Banyan Gold Files Technical Report for AurMac Project, Yukon, Canada
0
Banyan Gold Files Technical Report for AurMac Project, Yukon, Canada
June 26, 2026, TSX-V: BYN
VANCOUVER, BC, June 26, 2026 - Banyan Gold Corp. (the "Company" or "Banyan") (TSX-V:
BYN) (OTCQB: BYAGF) announces the filing of the Technical Report to support the updated
Mineral Resource Estimate ( “MRE”) in accordance with the Canadian Institute of Mining,
Metallurgy and Petroleum (“CIM”) Definition Standard incorporated by the reference in National
Instrument 43-101 (“NI 43-101”) for the AurMac Project (“AurMac”). The Technical Report (titled
“Technical Report, AurMac Property, Mayo Mining District, Yukon Territory, Canada) and dated
June 26, 2026, was prepared by Marc Jutras, P.Eng., M.A.Sc., Principal, Ginto Consulting Inc.,
Tysen Hantelmann, P.Eng., of JDS Energy & Mining Inc. and Frank Wright, P.Eng., of F. Wright
Consulting Inc. The Technical Report is available for review on SEDAR+ at www.sedar.ca and on
the Company’s website at www.banyangold.com.
As announced in the Company’s news release dated May 19, 2026, the updated MRE comprises
an Indicated Mineral Resource of 3.64 million oz of gold (“Au”) (167.3 M tonnes at 0.68 g/t
Au) and an Inferred Mineral Resource of 4.98 M oz of Au (267.2 M tonnes at 0.58 g/t Au) (as
defined in the 2014 CIM Definition Standards for Mineral Resources & Mineral Reserves
incorporated by reference into NI 43-101). The updated MRE is summarized below in Table 1.
The AurMac Project pit -constrained MRE is contained in two near/on -surface deposits: The
Airstrip and Powerline deposits. This new MRE exceeds the objectives set out for the 2025
diamond drill campaign at Banyan.
Table 1: Pit-constrained Indicated and Inferred Mineral Resources – AurMac Project
Cut-off Grade Tonnes Gold Grade Contained Gold
(Au g/t) (M Tonnes) (g/t) (M Oz)
Indicated MRE
Airstrip 0.30 37.7 0.69 0.840
Powerline 0.30 129.5 0.67 2.799
Combined 0.30 167.3 0.68 3.639
Inferred MRE
Airstrip 0.30 15.1 0.84 0.405
Powerline 0.30 252.1 0.57 4.580
Combined 0.30 267.2 0.58 4.985
Notes to Table 1:
1. The effective date for the MRE is May 15, 2026
1
2. The Mineral Resource Estimate was prepared by Marc Jutras, P.Eng., M.A.Sc.,
Principal, Ginto Consulting Inc., who is a independent Qualified Person as defined by NI
43-101.
3. Mineral Resources which are not Mineral Reserves do not have demonstrated economic
viability. The estimate of Mineral Resources may be materially affected by
environmental, permitting, legal, title, taxation, sociopolitical, marketing, changes in
global gold markets or other relevant issues.
4. The 2014 CIM Definition Standards were followed for classification of Mineral
Resources. The quantity and grade of reported Inferred Mineral Resources in this
estimation are uncertain in nature and there has been insufficient exploration to define
these Inferred Mineral Resources as an Indicated Mineral Resource. It is reasonably
expected that the majority of Inferred Mineral Resources could be upgraded to Indicated
Mineral Resources with continued exploration.
5. Mineral Resources are reported at a cut-off grade of 0.30 g/t gold for all deposits, using
a US$/CAN$ exchange rate of 0.73 and constrained within an open pit shell optimized
with the Lerchs-Grossman algorithm to constrain the Mineral Resources with the
following estimated parameters: gold price of US$3,500/ounce, US$2.75/t mining cost,
US$11.50/t processing cost, US$2.00/t G+A, 90% gold recoveries, and 45° pit slopes.
6. The number of tonnes was rounded to the nearest hundred thousand and ounces
rounded to the nearest thousand. Any discrepancies in the totals are due to rounding
effects.
