| CNC.V |
Canada Nickel Company Inc. |
2026-01-13 |
Government / policyOne Project, One Process (1P1P) framework designation |
Crawford Nickel ProjectOntarionickel |
Granted |
Province of Ontario |
allows Coordinated provincial permitting and review process |
View ↗
|
| CNC.V |
|
|
Government / policyReferral to federal Major Projects Office |
Crawford Nickel ProjectCanada (federal)nickel |
Granted2025-11 |
Major Projects Office |
— |
|
| NOB.V |
Noble Mineral Exploration Inc |
2026-01-13 |
Government / policyOne Project, One Process (1P1P) framework designation |
Crawford Nickel ProjectOntarionickel |
Granted |
Province of Ontario |
allows Named second project advanced under 1P1P framework to coordinate provincial permitting and reviewheld by Canada Nickel Company Inc. |
View ↗
|
| NOB.V |
|
|
Environmental assessmentImpact Statement under the Impact Assessment Act, 2019 |
Crawford Nickel ProjectCanada (federal)nickel |
Applied2024-11 |
— |
allows First mining project to submit an Impact Statement under the amended Actheld by Canada Nickel Company Inc. |
|
| GRBM.CN |
Green Bridge Metals Corporation |
2026-01-13 |
Drill / explorationdrill permit |
Titac ProjectSt. Louis County, Minnesota |
Renewed / amended |
St. Louis County |
allows allows building six (6) drill pads for multi-directional drilling |
View ↗
|
| ITR.V |
Integra Resources Corp |
2026-01-12 |
WaterGroundwater Point of Compliance Permit |
DeLamarIdahogold, silver |
Planned |
U.S. Army Corps of Engineers |
allows Protect beneficial uses of groundwater2 releases since 2025-09-04 |
View ↗
|
| ITR.V |
|
|
WaterIdaho Pollution Discharge Elimination System Permit |
DeLamarIdahogold, silver |
Planned |
— |
allows Treated industrial wastewater discharges2 releases since 2025-09-04 |
|
| ITR.V |
|
|
Construction / operatingCyanidation Permit |
DeLamarUnited Statesgold, silver |
Planned |
Federal, state and local regulatory authorities |
allows Heap leach operations3 releases since 2025-09-04 |
|
| ITR.V |
|
|
WaterSection 404 Clean Water Act Permit |
DeLamarUnited Statesgold, silver |
Planned |
U.S. Army Corps of Engineers |
allows Assess impacts to aquatic resources and implement compensatory mitigation where required |
|
| ITR.V |
|
|
Land access / communityProgrammatic Agreement (PA) |
DeLamarUnited Statesgold, silver |
Planned |
Tribal Nations (unnamed) |
allows Identify, manage and mitigate impacts to culturally sensitive areas and historic properties; expected as mitigation with Tribal Nations2 releases since 2023-12-20 |
|
| ITR.V |
|
|
OtherReclamation Plan (approved, with financial assurance) |
DeLamarUnited Statesgold, silver |
Planned |
Idaho Department of Environmental Quality |
allows Required before construction; supported by financial assurance2 releases since 2023-12-20 |
|
| ACM.CN |
Allied Critical Metals Inc. |
2026-01-12 |
Environmental assessmentFavourable Environmental Impact Declaration (DIA) |
Borralha Tungsten ProjectPortugaltungsten |
Granted |
— |
expires 2026-Q1allows Favourable, subject to standard regulatory conditions; underground mining development2 releases since 2025-11-19 |
View ↗
|
| ACM.CN |
|
|
Environmental assessmentProject of Execution and RECAPE (Environmental Compliance Report... |
Borralha Tungsten ProjectPortugaltungsten |
Planned |
Portuguese Environment Agency (APA) |
— |
|
| ACM.CN |
|
|
Government / policyLetter of Recognition |
Borralha Tungsten ProjectPortugaltungsten |
Granted |
idD Portugal Defense |
allows Endorsed as a strategic initiative of national importance for defense supply chains2 releases since 2025-10-29 |
|
| BUFF.V |
Buffalo Potash Corporation |
2026-01-12 |
Drill / explorationpotash test well licenses |
Disley ProjectSaskatchewan, Canadapotash |
Granted |
Saskatchewan Ministry of Energy and Resources |
allows Two potash test well licenses for Confirmation Phase drilling (Confirmation Wells #1 and #2) |
View ↗
|
| AUEN.V |
Golden Sky Minerals Corp |
2026-01-07 |
Drill / explorationSecond drill permit |
Rayfield-Gjoll PropertyBritish Columbia, Canadacopper-gold |
Granted |
British Columbia Ministry of Mining and Critical Minerals |
allows Gnome and Semlin target zones; IP survey then up to 3,000 m diamond drilling |
View ↗
|
| WML.V |
Wealth Minerals Ltd. |
2026-01-07 |
Government / policySpecial Lithium Operating Contract (CEOL) |
Kuska ProjectChilelithium |
In review2026-01-02 |
Chilean Ministry of Mining |
allows Resolution accepting CEOL application; final terms to be agreed with the Kuska Consortium before a supreme presidential decree certifies the CEOLheld by Kuska Consortium (Wealth Minerals, Quechua Indigenous Community of Ollagüe) |
View ↗
|
| WML.V |
|
|
Land access / communityKuska Consortium partnership (CEOL application) |
Kuska ProjectChilelithium |
Granted2026-01-02 |
Quechua Indigenous Community of Ollagüe |
allows Community partner (5% owner of Kuska Minerals LLC) in the Kuska Consortium; Resolution states the consortium has fully complied with CEOL application requirements3 releases since 2025-05-27 |
|
| ECU.V |
Element 29 Resources Inc |
2026-01-06 |
Drill / explorationDeclaración de Impacto Ambiental (DIA) environmental certification |
Elida Porphyry Cu-Mo-Ag DepositPerúCu-Mo-Ag |
Granted |
— |
term up to five yearsallows environmental certification for up to 40 drilling platforms |
View ↗
|
| ECU.V |
|
|
Land access / communityAccess Agreement |
Elida Porphyry Cu-Mo-Ag DepositPerúCu-Mo-Ag |
Granted |
host community |
term five-year |
|
| KTO.V |
K2 Gold Corporation |
2026-01-05 |
Environmental assessmentRecord of Decision |
Mojave ProjectInyo County, Californiagold |
Planned |
Bureau of Land Management (BLM) |
allows Final Record of Decision awaited before aggressively advancing the project (return to drilling)7 releases since 2023-12-21 |
View ↗
|
| APXC.CN |
Apex Critical Metals Corp. |
2026-01-05 |
Drill / explorationmineral exploration permit ("drill permit") |
Rift Rare Earth ProjectNebraska, U.S.A.REE |
Granted |
Nebraska Department of Water, Energy and Environment (NDEE) |
allows Drill program at Elk Creek Carbonatite Complex |
View ↗
|
| CUPR.CN |
Super Copper Corp. |
2025-12-24 |
Mining licence / leaseExploitation concessions |
Cordillera Cobre ProjectChilecopper |
Granted |
— |
allows 26 exploitation concessions, approx. 6,858 hectares; 25 with court resolutions, 15 published in Official Mining Gazette; registration in Copiapó Mining Registry underwayheld by Gardner Y Esteffan Limitada (JV partner, registered applicant) |
View ↗
|
| OGC.TO |
OceanaGold Corporation |
2025-12-18 |
Mining licence / leaseExpert Panel final decision approving the project |
Waihi North ProjectNew Zealandgold |
Granted |
Expert Panel appointed by the New Zealand government |
allows Development and operation of Wharekirauponga Underground mine, surface infrastructure, processing plant and water treatment plant expansion, new tailings storage facility |
View ↗
|
| HML.CN |
Heritage Mining Ltd. |
2025-12-16 |
Drill / explorationexploration permit |
Melba ProjectOntario, Canadagold |
Granted2025-12-15 |
— |
allows planned diamond drilling program, 26 holes ~1,780m2 releases since 2025-11-10 |
View ↗
|
| PSE.CN |
Pasinex Resources Limited |
2025-12-12 |
Government / policyApproval of transfer of shares in Horzum Arama ve Madencilik AŞ |
PinargözüTürkiyezinc |
Granted |
