Gold Mines Ltd |
2026-06-24 |
— |
Eagle River Minegold |
Commissionedexpected within the next 45 days |
— |
SRK Consulting; Norda SteloQPs: Benny Zhang; Eric Lecomte2 items since 2026-01-20 |
View ↗
|
| BAY.V |
Aston Bay Holdings Ltd. |
2026-06-24 |
FS |
Storm Copper Projectcopper |
Commissioned |
— |
Ausenco; Nuna Group |
View ↗
|
| MMX.V |
Mustang Minerals Limited |
2026-06-24 |
Property |
El Cobre Copper-Gold Porphyry Projectgold, copper |
Filed |
filed 2026-06-24 |
|
View ↗
|
| NEXM.V |
NexMetals Mining Corp |
2026-06-24 |
Resource |
Selkirk Projectcopper“NI 43-101 Technical Report Selkirk Nickel Project, North East District, Republic of Botswana” |
Commissionedexpected within 45 days |
effective 2024-11-01 |
MSAInferred 15.1 Mt @ 0.6 % CuEq · Indicated 78.2 Mt @ 0.66 % CuEq · Inferred 44.2 Mt @ 0.81 % CuEq4 items since 2024-11-27 |
View ↗
|
| VM.V |
VM.V |
2026-06-23 |
— |
Iodine Project |
Commissioned |
— |
Fluor |
View ↗
|
| RIO.TO |
Rio2 Limited |
2026-06-23 |
Resource |
Condestable Minegold, silver, copper“NI 43- 101 Technical Report on the Condestable Mine, Lima Department, Peru, dated April 12, 2024,...” |
Commissionedexpected within 45 days |
effective 2022-12-31 |
SLR Consulting2 items since 2026-05-15 |
View ↗
|
| ABRA.TO |
AbraSilver Resource Corp |
2026-06-22 |
FS |
Premier Undeveloped Silver-Gold Projectsgold, silver |
Commissionedexpected within 45 days |
— |
QPs: Miguel FuentealbaNPV5 C$4.2B after-tax · IRR 42.0% · capex C$722MProven & Probable 77.9 Mt @ 146 g/t AgEq |
View ↗
|
| RMI.V |
Ridgestone Mining Inc |
2026-06-22 |
— |
Las Pilas Rare Earth Element Prospectlithium, rare earth |
Commissioned |
— |
|
View ↗
|
| FMS.V |
Focus Graphite Inc |
2026-06-22 |
Resource |
Lac Tetepisca Projectgraphite |
Filed |
effective 2026-04-30filed 2026-06-22 |
DRA America's; DRA GlobalIndicated 120.2 Mt @ 10.3 % · Inferred 24.1 Mt @ 9.88 %3 items since 2025-12-18 |
View ↗
|
| RUA.TO |
Rua Gold Inc |
2026-06-19 |
PEA |
Auld Creek Projectgold |
Filed |
effective 2026-02-27filed 2026-06-19 |
|
View ↗
|
| ABRA.TO |
AbraSilver Resource Corp |
2026-06-19 |
Resource |
Diablillos Projectgold, silver“NI 43-101 Mineral Resource Estimate, Diablillos Silver-Gold Project” |
Filed |
effective 2026-05-06filed 2026-06-19 |
Measured & Indicated 102.0 Mt @ 65 g/t Ag |
View ↗
|
| MRZL.V |
Mont Royal Resources Limited |
2026-06-19 |
PEA |
Ashram Projectrare earth“NI 43 -101 Technical Report, Preliminary Economic Assessment for the Ashram Rare Earths Project, Nunavik,...” |
Filed |
effective 2026-05-29filed 2026-06-19 |
Indicated 73.2 Mt @ 1.89 %3 items since 2026-04-07 |
View ↗
|
| SVM.TO |
Silvercorp Metals Inc. |
2026-06-18 |
Resource |
Ying Property“NI 43-101 Technical Report Update on the Ying Ag-Pb-Zn-Au Property in Henan Province, People's Republic of China” |
Filed |
effective 2025-12-31filed 2026-06-18 |
AMC Mining Consultants |
View ↗
|
| AEC.V |
Anfield Energy Inc. |
2026-06-18 |
PEA |
Velvet-Wood Projecturanium, vanadium“The Shootaring Canyon Mill and Tributary Mines, Utah and Colorado, USA, Preliminary Economic Assessment” |
Filed |
effective 2022-04-10filed 2026-06-18 |
Wood; BRSNPV8 US$606M after-tax · IRR 97.0%Inferred 145,150 t @ 0.24 % U3O8 · Inferred 2.0 Mt @ 0.2 % U3O8 · Measured & Indicated 571,526 t @ 0.34 % |
View ↗
|
| RUA.TO |
Rua Gold Inc |
2026-06-18 |
PFS |
Auld Creek Gold-Antimony Projectgold, antimony“Technical Report on the Reefton Project, New Zealand” |
Commissionedexpected in Q4 2026 |
effective 2026-02-27 |
Minerals Security PartnersNPV5 US$42M after-tax · IRR 36.0% · capex US$132.6M3 items since 2026-05-05 |
View ↗
|
| NVRO.V |
NVRO.V |
2026-06-18 |
Resource |
—silver, copper, nickel |
Commissionedexpected within 45 days |
— |
Measured GroupMeasured 77.6 Mt |
View ↗
|
| APXC.CN |
Apex Critical Metals Corp. |
2026-06-16 |
Property |
Rift Rare Earth Projectrare earth |
Filed |
filed 2026-06-16 |
|
View ↗
|
| MTTA.CN |
Meta Critical Minerals Inc. |
2026-06-16 |
PFS |
Table Mountain Projectvanadium, rare earth, titanium |
Filed |
filed 2026-06-16 |
|
View ↗
|
| FCI.V |
First Canadian Graphite Inc. |
2026-06-16 |
Resource |
Lac Guéret South Projectgraphite |
Filed |
effective 2019-06-30filed 2026-06-16 |
Indicated 1.8 Mt @ 17 % · Inferred 1.5 Mt @ 16.4 %2 items since 2026-05-20 |
View ↗
|
| FCI.V |
|
|
Resource |
Berkwood Projectgraphite |
Filed |
effective 2019-06-30filed 2026-06-16 |
Indicated 1.8 Mt @ 17 % · Inferred 1.5 Mt @ 16.4 %2 items since 2026-05-20 |
|
| YGT.V |
Gold Terra Resource Corp |
2026-06-15 |
PEA |
Con Minegold |
Commissioned |
— |
SLR Consulting; Nordmin Engineering |
View ↗
|
| ABRA.TO |
AbraSilver Resource Corp |
2026-06-15 |
Resource |
La Coipita Projectgold, copper, molybdenum |
Commissionedexpected within 45 days |
