Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

ZON.V ·

Zonte Metals drilling discovers high- grade copper, gold and silver mineralization at its Cross Hill IOCG project

Exploration Programs

Zonte Metals drilling discovers high-

grade copper, gold and silver

mineralization at its Cross Hill IOCG

project

TSXV: ZON

HALIFAX, April 23, 2019 /CNW/ - Zonte Metals is pleased to

announce initial, partial results from its recently completed phase 1

drill program at its Cross Hills Iron Oxide Copper Gold project (IOCG)

on the island of Newfoundland and Labrador. The program was

conducted on the Dunns Mountain target and consisted of five drill

holes designed to test various geophysical variabilities in order to

ascertain possible relationships with copper mineralization. Drill hole

CH-19-004 intersected significant visual copper mineralization and a

select number of samples were expedited for assaying, which are

reported below.

Highlights

• 14.0% Cu, 15.8 g/t Au and 352 g/t Ag within a 0.43 m interval

sitting in a 2.76 m interval which averaged 2.89% Cu, 2.65 g/t

Au, 73.3 g/t Ag.

• Fertile IOCG system potentially represents the early stages of

defining a new copper belt in Canada.

• Planning for a phase 2 drill program is underway and program

expanding.

"This is an exciting new discovery for Zonte Metals, adding to our

growing portfolio of large-scale mineral opportunities. Early indications

show a discovery that has all the geologic signatures of a copper-rich

fertile IOCG target and possibly a new copper belt in Canada. The

Company controls 25 kilometre strike length of the belt with the Dunns

Mountain target located at the northern end. In light of these results

Zonte will increase its exploration and drilling program at Cross Hills."

states Terry Christopher, president and CEO of Zonte Metals.

Drill hole CH-19-004 was set-up to test the eastern side of the Dunns

Mountain magnetic anomaly, aiming to pass under the magnetic high,

in the 'transition' from high to moderate magnetics. This was the only

drill hole targeting the transition zone in the magnetic profile. A

number of discrete visually mineralized intervals were noted

throughout a 70 metre interval, between 168 and 243 metres, sitting

directly below a magnetic high. The hole was initially drilled to a depth

of 204 metres and later deepened to 283 metres when copper

mineralization was discovered in the last metre of core. The most

significant visual mineralization was intercepted between 168 to

170.76 metres which included a 0.43 metre interval of massive to

semi-massive bornite and chalcocite returning 14.0% Cu, 15.8 g/t Au

and 352 g/t Ag. The 2.76 m interval averaged 2.89% Cu, 2.65 g/t Au,

73.3 g/t Ag. The expedited results are highlighted in the table below. A

number of other intervals were expedited for assay and listed in the

table as well.

Drill Hole To

(m)

From

(m)

Thickness*

(m)

Au

(g/t)

Ag

(g/t)

Cu

(%)

Notes**

Ch-19-

004

168 170.76 2.76 2.65 73.3 2.89 Disseminated to massive mineralization. Bo & cc

with ankerite, mag and epidote.

including; 168 168.92 0.92 0.19 8.6 0.41

168.92 169.32 0.40 0.45 88.1 2.76

169.32 170.33 1.01 0.16 7.6 0.48

170.33 170.76 0.43 15.80 352.0 14.00 Heavy bo & cc with ankerite & magnetite.

And 204.41 204.89 0.48 0.01 2.18 0.13 Bo & cc with ankerite and mag.

And 218.41 220.16 1.75 0.016 4.77 0.17 Bo & cc with epidote & mag.

Including 218.41 219.43 1.02 0.019 6.51 0.26

219.43 220.16 0.73 0.012 2.33 0.05

And 231.16 231.64 0.48 0.148 18.1 0.80 Mal, az, bo & cc in heavy epidote alteration.

And 242 243 1.00 0.005 0.67 trace Potassicly altered breccia with disseminated cpy.

*Note. The true width of the mineralization is indeterminate at this time. The mineralization occurred mostly as disseminatio ns

and veins with the later showing multiple directions with respect to the core axis, including along, oblique and perpendicular to

the core axis. **Note; Bo = bornite, cc = chalcocite, cpy = chalcopyrite, mal = malachite, az = azurite and mag = magnetite.

Copper mineralization observed in the above noted intervals occurred

as massive to semi-massive veinlets and disseminated bornite and

chalcocite (with minor malachite and azurite) and weakly disseminated

chalcopyrite. Mineralization between 168 – 170.76 metres occurred in

two phases. The initial phase contained disseminated bornite and

chalcocite within magnetite and epidote alteration. This was later

overprinted by heavily disseminated to semi-massive and massive

bornite and chalcocite associated with ankerite and magnetite.

Potassic alteration, noted as biotite, sercite and k-feldspar, was

spatially associated with the mineralization. The weakly disseminated

chalcopyrite hosted in potassic breccias sits 'down-hole' from the

above noted and the relative relationship is unknown at this time. A

drill hole map and select pictures of the mineralization can be seen at

the Company's webpage; www.zontemetals.com.