Qualified Persons
Duncan Mackay, M.Sc., P.Geo., is a “ Qualified Person” as defined under National Instrument
43-101, Standards of Disclosure for Mineral Projects (“ NI 43 -101”), and has reviewed and
approved the content of this news release in respect of all disclosure other than the MRE. Mr.
Mackay is Vice President Exploration for Banyan and has verified the data disclosed in this news
release, including the sampling, analytical and test data underlying the information.
Upcoming Events
• July 6 – 10, 2026 The Rule Symposium Boca Raton, FL
• July 12 – 15, 2026, Invest Yukon Property Tours, Yukon
About Banyan
Banyan’s primary asset, the AurMac Project is located in the Traditional Territory of the First
Nation of Na-Cho Nyäk Dun, in Canada’s Yukon Territory. The AurMac deposit comprises two
main deposits, the Airstrip and Powerline Deposits. Mineralization is characteristic of a Reduced
Intrusion Related Gold system, hosted in auriferous cross -cutting sheeted quartz veins and
replacement style mineralization hosted in skarn horizons. The current Mineral Resource
Estimate (“MRE”) for the AurMac Project has an effective date of May 15, 2026 and c omprises
an Indicated Mineral Resource of 3.639 million ounces of gold (“Au“) (167.3 M tonnes at 0.68 g/t)
and an Inferred Mineral Resource of 4.985 Moz of Au (267.2 M tonnes at 0.58 g/t) (See MRE
2
Table below; as defined in the 2014 CIM Definition Standards for Mineral Resources and Mineral
Reserves incorporated by reference into NI 43-101). The 303 square kilometres (“sq km”) AurMac
Project lies 40 kilometres from Mayo, Yukon. The AurMac Project is transected by the main Yukon
highway and benefits from a 3-phase powerline, existing power station and cell phone coverage.
MRE Table: Pit-constrained Indicated and Inferred Mineral Resources – AurMac Project
Cut-off Grade Tonnes Gold Grade Contained
Gold
(Au g/t) (M Tonnes) (g/t) (M Oz)
Indicated MRE
Airstrip 0.30 37.7 0.69 0.840
Powerline 0.30 129.5 0.67 2.799
Combined 0.30 167.3 0.68 3.639
Inferred MRE
Airstrip 0.30 15.1 0.84 0.405
Powerline 0.30 252.1 0.57 4.580
Combined 0.30 267.2 0.58 4.985
Notes to MRE Table:
1. The effective date for the MRE is May 15, 2026
2. The Mineral Resource Estimate was prepared by Marc Jutras, P.Eng., M.A.Sc., Principal, Ginto Consulting Inc., who is an
independent Qualified Person as defined by NI 43-101.
3. Mineral Resources which are not Mineral Reserves do not have demonstrated economic viability. The estimate of Mineral
Resources may be materially affected by environmental, permitting, legal, title, taxation, sociopolitical, marketing, changes
in global gold markets or other relevant issues.
4. The 2014 CIM Definition Standards were followed for classification of Mineral Resources. The quantity and grade of reported
Inferred Mineral Resources in this estimation are uncertain in nature and there has been insufficient exploration to define
these Inferred Mineral Resources as an Indicated Mineral Resource. It is reasonably expected that the majority of Inferred
Mineral Resources could be upgraded to Indicated Mineral Resources with continued exploration.
5. Mineral Resources are reported at a cut-off grade of 0.30 g/t gold for all deposits, using a US$/CAN$ exchange rate of 0.73
and constrained within an open pit shell optimized with the Lerchs-Grossman algorithm to constrain the Mineral Resources
with the following estimated parameters: gold price of US$3,500/ounce, US$2.75/t mining cost, US$11.50/t processing cost,
US$2.00/t G+A, 90% gold recoveries, and 45° pit slopes.
6. The number of tonnes was rounded to the nearest hundred thousand and ounces rounded to the nearest thousand. Any
discrepancies in the totals are due to rounding effects.