— |
Measured & Indicated 102.0 Mt @ 65 g/t Ag |
View ↗
|
| WGO.V |
White Gold Corp. |
2026-06-15 |
— |
Bridget Propertygold |
Commissioned |
— |
|
View ↗
|
| RSM.V |
Resouro Strategic Metals Inc. |
2026-06-14 |
PEA |
Tiros Projectrare earth, titanium |
Commissionedexpected within 45 days |
— |
Tecnologia Ambiental; Atticus Geoscience CoNPV8 US$714.9M after-tax · IRR 44.2% · capex US$191MMeasured & Indicated 1400.0 Mt |
View ↗
|
| SCM.CN |
Steadright Critical Minerals Inc. |
2026-06-12 |
Property |
TitanBeach One (1) Project“NI 43-101 Technical Report on the TitanBeach One (1) Project, Kingdom of Morocco” |
Withdrawn |
— |
|
View ↗
|
| SCM.CN |
|
|
Propertyamended |
TitanBeach One (1) Project |
Commissioned |
— |
|
|
| MGM.V |
Maple Gold Mines Ltd |
2026-06-11 |
Resource |
Douay Gold Projectgold“NI 43-101 Technical Report, Douay/Joutel Gold Project, Northwestern Quebec, Canada” |
Filed |
effective 2026-04-24filed 2026-06-11 |
SLR ConsultingQPs: Denis DecharteIndicated 900,000 t @ 1.66 g/t Au · Indicated 19.1 Mt @ 1.48 g/t Au · Inferred 11.7 Mt @ 1.5 g/t Au |
View ↗
|
| MGM.V |
|
|
Resource |
Joutel Gold Projectgold“NI 43-101 Technical Report, Douay/Joutel Gold Project, Northwestern Quebec, Canada” |
Filed |
effective 2026-04-24filed 2026-06-11 |
SLR ConsultingQPs: Denis DecharteIndicated 900,000 t @ 1.66 g/t Au · Indicated 19.1 Mt @ 1.48 g/t Au · Inferred 11.7 Mt @ 1.5 g/t Au |
|
| WRR.V |
Walker River Resources Corp |
2026-06-11 |
Resource |
Lapon Canyon Gold Projectgold |
Commissioned |
— |
4 items since 2026-05-27 |
View ↗
|
| ERO.TO |
Ero Copper Corp. |
2026-06-10 |
PFS |
Furnas Projectgold, silver, copper“Preliminary Economic Assessment for the Furnas Project — Para State, Brazil — NI 43-101 Technical Report” |
Commissionedexpected in mid-2026 |
effective 2026-02-23 |
|
View ↗
|
| TCEC.CN |
Terra Clean Energy Corp. |
2026-06-10 |
Property |
Marysvale Uranium Mines Projecturanium |
Commissionedexpected shortly |
— |
|
View ↗
|
| ARA.TO |
Aclara Resources Inc. |
2026-06-09 |
FS |
Penco Module Project |
Commissionedexpected during the fourth quarter of 2026 |
— |
|
View ↗
|
| FURY.TO |
Fury Gold Mines Limited |
2026-06-09 |
PFS |
Eau Claire Gold Projectgold |
Commissioned |
— |
SGS Geological Services; BBA Consultants |
View ↗
|
| GPAC.V |
Great Pacific Gold Corp |
2026-06-09 |
Resource |
Belltopper Gold Projectgold |
Commissionedexpected within 45 days |
— |
Inferred 760,000 t @ 3.6 g/t Au |
View ↗
|
| NQC.V |
Nordique Critical Metals Inc. |
2026-06-08 |
PEA |
Augustus Lithium Projectlithium |
Commissioned |
— |
|
View ↗
|
| EVR.CN |
Evolve Royalties Ltd. |
2026-06-05 |
Resource |
HVC Minecopper, tin |
Commissionedexpected in the second half of 2026 |
— |
|
View ↗
|
| SAGE.V |
Sage Potash Corp |
2026-06-04 |
Resource |
Sage Plain Potash Projectpotash |
Commissioned |
— |
|
View ↗
|
| NOBL.V |
Noble Plains Uranium Corp |
2026-06-04 |
Resource |
Duck Creek Uranium Projecturanium“NI 43-101 Technical Report, Duck Creek Uranium Project, Converse County, Wyoming, USA” |
Filed |
filed 2026-06-04 |
WWC EngineeringIndicated 3.9 Mt @ 0.062 % U3O8 · Inferred 761,128 t @ 0.09 % U3O82 items since 2026-04-23 |
View ↗
|
| QTWO.V |
Q2 Metals Corp. |
2026-06-04 |
Resource |
Cisco Lithium Projectlithium“Mineral Resource Estimate for the Cisco Lithium Project” |
Filed |
effective 2026-04-20filed 2026-06-04 |
BBAInferred 270.0 Mt @ 1.36 % Li2O5 items since 2025-11-17 |
View ↗
|
| BRO.V |
Barksdale Resources Corp |
2026-06-03 |
Property |
Sunnyside Project |
Filed |
effective 2026-02-02filed 2026-06-03 |
APEX GeoscienceQPs: Andrew J. Turner |
View ↗
|
| CMT.CN |
CMT.CN |
2026-06-02 |
Property |
Burnt Pond NL VMS Project“NI 43-101 Technical Report on the Burnt Pond Volcanic Massive Sulphide (VMS) Project in Newfoundland and Labrador” |
Filed |
effective 2026-05-29filed 2026-06-02 |
|
View ↗
|
| AURR.CN |
Aurbis Resources Corp. |
2026-06-02 |
Property |
Ecru Projectgold |
Commissioned |
— |
Rangefront Mining ServicesQPs: Person Johan Lambrechts |
View ↗
|
| TRAC.CN |
Traction Uranium Corp |
2026-06-02 |
Property |
Aurora Uranium Projecturanium“Technical Report on the Aurora Property, Athabasca Basin, Saskatchewan, Canada” |
Filed |
effective 2026-05-21filed 2026-06-02 |
|
View ↗
|
| RM.TO |
Roxmore Resources Inc |
2026-06-01 |
PEA |
Converse Gold Projectgold“NI 43-101 Technical Report on the Preliminary Economic Assessment for the Converse Project, Nevada, USA” |
Filed |
filed 2026-06-01 |
SLR Consulting; Kappes, Cassiday |
View ↗
|
| IDEX.V |
IDEX Metals Corp. |
2026-06-01 |
Property |
Freeze Property“Technical Report for the Freeze Property” |
Filed |
filed 2026-06-01 |
QPs: David Hladky |
View ↗
|
| NEXM.V |
NexMetals Mining Corp |
2026-06-01 |
Resource |