Results for CH-19-001 and 002 have also been received with results

showing narrow anomalous values. These two holes targeted

magnetic highs on the northwest corner of the Dunns Mountain target.

Drill hole CH-19-004 was the only drill hole aimed at targeting the

transition, or outer zone, adjacent to the magnetic high on the western

side of the target. This drill hole passed under a magnetic high where

the intervals of mineralization were intersected. Geophysical and

geochemical surveys will be carried out prior to the next phase of

drilling. Results from the remaining phase 1 drill holes will be reported

when received.

The IOCG potential of the Cross Hills project area was documented in

a 2007 Geological Survey of Canada publication. Despite that

recognition, Zonte, which controls a 25 kilometre strike length in the

belt, is the first company to conduct a concerted exploration and drill

program to test the potential. The Dunns Mountain target is the first of

multiple targets to be drilled. The phase 1 drill program tested a

portion of the magnetic anomaly and variable relationships in the data

set. The initial success with the discovery of copper mineralization in

drill hole CH-19-004 suggests the Cross Hills Project is a fertile IOCG

system, and potentially represents the early stages of defining a new

copper belt in Canada. Drill hole CH-19-004 discovered copper

mineralization sitting peripheral to the magnetic high. The discovery in

drill hole CH-19-004 will be followed up in phase 2 drilling. In

preparation for phase 2 drilling at Dunns Mountain, additional

geophysics will be carried out including ground magnetics, Induced

Polarization (IP) and a gravity survey to first define the area to be

tested around drill hole CH-19-004 and secondly aim to identify

additional targets along the periphery of the magnetic anomaly. These

surveys will also cover the anomalies 2.5 km to the south in the Carols

Hat target area. In addition, the Company will complete a deep

penetrating IP and gravity surveys, over the K6 target in preparation

for phase II drilling. The K6 target sits 12 kilometres south of Dunns

Mountain.

Qualified Person

Dean Fraser, P.Geo. is the qualified person as defined by NI 43-101

and has reviewed and approved the contents and technical

disclosures in this press release.

Rock and Protocol and Drill Sampling Protocol

All 2019 drill core samples were collected carried out in a careful and

diligent manner using scientifically established sampling practices

designed and tested to ensure that the results are representative and

reliable. All drill core was logged and prepared for shipment on site

and shipped to AGAT Laboratories in St. John's by Zonte personnel.

QA/QC included the systematic insertion of certified standards and

blanks. Samples were described, photographed, tagged and sealed

prior to being transported to AGAT where the samples were analyzed

for the 201-070 package (44 element 4 acid leach, ICP-OES finish)

and the 202-551 package for gold (a 50 gram Fire Assay Au finish).

AGAT is an independent, reputable and accredited full-service

commercial laboratory; accredited to ISO/IEC 17025:2005. AGAT also

provides its own internal QA/QC protocol of blanks, duplicates and

standards in each work order, which is supplied to the Zonte with the

rock sample analysis.

About Zonte

Zonte Metals Inc. is a junior explorer focused on gold and copper. The

Company has signed Option Agreements to acquire 100% of the

McConnells Jest project, in the Tintina Gold Belt, located in the Yukon

Territory and the Cross Hills IOCG project located in Newfoundland

and holds a 100% interest in the drill ready Wings Point Gold Project

also located in Newfoundland. In addition, the Company and partner

have an application over open areas sitting on top of the open pit

outline of the Gramalote Deposit in Colombia, which is held by

AngloGold Ashanti (NYSE:AU) and B2Gold (TSX:BTO, NYSE:BTG).

The title issuance is being contested by the state governing the

application and the Company has started legal action to protect its

rights.

Forward-Looking Information

This news release contains forward-looking statements which include

statements regarding the Corporation's future plans, as well as

statements regarding financial and business prospects and the

Corporation's future plans, objectives or economic performance and

financial outlooks. The Corporation believes that the expectations

reflected in this news release are reasonable but actual results may

be affected by a variety of variables and may be materially different

from the results or events predicted in the forward-looking statements.

Readers are therefore cautioned not to place undue reliance on these

forward-looking statements. In evaluating forward-looking statements

readers should consider the risk factors which could cause actual

results or events to differ materially from those indicated by such

forward-looking statements. These forward-looking statements are

made as of the date hereof, and unless otherwise required by

applicable securities laws, the Corporation does not intend nor does it

undertake any obligation to update or revise any forward-looking

statements. Neither the TSX Venture Exchange nor its Regulation

Services Provider (as that term is defined in the policies of the TSX

Venture Exchange) accepts responsibility for the adequacy of

accuracy of this release.

SOURCE Zonte Metals Inc.

View original content:

http://www.newswire.ca/en/releases/archive/April2019/23/c2824.html

%SEDAR: 00029601E

For further information: Terry Christopher, CEO and President, 902-

405-3520, [email protected], www.zontemetals.com

CO: Zonte Metals Inc.

CNW 08:30e 23-APR-19