Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

YARR.V ·

Sokoman Minerals Commences Phase 4 Drilling at Moosehead 3-D Modelling Reveals Key Details about Eastern Trend

Exploration Programs

Sokoman Minerals Commences Phase 4 Drilling at Moosehead

3-D Modelling Reveals Key Details about Eastern Trend

St. John’s, NL, July 11, 2019 – Sokoman Minerals Corp. (TSX-V: SIC) (OTCQB: SICNF) (the

“Company” or “Sokoman”) is pleased to announce that all necessary permits have been received

and that the Phase 4 diamond drilling program contract has been awarded to Springdale Forest

Resources. Drilling will begin this week end or early next week , and the minimum 4,000 m

program is expected to take about six weeks to complete. The Company is also pleased to

announce that the on-going modelling of the Eastern Trend has revealed key features of the

mineralization that have been incorporated into the planning for the current drill program.

Key features of the Eastern Trend mineralization include:

1) It consists of at least three subparallel, possibly folded subzones.

2) Central and lower subzones appear to be coalescing or folded; this suggests that structural

thickening is possible. The Central Zone contains most of high-grade intercepts.

3) Overall mineralized trend appears to be more north than northeast trending.

4) Traced along strike for 175 m and to a depth of 250 m and remains open in all directions.

The modelling ha s significantly changed the approach for the Phase 4 drilling in that it now

appears unnecessary to complete barge -based drilling on North Pond which would be more

costly and time consuming. The newly recognized northerly strike of the trend means drilling to

the west of North Pond can effectively test both the strike and up -dip potential of the Eastern

Trend, while drilling to the east of North Pond can effec tively test the strike and down -dip

potential of the trend. Selected views of the Eastern Trend can be found at

www.sokomanmineralscorp.com

Phase 4 will consist of approximately 20 holes , each 100 to 350 metres deep with spacings

between 25 and 50 metres. The focus is to extend the Eastern Trend to the north and south to try

to at least double the strike length and also to extend the mineralization to depth . Drilling will

start at the north end of the trend following up on MH-19-62 that cut 4.80 m @ 33.59 g/t Au

from 239.85 m.

Timothy Froude, P. Geo., President and CEO, states: “We are eager to get the Phase 4 drilling

underway given what we have learned since completing the Phase 3 winter program. Modelling

has revealed details about the Eastern Trend that are critical in our planning for this phase. Our

focus has been, and will remain, the M oosehead Project. We still await final permits for Clarks

Brook, and will begin drilling operation there as soon as we receive final permits, which we

expect in the coming weeks. This will certainly be a busy and exciting summer for our

shareholders in tha t we will be drilling our two most important projects at the same time. We

expect a steady stream of news on several fronts moving forward.”

The summer 2019 operating budget has been pegged at $1.20 million of which $750,000 is

planned for the Moosehead Project, with the remaining $450,000 spread between the other three

projects, with Clarks Brook accounting for about $250,000. The Company currently has $2. 55

million in cash in the treasury and does not need to raise funds for the upcoming programs. The

Company wishes to extend gratitude to the Government of Newfoundland and Labrado r for its

continued support of the Moosehead Project through the JEA program.

QP

This news release has been reviewed and approved by Timothy Froude, P. Geo., a "Qualified

Person" under National Instrument 43-101 and President and CEO of Sokoman Minerals Corp.

About Sokoman Minerals

Sokoman Minerals Corp. is a discovery -oriented company with projects in Newfoundland &

Labrador, Canada. The Company’s primary focus is its portfolio of gold projects in Central

Newfoundland on the structural corridor hosting Marathon Gold’s Valentine Lake project (with

measured resources of 1.16 Moz of gold at 2.18 g/t, indicated resources of 1.53 Moz of gold at

1.66 g/t and inferred resources of 1.53 Moz. of gold at 1.77 g/t (Marathon Gold Website) 150 km

southwest of the Company’s high-grade Moosehead gold project. The Company also has a 100%

interest in an early -stage antimony /gold project in Newfoundland recently optioned to White

Metal Resources, as well as a 100% interest in the Clarks Brook Gold Property, 35 km southeast

of Moosehead. In Labrador, th e Company has a 100% interest in the Iron Horse (Fe /U/REE)

project.

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the

policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

Investors are cautioned that trading in the securities of the Corporation should be considered highly

speculative. Except for historical information contained herein, this news release contains forward -

looking statements that involve risks and uncertainties. Actual results may differ materially. Sokoman

Minerals Corp. will not update these forward -looking statements to reflect events or circumstances

To learn more, please contact:

Timothy Froude, P. Geo.,

President & CEO

Cathy Hume, Director,

Investor Relations

Website:

www.sokomanmineralscorp.com

709-765-1726 416-868-1079 x231 Twitter: @SokomanMinerals

[email protected] [email protected] Facebook: @SokomanMinerals

after the date hereof. More detailed information about potential factors that could affect financial

results is included in the documents filed from time to time with the Canadian securities regula tory

authorities by Sokoman Minerals Corp.