Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

FFM.TO ·

Exceptional assays show why high-grade core stands to super- charge early production profile at FireFly’s Green Bay

Corporate Updates

ASX: FFM | TSX: FFM

Company Announcement

2 July 2026

FireFly Metals Ltd

+61 8 9220 9030

[email protected]

www.fireflymetals.com.au

ACN 110 336 733

Principal & Registered Office:

Level 2/8 Richardson Street West Perth WA 6005

Green Bay Copper-Gold Project, Canada

Exceptional assays show why

high-grade core stands to super-

charge early production profile at

FireFly’s Green Bay

Latest assays such as 42m @ 6.1% CuEq and 9.8m @ 16.5% CuEq, which demonstrate the

outstanding continuity of the high-grade zone, will feed into the impending economic studies

KEY POINTS

• Drilling returns more e xceptional results which extend the high -grade core zone and

confirm the strong continuity of the mineralisation

• Given the strength of the results, FireFly will incorporate them into an updated resource

model underpinning the economic studies; This means these studies will now be completed

in July-August 2026

• The results, generated primarily from infill drilling, will be reflected in the Measured &

Indicated Resource category; This category is central to the economic studies

• The results are particularly important because they demonstrate the strong continuity and

grade of the high-grade core zone, which will be a key input to the upcoming economic

studies

• The assays continue to demonstrate strong continuity of mineralisation across the upper

copper-gold Volcanogenic Massive Sulphide (VMS) lenses, the footwall stringer -style

copper zone and the rich high-grade core zone which lies between the two

• Drilling in the +800m -long high -grade core zone has returned more continuous thick

intersections including:

o 42.0m @ 6.1% copper equivalent (CuEq)1 (4.7% Cu & 1.4g/t Au) including a high-grade VMS

zone of 9.8m @ 16.5% CuEq (12.7% Cu & 4.0g/t Au) (~ true thickness) in hole MUG26-053

o 51.5m @ 4.9% CuEq (4.0% Cu & 0.9g/t Au) including an upper zone grading 17.0m @ 9.1%

CuEq (7.5% Cu & 1.7g/t Au) (~ true thickness) in hole MUG26-054

o 50.2m @ 4.0% CuEq (3.5% Cu & 0.4g/t Au) in hole MUG26-036

1 Metal equivalent for drill results reported in this announcement have been calculated at a copper price of US$8,750/t, gold p rice of

US$2,500/oz, silver price of US$25/oz and zinc price of US$2,500/t. Metallurgical recoveries have been set at 95% for coppe r, 85% for precious

metals and 50% for zinc. CuEq(%) = Cu(%) + (Au(g/t) x 0.82190) + (Ag(g/t) x 0.0822) + (Zn(%) x 0.15038). In the opinion of th e Company, all

elements included in the metal equivalent calculation have a reasonable potential to be recovere d and sold based on current market

conditions, metallurgical test work, and historical performance achieved at the Green Bay project whilst in operation.

ASX: FFM | TSX: FFM

Page | 2

o 34.4m @ 5.0% CuEq (3.8% Cu & 1.2g/t Au) including an upper zone grading 14.3m @ 7.6%

CuEq (5.2% Cu & 2.5g/t Au) (~ true thickness) in hole MUG26-028

• The high -grade c ore zone remains open with the deepest hole drilled to date returning

49.0m @ 6.1% CuEq (see ASX announcement dated 16 October 2025).

• The upper VMS zones also continue to deliver spectacular copper and gold intersections,

including:

o 20.7m @ 7.7% CuEq (5.9% Cu & 1.9g/t Au) in hole MUG26-013 (~ true thickness)

o 13.6m @ 6.8% CuEq (5.7% Cu & 1.1g/t Au) in hole MUG26-029 (~ true thickness)

o 17.8m @ 6.7% CuEq (5.4% Cu & 1.4g/t Au) in hole MUG25-279 (~ true thickness)

o 25.9m @ 6.4% CuEq (5.5% Cu & 1.0g/t Au) in hole MUG26-044 (~ true thickness)

o 18.6m @ 6.1% CuEq (4.5% Cu & 1.7g/t Au) in hole MUG26-038 (~ true thickness)

o 9.2m @ 6.1% CuEq (1.8% Cu & 4.9g/t Au) in hole MUG25-281 (~ true thickness)

• Significant intersections were also returned from close -spaced drilling in the footwall zone

stringer-style mineralisation. These include:

o 35.7m @ 3.3% CuEq (3.1% Cu & 0.2g/t Au) in hole MUG25-278 (~ true thickness)

o 25.3m @ 3.8% CuEq (3.5% Cu & 0.3g/t Au) in hole MUG26-008 (~ true thickness)

o 43.5m @ 3.0% CuEq (2.6% Cu & 0.4g/t Au) in hole MUG25-285 (~ true thickness)

• The current Green Bay Mineral Resource currently stands at 50.4Mt @ 2.0% CuEq in the

Measured & Indicated (M&I) category and a further 29.3Mt @ 2.5% CuEq in the Inferred

category (see ASX announcement dated 18 November 2025).

