QC Copper Intersects 184 m of 0.32 % CuEq, including 49.5 m of 0.7 % CuEq, Extending Mineralization Within the Conceptual Pit
QC Copper Intersects 184 m of 0.32 % CuEq,
including 49.5 m of 0.7 % CuEq, Extending
Mineralization Within the Conceptual Pit
TORONTO
,
Feb. 15, 2022
/CNW/ - QC Copper and Gold Inc. ("
QC Copper
" or the "
Company
")
(TSXV: QCCU) (OTCQB: QCCUF) is pleased to announce initial assay results from its Q4 2021 drill
program. Significant results were obtained in several drill holes, but most notable was hole OPM-21-
122, which returned an intersection of 184.5 metres grading 0.32% Cu-eq, including 49.5
metres grading 0.70% Cu-eq.
"These results are notable because they extend mineralization into areas that were not well sampled
or included in September 2021's Mineral Resource Estimate. This hole clearly demonstrates the in-
pit mineralization expansion potential relative to what was defined in our initial Mineral Resource
Estimate. Priority step-out holes are planned to follow up to the east, west, and up-dip from Hole
122 as part of definition drilling to expand the in-pit mineral resource on the Springer-Perry deposit,"
said Mr.
Charles Beaudry
, Director and Vice President of Exploration for QC Copper.
Update on Geologic Interpretation / Domaining of Mineralization
As part of an updated mineral resource for the Springer-Perry deposits planned for late 2022, the
geology is being re-interpreted from a vein and halo categorization to the domaining of global
mineralized envelopes above a nominal cut-off grade of 0.2% Cu-eq using all historical and current
drilling results. This is an important factor as the original vein envelopes defined by the Company
were digitized before the 2021 drilling program, and many mineralized areas ended up outside the
vein envelopes, defined as halos, and were either not included in the initial mineral resource estimate
or were interpolated very conservatively in the 2021 Mineral Resource Estimate. The current phase
of drilling is focused on areas that are yet to demonstrate geological continuity in order to increase
the resource base within thee conceptual pit outline. It is also designed to better define low grade
envelopes around mined out stopes.
Table 1: Summary of significant composite intersections from Q1 2021 diamond drilling to date on Opemiska Project.
Hole ID
Zone
From
(m)
To
(m)
Interval
(m)
Grade
Copper
Eq (%)*
Copper
(%)
Gold
(gpt)
Silver
(gpt)
Zinc
(ppm)
Cobalt
(ppm)
OPM-21-122
Springer
196.5
381.0
184.5
0.32
0.228
0.089
0.328
81
33
OPM-21-122
Springer
277.5
327.0
49.5
0.70
0.557
0.15
2.03
91
35
OPM-21-102
East
90.0
100.5
1.83
1.83
1.646
0.009
8.56
262
156
OPM-21-109
South-East
124.5
219.0
94.5
0.17
0.123
0.014
1.74
88
26
OPM-21-109
South-East
189.0
219.0
30.0
0.24
0.179
0.015
2.76
158
31
OPM-21-110
South-East
223.5
246.0
22.5
0.55
0.451
0.017
5.72
135
57
OPM-21-121
Saddle
85.5
127.5
42.0
0.26
0.185
0.047
0.786
67
50
*
Copper Equivalent ("Cu Eq.") grade including copper, gold, silver, cobalt and zinc based on 100% recoveries is calculated using the following equation: Cu Eq. = [(Cu
% x 20 x Cu price) + (Au grade / 34.2857 x Au price) + (Ag grade / 34.2857 x Ag price) + (Co % x 20 x Co price) + (Zn % x 20 x Zn price)] / (20 x Cu price). We used Cu, Au,
Ag, Co and Zn price of US$4.00, US$1,730, US$26.00, US$23.90 and US$1.20 respectively. Note that the assays have not been capped.
The composite intervals are quoted "as is" and do not necessarily represent true widths of
mineralization. However within the deposit there are veins in several directions and these reported
holes are all drilled to the south to intersect the east-west trending veins which dip to the north and
suggests the intervals are near true width.
Update on Current Drill Program
Drilling started in late October and continued until
December 20
th
with 23 holes completed for a total
of 5,457 metres. A total of 3,423 core samples were submitted for analysis plus a suite of QAQC
samples and assays continue to be received from this drilling. As of
February 11
th
a total of 2,194
core assay results were received, and although a few batches are being reassayed due to QAQC
issues, significant validated results are presented in Figure 1 and Table 1.
Click Here to View Figure 1.
Drilling restarted in early
January 2022
and as of the
February 13
th
a total of 2,597 metres have
been drilled with 13 holes completed. A total of 1,633 samples have been collected and 1,496
samples were shipped to the laboratory for assaying. No assays have been received to date for any
drilling done in 2022.
Phase 2 2022 Drilling Program in Preparation
QC Copper's near-term priority is converting what may currently be considered waste into mineral
resources within the Springer-Perry open pit. The Company believes this opportunity represents the
lowest risk, highest return and most efficient way to grow the Opemiska Deposit.
Targeted areas outside the conceptual open pit will seek to test and confirm low-grade, open-pitable
mineralization along with the Cooke-Robitaille mines structural corridor before undertaking
systematic definition drilling in 2023.
QP Statement
The technical information contained in this news release has been reviewed and approved by
Charles Beaudry
, P.Geo and géo., Director and Vice President Exploration for QC Copper & Gold,
a Qualified Person, as defined in "National Instrument 43-101, Standards of Disclosure for Mineral
Projects." For the exploration undertaken by QC Copper & Gold, all assay batches are
accompanied by rigorous Quality Assurance procedures that include insertion of standards and
blanks and verification assays in a secondary laboratory. Quality Control results, including the
laboratory's control samples, are evaluated immediately on reception of batch results and
corrections implemented immediately if necessary. All drill collars are surveyed and positioned in
UTM coordinates. Downhole deviations surveys are done with a single-shot gyroscopic instrument at
30m
intervals.
For information and updates on QC Copper and Gold, please visit:
www.qccopper.com
And please follow us on Twitter
@qccoppergold
Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the
policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this
release. Certain information in this press release may contain forward-looking statements. This
information is based on current expectations that are subject to significant risks and uncertainties
that are difficult to predict. Actual results might differ materially from results suggested in any
forward-looking statements. QC Copper and Gold Inc. assumes no obligation to update the
forward-looking statements, or to update the reasons why actual results could differ from those
reflected in the forward looking-statements unless and until required by securities laws applicable
to QC Copper and Gold Inc. Additional information identifying risks and uncertainties is contained
in filings by QC Copper and Gold Inc. with Canadian securities regulators, which filings are
available under QC Copper and Gold Inc. profile at
www.sedar.com
.
SOURCE
QC Copper & Gold Inc.
View original content:
http://www.newswire.ca/en/releases/archive/February2022/15/c3683.html
%SEDAR: 00045293E
CO: QC Copper & Gold Inc.
CNW 06:00e 15-FEB-22