Selebi Mines“Technical Report, Selebi Mines, Central District, Republic of Botswana” |
Commissionedexpected in the second half of 2026 |
effective 2024-06-30 |
SLR ConsultingIndicated 3.0 Mt @ 2.92 % CuEq · Inferred 24.7 Mt @ 3.4 % CuEq2 items since 2026-05-07 |
View ↗
|
| IMG.TO |
IAMGOLD Corporation |
2026-06-01 |
Resource |
Côté Gold Minegold |
Commissionedexpected in the fourth quarter of 2026 |
— |
SLR Consulting |
View ↗
|
| EDDY.V |
Edison Lithium Corp |
2026-06-01 |
— |
Edison Lithium Locates Historical Drill Core During Propertygold, lithium |
Commissionedexpected in early June |
— |
|
View ↗
|
| OM.TO |
Osisko Metals Incorporated |
2026-05-29 |
Resource |
Gaspé Copper Projectcopper“NI 43-101 Technical Report on the Gaspé Copper Project with an Updated Mineral Resource Estimate for the...” |
Filed |
effective 2026-01-17filed 2026-05-29 |
PLR Resources; G Mining; SynectiqQPs: Christian LarocheInferred 980,000 t 2200.00 Mlb Cu · Measured & Indicated 834.0 Mt @ 0.27 % Cu · Inferred 240.0 Mt @ 0.41 % Cu5 items since 2024-05-06 |
View ↗
|
| AMX.V |
Amex Exploration Inc |
2026-05-29 |
FS |
Perron Gold Minegold“NI 43-101 Technical Report and Feasibility Study for the Perron Mine, Québec, Canada” |
Filed |
effective 2026-03-31filed 2026-05-28 |
P&E Mining Consultants; Evomine Consulting; Hydro-Ressources; Soutex; Norda SteloQPs: Antoine YassaNPV5 C$1.13B after-tax · IRR 114.6% · capex C$193.9MProven & Probable 2.0 Mt @ 12.1 g/t Au |
View ↗
|
| SOO.P.V |
SOO.P.V |
2026-05-28 |
— |
Nabisipi REE Projectrare earth |
Commissioned |
— |
|
View ↗
|
| NAU.V |
NevGold Corp |
2026-05-28 |
Resource |
Lage Antimony Prospectantimony |
Commissioned |
— |
|
View ↗
|
| LIFT.V |
Li-FT Power Ltd. |
2026-05-28 |
Resource |
Adina-Galinée Lithium Projectlithium |
Filed |
effective 2026-05-07filed 2026-05-28 |
SGS Geological ServicesQPs: Marc-Antoine Laporte |
View ↗
|
| NICU.V |
Magna Mining Inc |
2026-05-27 |
PFS |
Levack Minecopper, nickel |
Commissionedexpected in Q3 2026 |
— |
3 items since 2025-12-16 |
View ↗
|
| MAI.V |
Mining Americas Inc. |
2026-05-27 |
PFS |
Copperstone Gold Projectgold |
Commissionedexpected within 45 days |
— |
NPV5 US$374M after-tax · IRR 108.0% · capex US$58MProven & Probable 1.9 Mt @ 4.87 g/t Au |
View ↗
|
| NAU.V |
NevGold Corp |
2026-05-27 |
Resource |
Limousine Butte Projectantimony |
Commissioned |
— |
|
View ↗
|
| AXO.V |
AXO Metals Corp. |
2026-05-26 |
PEA |
San Antonio Project |
Commissioned |
— |
P&E Mining Consultants |
View ↗
|
| UPPR.CN |
Union Power Metals Corp. |
2026-05-26 |
Resource |
Michalova Manganese Projectmanganese |
Commissioned |
— |
SLR |
View ↗
|
| QGR.V |
Q-Gold Resources Ltd. |
2026-05-25 |
PEA |
Quartz Mountain Gold Projectgold |
Filed |
filed 2026-05-25 |
NPV5 US$1.71B after-tax · IRR 55.2% · capex US$290M2 items since 2025-11-21 |
View ↗
|
| MILI.CN |
Military Metals Corp. |
2026-05-22 |
Resource |
Trojarova Projectgold, antimony |
Filed |
effective 2026-04-06filed 2026-05-22 |
SLR ConsultingQPs: Luke Evans; Amanda KuheljInferred @ 1.02 % Sb4 items since 2026-01-07 |
View ↗
|
| BOOM.CN |
Galloper Gold Corp. |
2026-05-22 |
Resource |
Glover Island Gold Propertygold“Technical Report, and Updated Mineral Resource Estimate of the Glover Island Gold Property, Grand Lake...” |
Filed |
effective 2026-04-06filed 2026-05-22 |
P&E Mining ConsultantsInferred 6.7 Mt @ 1.02 g/t Au · Indicated 3.1 Mt @ 1.2 g/t Au3 items since 2026-02-17 |
View ↗
|
| ACM.CN |
Allied Critical Metals Inc. |
2026-05-20 |
PEA |
Borralha Tungsten Projecttungsten“Preliminary Economic Assessment – Borralha Tungsten Project, Parish of Salto, District of Vila Real, Portugal” |
Filed |
effective 2026-04-14filed 2026-05-20 |
Diamond Equity ResearchNPV8 $473.4M after-tax · IRR 48.8%2 items since 2026-04-14 |
View ↗
|
| LG.V |
Lahontan Gold Corp. |
2026-05-20 |
PEA |
Santa Fe Minegold“Preliminary Economic Assessment, NI 43-101 Technical Report, Santa Fe Project,” |
Commissioned |
effective 2024-12-10 |
Kappes, Cassiday; RESPEC Company; Equity Exploration ConsultantsQPs: Trevor Rabb; Kenji UmenoNPV5 US$8.7M after-tax · IRR 47.8% · capex US$135.1M4 items since 2024-07-16 |
View ↗
|
| DBG.V |
Doubleview Gold Corp |
2026-05-20 |
PEA |
Hat Polymetallic Projectgold“Preliminary Economic Assessment of the Hat Polymetallic Project, British Columbia, Canada.” |
Filed |
filed 2026-05-20 |
NPV5 C$6.73B after-tax · IRR 23.0%Measured & Indicated 609.0 Mt @ 0.43 % Au · Inferred 503.0 Mt @ 0.41 % Au5 items since 2025-07-16 |
View ↗
|
| ALAR.CN |
Alaros Exploration Inc. |
2026-05-20 |
— |
Toy Propertytungsten |
Commissioned |
— |
|
View ↗
|
| RSG.CN |
Rocky Shore Gold Ltd. |
2026-05-19 |
Property |
Mosquito Hill and Reid Gold Depositsgold |
Filed |
filed 2026-05-19 |
|
View ↗
