Zodiac Gold Expands District-Scale Gold System at Ben Ben with Trench Result of 56m at 0.40 g/t Au and Multiple Mineralized Trends
Zodiac Gold Expands District-Scale Gold
System at Ben Ben with Trench Result of 56m
at 0.40 g/t Au and Multiple Mineralized Trends
Vancouver, British Columbia--(Newsfile Corp. - April 20, 2026) - Zodiac Gold Inc. (TSXV: ZAU)
(OTCQB: ZAUIF) (FSE: K19) ("Zodiac Gold" or the "Company"), a West African gold exploration
company, is pleased to report additional results from the on-going trenching program along the Ben Ben
to Youth Camp trend at its flagship Todi Gold Project in Liberia. The Ben Ben target, located 1.3km
along strike from the Company's Arthington Discovery, lies within a 16km gold-in-soil corridor extending
from Arthington to Youth Camp. Following the Company's success at the Arthington Discovery, the Ben
Ben–to–Youth Camp portion of the trend is now being tested through a 3,600m trenching program and
up to 14,000 m of drilling, advancing toward a mineral resource estimate in Q4 2026. Results have been
received from 860m of trenching, while core logging, sampling, preparation and analysis is on-going for
the first nine holes drilled.
Exploration at the Ben Ben target continues to demonstrate the compelling geological characteristics of
the 16km Arthington to Youth Camp trend, consistent with a district-scale, shear-hosted gold system
within the broader Todi Shear Zone. Previous exploration by Zodiac Gold at the Arthington Discovery
demonstrated the presence of multiple parallel mineralized zones and, importantly, trenching at Ben Ben
has now confirmed gold mineralization across both interpreted east-west to northwest-southeast trends.
The southern trend, which has been the focus of exploration by Zodiac Gold to date, has a strike length of
1km, while the northern trend extends over 7.5km to the Youth Camp target to the southeast.
Notably, the lithologies identified in the mineralized zones on both the northern and southern trends are
interpreted as weathered amphibolite and melanocratic gneiss; the same hosts of gold mineralization as
at the Company's Arthington Discovery and other priority targets including Youth Camp and Alasala. In
addition to the lithological control on mineralization, the northwest trending, regional-scale Todi Shear
Zone, formed during the Pan African Orogeny, along with second order structures, structural
intersections and folding, are interpreted to play an important role in the localization of gold
mineralization in the region.
Highlighted results from the recent trenching on the northern trend at the Ben Ben target include
56m at
0.40 g/t Au
in BBT004, including
1m at 1.21 g/t Au, 1m at 1.17 g/t Au, 1m at 1.09 g/t Au and 1m at
1.01 g/t Au
.
Highlighted results from the 2025 trenching on the southern trend at the Ben Ben target (see
news
release dated December 1, 2025
) include:
30m at 1.24 g/t Au
in BBT002, including
1m at 25.1 g/t Au
and
1m at 6.61 g/t Au
36m at 0.28 g/t Au
in BBT002, including
2m at 0.81 g/t Au
25m at 0.31 g/t Au
in BBT001, including
1m at 3.91 g/t Au
19m at 0.21 g/t Au
in BBT003
The 56m at 0.40 g/t Au intercept in BBT004 on the northern trend is particularly significant as it
demonstrates broad, continuous, near-surface mineralization with higher-grade zones, coincident with a
210m long soil anomaly and adjacent artisanal workings. This relationship between geochemical
anomalies, trench results, and alluvial mining activity provides strong evidence of a fertile system with the
potential for multiple parallel zones.
When integrated with
previously reported results from the southern trend
—most notably 30m at 1.24 g/t
Au including high-grade intervals up to 25.1 g/t Au—the initial exploration of the Ben Ben target exhibits
a robust combination of bulk-tonnage potential and high-grade shoots, a key attribute of economically
significant orogenic deposits. Furthermore, the scale of trenching completed to date represents only a
fraction of the defined anomaly footprint, underscoring the significant upside potential for expansion.