• The high-grade core zone contains 8.8Mt @ 3.9% CuEq of M&I, and an additional 10.9Mt @

3.8% CuEq of Inferred, Mineral Resource (see ASX announcement dated 18 November 2025).

• Six rigs continue to operate underground at the Ming Mine

• Regional exploration continues with drilling of geophysical targets; Maiden drilling has

commenced at the Tilt Cove project

• The Company is well funded to achieve its growth objectives with ~A$ 219.9 million in cash

and liquid investments as at 31 March 2026

FireFly Managing Director Steve Parsons said: “ These are exceptional results with extremely

high grades over substantial widths. They also demonstrate the strong continuity of this

mineralisation. This is an outstanding combination of grade and width. The continuing of this

mineralisation is a very positive indicator for the upcoming economic studies, which will assess

the potential development scenarios for Green Bay.

“These results will be included in the economic studies, which are in the process of being

completed, enabling us to demonstrate the financial benefits of such a rich core of

mineralisation.

“With six rigs drilling underground, as well as regional exploration in progress, we intend to keep

growing and upgrading the resource in parallel with economic and technical studies”.

ASX: FFM | TSX: FFM

Page | 3

Perth, Australia, July 2, 2026, FireFly Metals Ltd (ASX, TSX: FFM) is pleased to announce more

exceptional drilling results that demonstrate the strong continuity of the high-grade mineralisation

at the Green Bay Copper-Gold Project in Newfoundland and Labrador, Canada.

Recent drilling has continued to focus on upgrading the existing Mineral Resource as part of the

economic studies on the upscaled restart of mining at Green Bay.

Infill drilling of the high -grade convergent core zone ( Core Zone) continues to return exceptional

copper and gold intersections over considerable thicknesses. Latest results from the Core Zone

include 42.0m @ 6.1% CuEq and 51.5m @ 4.9% CuEq further demonstrating continuity of what is

shaping as an economically significant part of future mining plans being considered in the

upcoming economic studies. The Core Zone has a current Mineral Resource of 8.8Mt @ 3.9% CuEq

M&I and 10.9Mt @ 3.8% CuEq Inferred with significant potential to grow (see ASX announcement dated

18 November 2025). The deepest hole drilled to date returning an intersection of 49.1m @ 6.1% CuEq

(see ASX announcement dated 16 October 2025).

Drilling of the VMS lodes has confirmed the presence of strong copper and gold mineralisation to

the west and down -plunge of existing mine development. This is significant because the strike

width of the sulphide horizons now extends beyond 400m in places and significantly enhances the

copper tonnes per vertical metre in the deposit. Recent intersections include 20.7m @ 7.7% CuEq,

17.8m @ 6.7% CuEq and 25.9m @ 6.4% CuEq.

Select holes were extended to test mineralisation in the lower footwall zone that hosts copper

stringer-style mineralisation. Results returned included thick high -grade zones of 25.3m @ 3.8%

CuEq, 35.7m @ 3.3% CuEq and 43.5m @ 3.0% CuEq.

The drill results reported in this announcement will be incorporated into an updated mid -year

Mineral Resource Estimate ( MRE). The current MRE for the Green Bay project stands at 50.4Mt @

2.0% CuEq M&I and 29.3Mt @ 2.5% CuEq Inferred (see ASX announcement dated 18 November 2025).

The mid-year MRE upgrade will underpin the Preliminary Economic Assessment ( PEA) / Scoping

Study that is nearing completion. The study is anticipated for release in July-August 2026 to enable

the recent drilling and the upgraded MRE to be incorporated into the mine plan and project

economics. This assessment will highlight multiple potential development scenarios for the future

operation at Green Bay.

Drilling continues underground with six rigs focused on a combination of both infill drilling and

extending the known Mineral Resource in the high-grade VMS zones.

Regional exploration is starting to accelerate following the winter period. Until recently, work has

focused on target generation utilising both geophysics, prospecting and historic data compilation.

