Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

XTM.V ·

Transition Metals Reports Multiple Mineralized Zones from Janice Lake Copper/Silver Project, Including 0.95% Copper and 9.7 g/t Silver Over 13 Metres

Drill Results

Transition Metals Reports Multiple Mineralized

Zones from Janice Lake Copper/Silver Project,

Including 0.95% Copper and 9.7 g/t Silver Over 13

Metres

Sudbury, Ontario--(Newsfile Corp. - October 9, 2019) - Transition Metals Corp (TSXV: XTM) ("Transition", "the

Company") is pleased to announce that that it has received positive assay results from hole JANL0005 drilled by

Rio Tinto Canada Exploration ("RTEC") on behalf of option partner Forum Energy Metals at a second location

referred to as the Janice Lake target, located 2 km to the northeast of Jansem target holes JANL0001 and

JANL0002 (see news release dated October 1, 2019).

Hole JANL0005 intersected 13m of 0.95% Cu and 9.7g/t Ag within a broader 57.1m mineralized zone grading

0.41% Cu and 4.2 g/t Ag at shallow depths. Copper and silver mineralization have been confirmed for a minimum

400 metre strike length. Furthermore, two more zones of mineralization were discovered at depths below

previously known mineralization on the Janice target.

Commenting on the results, President and CEO Scott McLean stated: "Much work has been completed on

Janice Lake since RTEC entered into a $30 million option agreement in May to explore the property. These

recent results are encouraging, and we look forward to receiving more news."

Highlights from JANL0005 are:

• 0.41% Cu and 4.2 g/t Ag over 57.1 metres from 78.9m to 136m, including 0.95% Cu and 9.7 g/t Ag over 13

metres from 89m to 102m

• 0.13% Cu and 4.9 g/t Ag over 16 metres from 150m to 166m

• 0.31% Cu and 5.9 g/t Ag over 20 metres from 238m to 258m

Drill Hole Summary (Figure 2 & Table 1)

• Hole JANL0005 was drilled to a depth of 351 metres and intersected three sections of Cu and Ag

mineralization from 78.9m to 136m, 150m to 166m and 238m to 258m. This hole was located approximately

100m to the northeast of historic drill hole PL93-11 (33.0m @ 0.77% Cu) and 100m southwest of historic hole

PL93-03 (39.2m @ 0.54% Cu) drilled by Noranda Exploration in 1993. This infill hole successfully confirmed the

continuity of mineralization along strike and down-dip. The hole intersected mineralization wider than expected,

with further mineralized zones intersected at deeper levels than was known from historic drilling.

Table 1: Assay results from Janice target

HOLE # Metres Drilled Easting Northing Dip/Azimuth From (m) To (m) T hickness (m)* Cu (%) Ag (g/t)

JANL0005 351 500979 6303139 -61/146 78.9 136 57.1 0.41 4.2

including 89.0 102.0 13.0 0.95 9.7

150.0 166.0 16.0 0.13 4.9

238.0 258.0 20.0 0.31 5.9

*True widths of the reported mineralized intervals have not been determined.

All drill core samples have been sent to ALS Global in Vancouver, BC for assay. Ken Wheatley, P.Geo. and

Forum's VP, Exploration and Qualified Person under National Instrument 43-101, has reviewed and approved

the contents of this news release.

Figure 1: Location of the Target Areas on the Janice Lake Project

To view an enhanced version of Figure 1, please visit:

https://orders.newsfilecorp.com/files/2766/48646_9b5c1744844be9d3_003full.jpg

Figure 2: Drill Hole Locations on the Janice Target

The squares are 500m in size, north is to the top of the page. The large red dot is the location of JANL0005

reported in this release and the large black dots are holes drilled by RTEC in their 2019 drill campaign. The small

black squares are historic holes.

To view an enhanced version of Figure 2, please visit:

https://orders.newsfilecorp.com/files/2766/48646_9b5c1744844be9d3_004full.jpg

Quality Control/ Quality Assurance

Core samples were sawed in half, keeping the half with the reference line for orientated core in the box. Samples

averaged 2 metres in length through the mineralized zone, 4 metres in length in the unmineralized zone,

however these lengths varied depending on stratigraphy, alteration or mineralization. Standards were introduced

after every 20th sample, using a high grade, low grade or unmineralized, depending on the surrounding core.