General Directorate of Mining and Petroleum Affairs (MAPEG) |
allows Transfer of 100% of Horzum AS shares from Kurmel Madencilik to Pasinex Arama; Horzum AS operates the Pinargözü zinc mineheld by Pasinex Arama ve Madencilik AŞ |
View ↗
|
| DAN.V |
Arianne Phosphate Inc. |
2025-12-11 |
Environmental assessmentMinisterial Decree |
Lac à Paul projectQuebec, Canadaphosphate |
Granted2015-12 |
Government of Quebec |
term 10 yearsallows Approval for the project's development; initial authorization period of 10 years |
View ↗
|
| DAN.V |
|
|
Environmental assessmentMinisterial Decree extension |
Lac à Paul projectQuebec, Canadaphosphate |
In review |
Ministry of the Environment (the "Ministry") |
term extension of up to five years from approbation if positiveexpires 2027-12allows Decree remains valid for up to two years (to December 2027) while extension request is decided; several required studies submitted |
|
| KBX.CN |
Kobrea Exploration Corp. |
2025-12-11 |
Drill / explorationEnvironmental Impact Statement |
El Destino ProjectMendoza Province, Argentina |
Granted2025-12-09 |
Senate and Chamber of Deputies of the Province of Mendoza |
allows Ratified by law; part of 27 exploration projects ("Metalliferous Mining Exploration of the El Destino Project and Others"); allows exploration including drilling |
View ↗
|
| KBX.CN |
|
|
Drill / explorationEnvironmental Impact Statement |
Sofi ProjectMendoza Province, Argentina |
Granted2025-12-09 |
Senate and Chamber of Deputies of the Province of Mendoza |
allows Ratified by law; part of 27 exploration projects; allows exploration including drilling |
|
| KBX.CN |
|
|
Drill / explorationEnvironmental Impact Statement |
El Perdido ProjectMendoza Province, Argentina |
Granted2025-12-09 |
Senate and Chamber of Deputies of the Province of Mendoza |
allows Covered by 'all of Kobrea's projects' approved for exploration including drilling; maiden diamond drilling to start in coming weeks |
|
| ARU.V |
Aurania Resources Ltd. |
2025-12-10 |
Drill / explorationEpona |
Brittany Peninsula, FranceBrittany, France |
Granted |
French government |
allows exploration license, polymetallic metals including goldheld by wholly-owned French subsidiary |
View ↗
|
| ARU.V |
|
|
Drill / explorationTaranis |
Brittany Peninsula, FranceBrittany / Pays de la Loire, France |
Granted |
French government |
allows exploration license, 359.5 km²held by wholly-owned French subsidiary |
|
| ARU.V |
|
|
Drill / explorationBélénos |
Brittany Peninsula, FranceBrittany / Pays de la Loire, France |
Granted |
French government |
allows exploration license, 440.9 km²held by wholly-owned French subsidiary |
|
| CDPR.V |
Cerro de Pasco Resources Inc. |
2025-12-10 |
Government / policyTwo resolutions of the independent Mining Council |
Quiulacocha ProjectPeru |
Granted2025-11 |
Mining Council (Peru) |
allows Provide a clear and affirmative basis for advancing the final stages of the permitting process for the Quiulacocha Project |
View ↗
|
| CDPR.V |
|
|
Government / policyTailings Reprocessing Application |
Quiulacocha ProjectPeru |
In review |
Ministry of Energy and Mines |
allows Evaluation and formalization of CDPR's Tailings Reprocessing Application, granting reprocessing rights beyond the El Metalurgista concession |
|
| CDPR.V |
|
|
Land access / communityFormalization of claim on entire tailings footprint |
Quiulacocha ProjectPeru |
Planned |
General Mining Bureau of Mining of the Ministry of Energy and Mines (DGM) |
term 2 yearsallows Formalization of tailings reprocessing rights beyond the El Metalurgista concession2 releases since 2023-08-29 |
|
| CDPR.V |
|
|
Environmental assessmentEnvironmental Impact Assessment |
Quiulacocha ProjectPeru |
In review |
— |
allows Baseline datasets will form the foundation of the project's Environmental Impact Assessment |
|
| ZFR.V |
Zephyr Minerals Ltd |
2025-12-09 |
Plan of operations / noticemining permit application (resubmission) |
Dawson Gold PropertyColorado, USAgold |
Planned |
Colorado Division of Reclamation, Mining and Safety (DRMS) |
allows Water baseline monitoring through December 2026, then resubmit the Application to DRMS |
View ↗
|
| CANU.CN |
Canadian Uranium Corp. |
2025-12-09 |
Drill / explorationexploration permit |
Castle South Uranium ProjectSaskatchewanuranium |
Planned |
— |
allows Exploration permit applications for MT survey, ground geophysics and ~10,000 m diamond drilling program |
View ↗
|
| ETL.V |
E3 LITHIUM LTD |
2025-12-08 |
Environmental assessmentEnvironmental Protection and Enhancement Act (EPEA) application |
Clearwater Project Central Processing FacilityAlbertalithium |
Applied |
Alberta Energy Regulator (AER) |
allows EPEA approval for CPF; up to 32,000 tpy lithium carbonate |
View ↗
|
| ETL.V |
|
|
Construction / operatingDirective 056 (D56) facility application |
Clearwater Project Central Processing FacilityAlbertalithium |
Planned2025-12 |
Alberta Energy Regulator (AER) |
allows D56 facility licence to construct and operate CPF; stakeholder consultation began late November 2025; application anticipated early 2026 |
|
| ETL.V |
|
|
Plan of operations / noticeDirective 065 reservoir scheme application |
Clearwater ProjectAlbertalithium |
Planned |
Alberta Energy Regulator (AER) |
allows Governs full production and reinjection of brine |
|
| ETL.V |
|
|
OtherMunicipal development permit |
Clearwater ProjectAlbertalithium |
Planned |
County |
— |
|
| FTUR.V |
Future Fuels Inc. |
2025-12-04 |
Drill / exploration |
Hornby Basin Uranium ProjectNunavut, CanadaUranium |
Planned |
Nunavut Water Board (NWB) and Crown-Indigenous Relations and Northern Affairs Canada (CIRNAC) |
allows Up to 10,000 m diamond drilling, two helicopter-portable rigs, 25-person seasonal camp near Mountain Lake; program planned for summer 20264 releases since 2025-09-08 |
View ↗
|
| RAMP.V |
Ramp Metals Inc |
2025-12-03 |
Drill / explorationdrill permit |
Rottenstone SW projectSaskatchewan |
Granted |
— |
term two-yearallows drill an additional 150 holes and build a temporary camp on site as needed2 releases since 2025-10-21 |
View ↗
|
| LEM.V |
Leading Edge Materials Corp. |
2025-12-03 |
Environmental assessmentEnvironmental permit |
Norra KärrSwedenHeavy rare earth elements |
Planned |
Government of Sweden |
allows Next phase of permitting; includes environmental impact and waterheld by Greenna Minerals AB6 releases since 2021-06-17 |
View ↗
|
| BEA.V |
Belmont Resources Inc. |
2025-12-02 |
Drill / explorationCrown Land Work Authorization (CLWA) |
Crackingstone Uranium–REE ProjectSaskatchewanUranium, REE |
Granted |
Saskatchewan Ministry of Environment |
term multi-yearexpires 2028-11-30allows Up to 40 drill holes and pads, up to 2.5 km new trail, 5 km trail refurbishment, ground geophysical surveys |
View ↗
|
| QGR.V |
Q-Gold Resources Ltd. |
2025-12-01 |
Environmental assessmentEnvironmental baseline studies |
Quartz Mountain Gold ProjectOregon, USAgold |
Planned |
— |
allows Environmental baseline data collection and permitting strategy; coordination with DOGAMI, U.S. Forest Service and other agencies |
View ↗
|
| STND.V |
Standard Uranium Ltd |
2025-11-27 |
Drill / explorationexploration permits |
Corvo Uranium ProjectSaskatchewan, Canadauranium |
Granted |
— |
term 18 monthsallows geophysical surveys and first drill program beginning January 2026 |
View ↗
|
| ARGL.CN |
Argyle Resources Corp. |