Two surface rigs are currently testing geophysical anomalies at Green Bay. Maiden drilling at the

Company’s Tilt Cove project has commenced.

FireFly is well funded to continue its growth drilling, economic studies and pre -construction early

works activities. The Company has ~A$219.9M in cash and liquid investments as at 31 March 2026.

ASX: FFM | TSX: FFM

Page | 4

Figure 1: Long section through the Green Bay Ming underground mine highlighting the location of select drill

results from this announcement only. Results from both the high-grade copper-gold VMS zone and broad copper

Footwall Zone are shown. The large scale DHEM conductor (green) beyond the edge of the current Mineral

Resource highlights strong potential for the Mineral Resource to continue. Drill assays >0.5% copper are shown in

red. All intersections downhole thickness. Refer to Appendix B for all drill results and locations.

About the Drilling Results

Drilling at the Ming underground copper-gold mine recommenced following FireFly’s acquisition of

the Green Bay Copper-Gold Project in October 2023 . In total, FireFly has completed ~192,000m of

underground diamond drilling up to 31 May 2026.

This announcement contains the results of 67 completed drill holes. The drilling results focus on

infill drilling and holes targeting the lateral margins of the mineralisation. Logging and analysis of

additional drill holes is ongoing.

There are two distinct styles of mineralisation present at the Ming Mine, consisting of a series of

upper copper-gold rich VMS lenses underlain by a broad copper -rich stringer zone, known as the

Footwall Zone (FWZ).

The FWZ is extensive, with the copper stringer mineralisation observed over thicknesses of ~150m

and widths exceeding 200m. The known strike of the mineralisation defined to date is three

kilometres and it remains open down-plunge.

The high-grade Core Zone consists of the VMS and the upper FWZ mineralisation where the two

styles converge down-plunge. The Core Zone has a current Mineral Resource of 8.8Mt @ 3.9% CuEq

M&I and 10.9Mt @ 3.8% CuEq.

ASX: FFM | TSX: FFM

Page | 5

Six drill rigs are currently operating underground , with the focus split between both step-out

extension (two rigs) and infill Mineral Resource conversion drilling (four rigs).

All drilling reported in this announcement has been conducted from the 805L drill drive. Whilst this

development is currently being utilised for exploration, it will form an important part of future mine

infrastructure for the potential upscaled operation.

Additional development has been completed from this drive to position the rigs to test for high

grade extensions of the 1806 and 1807 VMS lodes. The location of drill platforms and holes reported

in this announcement are presented in Figure 2. Significant assay results are presented in

Appendix B of this announcement.

Figure 2: Isometric view of the Ming Mine 805L Exploration Drive showing the location of drill platforms and

drilling reported in this announcement. Assay results greater than 0.5% Cu are shown in red.

Resource Conversion Drilling

805L Exploration Drive Crosscut 3 West

The drilling reported from the mid-section of the 805L Exploration drive (Crosscut 3 West) focused

on upgrading the data density of the Inferred Mineral Resource reported in MRE announced by the

Company on 18 November 2025 (November 2025 MRE).

Drilling focused on conversion of the western peripheral margins of the high-grade VMS zones

which will potentially form an important high -grade component in the early years of an upscaled

restart of production at the Ming Mine. The zones at the margins of the VMS lenses are typically

ASX: FFM | TSX: FFM

Page | 6

gold-rich which is likely the result of lateral variations in both fluid composition and fluid

depositional temperature.

Results from the 805L Crosscut 3 are summarised in Table 1.

Hole Number Style From

(m)

To

(m)

Width

(m)

Assay CuEq

% Comments

Cu % Au g/t Ag g/t Zn %

MUG25_257 VMS 285.1 287.4 2.3 3.20 4.9 31.3 1.36 7.68 Multiple gold-rich VMS zones

separated by post-mineral gabbro VMS 291.4 296.7 5.3 0.80 1.6 6.2 0.24 2.17

MUG25_262 VMS 262.9 269.2 6.3 1.72 1.4 11.7 0.83 3.08 VMS zone at outer western margin

MUG25_264 VMS 254.8 261.6 6.8 2.49 2.5 28.7 2.24 5.12 Copper-gold VMS zone

MUG25_272 VMS 465.2 489.8 24.7 1.39 2.6 20.8 0.38 3.74 Multiple gold-dominated VMS

zones including a 2.6m intersection

grading 9.9g/t Au

VMS 501.4 504.0 2.6 4.38 9.9 38.3 1.80 13.14

MUG26_001 FWZ 526.8 528.8 2.0 1.17 0.1 1.2 0.06 1.26 Isolated copper stringers in the FW

MUG26_039 VMS 340.9 347.0 6.1 4.40 3.7 27.9 1.33 7.91 VMS with high-grade copper and

gold

Table 1: Drill results from the 805L Exploration Drive Crosscut 3 West. All results presented are downhole intervals.