|
| BYN.V |
Banyan Gold Corp. |
2026-05-19 |
Resource |
AurMac Projectgold“Technical Report, AurMac Property, Mayo Mining District, Yukon Territory, Canada” |
Commissionedexpected within 45 days |
effective 2023-07-07 |
Ginto ConsultingQPs: Marc JutrasIndicated 37.7 Mt @ 0.69 g/t Au · Inferred 15.1 Mt @ 0.84 g/t Au6 items since 2023-07-31 |
View ↗
|
| AVL.TO |
Avalon Advanced Materials Inc |
2026-05-19 |
PEA |
Nechalacho Rare Earths Projectrare earth |
Commissioned |
— |
|
View ↗
|
| BTR.V |
Bonterra Resources Inc |
2026-05-19 |
Resource |
Desmaraisville South Project“Updated Mineral Resource Estimate and Technical Report of The Bachelor and Moroy Deposits, Desmaraisville...” |
Filed |
effective 2026-02-18filed 2026-05-19 |
P&E Mining ConsultantsQPs: Antoine YassaMeasured & Indicated 16.8 Mt @ 3.02 g/t Au · Inferred 15.6 Mt @ 4.32 g/t Au |
View ↗
|
| STGO.TO |
Steppe Gold Ltd. |
2026-05-14 |
FS |
Boroo Gold Minegold |
Commissionedexpected in the second half of 2026 |
— |
|
View ↗
|
| SIG.V |
Sitka Gold Corp |
2026-05-14 |
Resource |
RC Gold Projectgold, silver, tungsten“RC Gold Project, NI 43-101 Technical Report, Dawson Mining District, Yukon Territory” |
Commissionedexpected within 45 days |
effective 2026-02-25 |
GeoSim ServicesQPs: Ronald G. SimpsonMeasured & Indicated @ 0.05 % WO32 items since 2026-03-31 |
View ↗
|
| TSK.TO |
Talisker Resources Ltd |
2026-05-14 |
Resource |
Bralorne Gold Projectgold |
Commissionedexpected within 45 days |
— |
Inferred 11.2 Mt @ 8.73 g/t Au · Measured & Indicated 720,000 t @ 8.91 g/t Au |
View ↗
|
| RVG.V |
Revival Gold Inc |
2026-05-14 |
Resource |
Mercur Projectgold |
Commissioned |
— |
|
View ↗
|
| TNGD.V |
Tiernan Gold Corp |
2026-05-14 |
PFS |
Volcan Gold Projectgold |
Commissioned |
— |
Mining Metallurgy Environmental; Ausenco; SLR; SGS |
View ↗
|
| TNGD.V |
|
|
Resource |
Volcan Gold Projectgold |
Commissioned |
— |
SLR |
|
| MAU.TO |
Montage Gold Corp |
2026-05-14 |
Resource |
Koné Projectgold |
Commissionedexpected in the coming months |
— |
3 items since 2024-02-22 |
View ↗
|
| NSG.CN |
Northstar Gold Corp. |
2026-05-14 |
Resource |
Dual Gold and Copper Projectsgold, copper |
Commissioned |
— |
|
View ↗
|
| BRC.V |
Blackrock Silver Corp |
2026-05-13 |
PEA |
Tonopah West Silver-Gold Projectgold, silver“Updated Preliminary Economic Assessment of Mineral Resource Estimate - Tonopah West Silver-Gold Project,...” |
Filed |
effective 2026-03-25filed 2026-05-13 |
|
View ↗
|
| IAU.TO |
i-80 Gold Corp. |
2026-05-12 |
FS |
Ruby Hill Propertygold |
Commissionedexpected in the second quarter of 2026 |
— |
Professional EngineersQPs: Paul Chawrun; Tyler Hill2 items since 2025-07-08 |
View ↗
|
| IAU.TO |
|
|
FS |
Cove Underground Projectgold |
Commissionedexpected During the first quarter |
— |
|
|
| FM.TO |
First Quantum Minerals |
2026-05-11 |
Resource |
La Granja Projectcopper |
Filed |
effective 2025-12-31filed 2026-05-11 |
Measured & Indicated 5206.0 Mt @ 0.48 % Cu · Inferred @ 0.4 % Cu |
View ↗
|
| GGA.V |
Goldgroup Mining Inc. |
2026-05-11 |
Resource |
San Francisco Gold Projectgold“NI 43-101 Technical Report for the San Francisco Project, Sonora, Mexico” |
Filed |
effective 2026-04-30filed 2026-05-11 |
Micon InternationalQPs: William J. Lewis; Richard M. Gowans; Tudorel Ciuculescu; William Lewis |
View ↗
|
| APGO.V |
Apollo Silver Corp. |
2026-05-11 |
PEA |
Mule Propertygold, silver |
Commissionedexpected in Q3 2026 |
— |
Indicated 36.0 Mt @ 7.4 % BaSO4 · Inferred 17.0 Mt @ 3.9 % BaSO4 |
View ↗
|
| ABX.TO |
Barrick Mining Corporation |
2026-05-11 |
PFS |
—gold, copper |
Commissionedexpected in Q1 |
— |
|
View ↗
|
| KRY.V.TO |
KRY.V.TO |
2026-05-08 |
Resource |
Haib Copper Projectcopper“NI 43-101 Technical Report – March 2026 Mineral Resource Estimate Haib Copper Project, Namibia” |
Filed |
effective 2026-03-16filed 2026-05-08 |
MSAQPs: Jeremy C. Witley |
View ↗
|
| KRY.V.TO |
|
|
PEA |
Haib Copper Projectcopper |
Commissionedexpected by late Q2 2026 |
— |
|
|
| LMR.V |
Lomiko Metals Inc |
2026-05-08 |
PFS |
La Loutre Graphite Projectgraphite |
Filed |
effective 2026-03-24filed 2026-05-08 |
DRAQPs: Gordana SlepcevNPV8 C$617.4M after-tax · IRR 24.7% · capex C$504.6MProbable 46.8 Mt @ 4.79 % · Measured 215,000 t @ 4.47 % C · Indicated 69.7 Mt @ 4.41 % C2 items since 2026-04-13 |
View ↗
|
| ERKA.CN |
Eureka Lithium Corp. |
2026-05-08 |
Property |
Cabin Lake Polymetallic Projectlithium“NI 43-101 Technical Report on the Cabin Lake Property, Omineca Mining District British Columbia” |
Filed |
effective 2026-05-05filed 2026-05-08 |
QPs: Jeremy Hanson |
View ↗
|
| WHN.V |
Westhaven Gold Corp |
2026-05-07 |
PFS |
Shovelnose Gold and Silver Projectgold, silver |
Commissionedexpected in H2 2027 |
— |