Duplicates were also introduced on every 20th sample, quartering the core. Blanks were used for the first sample

of the hole and at the beginning and end of a mineralized interval, using certified rose quartz. A 4-acid digestion

was used on the samples at ALS lab in Vancouver, followed by analysis by ICP-MS (the ME-MS61L package).

Higher grade samples may be run again through copper screen using the coarse reject material.

Janice Lake Summer Exploration Program Summary

RTEC completed a 4,318 line kilometre high resolution airborne magnetic survey over the entire 52 km length of

the property and drilled 21 holes totalling 5,209 metres this summer. Nine holes have been completed on the

Jansem target, nine on the Janice target and three on the Kaz target (Figure 1). Results from the remaining

holes will be reported once received from RTEC.

About the Transition Agreement with Forum

Janice Lake is currently under option from the Company to Forum and is located approximately 55 km southeast

of Key Lake Saskatchewan. In May of 2019, Transition announced that RTEC had signed an Option Agreement

with Forum to earn an interest in Janice Lake Property (for full details see Transition news release dated May 9,

2019). Forum holds an option to earn 100% interest in the Janice Lake project by providing Transition with

8,000,000 shares of Forum (issued), completing expenditures of $250,000 over 6 months (completed), and

issuing cash option payments of $250,000 ($50,000 completed) over 48 months. Once Forum's 100% interest is

vested, Transition will retain a 2.0% Net Smelter Return royalty (NSR) of which 0.75% NSR can be purchased for

$1.5 million. Transition is furthermore entitled to a $1.0 million cash payment upon the completion of a Feasibility

Study and an additional $5,000,000 cash payment within 12 months of achieving Commercial Production from

the Property. (See Transition news release of February 6, 2018).

Under the terms of the Forum - RTEC agreement, RTEC will commit to spending $3 Million within 18 months on

the Property with the option to vest a 51% interest by spending $10 Million over 4 years. Upon vesting its

interest, RTEC can, at its option, earn a further 29% interest (for a total 80% interest) by spending a further $20

million over 3 years.

About the Janice Lake Sedimentary Copper/Silver Project, Saskatchewan

Janice Lake is a sedimentary hosted copper project located approximately 55 km southeast of Key Lake, in

north-central Saskatchewan with geologic features that are analogous to the giant Udokan development project

in Russia. Prior to the acquisition of the project by the Company, limited historic work had been completed

principally by Noranda and Phelps Dodge that identified 20 copper occurrences over a 6 km trend. In September

2018, Forum, following up mapping and geophysical work undertaken by Transition, completed 4 drill holes all of

which intersected shallow chalcocite, bornite and native copper mineralization above 80m in depth, including

Hole FEM-01, which intersected 19 m grading 1% copper, including 5.7 m of 2.18% copper within a 50.5 m

interval grading 0.45% copper (see Transition News Release of October 10, 2018).

About Transition Metals Corp

Transition Metals Corp (TSXV: XTM) is a Canadian-based, multi-commodity project generator that specializes in

converting new exploration ideas into discoveries. The award-winning team of geoscientists has extensive

exploration experience which actively develops and tests new ideas for discovering mineralization in places that

others have not looked, often allowing the company to acquire properties inexpensively. Joint venture partners

earn an interest in the projects by funding a portion of higher-risk drilling and exploration, allowing Transition to

conserve capital and minimize shareholder's equity dilution.

Cautionary Note on Forward-Looking Information

Except for statements of historical fact contained herein, the information in this news release constitutes

"forward-looking information" within the meaning of Canadian securities law. Such forward-looking information

may be identified by words such as "plans", "proposes", "estimates", "intends", "expects", "believes", "may", "will"

and include without limitation, statements regarding estimated capital and operating costs, expected production

timeline, benefits of updated development plans, foreign exchange assumptions and regulatory approvals. There

can be no assurance that such statements will prove to be accurate; actual results and future events could differ

materially from such statements. Factors that could cause actual results to differ materially include, among

others, metal prices, competition, risks inherent in the mining industry, and regulatory risks. Most of these factors

are outside the control of the Company. Investors are cautioned not to put undue reliance on forward-looking

information. Except as otherwise required by applicable securities statutes or regulation, the Company expressly

disclaims any intent or obligation to update publicly forward-looking information, whether as a result of new

information, future events or otherwise.

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of

the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

Further information is available at www.transitionmetalscorp.com or by contacting:

Scott McLean

President and CEO

Transition Metals Corp.

Tel: (705) 669-1777

To view the source version of this press release, please visit https://www.newsfilecorp.com/release/48646