Based on drill angles and interpreted geology the true thickness is approximately 60-75% of the reported downhole

interval for holes drilled in the 805L Crosscut 3.

880R 1807 Crosscut

Drilling completed from the 880L 1807 Remuck was designed to test down -plunge extents of the

western margin of the VMS lodes . The three h oles that successfully reached target intersected

copper and/or gold rich VMS style mineralisation (Table 2).

Hole Number Style From

(m)

To

(m)

Width

(m)

Assay CuEq

% Comments

Cu % Au g/t Ag g/t Zn %

MUG26_002 VMS 308.2 315.2 7.0 4.62 2.7 27.3 0.40 7.09 Copper and gold rich VMS zone

MUG26_023 VMS 273.2 281.7 8.6 1.80 2.0 20.7 2.97 4.05 Zinc-rich copper and gold zone

MUG26_043 VMS 422.8 425.3 2.4 0.38 2.2 13.7 0.06 2.29 Thin gold-dominated VMS zone at

the margins of the channel

Table 2: Drill results from the 8 80R 1807 Crosscut. All results presented are downhole intervals. Based on drill

angles and interpreted geology the true thickness is approximately 75 -80% of the reported downhole interval for

holes drilled in the 880R 1807 crosscut.

880R Remuck 1 and 2

The drilling completed from the 880 Remuck bays 1 and two focused on infill drilling of the eastern

high-grade VMS zones with select holes continued deeper into the footwall stringer mineralisation.

The VMS mineralisation intersected to the east is typically copper-dominant with moderate to

locally high-gold grades.

Results from the 880R Remuck bays are summarised in Table 3.

ASX: FFM | TSX: FFM

Page | 7

Hole Number Style From

(m)

To

(m)

Width

(m)

Assay CuEq

% Comments

Cu % Au g/t Ag g/t Zn %

MUG25_246 VMS 314.3 318.4 4.1 5.40 2.0 13.8 1.14 7.33 High grade copper and gold VMS

MUG25_250 FWZ 505.9 511.8 5.9 1.56 0.1 1.4 0.04 1.64 Multiple zones of moderately

grading footwall stringer veins from

~506m to ~580m

FWZ 528.8 539.0 10.2 1.79 0.1 1.5 0.02 1.87

FWZ 546.3 562.4 16.2 1.31 0.1 1.3 0.02 1.37

FWZ 567.5 579.4 11.9 1.59 0.1 1.7 0.03 1.66

MUG25_255 VMS 319.8 330.3 10.5 3.05 1.8 16.5 1.50 4.86 Thick zone of copper dominated

VMS mineralisation

MUG25_260 VMS 322.8 332.5 9.8 5.04 1.8 12.9 1.34 6.80 Thick and high-grade copper and

gold VMS

MUG25_263 VMS 342.1 345.0 2.9 1.25 0.5 3.3 0.60 1.78 Thin VMS zone with gabbro dykes

MUG25_265 VMS 326.5 330.3 3.8 2.43 1.2 13.9 1.98 3.82 Copper-gold VMS

MUG25_270 VMS 329.4 338.8 9.4 2.66 1.4 12.5 2.03 4.26 An upper copper-gold VMS

underlain by a gold rich zone

devoid of copper

VMS 340.5 348.0 7.5 0.03 1.1 7.4 0.56 1.08

MUG25_277 VMS 329.5 341.3 11.8 2.32 1.2 11.2 1.56 3.62 Thick moderately grading VMS

zone with both copper and gold

MUG25_283 VMS 365.3 369.2 3.9 1.39 1.2 16.8 0.67 2.62 VMS zone at mineralisation

margins

Table 3: Drill results from the 8 80R Remuck 1 and 2 drill cuddies. All results presented are approximate true

thickness unless otherwise stated.

900L Crosscuts 7 and 8

900L Crosscuts 7 and 8 were mined during 2026 as drill platforms to test the western zones of the

VMS mineralisation.

Work completed from the 900L crosscuts 7 and 8 was focused on infilling and extending the

western margins of the Ming North VMS lode. This drilling successfully demonstrated both down-

plunge and lateral continuity of the zones, highlighted by intersections including 20.7m @ 7.7%

CuEq, 9.3m @ 7.0% CuEq and 17.8m @ 6.7% CuEq.

