Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

AEMC.V ·

Alaska Energy Metals Announces Nikolai Nickel Project Coverage ON US Permitting Council’S FAST-41 Transparency Dashboard

Permits & Approvals

ALASKA ENERGY METALS CORP. | Suite 300 – 1055 West Hastings St. | Vancouver, BC V6E 2E9

Tel: 604 638 3164 | Fax: 907 677 3599 | www.alaskaenergymetals.com

NR24-20

ALASKA ENERGY METALS ANNOUNCES NIKOLAI NICKEL PROJECT

COVERAGE ON US PERMITTING COUNCIL’S FAST-41 TRANSPARENCY

DASHBOARD

Highlights:

• Alaska Energy Metals announces that the Nikolai Nickel project has been

accepted for coverage on the FAST-41 Transparency Dashboard by the US

Permitting Council.

• Permitting Council Executive Director: “We are proud to support more mining

projects that will strengthen the U.S. economy and reduce our reliance on foreign

nations.

• The FAST-41 listing will focus initially on the rehabilitation and extension of the

existing Rainy Creek Mining Trail, including installation of two temporary bridges,

and an on-site camp.

• The road and camp project will facilitate ground access, greatly reduce costs and

accelerate timelines for advanced exploration and development of the Eureka

deposit, situated on the Nikolai project. Eureka is the largest known nickel

resource in the US and contains multiple critical metals: nickel, copper, cobalt,

chromium, platinum and palladium, as well as iron.

• The listing will result in full transparency and coordination amongst the federal

permitting agencies and set firm timelines on Federal permitting milestones.

VANCOUVER, BRITISH COLUMBIA, November 24, 2025 – Alaska Energy Metals

Corporation (TSX- V: AEMC, OTCQB: AKEMF) (“AEMC” or the “Company”) is pleased

Fast41 Permitting

Page 2

to announce that the Nikolai Nickel project in Alaska has been accepted for

coverage on the FAST-41 Transparency Dashboard by the Federal Permitting

Improvement Steering Council (“Permitting Council” or “Council”). The

Transparency Dashboard listing will focus initially on infrastructure improvements

supporting Nikolai, beginning with the rehabilitation and extension of the existing

Rainy Creek Mining Trail, including installation of two temporary bridges, and an

on-site camp.

The road and camp project will facilitate ground access, greatly reduce costs,

increase safety, and accelerate timelines for more advanced exploration and

development of the Eureka deposit, situated on the Nikolai project. Eureka contains

multiple critical metals: nickel, copper, cobalt, chromium, platinum and palladium,

as well as iron. Thought to be the largest nickel resource known in the US, the

deposit is documented to contain an Inferred Resource of 4.25 million tonnes (9.38

billion pounds) of nickel in situ (2,082 million tonnes grading 0.20% nickel) and a

higher confidence Indicated Resource of 2.54 million tonnes (5.62 billion pounds) in

situ (1,189 million tonnes grading 0.21% nickel (for further details please refer to

the 2025 Mineral Resource Estimate here). The listing will result in full transparency

and coordination amongst the federal permitting agencies and set timelines on

permitting milestones.

AEMC CEO Gregory Beischer commented: “The cost and time savings for further

exploration and development once ground access is established will be quite significant. It is

very encouraging to see proactive streamlining and coordination amongst permitting

agencies. We are grateful to the Permitting Council for including the Nikolai Nickel project in

the FAST-41 program. With Nikolai hosting six Critical Minerals – nickel, cobalt, copper,

chromium, platinum and palladium, two of which, nickel and cobalt, are Defense Production

Act Title III materials deemed to be in shortfall, we are extremely well aligned with the U.S.

national security objective of developing long-lived, domestic sources of metals and minerals

essential to the national economy and national defense. Nikolai is a project potentially

capable of significantly reducing US nickel and cobalt import dependency and vulnerability.”

Fast41 Permitting

Page 3

“I am excited to welcome the Nikolai Nickel project to the FAST-41 program,” said Emily

Domenech, Permitting Council Executive Director. “We are proud to support more

mining projects that will strengthen the U.S. economy and reduce our reliance on foreign

nations. I look forward to working with the Alaska Energy Metals Development

Corporation to provide a transparent and predictable federal permitting process while

achieving President Trump’s vision for American energy dominance.”

The Eureka deposit of the Nikolai project is situated approximately 80 kilometers (60

miles) south of the town of Delta Junction and 32 kilometers (20 miles) west of the

Richardson Highway. The Rainy Creek Mining Trail leads from the Richardson Highway

to present and past-producing alluvial gold mines at Rainy Creek and Broxson Gulch.

AEMC proposes to rehabilitate the existing roadway, and to extend it approximately 8

kilometers (6 miles) from Broxson Gulch southward to the Eureka deposit. Additionally,

a campsite is proposed. It is anticipated that the camp would house up to 100 company

personnel and contractors. As part of the road project, temporary bridges would be

placed to allow exploration vehicles and supplies to cross the Delta River and Eureka

Creek.