Collectively, these results materially strengthen the geological model at the Todi Gold Project, confirming
that the Ben Ben target is not an isolated occurrence but rather part of a larger, interconnected gold
system extending from Arthington to Youth Camp. The emergence of multiple mineralized trends within
this corridor supports the Company's view that the project hosts district-scale potential comparable to
other major West African shear-hosted gold camps.
David Kol, President and CEO of Zodiac Gold, commented: "These results continue to validate our
interpretation of a large-scale, structurally controlled gold system at Todi. The emergence of parallel
mineralized trends at Ben Ben, combined with strong continuity and localized high-grade zones, is
exactly what we look for when building a meaningful gold district. We are still early in the exploration
cycle, and the scale of this system continues to grow with each phase of work."
Map 1: Trench results at the Ben Ben target
To view an enhanced version of this graphic, please visit:
https://images.newsfilecorp.com/files/7932/293283_d8e54c87e4aa29cb_001full.jpg
A total of 1,195.80m of trenching has been completed to date in the 2025 and 2026 programs. Trench
collar data is presented in Table 1 and significant intersections are summarized in Table 2. Note that
BBT004 was extended from the original trench sampled by the Company in 2025. The collar data in
Table 1 shows the new start point and combined length of BBT004, and combined significant
intersections are shown in Table 2.
Table 1: 2025-2026 trench collar data at the Ben Ben target
Trench ID
Easting (UTM
WGS84, 29N)
Northing (UTM
WGS84, 29N)
Elevation
(m)
Azimuth
(degrees)
Dip
(degrees)
Length
(m)
BBT001
325511
721959
44
34
0
116.3
BBT002
325726
722008
64
31
0
141.4
BBT002EXT
325574
721765
49
32
0
283
BBT003
325833
721979
66
41
0
50.3
BBT004
326015
722217
66
45
0
118.8
BBT005
325886
721838
64
31
0
170
BBT006
325355
721925
52
0
0
155
BBT007
325708
722210
59
40
0
161
Table 2: Significant trench intersections at Ben Ben
Trench ID
From (m)
To (m)
Interval (m)
Au g/t
BBT001
2.00
27.00
25.00
0.31
Including
22.00
23.00
1.00
3.91
BBT001
52.00
56.00
4.00
0.13
BBT001
59.00
72.00
13.00
0.14
BBT001
76.00
79.00
3.00
0.12
BBT002
0.00
36.00
36.00
0.28
Including
28.00
30.00
2.00
0.81
BBT002
50.00
80.00
30.00
1.24
Including
66.00
73.00
7.00
4.75
Including
66.00
68.00
1.00
6.61
Including
72.00
73.00
1.00
25.1
BBT002
90.00
94.00
4.00
0.13
BBT002Ext
252
269
17
0.13
BBT002Ext
279
284
5
0.12
BBT003
0.00
19.00
19.00
0.21
BBT003
27.00
29.00
2.00
0.19
BBT003
33.00
42.00
9.00
0.15
BBT004
7
63
56
0.40
Including
32
33
1
1.09
Including
39
40
1
1.17
Including
52
53
1
1.21
Including
56
57
1
1.01
BBT004
67
70
3
0.22
BBT004
73
85
12
0.28
BBT005
83
85
2
0.13
BBT005
91.00
123.00
32.00
0.56
Including
108.00
122.00
14.00
1.08
Including
111.00
112.00
1.00
9.40
BBT005
149
162
13
0.25
BBT005
167
170
3
0.10
BBT006
142
143
1
0.91
BBT007
9
10
1
1.68
BBT007
31
34
3
0.10
BBT007
43
45
2
0.13
BBT007
54
56
2
0.12
BBT007
79
82
3
0.13
BBT007
85
90
5
0.12
BBT007
104
119
15
0.17
BBT007
123
126
3
0.15
BBT007
138
140
2
0.13
BBT007
145
162
17
0.13
Note that significant intersections have been determined as intervals above 0.1 g/t Au with a minimum length of 2m and a maximum of 2m of
consecutive samples below 0.1 g/t Au. Further exploration is required to confirm the orientation of the mineralized zones and, as such, intervals are
sampled lengths rather than true thicknesses.