2025-11-27 |
Drill / exploration |
Lac Comporté Silica ProjectQuebec, CanadaSilica |
Granted |
— |
allows Drilling program up to 3,000 metres of NQ core; all permits in place2 releases since 2025-11-18 |
View ↗
|
| LGD.TO |
Liberty Gold Corp. |
2025-11-26 |
OtherIdaho state-level permits |
Black Pine Oxide Gold ProjectIdaho, USAgold |
Planned |
Idaho Department of Environmental Quality (IDEQ); Idaho Department of Lands (IDL) |
allows Water rights, air quality, mine reclamation, and cyanidation permits advancing in parallel |
View ↗
|
| LGD.TO |
|
|
Land access / communityInteragency Memorandum of Understanding (MOU) |
Black Pine Oxide Gold ProjectIdaho, USAgold |
Granted2025-02 |
USFS, BLM, IDEQ, IDL and Idaho Governor’s Office of Energy and Mineral Resources (OEMR) |
allows Formalized agency roles and timelines for coordination through the NEPA process |
|
| NOBL.V |
Noble Plains Uranium Corp |
2025-11-25 |
Drill / explorationDrill permit |
Duck Creek ProjectWyoming, USAuranium |
Granted |
— |
allows Up to 37,400 feet of drilling; original application contemplated 198 holes, now approximately 175 holes3 releases since 2025-08-27 |
View ↗
|
| PDQ.V |
Paradigm Gold Corp. |
2025-11-25 |
Drill / explorationdrill permit |
Swift Katie Gold-Copper PropertyBritish ColumbiaGold-Copper |
Granted |
— |
term 5 yearsexpires 2030-12-31allows Drilling at Swift Katie property including Swift and Katie targets; initial 2,000m planned |
View ↗
|
| AEMC.V |
Alaska Energy Metals Corporation |
2025-11-24 |
Government / policyFAST-41 Transparency Dashboard coverage |
Nikolai Nickel projectAlaska, USAnickel |
Granted |
Federal Permitting Improvement Steering Council (Permitting Council) |
allows Initial focus on rehabilitation and extension of the Rainy Creek Mining Trail, two temporary bridges, and an on-site camp |
View ↗
|
| AUCU.CN |
Inflection Resources Ltd |
2025-11-24 |
Drill / explorationexploration license |
Dandaloo projectNew South Wales, Australiacopper-gold |
Granted |
— |
allows Copper-gold exploration license adjoining Trangie project; 100%-owned; awarded to Australian subsidiary |
View ↗
|
| AUCU.CN |
|
|
Land access / communityland access discussions |
Dandaloo projectNew South Wales, Australiacopper-gold |
In review |
— |
allows Land access discussions for air core drilling |
|
| MJS.V |
Majestic Gold Corp |
2025-11-24 |
Construction / operatingsafety production permit |
Songjiagou Underground MineShandong Province, Chinagold |
Renewed / amended2025-11-20 |
— |
allows Renewal of safety production permit; operations resumed after suspension since Sept 1, 2025 due to expiryheld by Yantai Zhongjia Mining Co., Ltd. |
View ↗
|
| FG.V |
Falcon Gold Corp |
2025-11-21 |
Drill / exploration |
Sunny Boy–Spitfire ProjectBritish Columbiagold |
Renewed / amended |
— |
allows updated field permits supporting inaugural drill campaign2 releases since 2025-10-29 |
View ↗
|
| FG.V |
|
|
Drill / exploration |
Central Newfoundland land package (Stoney Lake Claims)Newfoundland |
Applied |
— |
allows permitting to support exploration activities in 2026 |
|
| FRI.V |
Freeport Resources Inc. |
2025-11-18 |
Land access / communityLandowner support for EL 1335 renewal |
Yandera Copper ProjectPapua New Guineacopper |
Granted |
Yandera communities and landowners |
allows Stated support for renewal of EL 1335 |
View ↗
|
| FFF.CN |
55 North Mining Inc. |
2025-11-14 |
Drill / explorationdrill authorization |
Last Hope Gold ProjectManitoba, Canadagold |
Granted |
Province of Manitoba |
allows 2025–2026 winter drill program |
View ↗
|
| NUKE.CN |
American Atomics Inc. |
2025-11-13 |
OtherNRC license to remediate abandoned mine waste |
—United Statesuranium |
Granted |
Nuclear Regulatory Commission (NRC) |
allows first of its kind license to remediate abandoned uranium mine wasteheld by DISA Technologies |
View ↗
|
| LG.V |
Lahontan Gold Corp. |
2025-11-13 |
Environmental assessmentDecision Record and Finding of No Significant Impact (NEPA EA) |
Santa Fe Mine projectNevada, USAgold, silver |
Granted |
Federal Bureau of Land Management (BLM) |
allows Concludes NEPA Environmental Assessment process for the EPOO6 releases since 2023-04-12 |
View ↗
|
| SLV.CN |
Silver Dollar Resources Inc. |
2025-11-12 |
Drill / explorationDrill permit |
Nora propertyDurango, Mexicosilver-gold |
Granted |
— |
term 3 yearsallows Repair of access roads and building of up to 18 drill pads3 releases since 2023-06-20 |
View ↗
|
| PSE.CN |
Pasinex Resources Limited |
2025-11-11 |
OtherApproval of transfer of shares in Aydın Teknik Madencilik |
Sarikaya zinc projectKayseri Province, Türkiyezinc |
Granted |
General Directorate of Mining and Petroleum Affairs (MAPEG) |
allows Transfer of shares from Abdullah Aydın to Pasinex Arama ve Madencilik A.Ş.; gives 100% ownership of projectheld by Pasinex Arama ve Madencilik A.Ş. |
View ↗
|
| PSE.CN |
|
|
OtherMAPEG approval of full ownership of Horzum AS |
Horzum AS (Pinargözü mine)Türkiyezinc |
In review |
MAPEG |
allows Pending approval for full ownership of Horzum AS, expected soon |
|
| CVB.V |
Compass Gold Corp |
2025-11-11 |
Environmental assessmentEnvironmental Permit |
Massala Small Mine ProjectMaligold |
Granted |
Ministry of Environment, Sanitation and Sustainable Development of Mali |
allows ESIA approved September 34 releases since 2025-01-06 |
View ↗
|
| CVB.V |
|
|
Environmental assessmentEnvironmental and Social Impact Study approval |
Massala Small Mine ProjectMaligold |
Granted2025-09-04 |
Malian Inter-Ministerial Committee |
— |
|
| MARI.TO |
Marimaca Copper Corp. |
2025-11-11 |
Environmental assessmentResolución de Calificación Ambiental (RCA) |
Marimaca Oxide ProjectAntofagasta region, Chilecopper |
Granted |
— |
allows Formal approval of the Declaración de Impacto Ambiental (DIA) submitted December 2024held by Marimaca NewCo Limitada |
View ↗
|
| LAR.TO |
Lithium Argentina |
2025-11-10 |
Environmental assessmentEnvironmental Impact Statement (Declaración de Impacto Ambiental, DIA) |
Pozuelos-Pastos Grandes lithium brine project (PPG Project)Salta Province, Argentinalithium |
Granted2025-11-07 |
Secretariat of Mining and Energy of the Province of Salta |
allows Stage 1 of the PPG Project; followed a 14-month review2 releases since 2025-11-10 |
View ↗
|
| GRG.V |
GRG Resources Corp. |
2025-11-10 |
Drill / explorationEnvironmental Qualification Resolution (RCA) |
San PietroAtacama Region, Chilecopper; gold |
Granted2025-11-06 |
— |
allows Additional 80 drilling platforms, mainly in the Rincones and Colla deposits area; includes several authorizationsheld by New Golden Explorations Inc. (NGE) |
View ↗
|
| GRG.V |
|
|
Environmental assessmentDeclaración de Impacto Ambiental (DIA) evaluation, concluded with... |
San PietroAtacama Region, Chilecopper; gold |
Granted2025-11-06 |
Chilean authorities responsible for environmental matters |
allows Environmental impact declaration for the requested drilling areas; evaluation concluded with RCAheld by New Golden Explorations Inc. (NGE) |
|
| PPX.V |
PPX Mining Corp. |
2025-11-10 |
WaterWater Use License |
Igor ProjectPerugold, silver |
Planned |
National Water Authority of Peru |
allows Final water use license for the Igor processing plant, after completion of construction2 releases since 2024-06-13 |
View ↗
|
| SLVR.TO |
Silver Tiger Metals Inc. |
2025-11-07 |
Construction / operating |
