Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

XTM.V ·

Transition Metals Corp Announces Drill Results From its Sunday Lake PGM Project Including

Drill Results

Transition Metals Corp Announces Drill Results From its Sunday Lake PGM Project Including

35.80m @ 3.90 g/t PGM

Sudbury, March 27, 2018 – Transition Metals Corp (XTM – TSX.V) (“Transition”, “the Company”) is pleased to

announce it has received the first set of assay results from the ongoing drill program conducted by North

American Palladium (NAP), on the Sunday Lake platinum- palladium (PGM) Project. NAP holds an option to

earn up to a 75% interest in the Property and XTM holds a 25% free carried interest through to the completion

of a Feasibility Study.

Results are sourced from an NAP news release dated March 27, 2018. Please refer to that release for the full

information regarding the drill program, including lo cation maps, cross sections and drill hole details.

http://www.nap.com/investors/news-releases/news-releases-details/2018/North-American-Palladium-Expands-

PGM-Mineralization-at-Sunday-Lake/default.aspx

Highlights:

 Hole SL-17-18B : 18.65m @ 4.05 g/t PGM (Pt+Pd+Au) including 4.9m @ 6.10 g/t PGM and 0.64% Cu

 Hole SL-18-21: 35.80m @ 3.90 g/t PGM including 6.50m @ 8.34 g/t PGM

 Hole SL-18-22: 33.20m @ 2.80 g/t PGM including 5.90m @ 6.80 g/t PGM and 0.67% Cu.

Commenting on the results, Company CEO and President Scott McLean stated “These results demonstrate the

potential of the Sunday Lake Intrusion to host signifi cant economic mineralization and the grades encountered

are higher than other similar deposits and mines in the district. The geology at Sunday Lake bears many

similarities to the Company’s 100% owned Saturday Night project located in similar geology 16km to the west

that we feel may have similar potential.”

The property occurs within the emerging Mid-Continental Rift (MCR) PGM camp. Recent discoveries in the

district include Panoramic Resources’, Thunder Bay North Project (Indicated Resources 8.46Mt @ 2.09g/t PGM1) in Ontario,

Lundin Mining’s, Eagle Mine (Reserves 3.72Mt @ 2.50% Ni, 2.20% Cu 2) in Michigan and Rio Tinto’s Tamarack Deposit

(Indicated Resource 3.75Mt @ 1.81% Ni, 1.00% Cu, 0.85g/t PGM; Inferred Resource 3.38Mt @ 1.63% Ni, 0.94% Cu, 0.67g/t PGM3) in Minnesota.

The Sunday Lake PGM property is held by Joint Ventur e Partners Transition Metals and Impala Platinum

Holdings Limited (“Implats”). NAP holds the right to acquire Implats’ interest up to a 75% ownership in the Sunday

Lake Project by completing work commitments totaling $4.5M and making cash payments of $3.5M over a five-

year period. (see NAP Press Release dated June 20, 2017 for details). Without any further expenses, Transition

retains a 25% free carried interest in the project through to the completion of a feasibility study.

Exploration Program

Diamond Drilling

For the period spanning October 2017 to March 2018, NAP has completed a total of 8,500m in ten holes to date

and continues to drill the property with two rigs on site. Results from these first eight holes completed are

presented in Table 1.

Table 1: Assay results for the October 2017 to March 2018 Sunday Lake exploration drilling program.

Hole #  From (m)  To (m)  Length (m)  PGM g/t  Pt g/t  Pd g/t  Au g/t  Cu wt.%  Ni wt.% 