NPV6 C$454M after-tax · IRR 43.2% |
View ↗
|
| HSTR.V |
Heliostar Metals Ltd |
2026-05-07 |
Property |
Goldstrike Projectlead“NI 43-101 Technical Report Goldstrike Project, Utah, USA” |
Filed |
effective 2026-03-23filed 2026-05-07 |
|
View ↗
|
| DC.A.TO |
DC.A.TO |
2026-05-07 |
PFS |
In-Fillgold, silver |
Commissionedexpected in H2 2027 |
— |
|
View ↗
|
| ABRA.TO |
AbraSilver Resource Corp |
2026-05-06 |
Resource |
Diablillos Projectgold, silver“NI 43-101 Technical Report, Mineral Resource Estimate, Diablillos Ag-Au Project” |
Commissionedexpected within 45 days |
effective 2025-07-29 |
QPs: Luis Rodrigo PeraltaInferred 14.4 Mt @ 25 g/t Ag · Measured & Indicated 102.0 Mt @ 65 g/t Ag · Measured & Indicated 232.0 Mt 248.00 Moz Ag2 items since 2025-09-12 |
View ↗
|
| IVN.TO |
Ivanhoe Mines |
2026-05-06 |
Resource |
Kamoa-Kakula Copper Complexcopper“Kamoa-Kakula Mineral Reserve and Mineral Resource Technical Report” |
Commissionedexpected in early Q3 2026 |
effective 2025-12-31 |
AMC Mining Consultants; South Africa (Pty) Ltd and MSAIndicated 1270.0 Mt @ 2.65 % Cu · Inferred 336.0 Mt @ 1.82 % Cu2 items since 2026-03-31 |
View ↗
|
| NAU.V |
NevGold Corp |
2026-05-06 |
PFS |
Auld Creek Gold-Antimony Projectgold, antimony |
Commissionedexpected Within 45 days |
— |
QPs: INDEPENDENT QUALIFIED; PERSONS TheNPV5 US$42M after-tax · IRR 17.0% · capex US$132.6MIndicated 300,000 t @ 5.67 g/t AuEq · Inferred 1.3 Mt @ 3.66 g/t AuEq |
View ↗
|
| NFG.V |
New Found Gold Corp |
2026-05-06 |
PEA |
Auld Creek Gold-Antimony Projectgold, antimony |
Commissionedexpected within 45 days |
— |
NPV5 US$42M after-tax · IRR 17.0% · capex US$132.6MIndicated 300,000 t @ 5.67 g/t AuEq · Inferred 1.3 Mt @ 3.66 g/t AuEq |
View ↗
|
| R.P.V |
R.P.V |
2026-05-06 |
— |
Genesis Project |
Commissioned |
— |
|
View ↗
|
| PAAS.TO |
Pan American Silver Corp |
2026-05-05 |
Other |
Strong Minesilver, lead |
Commissionedexpected within 45 days |
— |
|
View ↗
|
| TFPM.TO |
Triple Flag Precious Metals Corp. |
2026-05-05 |
PFS |
Gunnison Projectgold, silver, copper |
Commissionedexpected during the fourth quarter of 2025 |
— |
Measured & Indicated 1.8 Mt @ 7.52 g/t Au · Measured & Indicated 5.2 Mt @ 23.8 g/t Ag · Measured & Indicated 29.0 Mt @ 7.2 g/t Au |
View ↗
|
| TFPM.TO |
|
|
FS |
Gunnison Projectgold, silver, copper |
Commissionedexpected in the second quarter of 2026 |
— |
|
|
| NOAL.V |
NOA Lithium Brines Inc. |
2026-05-05 |
PFS |
Rio Grande Projectlead |
Commissioned |
— |
|
View ↗
|
| VIPR.V |
Silver Viper Minerals Corp |
2026-05-04 |
Property |
Coneto Silver-Gold Projectgold, silver“Independent Technical Report for the Coneto Gold-Silver Project, Durango, Mexico” |
Filed |
effective 2026-01-31filed 2026-05-04 |
|
View ↗
|
| GAL.V |
Galantas Gold Corporation |
2026-05-04 |
Resource |
Andacollo Projectgold“Mineral Resource Estimate Update, Andacollo Oro Gold Project, Coquimbo Region, Chile” |
Filed |
effective 2026-02-01filed 2026-05-04 |
DRA AmericasQPs: Ryan Wilson; Matthew Halliday; David FrostIndicated 102.4 Mt 1.47 Moz Au · Inferred 347.9 Mt @ 0.41 g/t Au |
View ↗
|
| MUX.TO |
McEwen Mining Inc. (dual-listed NYSE/TSX; note some sources now show "McEwen Inc.") |
2026-05-04 |
Resource |
Tartan Minegold“Mineral Resource Estimate NI 43-101 Technical Report Tartan Mine Project, Manitoba, Canada” |
Filed |
effective 2025-12-31filed 2026-05-04 |
Global Resource Engineering; GREQPs: Terre Lane; Hamid Samari; Larry BreckenridgeIndicated 2.6 Mt @ 3.67 g/t Au · Inferred 2.8 Mt @ 3.32 g/t Au |
View ↗
|
| AEC.V |
Anfield Energy Inc. |
2026-05-04 |
PEA |
Velvet-Wood and Slick Rock Uranium Projectsuranium, vanadium“The Shootaring Canyon Mill and Velvet-Wood and Slick Rock Uranium Projects, Preliminary Economic Assessment” |
Commissionedexpected within 45 days |
— |
WoodNPV8 US$606M after-tax · IRR 97.0%Inferred 145,150 t @ 0.24 % U3O8 · Inferred 2.0 Mt @ 0.2 % U3O8 · Measured & Indicated 571,526 t @ 0.34 % |
View ↗
|
| ONAU.V |
ONGold Resources Ltd |
2026-05-04 |
Resource |
Monument Bay Projectgold“Technical Report on the Monument Bay Project, Manitoba” |
Commissioned |
— |
SRKIndicated 24.4 Mt @ 0.92 g/t Au |
View ↗
|
| NGC.V |
Northern Graphite Corporation |
2026-05-01 |
— |
Lac des Iles Minegraphite |
Commissioned |
— |
|
View ↗
|
| NCAU.V |
Newcore Gold Ltd. |
2026-05-01 |
Resource |
Enchi Gold Projectgold“Technical Report Mineral Resource Estimate Update, Enchi Gold Project, Ghana” |
Filed |
effective 2025-10-06filed 2026-05-01 |
DRA AmericasQPs: Ryan Wilson; Matthew Halliday; Schadrac IbrangoInferred 40.1 Mt @ 0.48 g/t Au · Indicated 83.6 Mt 1.50 Moz Au2 items since 2026-04-08 |
View ↗
|
| NCAU.V |
|
|
PFS |
Enchi Gold Projectgold“NI 43 -101 Technical Report, Preliminary Economic Assessment on the Enchi Gold Project, Ghana” |