Sampling and QA/QC Procedures
Following excavation, the walls of the trenches were cleaned and samples were taken at 1m intervals in
channels along one wall, with care being taken to avoid contamination between samples. QA/QC
procedures included the addition of blank and duplicate samples to the sample sequence, all of which
returned acceptable results.
All samples met the standards for chain of custody without the opportunity for third party access from
Zodiac Gold's exploration camp to the Liberia Geochemical Services Inc. sample preparation laboratory
in Monrovia, Liberia. Each sample was dried and then crushed to 70% passing -2mm and a
representative 1kg split was taken by riffle splitting. The split was then pulverized to 85% passing -75
micron and approximately 200g was bagged and labelled, with the remainder being returned to Zodiac
Gold. Analysis was performed by 50g fire assay with an atomic absorption finish (method Au-AA26) at
the ALS Geochemistry laboratory in Kumasi, Ghana. ALS Geochemistry is independent of Zodiac Gold
and is accredited for method Au-AA26.
Qualified Person
Tom Dowrick, Director of Exploration at Zodiac Gold, is a Chartered Geologist of the Geological Society
of London and a Qualified Person as defined by NI 43-101. He has reviewed and approved the technical
and scientific information contained in this release.
About Zodiac Gold
Zodiac Gold Inc. (TSXV: ZAU) (OTCQB: ZAUIF) (FSE: K19) is a West-African gold exploration company
focused on its flagship Todi Gold Project in Liberia—an underexplored, politically stable, mining friendly
jurisdiction hosting several large-scale gold and iron ore deposits. Strategically positioned along the
fertile Todi Shear Zone, Zodiac Gold is developing a district-scale gold opportunity with additional iron
ore potential, covering a vast 2,316 km2 land package. The Todi Gold Project has undergone de-risking,
showcasing proven gold occurrences at both surface and depth, with five drill-ready targets, of which two
have been drilled and high-grade gold intercepts.
For further information, please visit the Zodiac Gold website at
www.zodiac-gold.com
or contact:
David Kol
President & CEO
Forward-Looking Information
This news release includes certain "forward-looking statements" within the meaning of Canadian
securities legislation.
Forward-looking statements include predictions, projections, and forecasts and are often, but not always,
identified by the use of words such as "seek", "anticipate", "believe", "plan", "estimate", "forecast",
"expect", "potential", "project", "target", "schedule", "budget" and "intend" and statements that an event
or result "may", "will", "should", "could" or "might" occur or be achieved and other similar expressions
and includes the negatives thereof. All statements other than statements of historical fact included in this
release, including, without limitation, statements regarding the Company's planned exploration programs
and drill programs and potential significance of results are forward-looking statements that involve
various risks and uncertainties. There can be no assurance that such statements will prove to be
accurate and actual results and future events could differ materially from those anticipated in such
statements. Forward-looking statements are based on a number of material factors and assumptions.
Important factors that could cause actual results to differ materially from Company's expectations include
actual exploration results, changes in project parameters as plans continue to be refined, results of future
resource estimates, future metal prices, availability of capital, and financing on acceptable terms,
general economic, market or business conditions, uninsured risks, regulatory changes, defects in title,
availability of personnel, materials, and equipment on a timely basis, accidents or equipment
breakdowns, delays in receiving government approvals, unanticipated environmental impacts on
operations and costs to remedy same, and other exploration or other risks detailed herein and from time
to time in the filings made by the Company with securities regulators. Although the Company has
attempted to identify important factors that could cause actual actions, events, or results to differ from
those described in forward-looking statements, there may be other factors that cause such actions,
events, or results to differ materially from those anticipated. There can be no assurance that forward-
looking statements will prove to be accurate, and accordingly readers are cautioned not to place undue
reliance on forward-looking statements.
Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the
policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this
release.
To view the source version of this press release, please visit
https://www.newsfilecorp.com/release/293283