Select holes were extended to test footwall mineralisation.

Drilling completed from the 900L Crosscuts 7 and 8 reported in this announcement is summarised

in Table 4.

ASX: FFM | TSX: FFM

Page | 8

Hole Number Style From

(m)

To

(m)

Width

(m)

Assay CuEq

% Comments

Cu % Au g/t Ag g/t Zn %

MUG25_261 VMS 400.3 403.4 3.1 7.99 2.6 19.0 1.65 10.55 High-grade copper and gold VMS

MUG25_267 VMS 390.1 399.4 9.3 5.10 1.6 20.3 2.94 7.00 Thick zone of copper-dominated

high grade VMS

MUG25_273 VMS 375.9 378.2 2.3 4.04 1.4 14.9 0.56 5.41 Multiple VMS horizons intersected

separated by ~13m VMS 391.1 396.9 5.8 1.95 0.8 4.2 0.17 2.66

MUG25_279 VMS 384.2 401.9 17.8 5.40 1.3 15.8 0.36 6.69 Thick high-grade upper VMS

grading into sericite-rich upper-

footwall stringer mineralisation

FWZ 413.0 415.0 2.0 1.85 0.1 1.7 0.06 1.99

FWZ 423.1 426.0 2.9 1.36 0.1 1.1 0.18 1.49

MUG25_280 VMS 383.5 387.7 4.2 2.71 1.1 13.4 2.96 4.20 Copper-gold VMS horizon

MUG26_003 VMS 404.0 416.8 12.8 3.02 2.0 12.6 3.33 5.28 Thick copper and gold VMS

MUG26_013 VMS 375.0 395.7 20.7 5.90 1.9 14.1 0.74 7.71 Massive sulphide zone transitioning

into footwall stringer mineralisation FWZ 411.0 416.8 5.8 3.39 0.2 3.8 0.22 3.63

MUG26_015 VMS 389.5 400.0 10.6 3.72 1.7 20.0 3.57 5.82 VMS zone with strong copper and

gold grades with high silver and

zinc contents

MUG26_029 VMS 377.0 390.6 13.6 5.72 1.1 15.4 0.40 6.83 Chalcopyrite-dominated VMS zone

MUG26_031 VMS 373.5 382.7 9.2 2.18 1.0 14.6 2.75 3.56 Moderately grading pyrite-

dominated VMS

MUG26_038 VMS 369.7 388.3 18.6 4.48 1.7 17.2 0.80 6.13 Thick zone of copper and gold

mineralisation grading into footwall

stringers

MUG26_042 VMS 387.3 398.8 11.6 2.94 2.5 19.1 0.78 5.23 Copper-gold VMS

MUG26_046 VMS 391.0 395.5 4.5 3.05 3.1 30.9 1.61 6.09 Polymetallic copper-gold VMS

intersection with high silver grade

Table 4: Drill results from the 900L Crosscuts 7 and 8. All results presented are approximate true thickness unless

otherwise stated.

900L Crosscuts 5 and 6

The 900L crosscuts 5 and 6 are the northern -most drill positions in the 805L exploration drive.

Drilling completed from crosscuts 5 and 6 reported in this announcement focused on the

conversion of Inferred Mineral Resources to the higher confidence M&I category for inclusion in the

upcoming economic studies.

The drilling successfully demonstrated continuity of the convergent high -grade core zone, with

notable intersections including 42.0m @ 6.1% CuEq, 51.5m @ 4.9% CuEq, 34.4m @ 5.0% CuEq and

50.2m @ 4.0% CuEq.

Infill drilling of the footwall stringer zone successfully confirmed thick and continuous mineralisation

with key intersections including 25.3m @ 3.8% CuEq, 35.7m @ 3.3% CuEq and 30.1m @ 2.1% CuEq.

A summary of the results of drilling from the 900L Crosscuts 5 and 6 is presented in Table 5.

Hole Number Style From

(m)

To

(m)

Width

(m)

Assay CuEq

% Comments

Cu % Au g/t Ag g/t Zn %

MUG25_247 VMS 441.8 444.1 2.3 3.68 5.9 64.8 0.62 9.12 Thin high-grade upper VMS zone

with multiple lower footwall stringer

intersections

FWZ 533.2 539.0 5.9 1.52 0.2 1.7 0.15 1.71

FWZ 555.0 579.0 24.0 1.00 0.1 1.0 0.01 1.06

FWZ 602.5 622.0 19.6 1.40 0.1 1.9 0.01 1.45