Commissioned |
effective 2024-04-24 |
DRA GlobalQPs: Ryan Wilson; Matthew Halliday; Schadrac IbrangoIndicated 83.6 Mt @ 0.56 g/t Au · Inferred 40.1 Mt @ 0.49 g/t Au3 items since 2026-02-05 |
|
| RLYG.V |
Riley Gold Corp |
2026-05-01 |
Property |
PWC Gold Projectgold“NI 43-101 Technical Report, Pipeline West/Clipper Property, Lander County, Nevada, U.S.A” |
Filed |
effective 2026-02-11filed 2026-05-01 |
QPs: Matthew Dumula |
View ↗
|
| GLDC.V |
Cassiar Gold Corp |
2026-05-01 |
PEA |
Cassiar North Projectgold |
Commissioned |
— |
Ausenco |
View ↗
|
| TLO.TO |
Talon Metals Corp |
2026-04-30 |
Property |
Eagle Mine“NI 43-101 Technical Report on the Eagle Mine, Michigan, USA,” |
Filed |
effective 2026-02-28filed 2026-04-30 |
WSP CanadaQPs: Bill Bagnell |
View ↗
|
| AZT.V |
Aztec Minerals Corp |
2026-04-30 |
Resource |
Tombstone and Cervantes Projectsgold |
Commissioned |
— |
|
View ↗
|
| OR.TO |
OR Royalties Inc. |
2026-04-30 |
PEA |
Dalgaranga Minegold |
Commissionedexpected during the second quarter of 2026 |
— |
Proven & Probable 15.0 Mt @ 10.6 g/t Au |
View ↗
|
| AMC.TO |
Arizona Metals Corp |
2026-04-30 |
PEA |
Kay Minecopper |
Commissionedexpected within 45 days |
— |
G Mining ServicesQPs: Highlights Description Unit; Initial CA; PEX Sensitivity CANPV5 -US$6M after-tax · IRR 4.9%Indicated 9.3 Mt @ 3.18 % CuEq · Inferred 860,000 t @ 2.44 % CuEq2 items since 2025-06-30 |
View ↗
|
| PGLD.V |
P2 Gold Inc |
2026-04-29 |
Resource |
Gabbs Projectgold“NI 43-101 Technical Report, Preliminary Economic Assessment, Gabbs Heap Leach and Mill Project, Nye...” |
Commissionedexpected in the third quarter |
effective 2025-10-07 |
9 items since 2025-12-16 |
View ↗
|
| ITR.V |
Integra Resources Corp |
2026-04-29 |
PFS |
Nevada North Projectgold |
Commissionedexpected in H2 2027 |
— |
|
View ↗
|
| EMET.CN |
Canamera Energy Metals Corp. |
2026-04-28 |
Property |
Schryburt Lake Carbonatite Complexrare earth, niobium“Technical Report “) on the Schryburt Lake rare earth element (“ REE “) and niobium project (the “ Project” |
Filed |
effective 2026-04-15filed 2026-04-28 |
Clark Exploration ConsultingQPs: Garry Clark |
View ↗
|
| FM.TO |
First Quantum Minerals |
2026-04-28 |
Property |
Taca Taca Projectcopper |
Filed |
effective 2025-12-31filed 2026-04-28 |
2 items since 2026-02-19 |
View ↗
|
| GOLD.TO |
GoldMining Inc |
2026-04-28 |
PEA |
La Mina Projectgold, silver, copper“NI 43-101 Technical Report and Preliminary Economic Assessment For The La Mina Project, Antioquia,...” |
Commissionedexpected within 45 days |
effective 2023-07-24 |
QPs: La Mina; PEA Summary The; Scott Wilson; Scott E. Wilson; Zeke Blakeley; Rick JordanNPV5 US$1B after-tax · IRR 32.0% · capex US$523M |
View ↗
|
| BRAU.V |
Big Ridge Gold Corp |
2026-04-28 |
PEA |
Hope Brook Gold Projectgold |
Commissioned |
— |
SGS Geological ServicesInferred 231,000 oz Au3 items since 2025-09-16 |
View ↗
|
| SBI.TO |
Serabi Gold plc |
2026-04-28 |
Resource |
Palito Complexgold“Palito Mining Complex , NI 43-101 Technical Report, Pará State, Brazil” |
Commissionedexpected within 45 days |
effective 2025-03-31 |
Inferred 2.5 Mt2 items since 2025-09-12 |
View ↗
|
| GSVR.V |
Guanajuato Silver Company Ltd. |
2026-04-27 |
Resource |
Bolanitos Minesilver“NI 43 -101 Technical Report: Updated Mineral Resource and Reserve Estimates for the Bolañitos Project,...” |
Filed |
effective 2026-03-19filed 2026-04-27 |
Hard Rock ConsultingQPs: Brian Arthur3 items since 2025-11-24 |
View ↗
|
| MGM.V |
Maple Gold Mines Ltd |
2026-04-27 |
Resource |
Douay/Joutel Gold Projectgold |
Commissionedexpected within 45 days |
— |
SLRInferred 111.1 Mt @ 0.77 g/t Au · Inferred 11.7 Mt @ 1.5 g/t Au · Inferred 7.5 Mt @ 4.11 g/t Au2 items since 2025-11-19 |
View ↗
|
| ZIGY.CN |
Stardust Metal Corp. |
2026-04-27 |
Property |
McGarry Projectgold |
Filed |
filed 2026-04-27 |
2 items since 2026-04-27 |
View ↗
|
| LVG.V |
Lake Victoria Gold Ltd |
2026-04-23 |
FS |
Blanket Minegold |
Commissionedexpected in H2 2027 |
— |
NPV5 US$908M pre-tax · IRR 73.0% · capex US$254M |
View ↗
|
| LCE.V |
Century Lithium Corp |
2026-04-23 |
Property |
Angel Island Depositlithium |
Filed |
filed 2026-04-23 |
Mineral Property Development; Global Resource Engineering |
View ↗
|
| EDV.TO |
Endeavour Mining plc |
2026-04-23 |
FS |
Assafou Projectgold, lead |
Commissionedexpected within 45 days |
— |
Lycopodium Minerals Canada; Knight Piésold; SRK Consulting; Digby Wells Environmental; Holding; ECG EngineeringNPV5 $2.1B after-tax · IRR 28.0% · capex $1.06BMeasured & Indicated 4.7 Mt @ 1.55 g/t |
View ↗
|
| ASM.TO |
Avino Silver & Gold Mines Ltd. |
2026-04-23 |
Resource |
Avino Propertygold, silver, copper |
Commissionedexpected within 45 days |
— |