El Tigre Stockwork Silver-Gold ProjectSonora, Mexicosilver-gold |
Granted |
Mexican Federal Environmental Department (SEMARNAT) |
allows all required approvals and permits to construct the Project |
View ↗
|
| MGMA.V |
Magma Silver Corp. |
2025-11-06 |
Drill / explorationDrill permit |
Niñobamba ProjectPerusilver, gold |
Granted2025-10-17 |
MINISTERIO DE ENERGÍA Y MINAS |
term 14 months from date of issuanceallows Drilling on the Joramina zone from 20 drill pads; multiple directional drilling from each padheld by Rio Silver Inc.2 releases since 2025-01-21 |
View ↗
|
| MGMA.V |
|
|
Drill / explorationDrill permit modification |
Niñobamba ProjectPerusilver, gold |
Planned |
MINISTERIO DE ENERGÍA Y MINAS |
allows Modification to allow drilling from inside the drift in the Joramina zone |
|
| WEX.V |
Western Exploration Inc |
2025-11-06 |
Plan of operations / noticeNotice of Intent (NOI) and Mine Plan of Operations (MPO) |
Aura Gold-Silver ProjectElko County, NevadaGold-Silver |
Planned |
— |
allows NOI and MPO for Doby George Deposit; Stantec engaged to prepare and initiate |
View ↗
|
| ABM.V |
Aben Gold Corp |
2025-11-05 |
Drill / explorationClass 1 Quartz Approval |
Justin Gold ProjectYukon Territorygold |
Granted |
Government of the Yukon |
allows exploration and diamond drilling activities in 2026; grid soil sampling, rock sampling, geological mapping and diamond drilling2 releases since 2025-09-09 |
View ↗
|
| ABM.V |
|
|
Drill / explorationClass 1 Quartz Approval |
Justin Gold ProjectYukon Territorygold |
Granted |
Liard First Nations |
allows exploration and diamond drilling activities in 20262 releases since 2025-09-09 |
|
| ABM.V |
|
|
Drill / explorationClass 1 Quartz Approval |
Justin Gold ProjectYukon Territorygold |
Granted |
— |
allows exploration and diamond drilling activities in 2026 |
|
| ABM.V |
|
|
Mining licence / leaseClass 3 Quartz Program |
Justin Gold ProjectYukon Territorygold |
In review2023-06 |
Government of the Yukon |
allows pending application submitted June 2023, remains under consultation |
|
| GPS.V |
Great Plains Metals Corp. |
2025-11-05 |
Land access / communityLand Access Agreement |
Everton ProjectVictoria, Australiamolybdenum |
Granted |
— |
allows allows exploration work on the ground including drilling |
View ↗
|
| ZFR.V |
Zephyr Minerals Ltd |
2025-11-04 |
Drill / explorationpermit modification |
Judith Patented Placer ClaimColorado, USAgold |
Planned |
— |
allows Exploratory trenching program, expected completion before end of Q1 2026 |
View ↗
|
| NEXG.V |
NexGold Mining Corp |
2025-11-04 |
Construction / operatingFisheries Act Authorizations (FAAs) |
Goldboro Gold ProjectCanada (federal)gold |
Granted |
Fisheries and Oceans Canada (DFO) |
allows Construction and operation; issued under Paragraphs 34.4(2)(b) and 35(2)(b) of the Fisheries Act; final federal authorizations |
View ↗
|
| EFF.V |
1844 Resources Inc. |
2025-10-30 |
Drill / explorationWork Authorization for Impact (Authorisation de travaux d'impact, ATI) |
Vortex/Vallières ProjectQuebec, Canadacopper |
Granted |
Quebec's Ministry of Natural Resources and Forests (MRNF) |
allows Exploration activities with environmental or community impacts; issued after consultation with Indigenous communities and municipalities; Sullipek East project |
View ↗
|
| EFF.V |
|
|
Drill / explorationDrilling permit |
Vortex/Vallières ProjectQuebec, Canadacopper |
Granted |
Quebec's Ministry of Natural Resources and Forests (MRNF) |
allows 3,000-metre drilling program on the Sullipek East portion |
|
| SLI.V |
Standard Lithium Ltd. |
2025-10-30 |
Mining licence / leaseIntegration Application approval |
South West Arkansas ProjectArkansaslithium |
Granted |
Arkansas Oil and Gas Commission (AOGC) |
allows Integration of non-leased mineral interests into Reynolds Brine Unitheld by Smackover Lithium |
View ↗
|
| SLI.V |
|
|
Mining licence / leaseUnitization approval |
South West Arkansas ProjectArkansaslithium |
Granted2025-04-24 |
Arkansas Oil and Gas Commission (AOGC) |
allows Reynolds brine production area covering 20,854 acresheld by Smackover Lithium |
|
| SLI.V |
|
|
Government / policyLithium royalty approval |
South West Arkansas ProjectArkansaslithium |
Granted2025-05-29 |
Arkansas Oil and Gas Commission (AOGC) |
allows 2.5% lithium royalty, first for lithium from brine in Arkansasheld by Smackover Lithium |
|
| MTTA.CN |
Meta Critical Minerals Inc. |
2025-10-30 |
Land access / communityLocal Government Agreement incl. CSR plan |
Tsagaan ZalaaMongoliasilica |
In review2025-11 |
— |
allows Local Government Agreement including CSR plan, in progress, November 2025held by Grand Samsara Consulting LLC |
View ↗
|
| MTTA.CN |
|
|
OtherBlasting Permit |
Tsagaan ZalaaMongoliasilica |
In review2025-12 |
— |
allows Blasting Permit application in progress, December 2025held by Grand Samsara Consulting LLC |
|
| MTTA.CN |
|
|
OtherEnvironmental Management Plan and Emergency Response Plan |
Tsagaan ZalaaMongoliasilica |
In review2025-11 |
— |
allows EMP and ERP in progress, November 2025held by Grand Samsara Consulting LLC |
|
| MTTA.CN |
|
|
Government / policyHPQ silica resource registration |
Tsagaan ZalaaMongoliasilica |
Granted |
Mineral Resources and Petroleum Authority of Mongolia |
allows Registration of high-purity quartz silica resources, approved by a 15-member council appointed by the Ministryheld by Grand Samsara Consulting LLC |
|
| ABI.V |
Abcourt Mines Inc |
2025-10-28 |
Construction / operatingenvironmental certificate of authorization for custom milling |
Sleeping Giant MillQuebec, Canadagold |
Granted |
— |
allows custom milling of ore from off-site deposits |
View ↗
|
| CAN.V |
Canadian Gold Resources Ltd |
2025-10-27 |
Drill / explorationDrill permits |
Lac Arsenault Gold ProjectQuébecgold |
Granted |
Ministère des Ressources naturelles et des Forêts (MRNF) |
allows Maiden drill program, minimum 36 holes, ~3,000 metres2 releases since 2025-09-10 |
View ↗
|
| MAXX.CN |
Max Power Mining Corp. |
2025-10-24 |
Drill / explorationdrilling license |
Lawson target well, Genesis Trend natural hydrogen drill programSaskatchewan, CanadaNatural hydrogen |
Granted |
— |
allows first well of planned multi-well Natural Hydrogen drill program; spud on or about 2025-11-07 |
View ↗
|
| STLR.TO |
STLLR Gold Inc |
2025-10-22 |
Environmental assessmentEnvironmental baseline studies for federal Impact Assessment |
Tower Gold ProjectCanada (federal)gold |
In review |
— |
term minimum of two yearsallows Field-based baseline studies began fall 2025, foundation for the federal Impact Assessment |
View ↗
|
| NBLC.V |
Nobel Resources Corp. |
2025-10-21 |
Drill / exploration |
CupritaChilecopper |
Granted |
Servicio Nacional de Geologia y Minera (SERNAGEOMIN) |
allows Diamond drilling at Cuprita; first phase expected to include diamond drill holes from eight initial platforms; drilling as early as November |
View ↗
|
| WHY.V |
West High Yield (W.H.Y.) Resources Ltd. |
2025-10-21 |
Mining licence / leaseMines Act Permit |
Record Ridge Industrial Mineral MineBritish Columbia, Canadamagnesium, silica, nickel, iron |
Granted |
British Columbia Ministry of Mines and Critical Minerals (MCM) |
allows Authorizes development, construction and operation of RRIMM2 releases since 2023-10-25 |
View ↗
|
| WHY.V |
|
|
Land access / community |
