Wednesday, September 16, 2026
MiningNewsTerminal
Wednesday, September 16, 2026 Admin

YARR.V ·

Pirate Gold Provides Crippleback Drilling Update, Appoints New CFO and Releases Episode 8 of Treasure Hunters Two drills are actively targeting the argillic alteration envelope at Crippleback Lake , the alteration envelope thought to indicate high sulphidation epithermal system or porphyry style

Management Changes Exploration Programs

Pirate Gold Provides Crippleback Drilling

Update, Appoints New CFO and Releases

Episode 8 of Treasure Hunters

Two drills are actively targeting the argillic alteration envelope at Crippleback Lake

, the

alteration envelope thought to indicate high sulphidation epithermal system or porphyry style

mineralization

Drill hole PGC-26-058,

encountered vuggy silicified mineralization near the bedrock surface;

indications of advanced argillic alteration and silicification and strong pyrite mineralization

throughout

Drill hole PGC-26-064,

encountered a broad zone of vuggy silicified mineralization from 120 to

300m depth showing advanced argillic style alteration

Episode 8 of Pirate Gold Treasure Hunters now airing

:

https://youtu.be/Nii-tDFo2cE

St. John's, Newfoundland and Labrador--(Newsfile Corp. - April 2, 2026) -

Pirate Gold Corp.

(TSXV:

YARR) (OTCQB: SICNF) ("Pirate Gold" or the "Company"), is pleased to provide an update on drilling at

the Crippleback Lake target zone ("Crippleback") within its district-scale Treasure Island Project in

central Newfoundland, alongside the release of Episode 8 of

The

Pirate Gold Treasure Hunters

series.

Crippleback: Drilling Into the System

Two drill holes are ongoing targeting the argillic alteration zone first encountered in 2024.

One drill is

operating on the north and one on the south side of the alteration anomaly. Below is a general summary

of the drilled intervals and alteration sequences:

PGC-26-058

targeted the alteration system from the south side of Crippleback Lake; this hole

intersected an interval of vuggy, silicified volcanic rock from 15 to 137m downhole containing

disseminated pyrite and muscovite alteration; from 137 to 247m in highly altered quartz monzonite

marked by chlorite and montmorillonite alteration with pyrite mineralization. This included a veined zone

from 224.5 to 232.0m with locally massive to semi massive pyrite; 247 to 293m intersected a phengite

dominated volcanic sequence with disseminated pyrite and locally chalcopyrite; 293 to 395m intersected

a kaolinite dominated alteration in both volcanic and felsic intrusive rocks with pyrite mineralization

including a veined zone from 343.0 to 349.5m containing semi-massive pyrite mineralization; 395 to

562m intersected a volcanic sequence with muscovite-phengite alteration and disseminated pyrite

mineralization; 562 to 602m intersected highly silicified monzonite and volcanic sequence containing

pyrite as stringers.

PGC-26-064

is targeting the alteration system from the north side of Crippleback Lake. This hole

intersected quartz monzonite from 0 to 107m depth dominated by chlorite alteration and disseminated

pyrite mineralization; from 107 to 197m depth intersected silicified and vuggy volcanic and intrusive

sequences with pyrite as stringers and disseminations dominated by muscovite and kaolinite alteration;

197 to 215m intersected heavily clay altered volcanic rocks dominated by pyrophyllite with local vuggy

segments and pyrite

mineralization; 215 to 295m contained heavily clay altered volcanic rock with vuggy textures dominated

by muscovite and kaolinite alteration carrying pyrite as disseminations and stringers; 295 to 349m

intersected volcanic sequence heavily altered with pyrophyllite, pyrite as disseminations; 349 to 422m

intersected monzonite with phengite and montmorillonite alteration with pyrite as semi-massive stringers

and disseminations.

Greg Matheson, VP Exploration, commented:

"Preliminary observations from drilling at Crippleback have shown the alteration envelope has an

extensive footprint now exceeding 1,700m in length and 700m in width at to vertical depths exceeding

400m. The scale of alteration is impressive and more importantly, we are seeing mineral assemblages

of advanced argillic alteration consistent with high sulphidation epithermal systems and/or copper

porphyry deposits. The vuggy silica textures encountered in both holes with pyrite mineralization

throughout both drill holes are certainly encouraging; assays are now being submitted to the laboratory

for analysis. We expect to complete several more holes in this phase of the exploration campaign before

shifting our focus to the orogenic potential at Crippleback."