Tetra Tech CanadaQPs: Michael O'Brien; Peter LattaProven & Probable 27.0 Mt @ 109 g/t Ag2 items since 2026-04-16 |
View ↗
|
| PUMA.V |
Puma Exploration Inc |
2026-04-22 |
Resource |
Legacy Projectsilver, copper |
Commissioned |
— |
SRK ConsultingQPs: Stull Lake QUALIFIEDInferred 930,000 t @ 0.66 % Cu |
View ↗
|
| SKEL.V |
Skeleton Coast Uranium Corp |
2026-04-22 |
— |
Langer Heinrich Mineuranium |
Commissioned |
— |
|
View ↗
|
| ELO.TO |
Eloro Resources Ltd |
2026-04-22 |
Resource |
Iska Iska Projectgold, silver, zinc |
Commissionedexpected within 45 days |
— |
Micon InternationalQPs: Charley Murahwi; Richard GowansInferred 13.8 Mt @ 15 g/t Ag · Inferred 722.6 Mt @ 7 g/t Ag · Inferred 945.4 Mt 248.60 Moz Ag |
View ↗
|
| GPG.V |
Grande Portage Resources Ltd |
2026-04-21 |
PEA |
Amalga Gold Projectgold“PRELIMINARY ECONOMIC ASSESSMENT FOR THE NEW AMALGA GOLD PROJECT” |
Filed |
effective 2026-02-11filed 2026-04-21 |
SRK Consulting; Core Geoscience; OreLogic; DRW Geological Consultants; RESPECQPs: Sustaining CA; PEX Sustaining CA; Total Sustaining CA; MINERAL RESOURCES TheNPV5 US$721M after-tax · IRR 56.0% · capex US$254.8MIndicated 4.7 Mt @ 9.47 g/t Au · Inferred 1.8 Mt @ 8.58 g/t Au2 items since 2026-04-15 |
View ↗
|
| SMN.V |
Sun Summit Minerals Corp |
2026-04-21 |
Property |
JD Project“NI 43-101 Technical Report on the JD Property, Toodoggone Region, BC” |
Filed |
effective 2026-01-23filed 2026-04-21 |
|
View ↗
|
| RSH.CN |
RSH.CN |
2026-04-20 |
Property |
Copper Mountain Uranium Projectcopper, uranium |
Filed |
effective 2026-03-31filed 2026-04-20 |
|
View ↗
|
| AZEM.V |
Arizona Eagle Mining Corp |
2026-04-20 |
Resource |
Consolidate Eagle Silver Projectsilver |
Commissioned |
— |
|
View ↗
|
| RUA.TO |
Rua Gold Inc |
2026-04-20 |
PFS |
Auld Creek Projectgold |
Commissioned |
— |
|
View ↗
|
| ETL.V |
E3 LITHIUM LTD |
2026-04-20 |
FS |
Clearwater Projectlithium |
Commissioned |
— |
2 items since 2025-12-08 |
View ↗
|
| M.CN |
Myriad Uranium Corp. |
2026-04-20 |
Property |
Copper Mountain Uranium Projectcopper, uranium |
Filed |
effective 2026-03-31filed 2026-04-20 |
|
View ↗
|
| WLF.V |
Wolfden Resources Corporation |
2026-04-16 |
Resource |
Large Polymetallic VMS Deposit |
Filed |
effective 2026-02-15filed 2026-04-16 |
|
View ↗
|
| ALDE.V |
Aldebaran Resources Inc. |
2026-04-16 |
Resource |
Rio Grande Gold-Copper Projectgold, copper“Rio Grande Project Mineral Resource Estimate, Salta Province, Argentina” |
Filed |
effective 2026-04-13filed 2026-04-16 |
SLRQPs: Benjamin Sanfurgo2 items since 2026-03-02 |
View ↗
|
| ROS.V |
Roscan Gold Corporation |
2026-04-16 |
PEA |
Kandiole Gold Projectgold“Preliminary Economic Assessment of the Kandiole Project, Mali, West Africa” |
Filed |
effective 2026-02-20filed 2026-04-16 |
NPV5 US$498M after-tax · IRR 43.0% · capex US$218.7MIndicated 58.2 Mt @ 0.68 g/t Au · Inferred 5.6 Mt @ 0.52 g/t Au2 items since 2026-03-02 |
View ↗
|
| SVM.TO |
Silvercorp Metals Inc. |
2026-04-16 |
— |
GC Minegold, silver, zinc |
Commissionedexpected in the coming weeks |
— |
|
View ↗
|
| MOON.V |
Blue Moon Metals Inc |
2026-04-16 |
FS |
Nussir Projectgold, silver, copper“Report 43-101 Technical Report On The Mineral Resources Of The Nussir And Ulveryggen Projects, Norway” |
Commissionedexpected within 45 days |
effective 2026-04-14 |
Worley EuropeQPs: Adam WheelerNPV8 US$235M after-tax · IRR 2028.0% · capex US$184MProven & Probable 25.0 Mt @ 0.99 % CuEq · Measured & Indicated 28.7 Mt @ 1.2 % CuEq2 items since 2025-07-07 |
View ↗
|
| FTZ.V |
Fitzroy Minerals Inc. |
2026-04-16 |
Resource |
Buen Retiro Copper Projectcopper |
Commissioned |
— |
|
View ↗
|
| FTZ.V |
|
|
PFS |
Buen Retiro Copper Projectcopper |
Commissioned |
— |
|
|
| FAN.V |
First Atlantic Nickel & Cobalt Corp |
2026-04-15 |
— |
Lucky Mike Copper-Silver-Tungsten Projectsilver, copper, nickel |
Commissioned |
— |
Professional Engineers2 items since 2026-02-19 |
View ↗
|
| SGO.V |
Sonoro Gold Corp. |
2026-04-15 |
PEA |
Cerro Caliche Projectgold“Updated Mineral Resource Estimate and Preliminary Economic Assessment on the Cerro Caliche Gold Project,...” |
Filed |
effective 2025-12-04filed 2026-04-15 |
P&E Mining ConsultantsNPV8 $224M after-tax · IRR 50.0% · capex $83M2 items since 2026-01-14 |
View ↗
|
| TRX.TO |
TRX Gold Corporation |
2026-04-15 |
PEA |
Strategic Minegold |
Commissionedexpected in Q4 2026 |
— |
|
View ↗
|
| HMMC.V |
Hemlo Mining Corp |
2026-04-15 |
— |
Hemlo Gold Minegold“NI 43-101 Technical Report Hemlo Mine, Ontario, Canada” |
Commissionedexpected in the second half of 2027 |
effective 2024-12-31 |
2 items since 2026-01-29 |
View ↗
|
| ITR.V |
Integra Resources Corp |
2026-04-14 |
FS |
Highlighting Near-Mine Growth Minegold |
Commissionedexpected in the third quarter of 2026 |