Record Ridge Industrial Mineral MineBritish Columbia, Canada |
Granted |
Osoyoos Indian Band (OIB) |
allows Chief states support for project moving forward under the Permit; Skemxist Solutions partnership for construction and mining2 releases since 2025-05-28 |
|
| FWM.CN |
Flow Metals Corp. |
2025-10-20 |
Drill / explorationClass 3 Quartz exploration permit |
Sixtymile Gold ProjectYukongold |
Granted |
Yukon Government |
term 10-yearallows Up to 100 diamond drill holes per year, up to 5km mechanized trenching and soil sampling, access road and trail construction and upgrading2 releases since 2025-03-13 |
View ↗
|
| RKR.V |
Rokmaster Resources Corp |
2025-10-16 |
Drill / explorationMulti-year Area Based Exploration Permit (MYAB Permit) |
Big Copper ProjectBritish Columbia |
Granted |
British Columbia Ministry of Mining and Critical Minerals |
term five-yearallows 20 helicopter-supported drillsites and 4 helicopter pads |
View ↗
|
| NTX.V |
NeoTerrex Minerals Inc |
2025-10-15 |
Drill / explorationdrill permits |
Monument Rare Earths ProjectQuébecrare earths |
Granted |
— |
allows First phase of drilling, 14 holes totalling 2,000 metres, on a portion of REE targets |
View ↗
|
| REVX.V |
Rev Exploration Corp. |
2025-10-15 |
Drill / explorationAutorisation de Travaux d’Exploration à Impacts (ATI) |
JMW PropertyQuebec, Canadagold |
Granted |
MRNF |
allows Authorization for drilling; initial program up to 32 permitted drill pads3 releases since 2025-09-25 |
View ↗
|
| CMET.CN |
Clarity Metals Corp. |
2025-10-14 |
Drill / exploration |
Fecteau Gold ProjectQuebecAu |
Granted |
— |
allows drill permits (number not stated) |
View ↗
|
| SCY.V |
Scandium International Mining Corp |
2025-10-10 |
Mining licence / leaseMining Lease No 1893 (Act 1992) (ML 1893) |
Nyngan Scandium ProjectNew South Wales, Australiascandium |
Granted2025-10-07 |
Department of Primary Industrials and Regional Development – NSW Resources |
No. ML 1893term 21 yearsexpires 2046-10allows Granted in satisfaction of Mining Lease Application No 531; supersedes underlapping Mining Lease No 1792; covers full mine footprintheld by EMC Metals Australia Pty Ltd |
View ↗
|
| M.CN |
Myriad Uranium Corp. |
2025-10-09 |
Drill / explorationDrilling Notification |
Copper Mountain Project AreaWyoming, USAuranium |
Renewed / amended |
State of Wyoming |
allows Bonded for 70 of 222 holes; can be updated to bond remaining holes in subsequent phases |
View ↗
|
| HCH.V |
Hot Chili Limited |
2025-10-09 |
Drill / explorationDIA (Environmental Impact Declaration) |
La Verde Cu-Au discoveryChileCu-Au |
Planned |
— |
allows full DIA to be processed in a next drilling stage |
View ↗
|
| NBY.V |
Niobay Metals Inc. |
2025-10-09 |
Drill / explorationexploration permit |
James Bay Niobium ProjectOntarioniobium |
Granted |
Ontario Ministry of Mines |
term three yearsallows Allows resumption and completion of the drilling campaign suspended in 2022; helicopter-borne campaign with strict water and drilling mud management2 releases since 2024-01-18 |
View ↗
|
| DLTA.V |
Delta Resources Limited |
2025-10-08 |
Environmental assessmentEnvironmental baseline program |
Delta-1 Gold PropertyOntariogold |
In review |
— |
allows 2025–2026 baseline studies: hydrology, surface water quality, Species at Risk surveys, Stage 1 archaeological assessment, led by CSL Environmental & Geotechnical Ltd. |
View ↗
|
| VMXX.V |
Valhalla Metals Inc |
2025-10-07 |
Government / policyApproval of AIDEA appeal under ANILCA Section 1106, reversing the... |
Ambler Access RoadAlaska, USA |
Granted2025-10-06 |
President Trump / White House |
allows Reverses June 2024 decision that terminated the Record of Decision and rights-of-way for the Ambler Access Road; road to cross Valhalla's Sun project claimsheld by Alaska Industrial Development and Export Authority (AIDEA) |
View ↗
|
| VMXX.V |
|
|
OtherReinstatement of Record of Decision, rights-of-way and all... |
Ambler Access RoadAlaska, USA |
Planned |
Relevant federal agencies (Department of Interior) |
allows President directed agencies to promptly reinstate, grant and finalize all necessary permits for road constructionheld by Alaska Industrial Development and Export Authority (AIDEA)2 releases since 2022-12-01 |
|
| CPAU.V |
CopAur Minerals Inc |
2025-10-07 |
Drill / explorationTemporary Discharge Permit for Closed Facility Exploration |
Kinsley Mountain Gold ProjectNevada, USAgold |
Applied |
Nevada Division of Environmental Protection |
allows Authorization to sample the closed and reclaimed heap leach pad for metallurgical testing |
View ↗
|
| CCCU.CN |
Critical Copper Mining Corp |
2025-10-07 |
Drill / explorationPermit for Drill |
LocaƟon of Fecteau Gold ProjectQuebec, Canadagold |
Granted |
— |
— |
View ↗
|
| MLM.CN |
McFarlane Lake Mining Limited |
2025-10-07 |
Drill / explorationExploration Permit |
Juby Gold ProjectOntario, Canadagold |
Applied2025-10-06 |
Ontario Ministry of Mines |
allows up to 10,000 metres of drilling; geophysical surveys (IP and Magnetic) |
View ↗
|
| NTH.V |
Nord Precious Metals Mining Inc |
2025-10-06 |
Plan of operations / noticeRecovery Permit |
Beaver MineOntariosilver |
Planned |
Ontario's Ministry of Energy and Mines |
allows Processing of Beaver Mine tailings; toll processing of adjacent-property tailings to be included; commissioning of 600 tpd modular gravity plant upon permit receipt |
View ↗
|
| NTH.V |
|
|
Land access / community |
Beaver MineOntario |
Granted |
Three First Nations groups (unnamed) |
allows Agreements with three First Nations groups ensuring social license and community support; not individually named |
|
| HWG.CN |
Headwater Gold Inc. |
2025-10-02 |
Plan of operations / noticeLodestar Plan of Operations |
Lodestar ProjectNevada, USAgold |
Granted |
U.S. Forest Service |
allows Authorizes commencement of drilling; inaugural up to 3,500 metre drill program, 10 to 15 holes2 releases since 2025-07-24 |
View ↗
|
| USGD.CN |
American Pacific Mining Corp |
2025-10-01 |
Drill / explorationNotice of Intent |
Madison Copper-Gold ProjectMontana, USAcopper-gold |
Granted |
Bureau of Land Management (BLM) |
allows 7 drill pads fully permitted |
View ↗
|
| ATY.V |
Atico Mining Corporation |
2025-10-01 |
WaterWater use permit |
La Plata projectEcuador |
Granted |
Ministry of Environment, Water and Ecological Transition (MAATE) |
allows Water use in industrial activities incl. extraction and processing, staff consumption, dust suppression, environmental mitigation |
View ↗
|
| ATY.V |
|
|
WaterReview and approval of detailed engineering plans for water works |
La Plata projectEcuador |
Planned |
Unified Water Authority |
allows Collection, conduction, storage and discharge works design |
|
| KCLI.CN |
American Critical Minerals Corp. |
2025-09-29 |
Drill / explorationMineral and Minerals Salt Leases |
Green River ProjectUtah, USApotash, lithium |
Renewed / amended |
State of Utah (SITLA) |
term annualallows 11 SITLA leases, approx. 7,050 acres; annual payments made2 releases since 2024-11-12 |
View ↗
|
| KCLI.CN |
|
|
Drill / explorationPotash Prospecting Permits |
Green River ProjectUtah, USApotash |
Renewed / amended |
Bureau of Land Management (BLM) |
term annualallows 11 federal potash prospecting permits, approx. 25,480 acres; annual payments made4 releases since 2024-09-09 |
|
| GZD.V |
Grizzly Discoveries Inc |
2025-09-29 |