Fast41 Permitting

Page 4

Qualified Person: Gregory Beischer, the Company’s Chief Executive Officer, is the

qualified person, as defined under NI 43-101, having reviewed and approved the

scientific and technical information contained in this news release.

Restricted Share Unit Change: The Company also announces that the expiry date

of 1,500,000 restricted share units ("RSUs") that were granted to an arm’s length

consultant on October 4, 2024 pursuant to the terms of the Company’s restricted

share unit plan are being extended. The Company has agreed to extend the expiry

date of the 1,500,000 RSUs originally expiring on October 4, 2026 to now expire on

December 31, 2026. The extension of the RSUs expiry date is subject to approval by

the TSX Venture Exchange. All other terms of such RSUs remain unamended.

For additional information, visit: https://alaskaenergymetals.com/

Fast41 Permitting

Page 5

About the Permitting Council and FAST-41

Established in 2015 by Title 41 of the Fixing America’s Surface Transportation Act

(FAST-41), the Federal Permitting Improvement Steering Council (Permitting

Council) is a federal agency charged with improving the transparency and

predictability of the federal environmental review and authorization process for

certain critical infrastructure projects. The Permitting Council is composed of the

Permitting Council Executive Director, who serves as the Council Chair; 13 federal

agency Council members; and the Chair of the White House Council on

Environmental Quality and the Director of the Office of Management and Budget.

The Office of the Executive Director coordinates federal environmental reviews and

authorizations for projects that seek and qualify for FAST-41 coverage, which are in

turn entitled to comprehensive permitting timetables and transparent,

collaborative management of those timetables on the Federal Permitting

Dashboard.

Learn more about the Permitting Council at permitting.gov

ABOUT ALASKA ENERGY METALS

Alaska Energy Metals Corporation (AEMC) is an Alaska-based corporation with

offices in Anchorage and Vancouver working to sustainably deliver the critical

materials needed for national security and a bright energy future, while

generating superior returns for shareholders.

AEMC is focused on delineating and developing the large-scale, bulk tonnage,

polymetallic Nikolai Project Eureka deposit containing nickel, copper, cobalt,

chromium, iron, platinum, palladium, and gold. Located in Interior Alaska near

existing transportation and power infrastructure, its flagship project, Nikolai, is

well-situated to become a significant domestic source of strategic metals for

North America. AEMC also holds a secondary project in western Quebec; the

Angliers – Belleterre project. Today, material sourcing demands excellence in

environmental performance, technological innovation, carbon mitigation and the

responsible management of human and financial capital. AEMC works every day

Fast41 Permitting

Page 6

to earn and maintain the respect and confidence of the public and believes that

ESG performance is measured by action and led from the top.

ON BEHALF OF THE BOARD

“Gregory Beischer”

Gregory Beischer, President & CEO

FOR FURTHER INFORMATION, PLEASE CONTACT:

Gregory A. Beischer, President & CEO

Toll-Free: 877-217-8978 | Local: 604-609-7149

Some statements in this news release may contain forward -looking information

(within the meaning of Canadian securities legislation), including, without

limitation statements relating to rehabilitation and extension of an existing access trail

to the Eureka deposit at the Nikolai project, and receipt of permits for the same. These

statements address future events and conditions and, as such, involve known

and unknown risks, uncertainties, and other factors which may cause the actual

results, performance, or achievements to be materially different from any future

results, performance, or achievements expressed or implied by the statements.

Forward-looking statements speak only as of the date those statements are made.

Although the Company believes the expectations expressed in such forward-looking

statements are based on reasonable assumptions, such statements do not

guarantee future performance and actual results may differ materially from

those in the forward-looking statements. Factors that could cause the actual results

to differ materially from those in forward -looking statements include but are not

limited to uncertainty relating to the estimation of mineral resources, regulatory

actions, market prices, and continued availability of capital and financing, and

general economic, market or business conditions. Investors are cautioned that any

such statements are not guarantees of future performance and actual results or

developments may differ materially from those projected in the forward -looking

statements. Forward-looking statements are based on the beliefs, estimates and

opinions of the Company's management on the date the statements are made.

Fast41 Permitting

Page 7

Except as required by applicable law, the Company assumes no obligation to

update or to publicly announce the results of any change to any forward -looking

statement contained or incorporated by reference herein to reflect actual results,

future events or developments, changes in assumptions, or changes in other factors

affecting the forward -looking statements. If the Company updates any forward -

looking statement(s), no inference should be drawn that it will make additional

updates with respect to those or other forward-looking statements.

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that

term is defined in the policies of the TSX Venture Exchange) accepts responsibility

for the adequacy or accuracy of this press release.