Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

ZFR.V ·

Zephyr Provides Update

Corporate Updates

NEWS RELEASE

December 9, 2025 Shares Outstanding: 86,911,985

NR#06-2025 TSX.V: ZFR; OTC: ZPHYF

ZEPHYR PROVIDES UPDATE

Halifax, Nova Scotia – December 9, 2025 - Zephyr Minerals Ltd. (TSXV:ZFR) (OTC:ZPHYF)

("Zephyr" or the "Company") is pleased to announce that it has engaged Pinyon Environmental,

Inc., of Lakewood, Colorado, to conduct a comprehensive water monitoring and analytical program

in support of resubmitting a mining permit application ( the “Application”) to the Colorado Division

of Reclamation, Mining and Safety (“DRMS”) for its 100% -controlled Dawson Gold Property in

Colorado, USA. The program is designed to establish baseline ground water and surface water

conditions at and around the Dawson Gold Deposit. Monitoring will begin this month and continue

on a quarterly basis through December 2026, after which the Company intends to resubmit the

Application to DRMS.

Also, the Company wishes to announce the retirement of Ms. Suzan Frazer as corporate secretary

of the Company. Ms. Frazer has served as corporate secretary since the Company’s inception in

2010. The Board wishes to extend its gratitude to Ms. Frazer and wishes her the very best in he r

retirement. Mr. David Felderhof, a director and Chief Financial Officer of the Company, will succeed

Ms. Frazer as corporate secretary.

About Dawson Gold Property

The Dawson Gold Deposit hosts an Inferred Mineral Resource 1 prepared in accordance with

National Instrument 43-101 (“NI 43-101”) of 343,000 tonnes grading 12.11 g/t for 133,500 ounces

of gold at a 5 g/t cut -off with no top cut, and 116,300 ounces of gold at 10.55 g/t with a 40 g/t top

cut. The estimate has an effective date of July 19, 2013. No updates to the resource estimate have

been made to incorporate the results from drilling programs completed between 2017 and

2020.The deposit is open at depth, with exploration potential to the east and west. A Preliminary

Economic Assessment2 (“PEA”) was prepared in accordance with NI 43-101 with an effective date

of March 21, 2017. Utilizing a gold price of $1,250/oz, the PEA showed robust economics with an

all-in sustaining cost (“AISC”) per ounce of $692. Mineral Resources that are not Mineral Reserves

do not have demonstrated economic viability. Given the substantial increase in the gold price since

2017, the attractiveness of the Dawson project has been significantly enhanced. The potential to

expand resources is excellent at depth on the Dawson Gold Deposit, along strike to the east in the

700-metre-long Sentinel zone, which has not been drill tested , and through follow -up drilling of

promising targets in the Windy Gulch and Windy Poi nt zones to the west. The Dawson project

features key attributes, including a small footprint associated with the proposed underground mine,

ownership or control of all necessary lands by Zephyr, a climate that supports year -round

operations, and nearby infrastructure and industrial support.

About Zephyr Minerals Ltd.

Zephyr Minerals is mission focused on obtaining a mining permit for its 100% owned Dawson Gold

property in Colorado with the view to continuing to advance this project to the next stage of

development. The Company continues to wait for the Zimbabwean Government to grant two

Exclusive Prospecting Orders (“ EPO”), covering 124,000 hectares applied for in 2021. The areas

covered by the EPO applications are prospective for gold and lithium.

Notes

1 The Report is titled Resource Estimate Technical Report for the Dawson Property Fremont

County, Colorado, USA, dated September 6, 2013, and was prepared for Zephyr by Andrew

Hilchey, P.Geo., Mercator Geological Services Limited, Isobel Wolfson, M.Sc., P.Geo, and Mark

Graves, P.Geo..

2 The report is entitled “National Instrument 43 -101 Technical Report for the Dawson Property,

Colorado, USA”, effective March 21, 2017 (the “Technical Report”). The Technical Report was

prepared by independent engineering firm, Golder Associates Ltd., with input from a number of

other specialized and experienced consulting firms, and is in accordance with National Instrument

43-101 - Standards of Disclosure for Minera l Projects. This PEA is preliminary in nature and

includes inferred mineral resources that are too speculative geologically to have economic

considerations applied to them that would enable them to be categorized as mineral reserves.

There has been insufficient drilling to define the inferred resources as indicted or measured

mineral resource; however, it is reasonable to expect that the inferred mineral resources could be

upgraded to indicated and possibly measured resources with continued drilling. There is no

guarantee that any part of the mineral resources discussed herein will be converted into a mineral

reserve in the future.

For further information please contact:

Loren Komperdo, President & CEO

T: 902 706-0222

[email protected]

Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in policies of the TSX Venture

Exchange) accepts responsibility for the adequacy or accuracy of this release. The forward-looking statements contained

in this docume nt are based on certain key expectations and assumptions made by the Company . The forward-looking

statements contained in this document are made as of the date hereof and the Company undertakes no obligation to

update publicly or revise any forward-looking statements or information, whether as a result of new information, future

events or otherwise, unless so required by applicable securities laws.