— |
|
View ↗
|
| UCU.V |
UCU.V |
2026-04-14 |
Resource |
Bokan Dotson-Ridge Rare Earth Propertyrare earth |
Commissionedexpected within 45 days |
— |
Aurora Geoscience |
View ↗
|
| MSR.V |
Minsud Resources Corp |
2026-04-14 |
Resource |
Chita Valley Projectcopper“NI 43- 101 Technical Report Mineral Resource Estimate On Chita Valley Project, Iglesia Department, San...” |
Filed |
filed 2026-04-14 |
GeoEstima Spa. and Cube ConsultingQPs: Michael JobInferred 3.33 Mt Cu · Indicated @ 0.3 % Cu3 items since 2025-02-14 |
View ↗
|
| ARA.TO |
Aclara Resources Inc. |
2026-04-13 |
FS |
Carina Project“NI 43-101 Technical Report & Feasibility Study on the Carina Project, Goiás, Brazil” |
Filed |
effective 2026-03-20filed 2026-04-13 |
Hatch Consultoria; ProjetosNPV8 US$1.7B after-tax · IRR 26.9% · capex US$678.2M4 items since 2024-05-06 |
View ↗
|
| AURO.V |
Auro Metals Inc |
2026-04-09 |
Resource |
Santa Barbara Projectgold, copper“Independent Technical Report for the Santa Barbara Gold and Copper Project, Ecuador” |
Filed |
effective 2026-03-23filed 2026-04-09 |
SRK ConsultingInferred 205.7 Mt @ 0.52 g/t Au · Indicated 29.8 Mt @ 0.1 % Cu |
View ↗
|
| BTR.V |
Bonterra Resources Inc |
2026-04-09 |
Resource |
Barry and Gladiator Gold Propertiesgold“Updated Mineral Resource Estimate and Technical Report on the Barry and Gladiator Gold Properties, Phoenix...” |
Filed |
effective 2026-02-18filed 2026-04-09 |
P&E Mining ConsultantsQPs: Antoine YassaMeasured & Indicated 16.8 Mt @ 3.02 g/t Au · Inferred 15.6 Mt @ 4.32 g/t Au |
View ↗
|
| ALDE.V |
Aldebaran Resources Inc. |
2026-04-09 |
Resource |
Altar Copper-Gold Projectgold, copper“Technical Report Estimated Mineral Resources, Altar Project, San Juan Province, Argentina” |
Commissionedexpected in Q2 |
effective 2024-12-31 |
Whittle ConsultingQPs: Jacob Richey4 items since 2024-11-07 |
View ↗
|
| ALDE.V |
|
|
PFS |
Altar Copper-Gold Projectgold, copper |
Commissionedexpected in Q2 |
— |
3 items since 2024-11-07 |
|
| VLTA.CN |
Volta Metals Ltd. |
2026-04-09 |
Resource |
Springer Projectrare earth |
Filed |
effective 2025-12-31filed 2026-04-09 |
SLR ConsultingIndicated 56.6 Mt @ 346 ppm TREO · Inferred 119.5 Mt @ 0.58 % TREO2 items since 2026-02-23 |
View ↗
|
| IAU.TO |
i-80 Gold Corp. |
2026-04-08 |
FS |
Archimedes Underground Projectgold |
Commissionedexpected in the first quarter of 2027 |
— |
NPV5 $127M after-tax · IRR 23.0% |
View ↗
|
| QGR.V |
Q-Gold Resources Ltd. |
2026-04-08 |
Resource |
Quartz Mountain Gold Projectgold“National Instrument 43-101 Technical Report and Mineral Resource Estimate of the Quartz Mountain Project,...” |
Commissionedexpected within 45 days |
effective 2025-09-26 |
Kappes, CassidayQPs: Fred BrownIndicated 6.0 Mt @ 0.77 g/t Au5 items since 2025-07-21 |
View ↗
|
| TALA.V |
Talamore Mining Corp. |
2026-04-08 |
PEA |
Coffee Gold Projectgold“NI 43-101 Technical Report for the 2026 Preliminary Economic Assessment on the Coffee Gold Project, Yukon, Canada” |
Filed |
effective 2026-03-27filed 2026-04-08 |
WSP Canada; Micon; SRK; LoraxNPV5 C$3B after-tax · IRR 43.5%2 items since 2025-12-15 |
View ↗
|
| EXN.V |
Excellon Resources Inc |
2026-04-08 |
Resource |
Mallay Silver-Lead-Zinc Minesilver, zinc, lead |
Filed |
effective 2026-02-18filed 2026-04-08 |
SGSInferred 362,000 t @ 149 g/t Ag · Indicated 5.57 Moz Ag · Inferred 1.74 Moz Ag3 items since 2025-08-06 |
View ↗
|
| PGLD.V |
P2 Gold Inc |
2026-04-08 |
FS |
Gabbs Projectgold, copper |
Commissionedexpected in the fourth quarter of 2026 |
— |
6 items since 2025-12-16 |
View ↗
|
| TRX.TO |
TRX Gold Corporation |
2026-04-08 |
PEA |
Buckreef Gold Projectgold |
Commissionedexpected in Q4 2026 |
effective 2025-04-15 |
P&E Mining ConsultantsQPs: PEA Authors TheNPV5 US$701M after-tax · capex US$89MMeasured & Indicated 10.8 Mt 893,000 oz Au · Inferred 9.1 Mt @ 2.47 g/t Au3 items since 2025-04-22 |
View ↗
|
| NBY.V |
Niobay Metals Inc. |
2026-04-08 |
Resource |
Crevier Projectniobium, tantalum“NI 43 ‐101 Technical Report – Mineral Resource Estimate Update for the Crevier Project” |
Filed |
effective 2026-02-25filed 2026-04-08 |
IOS Geoscientific Services2 items since 2026-02-25 |
View ↗
|
| EDM.V |
EDM Resources Inc. |
2026-04-08 |
Resource |
Scotia Mine |
Commissionedexpected in Q2 2026 |
— |
|
View ↗
|
| PNGC.CN |
Loyalist Exploration Limited |
2026-04-08 |
Property |
Loveland Polymetallic Projectgold, copper, nickel“National Instrument 43-101 Technical Report on the Loveland Polymetallic Project” |
Filed |
effective 2026-04-06filed 2026-04-08 |
Caracle Creek International Consulting |
View ↗
|
| MRZL.V |
Mont Royal Resources Limited |
2026-04-07 |
PEA |
MRZL Ashram Projectrare earth, fluorspar |
Commissioned |
— |
Indicated 73.2 Mt @ 1.89 % |
View ↗
|