Drill / explorationdrilling and trenching permits |
Greenwood ProjectBritish Columbiaprecious and battery metals |
Granted |
— |
allows Drilling and trenching at four targets: Midway, Sappho, Copper Mountain (Prince of Wales, Coronation, Mabel Jenny) and Imperial |
View ↗
|
| NEXU.CN |
Nexus Uranium Corp. |
2025-09-25 |
Drill / explorationPlan of Operations (October Jinx area) |
Chord ProjectUnited States (federal lands)uranium |
Granted2024-11-27 |
U.S. Forest Service (USFS) |
allows Up to 17 drill holes, four convertible to cased groundwater monitoring wells; max depth about 700 ft; about 1.4 acres surface disturbance; no new road constructionheld by Clean Nuclear Energy Corp. |
View ↗
|
| NEXU.CN |
|
|
Land access / communityMemorandum of Understanding (MOU) with USFS |
Chord ProjectUnited States (federal lands)uranium |
Granted2025-07-15 |
U.S. Forest Service (USFS) |
allows Guides NEPA process, communication protocols and third-party contractor scopeheld by Clean Nuclear Energy Corp. |
|
| ALTA.V |
Altamira Gold Corp |
2025-09-24 |
Construction / operatingEnvironmental Installation License (Licença de Instalação, LI) for... |
Cajueiro ProjectPará State, Brazilgold |
Granted2025-09-22 |
Pará State Secretariat of Environment, Climate and Sustainability (SEMAS/PA) |
No. LI No 3651/2025term two yearsexpires 2027-09-22allows Trial mining plant up to 100,000 tonnes per year across ANM processes 850.224/2009 and 866.464/2017 (Baldo and Matrincha targets) |
View ↗
|
| HLU.V |
Homeland Uranium Corp |
2025-09-24 |
Drill / explorationNotice of Intent Permit |
Coyote Basin ProjectMoffat and Rio Blanco Counties, Coloradouranium |
Granted |
US Bureau of Land Management (BLM) |
allows Part 1 of Phase 1: ~35 RC holes, ~17,000 ft (5,300 m)held by Shift Exploration Inc.2 releases since 2025-07-09 |
View ↗
|
| HLU.V |
|
|
Drill / exploration |
Coyote Basin ProjectMoffat and Rio Blanco Counties, Coloradouranium |
Planned |
US Bureau of Land Management (BLM) |
allows Part 2 Phase 1 drill holes, contingent on Part 1 resultsheld by Shift Exploration Inc. |
|
| HLU.V |
|
|
Drill / exploration |
Coyote Basin ProjectMoffat and Rio Blanco Counties, Coloradouranium |
Planned |
Colorado Division of Mine Reclamation and Safety (DMRS) |
allows Part 2 Phase 1 drill holes, contingent on Part 1 resultsheld by Shift Exploration Inc. |
|
| SKP.V |
StrikePoint Gold Inc |
2025-09-23 |
Drill / explorationNotice of Intent to Explore |
Hercules Gold ProjectNevadagold |
Granted |
Bureau of Land Management of Nevada (BLM) |
allows three drill pads at the Pony Meadows Target with minor associated drill road disturbance2 releases since 2024-09-24 |
View ↗
|
| SKP.V |
|
|
Drill / explorationdrill permit |
Hercules Gold ProjectNevada |
Granted |
Bureau of Land Management of Nevada (BLM) |
allows Sirens showing, southern portion of Hercules Gold Project |
|
| ARQ.CN |
Argo Gold Inc. |
2025-09-22 |
Drill / explorationmineral exploration permits |
Rottenstone ProjectSaskatchewan |
Granted |
Saskatchewan Ministry of Environment |
allows Prospecting, geological mapping, surface sampling; airborne surveys upon notifying the Ministry; covers 26,661 hectares of mineral claims |
View ↗
|
| ARQ.CN |
|
|
Drill / explorationmineral exploration permits |
Dreaver Lake Gold ProjectSaskatchewangold |
Granted |
Saskatchewan Ministry of Environment |
allows Prospecting, geological mapping, surface sampling; airborne surveys upon notifying the Ministry; covers 1,155 hectares |
|
| FTUR.V |
Future Fuels Inc. |
2025-09-22 |
Drill / explorationPhase One exploration permits |
Hornby Basin ProjectNunavuturanium |
Granted |
Crown-Indigenous Relations and Northern Affairs Canada (CIRNAC) |
allows 2025 Phase One program: ground gravity survey (~540 stations, ~12 km²), prospecting, mapping, sampling2 releases since 2025-09-08 |
View ↗
|
| FTUR.V |
|
|
Environmental assessmentExemption from NIRB screening |
Hornby Basin ProjectNunavuturanium |
Granted |
Nunavut Planning Commission (NPC) |
allows Proposed work program exempt from screening by the Nunavut Impact Review Board; falls within Schedule 12-1 class of works2 releases since 2025-09-08 |
|
| ROS.V |
Roscan Gold Corporation |
2025-09-22 |
Drill / explorationexploration permits |
Kandiole Gold ProjectMali |
Renewed / amended |
— |
allows renewal of key exploration permits |
View ↗
|
| FOMO.CN |
Formation Metals Inc. |
2025-09-22 |
Drill / explorationAuthorization to Intervene (ATI) |
N2 Gold ProjectQuebecgold |
Granted |
Ministère des Ressources naturelles et des Forets (MERN) |
allows drilling for 10,000 metre drill program |
View ↗
|
| FOMO.CN |
|
|
Drill / explorationForestry Intervention permit |
N2 Gold ProjectQuebecgold |
Granted |
responsible municipal authorities |
allows drilling for 10,000 metre drill program5 releases since 2025-04-22 |
|
| ARGL.CN |
Argyle Resources Corp. |
2025-09-22 |
Drill / exploration |
Clay Howells Rare Earth Element (REE) ProjectOntario, CanadaREE |
Granted |
Ontario Ministry of Mines |
allows 2000-meter diamond drill program twinning six historic drill holes |
View ↗
|
| PPTA.TO |
Perpetua Resources Corp. |
2025-09-19 |
Construction / operatingNotice to Proceed |
Stibnite Gold ProjectIdaho, USA |
Granted |
U.S. Forest Service (USFS) |
allows Conditional; project satisfied all Record of Decision requirements; construction may begin once joint financial assurance bonding is posted |
View ↗
|
| PPTA.TO |
|
|
Government / policyFAST-41 Transparency Projects list |
Stibnite Gold ProjectUSA |
Granted2025 |
Trump Administration |
allows Project placed on Transparency Projects list under FAST-41 Program for streamlined permitting |
|
| PRU.TO |
Perseus Mining Limited |
2025-09-19 |
Mining licence / leasePresidential Decree |
CMA underground projectCôte d'Ivoiregold |
Granted2025-09-18 |
President of the Republic of Côte d'Ivoire |
allows authorising development and operation of the CMA underground project at Yaouré Gold Mine |
View ↗
|
| PRU.TO |
|
|
Environmental assessmentEnvironmental and Social Impact Assessment approval and Ministerial Arrêté |
CMA underground projectCôte d'Ivoiregold |
Granted |
— |
allows ESIA approval and issuance of Ministerial Arrêté, prerequisite for development phase |
|
| NOP.CN |
Nevada Organic Phosphate Inc. |
2025-09-18 |
Drill / explorationPhosphate Exploration Permit |
Murdock Mountain propertyNevadaphosphate |
Granted2025-09-17 |
Bureau of Land Management (BLM) |
allows Allows launch of drill program; BLM Elko Field Officeheld by Nevagro4 releases since 2024-07-08 |
View ↗
|
| NTX.V |
NeoTerrex Minerals Inc |
2025-09-17 |
Drill / explorationdrill permits |
Monument Rare Earth Element projectQuebecRare earths |
Applied |
— |
allows applications for drill permits submitted for upcoming drill program |
View ↗
|
| CAM.V |
Cascadia Minerals Ltd. |
2025-09-17 |
Drill / explorationClass 4 exploration permit |
Carmacks ProjectYukoncopper-gold |
Granted |
— |
term 10-yearallows Includes significant amounts of diamond drilling and support activities; 4,000 m diamond drill program |
View ↗
|
| EU.V |
enCore Energy Corp. |
2025-09-16 |
Construction / operatingClass III and Class V Underground Injection Control (UIC) permits |
Dewey Burdock ProjectSouth Dakotauranium |
Granted |
U.S. Environmental Protection Agency (EPA) |
allows EAB denied in full petition for review; permits final and effective2 releases since 2024-09-12 |
