Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

ZFR.V ·

Zephyr Provides Dawson GOLD Update

Corporate Updates

NEWS RELEASE

September 15, 2025 Shares Outstanding: 85,586,985

NR#04-2025 Trading Symbols: TSX.V: ZFR

ZEPHYR PROVIDES DAWSON GOLD UPDATE

Not for Distribution to U.S. Newswire Services or for Dissemination in the United States

Halifax, Nova Scotia – September 15, 2025 - Zephyr Minerals Ltd. (TSXV:ZFR) ("Zephyr" or the

"Company") is pleased to announce the commencement of a water monitoring drill program in

support of resubmitting a mining permit application (the “ Application”) with the Colorado Division

of Reclamation, Mining and Safety (“ DRMS”) for its 100% -controlled Dawson gold property in

Colorado, USA. The Application will be resubmitted immediately after receipt of the analytical

results from the water samples collected in the fifth and final quarter of monitoring. The Company

anticipates receiving the first quarter of water sample analytics before the end of the year; however,

additional funding is required to complete the full five-quarter analytical program.

Loren Komperdo, President and CEO stated “What sets Dawson apart is its high gold grades. With

gold at record levels and a strong outlook for the metal, the Company is excited to begin the final

step needed to resubmit the Application.”

Mr. Komperdo further stated, “ Zephyr is in an advantageous position to obtain a mining permit

because the proposed operations will be limited to patented lode mining claims owned or controlled

by the Company. Additionally, the low sulphide content and absence of deleterious elements in the

Dawson deposit demonstrate that the proposed mining operation will be environmentally benign.

Obtaining a mining permit would be a key milestone in the project’s development and should be

instrumental in delivering shareholder value.”

Management is evaluating the merits of exploring its wholly owned Judith Patented Placer Claim

for placer gold in the gulch that directly drains from the Windy Gulch gold deposit and Windy Point

gold showings. The Windy Gulch deposit, in particular, has significant gold at surface that is eroding

down slope and into the gulch. Previous bedrock trenching in 2017 at Windy Gulch returned 5.8 g/t

gold over 31.7 meters. Approximately 40 meters downslope another trench returned 7.6 g/t over

11.9 meters. Initially, the Company will complete exploratory trenching in the gulch. This exploration

program is expected to provide an estimate of the gravel volume in the gulch, the gold grade, and

the distribution of gold within the gravels. If successful, a gold recovery plan will be developed and

implemented, subject to permitting requirements. Gold recovered from this potential placer

operation will be used to fund further exploration, development, and permitting activities at Dawson,

thereby minimizing dilution to shareholders. Placer gold can be readily recovered using simple

gravity equipment and does not require crushing, grinding, or chemical processing.

About Dawson Gold Property

The Dawson gold deposit hosts an Inferred Mineral Resource 1 prepared in accordance with

National Instrument 43-101 (“NI 43-101”) of 343,000 tonnes grading 12.11 g/t for 133,500 ounces

of gold at a 5 g/t cut-off with no top cut, and 116,300 ounces at 10.55 g/t with a 40 g/t top cut. The

estimate has an effective date of July 19, 2013. No updates to the resource estimate have been

made to incorporate the results from drilling programs completed between 2017 and 2020. The

deposit is open at depth, with exploration potential to the east and west. A Preliminary Economic

Assessment2 (“PEA”) was prepared in accordance with N I 43-101 with an effective date of March

21, 2017 . Utilizing a gold price of $1,250/oz, the PEA showed robust economics with an all -in

sustaining cost (“AISC”) per ounce of $692. Mineral Resources that are not Mineral Reserves do

not have demonstrated economic viability. Given the substantial increase in the gold price since

2017, the attractiveness of the Dawson project has been significantly enhanced. The potential to

grow resources is excellent at depth on the Dawson deposit, along strike to the east in the 700 m

long Sentinel Zone —which has not been drill tested —and through follow-up drilling of promising

targets in the Windy Gulch and Windy Point Zones to the west. The Dawson project features key

attributes such as a small footprint (proposed underground mine), ownership or control of all

necessary lands by Zephyr, a climate that supports year-round operation, and nearby infrastructure

and industrial support.

About Zephyr Minerals Ltd.

Zephyr Minerals is mission focused on obtaining a mining permit for its 100% owned Dawson Gold

property in Colorado with the view to continuing to advance this project to the next stage of

development. The Company continues to wait for the Zimbabwean Government to grant two

Exclusive Prospecting Orders (“ EPO”), covering 124,000 hectares applied for in 2021. The areas

covered by the EPO applications are prospective for gold and lithium.

Notes

1 The Report is titled Resource Estimate Technical Report for the Dawson Property Fremont

County, Colorado, USA, dated September 6, 2013, and was prepared for Zephyr by Andrew

Hilchey, P.Geo., Mercator Geological Services Limited, Isobel Wolfson, M.Sc., P.Ge o, and Mark

Graves, P.Geo..

2 The report is entitled “National Instrument 43 -101 Technical Report for the Dawson Property,

Colorado, USA”, effective March 21, 2017 (the “Technical Report”). The Technical Report was

prepared by independent engineering firm, Golder Associates Ltd., with input from a number of

other specialized and experienced consulting firms, and is in accordance with National Instrument

43-101 - Standards of Disclosure for Minera l Projects. This PEA is preliminary in nature and

includes inferred mineral resources that are too speculative geologically to have economic

considerations applied to them that would enable them to be categorized as mineral reserves.

There has been insufficient drilling to define the inferred resources as indicted or measured

mineral resource; however, it is reasonable to expect that the inferred mineral resources could be

upgraded to indicated and possibly measured resources with continued drilling. There is no

guarantee that any part of the mineral resources discussed herein will be converted into a mineral

reserve in the future.

Qualified Person

Brian Arkell, B.S. Geology and M.S. Economic Geology, SME (Registered Member), AusIMM

(Fellow) and SEG (Fellow), a Director of the Company, and a Qualified Person as the term is

defined under National Instrument 43-101, has reviewed and approved the scientific and technical

disclosure contained in this press release.

For further information please contact:

Loren Komperdo, President & CEO

T: 902 706-0222

[email protected]

Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in policies of the TSX Venture

Exchange) accepts responsibility for the adequacy or accuracy of this release. The forward-looking statements contained

in this docume nt are based on certain key expectations and assumptions made by the Company . The forward-looking

statements contained in this document are made as of the date hereof and the Company undertakes no obligation to

update publicly or revise any forward-looking statements or information, whether as a result of new information, future

events or otherwise, unless so required by applicable securities laws.