In addition to the AurMac Project, the Company holds the Hyland Gold Project, located 70 km
Northeast of Watson Lake, Yukon, along the Southeast end of the Tintina Gold Belt (the “Hyland
Project”) in the Traditional Territory of the Kaska Nations, closest to the Liard First Nation and
Daylu Dena Council. The Hyland Project represents a sediment hosted, structurally controlled,
intrusion-related gold deposit, within a large land package (over 125 sq km), accessible by a
network of existing gravel access roads. The updated MRE compri ses an Indicated Mineral
Resource of 337 thousand (“K”) ounces (“oz”) of gold (“Au”) and 2.63 million (“M”) oz of silver
(“Ag”) (11.3 M tonnes at 0.93 g/t Au and 7.27 g/t Ag), and an Inferred Mineral Resource of 118
Koz of Au and 0.86 Moz Ag (3.9 M tonnes at 0.95 g/t Au and 6.94 g/t Ag) (as defined in the 2014
CIM Definition Standards for Mineral Resources & Mineral Reserves incorporated by reference
into NI 43-101) effective September 1, 2025 and with technical report filed on Sedar on October
27, 2025.
3
Banyan also holds the Nitra Gold Project, a grassroots exploration project located in the Mayo
Mining district, approximately 10 km west of the AurMac Gold Project. The Nitra Property lies in
the northern part of the Selwyn basin and is underlain by metaclastic rocks of the Late Proterozoic
Yusezyu Formation of the Hyland Group, similar to lithologies hosting portions of the AurMac
Project. Middle Cretaceous Tombsto ne Plutonic suite intrusions occur along the property
including the Morrison Creek and Minto Creek stocks. The property is 100% owned and operated
by Banyan Gold Corp . ("Banyan") and covers approximately 313.9 sq km. The property is
accessible by road along the Silver Trail Highway, South McQuesten Road and 4x4 roads.
Banyan trades on the TSX -Venture Exchange under the symbol “ BYN” and is quoted on the
OTCQB Venture Market under the symbol “ BYAGF”. For more information, please visit the
corporate website at www.banyangold.com or contact the Company.
ON BEHALF OF BANYAN GOLD CORPORATION
(signed) "Tara Christie"
Tara Christie
President & CEO
For more information, please contact:
Tara Christie • 778 928 0556 • [email protected]
Jasmine Sangria • 604 312 5610 • [email protected]
CAUTIONARY STATEMENT: Neither the TSX Venture Exchange, its Regulation Services Provider (as that term
is defined in policies of the TSX Venture Exchange) nor OTCQB Venture Market accepts responsibility for the
adequacy or accuracy of this release.
No stock exchange, securities commission or other regulatory authority has approved or disapproved the
information contained herein.
FORWARD LOOKING INFORMATION: This release contains forward -looking information, which is not comprised of
historical facts and is based upon the Company’s current internal expectations, estimates, projections, assumptions
and beliefs. Such information can generally be identified by the use of forward -looking wording such as “may”, “will”,
“expect”, “estimate”, “anticipate”, “intend(s)”, “believe”, “potential” and “continue” or the negative thereof or similar
variations. Forward-looking information involves risks, uncertainties and other factors that could cause actual events,
results, performance, prospects and opportunities to differ materially from those expressed or implied by such forward-
looking information. Forward looking information in this news release includes, but is not limited to mineral recoveries,
foreign exchange rates and anticipated mining costs. Factors that could cause actual results to differ materially from
such forward -looking information include uncertainties inherent in resource estimates, continuity and extent of
mineralization, capital and operating costs var ying significantly from estimates, the preliminary nature of metallurgical
test results, delays in obtaining or failures to obtain required governmental, environmental or other project approvals,
political risks, uncertainties relating to the availability and costs of financing needed in the future, changes in equity
markets, inflation, changes in exchange rates, fluctuations in commodity prices, and the other risks involved in the
mineral exploration and development industry, enhanced risks inherent to conducting business in any jurisdiction, and
those risks set out in Banyan’s public documents filed on SEDAR +. Although Banyan believes that the assumptions
and factors used in preparing the forward -looking information in this news release are reasonable, undue reliance
should not be placed on such information, which only applies as of the date of this news relea se, and no assurance
can be given that such events will occur in the disclosed time frames or at all. Banyan disclaims any intention or
obligation to update or revise any forward-looking information, whether as a result of new information, future events or
otherwise, other than as required by law.
4