View ↗
|
| EU.V |
|
|
Mining licence / leaseSource and Byproduct Materials License |
Dewey Burdock ProjectSouth Dakotauranium |
Granted2014-04-08 |
Nuclear Regulatory Commission (NRC) |
No. SUA-1600allows covers 10,580 acres |
|
| EMPS.CN |
EMP Metals Corp. |
2025-09-15 |
Construction / operating |
Project AuroraSaskatchewanlithium |
Granted |
Saskatchewan Ministry of Energy and Resources |
allows construction and operation of lithium refining demonstration plant |
View ↗
|
| EMPS.CN |
|
|
Construction / operating |
Project AuroraSaskatchewanlithium |
Granted |
— |
allows construction and operation of lithium refining demonstration plant |
|
| UUU.CN |
Uranium One Mining Corp. |
2025-09-12 |
Drill / explorationEnvironmental License |
Yuty Prometeo Uranium ProjectParaguayuranium |
Applied |
Ministerio del Ambiente y Desarrollo Sostenible (MADES) |
allows Environmental License Application as part of process toward Prospection Permit3 releases since 2025-04-08 |
View ↗
|
| UUU.CN |
|
|
Drill / explorationProspection Permit |
Yuty Prometeo Uranium ProjectParaguayuranium |
Planned |
Ministerio del Ambiente y Desarrollo Sostenible (MADES) |
— |
|
| GRDM.V |
Grid Metals Corp. |
2025-09-11 |
Drill / explorationexploration drill permit |
Falcon West Lithium/Cesium PropertyManitoba, Canadacesium, lithium |
Granted |
Province of Manitoba |
allows Drilling of the Lucy South cesium zone planned to begin in September2 releases since 2025-03-13 |
View ↗
|
| ETL.V |
E3 LITHIUM LTD |
2025-09-11 |
OtherDirective 065 approval for mineral scheme |
Clearwater Project Demonstration FacilityAlbertalithium |
Granted |
Alberta Energy Regulator (AER) |
allows Mineral scheme, including subsurface injection of produced fluids; Phase 2 |
View ↗
|
| ETL.V |
|
|
Drill / explorationDirective 056 approval for mineral wells |
Clearwater Project Demonstration FacilityAlbertalithium |
Granted |
Alberta Energy Regulator (AER) |
allows Mineral wells, technical and licensing requirements; production and injection well, Phase 2 |
|
| ETL.V |
|
|
Construction / operatingDirective 056 approval for mineral facility |
Clearwater Project Demonstration FacilityAlbertalithium |
Granted |
Alberta Energy Regulator (AER) |
allows Mineral facility, technical and licensing requirements |
|
| ETL.V |
|
|
Construction / operatingDirective 056 application |
Clearwater Project commercial facilityAlbertalithium |
Planned |
Alberta Energy Regulator (AER) |
allows Commercial facility application being completed |
|
| ETL.V |
|
|
Environmental assessmentEnvironmental Protection and Enhancement Act (EPEA) application |
Clearwater Project commercial facilityAlbertalithium |
Planned |
— |
allows To accompany Directive 056 application for commercial facility |
|
| RKL.CN |
Rockland Resources Ltd. |
2025-09-11 |
Drill / explorationexploration permit |
Cole Gold Mines ProjectRed Lake, Ontariogold |
Granted |
Ontario Ministry of Northern Development and Mines |
term 3 yearsallows prospecting, trenching and diamond drilling2 releases since 2024-04-18 |
View ↗
|
| ECR.V |
Cartier Resources Inc. |
2025-09-09 |
Environmental assessmentEnvironmental baseline studies (desktop study and preliminary... |
Cadillac projectQuebecgold |
In review |
— |
allows Contract awarded to Stantec; desktop study and geochemical characterization per Directive 019 (MELCCFP); basis for PEA Chapter 20 |
View ↗
|
| APN.V |
Altiplano Metals Inc. |
2025-09-09 |
Plan of operations / noticemine planning and expansion approval |
Santa Beatriz mineChilecopper-gold-iron |
Renewed / amended |
SERNAGEOMIN (the Chilean mining authority) |
term 42 monthsallows extraction of up to 4,275 t/m; approval for two additional mine openings (3 in total) |
View ↗
|
| SRI.V |
Sparton Resources Inc. |
2025-09-08 |
Drill / explorationexploration permits |
Pense Critical Metals ProjectOntario |
Granted |
Ontario government |
allows New exploration permits; all activities including proposed drilling sites approved |
View ↗
|
| SRI.V |
|
|
Drill / explorationexploration permits |
Pense Critical Metals ProjectQuebec |
Granted |
Quebec government |
allows New exploration permits; all activities including proposed drilling sites approved |
|
| HWG.CN |
Headwater Gold Inc. |
2025-09-08 |
Drill / explorationNotice of Intent |
Crane Creek gold projectIdaho, USAgold |
Granted |
Bureau of Land Management (BLM) |
allows exploration drilling; drill pads across BLM land (14 pads total with Idaho land) |
View ↗
|
| HWG.CN |
|
|
Plan of operations / noticePlan of Operation |
Crane Creek gold projectIdaho, USAgold |
Granted |
— |
allows exploration drilling on leased State of Idaho land; 14 drill pads total with BLM land |
|
| FTUR.V |
Future Fuels Inc. |
2025-09-08 |
Drill / explorationexploration permits |
Hornby Basin ProjectNunavuturanium, copper |
Applied |
— |
allows 2025 ground geophysical surveys, geological mapping, geochemical sampling, optional airborne geophysics; Crown Land |
View ↗
|
| FTUR.V |
|
|
Water |
Hornby Basin ProjectNunavuturanium, copper |
Planned |
Nunavut Water Board |
allows 2026 drilling program water sourcing |
|
| COS.V |
Coniagas Battery Metals Inc. |
2025-09-08 |
Drill / explorationAuthorization for Impact-Causing Exploration Work (ATI) |
Graal propertyQuebecnickel, copper, cobalt |
Granted |
— |
allows diamond drilling |
View ↗
|
| TCO.V |
Transatlantic Mining Corp |
2025-09-08 |
Drill / exploration |
Golden Jubilee projectGranite County, Montanagold |
Granted |
United States Forrest Service |
expires 2025-12-01allows New drilling (up to 1,000 m in 2 to 4 holes) and dewatering of the mine2 releases since 2023-04-13 |
View ↗
|
| IAU.TO |
i-80 Gold Corp. |
2025-09-05 |
Environmental assessmentenvironmental permits |
Archimedes projectNevada, U.S.gold |
Granted |
Bureau of Land Management |
allows underground mining above 5100-foot elevation |
View ↗
|
| IAU.TO |
|
|
Environmental assessmentNEPA and NDEP requirements for mining below 5100-foot elevation |
Archimedes projectNevada, U.S.gold |
In review |
Nevada Department of Environmental Protection |
allows mining below the 5100-foot elevation; estimated completion first half of 2027 |
|
| AUX.V |
Golden Cross Resources |
2025-09-04 |
Drill / explorationExploration Licence |
Welcome & Ti Tree Gold ProjectsVictoria, Australiagold |
Applied |
— |
No. EL008779allows 305 km² additional ground, approx. 46 km of strike across several anticlines |
View ↗
|
| ITR.V |
Integra Resources Corp |
2025-09-04 |
Watergroundwater Point of Compliance Permit |
DeLamar ProjectIdaho, USAgold, silver |
Planned |
Idaho state agencies |
allows Host of other permits from multiple Idaho state agencies protecting air, water and land quality3 releases since 2023-12-20 |
View ↗
|
| ITR.V |
|
|
Construction / operatingCyanidation Permit |
DeLamar ProjectIdaho, USA |
Planned |
Federal, State and Local regulatory authorities |
allows all necessary permits for mine construction, operations, and reclamation2 releases since 2025-08-13 |
|
| ATY.V |
Atico Mining Corporation |
2025-09-03 |
Mining licence / leaseEnvironmental License for exploitation |
La Plata ProjectEcuador |
Planned |
Ministry of the Environment, Water, and Ecological Transition (MAATE) |
allows exploitation and beneficiation activities |
View ↗
|
| GPG.V |
Grande Portage Resources Ltd |
2025-09-03 |
WaterFish Habitat Permit |