Drill Hole

Easting

Northing

Azimuth

Dip

Length (m)

PGC-26-058

562451

5398587

345

-65

122

PGC-26-064

562723

5399556

145

-45

422*

*Drilling ongoing

Fig. 1 - Crippleback Zone Drill Holes PGC-26-058 and PGC-26-064

To view an enhanced version of this graphic, please visit:

https://images.newsfilecorp.com/files/6079/290989_59f89cfd949c4bf4_001full.jpg

Pirate Gold Treasure Hunters Season 1 Episode 8 - Sounding the Deep

Episode 8 of Pirate Gold Treasure Hunters advances the 2026 exploration campaign at Crippleback,

with multiple drills now active and targeting the system at depth. The episode features:

Second drill brought online at Crippleback, accelerating exploration across the target

Drilling on both sides of Crippleback Lake, testing large-scale geophysical anomalies

Broad zones of advanced argillic alteration and vuggy silicification intersected at depth, with

disseminated sulfides

Three drills now turning across the project, including ongoing high-grade work at Moosehead

Continued refinement of the geological model as drilling tests a large-scale alteration footprint at

depth

Cannot view this video?

Visit:

https://www.youtube.com/watch?v=Nii-tDFo2cE

Fig. 2 - Crippleback Zone Location Map

To view an enhanced version of this graphic, please visit:

https://images.newsfilecorp.com/files/6079/290989_59f89cfd949c4bf4_002full.jpg

Pirate Gold Appoints Natalia Samartseva as Chief Financial Officer

The Company is pleased to announce the appointment of Natalia Samartseva as Chief Financial Officer

('CFO") and Corporate Secretary of the Company, effective April 1, 2026.

Ms. Samartseva is a Chartered Professional Accountant with significant experience in public company

reporting, IFRS, internal controls and auditing. She brings over 15 years of experience across diverse

financial leadership positions having previously served as Chief Financial Officer and Director of

Financial Reporting of companies listed in Canada and the United States. She has also held a variety of

public accounting practice positions, including senior audit manager, and consulting engagements

focused on financial reporting and analysis for junior resource companies. During her career, Ms.

Samartseva has overseen projects related to internal control improvements implementation, preparation

of financial models, forecasts, business valuation models, transition from exploration to commercial

production stage for mining companies and other complex accounting and tax issues.

Concurrent with this appointment, Eric Myung has stepped down as CFO. The Board of Directors and

executive management team of the Company extend their gratitude to Mr. Myung for his valuable

contributions during his tenure and his support ensuring a seamless transition.

Qualified Person

Greg Matheson, P.Geo., VP Exploration for Pirate Gold, a "Qualified Person" under National Instrument

43-101, has reviewed and approved the scientific and technical information in this press release.

About Pirate Gold Corp.

Pirate Gold Corp. is led by an experienced management team and is the dominant explorer along the

Valentine Lake Fault Zone in Newfoundland, Canada's newest gold district. The

Company's primary focus is its 100% owned district-scale Treasure Island Gold Project, along with a

portfolio of gold projects, including the district-scale Fleur de Lys Project.

For more information, please contact:

Denis Laviolette, Executive Chairman, CEO & Director

E

:

[email protected]

Cathy Hume, VP Corporate Development & Director

T:

416-868-1079 x 251

E:

[email protected]

Website:

www.pirategold.ca

Twitter

:

@PirateGoldCorp

Facebook

:

@PirateGoldCorp

LinkedIn:

@PirateGoldCorp

Acknowledgment

Pirate Gold acknowledges the financial support of the Junior Exploration Assistance Program,

Department of Natural Resources, Government of Newfoundland and Labrador.

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the

policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this

release.

Investors are cautioned that trading in the securities of the Company should be considered

highly speculative. This news release contains "forward-looking statements" within the meaning of the

applicable Canadian securities legislation that are based on expectations, estimates, assumptions,

geological theories, and projections as at the date of this news release. The information in this news

release about any information herein that is not a historical fact may be "forward-looking statements."

Actual results may differ materially. Any statement that involves discussions with respect to

predictions, expectations, beliefs, plans, projections, objectives, assumptions, future events or

performance (which may, but not always, include phrases such as "anticipates", "plans", "scheduled",

"believed" or "intends" or variations of such words and phrases or stating that certain actions, events

or results "may" or "could", "would", "might" or "will" be taken to occur or be achieved) including

statements regarding the Company's plans with respect to the Company's projects and the timing

related thereto, the merits of the Company's projects, the Company's objectives, plans and strategies,

and other matters are not statements of historical fact and may be forward-looking statements and are

intended to identify forward-looking statements. Factors that may cause results to vary include delays

in obtaining necessary approvals, changes in the market for the Company's securities, results of

exploration, loss of title to properties, delays in obtaining permits or access to mineral properties,

including as a result of adverse weather, fire or flood, changes to the Tax Act, rejection of expenditures

as Qualifying Expenditures, and factors included in the documents filed from time to time with the

Canadian securities regulatory authorities by Pirate Gold Corp. Pirate Gold Corp. will not update these

forward-looking statements to reflect events or circumstances after the date hereof, except as required

by law.

To view the source version of this press release, please visit

https://www.newsfilecorp.com/release/290989