New Amalga Gold ProjectAlaska, USAgold |
Granted |
Alaska Department of Fish & Game |
term five-yearallows installation of a stream level monitoring system for the Herbert River2 releases since 2025-08-12 |
View ↗
|
| PMET.TO |
PMET Resources Inc. |
2025-09-03 |
Environmental assessmentFederal impact assessment (Tailored Impact Statement Guidelines,... |
Shaakichiuwaanaan Lithium ProjectFederal, Canadalithium |
In review2025-08 |
Impact Assessment Agency of Canada (IAAC) |
allows CV5 Pegmatite; Initial Project Description submitted Feb 2025; IAAC guidelines and plans issued Aug 20252 releases since 2025-05-01 |
View ↗
|
| PMET.TO |
|
|
Environmental assessmentProvincial Environmental and Social Impact Assessment (ESIA) |
Shaakichiuwaanaan Lithium ProjectQuebeclithium |
In review |
Impact Assessment Agency of Canada (IAAC) |
allows CV5 Pegmatite; provincial process commenced 2023; ESIA submission targeted late 20252 releases since 2025-05-01 |
|
| QQQ.CN |
Questcorp Mining Inc. |
2025-09-03 |
Drill / explorationPermit exemption under the British Columbia Mines Act |
North Island Copper projectBritish Columbia, Canadacopper |
Granted |
— |
allows 10 to 15 line km induced polarization (IP) survey |
View ↗
|
| EU.V |
enCore Energy Corp. |
2025-09-02 |
Government / policyFast-41 Program inclusion |
Dewey Burdock ISR Uranium ProjectSouth Dakota, United Statesuranium |
Granted |
U.S. Federal Permitting Improvement Steering Council (Permitting Council) |
allows Approved for inclusion in Fast-41 accelerated federal permitting; NRC lead agency |
View ↗
|
| EU.V |
|
|
Mining licence / leaseSource and Byproduct Materials License |
Dewey Burdock ISR Uranium ProjectSouth Dakota, United Statesuranium |
Renewed / amended |
Nuclear Regulatory Commission (NRC) |
No. SUA-1600allows 10,580 acres; originally received April 8, 2014; now under timely renewal |
|
| SAGE.V |
Sage Potash Corp |
2025-09-02 |
Government / policyDraft critical minerals list addition |
Sage Plain Potash ProjectUnited Statespotash |
Granted2025-08-25 |
Department of the Interior and U.S. Geological Survey |
allows Potash added to draft list of critical minerals, providing access to federal funding and tax credit opportunities |
View ↗
|
| NGC.V |
Northern Graphite Corporation |
2025-09-02 |
Government / policyStrategic Project status |
Okanjande project (graphite upgrade to Battery Anode Material in France)European Union / Francegraphite |
Granted |
European Union Critical Raw Materials Act (CRMA) |
allows qualifies for fast tracked permitting and funding support; one of 47 Strategic Projects |
View ↗
|
| GPH.V |
Graphite One Inc |
2025-08-28 |
Government / policyFAST-41 listing |
Graphite Creek projectAlaska, USAgraphite |
Granted |
Federal Permitting Improvement Steering Council (Permitting Council) |
term 13.5 monthsallows Project listed on both the federal FAST-41 and Alaska state permitting dashboards5 releases since 2025-06-03 |
View ↗
|
| GRZ.V |
Gold Reserve Ltd |
2025-08-28 |
Government / policyHart-Scott-Rodino Act early termination of waiting period |
CITGO sale process (PDVH Shares)United States |
Granted2025-08-27 |
Federal Trade Commission (FTC) |
allows Proposed acquisition by Gold Reserve of the PDVH Shares via Dalinar Energy Corporationheld by Dalinar Energy Corporation |
View ↗
|
| NTH.V |
Nord Precious Metals Mining Inc |
2025-08-28 |
Government / policyRecovery Permit pre-submission guidance |
Temiskaming Testing LabOntariosilver |
Granted2025-08-29 |
Ontario Ministry of Energy and Mines |
allows Written ministry guidance confirming toll processing arrangements can be included in the Recovery Permit application; invitation to submit draft applications for preliminary review |
View ↗
|
| NTH.V |
|
|
Mining licence / leaseRecovery Permit |
CastleOntariosilver |
Planned2025-Q4 |
Ontario Ministry of Energy and Mines |
allows Recovery Permit covering processing of Castle and Beaver Mine legacy tailings, recovery of broken mineralized material from Castle Level 1 stopes, and toll processing of tailings from adjacent propertiesheld by Nord Precious Metals Mining Inc. |
|
| BOL.V |
Bold Ventures Inc |
2025-08-28 |
Drill / explorationexploration permits |
Burchell Gold Copper ProjectOntario, Canadagold, copper |
Granted |
— |
allows Two exploration permits; line cutting, mechanical stripping, geophysical surveys and diamond drilling |
View ↗
|
| AUCU.CN |
Inflection Resources Ltd |
2025-08-27 |
Drill / explorationExploration Licenses |
Molong North projectNew South Wales, Australiacopper-gold |
Granted |
— |
allows Several exploration licences totalling 3,336 km² in two areas, Coonamble and Mendooran |
View ↗
|
| NEXG.V |
NexGold Mining Corp |
2025-08-27 |
Environmental assessmentEnvironmental Assessment approval |
Goldboro Gold ProjectNova Scotiagold |
Granted2022-08-02 |
Government of Nova Scotia |
allows IA developed in compliance with conditions of this EA approval; mentioned as background2 releases since 2025-07-08 |
View ↗
|
| APGO.V |
Apollo Silver Corp. |
2025-08-25 |
Drill / explorationTemporary Use Permit (TUP) |
Calico Silver ProjectSan Bernardino County, Californiasilver |
Renewed / amended |
San Bernardino County Land Use Services Department |
term 12 monthsallows Third extension of TUP for the Waterloo Property allowing exploration drilling |
View ↗
|
| IDEX.V |
IDEX Metals Corp. |
2025-08-25 |
Plan of operations / noticePlan of Operations under a Categorical Exclusion (CE) |
Freeze ProjectWashington County, Idaho, USAcopper-gold |
Granted |
U.S. Forest Service (USFS) |
allows Expanded exploration on USFS claims in western Freeze project: diamond drilling, geophysics, mapping, sampling; allows drilling at CM prospect |
View ↗
|
| LVG.V |
Lake Victoria Gold Ltd |
2025-08-21 |
Environmental assessmentupdated Environmental and Social Management Plan (ESMP) |
Imwelo Gold ProjectGeita Region, Tanzaniagold |
Renewed / amended |
Tanzanian National Environment Management Council (NEMC) |
allows Update of the 2013 study; mitigation, community engagement, rehabilitation, monitoring of water, waste and tailings |
View ↗
|
| LVG.V |
|
|
Mining licence / leaseMining Licence |
Imwelo Gold ProjectTanzaniagold |
Renewed / amended2024-11 |
Tanzanian Mining Commission |
No. ML538/2015term 10 yearsallows 3.85 km² mining licence; renewal and formal transfer completed3 releases since 2024-09-04 |
|
| AUAU.V |
A2 Gold Corp. |
2025-08-20 |
Plan of operations / noticePlan of Operations |
Castle ProjectEsmeralda County, Nevadagold |
Granted |
Bureau of Land Management (BLM) and Nevada Division of Environmental Protection (NDEP) |
allows Multi-year exploration; up to 50 acres disturbance within 1,658-acre boundary; up to 145 drill pads in Phase I; roads, pads, sumps, trenching3 releases since 2023-05-24 |
View ↗
|
| AUAU.V |
|
|
Environmental assessmentEnvironmental Assessment (EA) |
Castle ProjectEsmeralda County, Nevadagold |
Granted |
Bureau of Land Management (BLM) and Nevada Division of Environmental Protection (NDEP) |
— |
|
| TK.V |
Tinka Resources Limited |
2025-08-18 |
Drill / explorationAuthorization to initiate activities |
Silvia gold-copper projectPerugold-copper |
Granted2025-08-12 |
Peruvian authorities |
allows Formal resolution from the Ministry of Energy and Mines allowing the drill program to start at any time2 releases since 2025-05-22 |
View ↗
|