SL-17-15 731.00 736.00 5.00 1.14 0.61 0.49 0.04 0.21 0.12

and 807.15 812.00 4.85 1.20 0.71 0.42 0.07 0.16 0.08

SL-17-16 807.00 828.50 21.50 1.82 1.00 0.74 0.08 0.34 0.16

including 812.50 818.50 6.00 3.17 1.82 1.25 0.10 0.43 0.17

including 816.50 818.50 2.00 2.91 1.52 1.25 0.14 0.68 0.25

SL-17-17 626.00 629.00 3.00 1.09 0.57 0.47 0.04 0.19 0.10

and 634.00 639.30 5.30 1.31 0.78 0.49 0.05 0.16 0.08

SL-17-18B 667.70 703.15 35.45 2.83 1.65 1.09 0.09 0.41 0.16

including 684.50 703.15 18.65 4.05 2.43 1.49 0.13 0.48 0.17

including 692.25 697.15 4.90 6.17 3.89 2.07 0.20 0.64 0.24

and 701.15 702.15 1.00 9.27 6.13 2.82 0.32 0.92 0.07

SL-18-19 856.00 867.90 11.90 1.37 0.72 0.61 0.05 0.20 0.12

including 860.00 865.00 5.00 2.29 1.15 1.05 0.08 0.35 0.16

SL-18-20 710.00 715.10 5.10 1.52 0.89 0.55 0.07 0.22 0.11

SL-18-21 863.50 899.35 35.85 3.90 2.40 1.32 0.18 0.43 0.17

including 875.05 898.35 23.30 5.43 3.34 1.83 0.26 0.60 0.21

including 890.85 897.35 6.50 8.34 5.17 2.62 0.55 1.08 0.36

including 892.55 893.80 1.25 11.97 7.45 3.78 0.74 1.37 0.38

SL-18-22 1039.0 1072.2 33.20 2.85 1.68 1.03 0.13 0.34 0.12

including 1056.0 1066.9 10.90 4.98 3.08 1.65 0.25 0.51 0.14

including 1061.0 1066.9 5.90 6.87 4.30 2.22 0.35 0.67 0.16

including 1065.0 1066.0 1.00 17.50 11.23 5.32 0.95 1.48 0.27

Note: Reported interval length are estimated as being between 80% and 90% of true width of the intersected sulphide mineralization.

About the Sunday Lake Property 

The Sunday Lake PGM Project is located 25 km north of Thunder Bay in Jacques Township and approximately

95 km south of NAP’s producing Lac Des Iles Mine. The Sunday Lake Property covers a 3.5 km diameter circular

reversely-polarized magnetic anomaly associated with a large buried mafic-ultramafic intrusion interpreted to be

Proterozoic in age and related to the Mid-Continental Rift (MCR).

The Company’s 100% owned Saturday Night Project is located 16 kilometres to the west of Sunday Lake and

host mineralization and geology similar to Sunday Lake. The Company is currently seeking a partner for

Saturday Night.

¹ Resource reported by Panoramic Resources, Thunder Bay North deposit: 2011 JORC compliant mineral resources estimate prepared by AMEC Americas

Ltd.

² Lundin Mining – Reserves and Resources June 30, 2016. http://www.lundinmining.com/s/Reserves.asp

3 Resource reported by Talon Resources, Tamarack North Techni cal Report: 2014 NI 43-101mineral resource estimate prepared by Gol der Associates

Ltd. www.sedar.com

Qualified Person

The technical elements of this press release have been approved by Mr. Grant Mourre, P.Geo. (APGO), a

Qualified Person under National Instrument 43-101. The analyses reported in this news release were performed

by ALS Global in Vancouver, British Columbia. NAP’ s rigorous internal quality control and quality assurance

protocols are described in detail in NAP’s current Technical Report for its Lac des Iles mine (June 2017 –

available on SEDAR).

About Transition Metals Corp

Transition Metals Corp (XTM -TSX.V) is a Canadian-based, multi-commodity project generator that specializes

in converting new exploration ideas into Canadian disc overies. The award-winning team of geoscientists has

extensive exploration experience in established, emerging and historic mining camps and actively develops and

tests new ideas for discovering mineralization in places that others have not looked, which often allows the

company to acquire properties inexpensively. The team is rigorous in its fieldwork and combines traditional

techniques with newer ones to help unearth compelling prospects and drill targets. Transition uses the project

generator business model to acquire and advance multip le exploration projects simultaneously, thereby

maximizing shareholder exposure to discovery and capital gain. Joint venture partners earn an interest in the

projects by funding a portion of higher-risk drilling and exploration, allowing Transition to conserve capital and

minimize shareholder’s equity dilution. The Company has an expanding portfolio that currently includes more

than 25 gold, copper, nickel and platinum projects primar ily in Ontario, Nunavut, British Columbia, Minnesota

and Saskatchewan.

Cautionary Note on Forward-Looking Information

Except for statements of historical fact contained herei n, the information in this news release constitutes

“forward-looking information” within the meaning of Canadian securities law. Such forward-looking information

may be identified by words such as “plans”, “proposes”, “estimates”, “intends”, “expects”, “believes”, “may”, “will”

and include without limitation, statements regarding estimated capital and operating costs, expected production

timeline, benefits of updated development plans, foreign exchange assumptions and regulatory approvals. There

can be no assurance that such statements will prove to be accurate; actual results and future events could differ

materially from such statements. Factors that could cause actual results to differ materially include, among

others, metal prices, competition, risks inherent in the mining industry, and regulatory risks. Most of these factors

are outside the control of the Company. Investors are cautioned not to put undue reliance on forward-looking

information. Except as otherwise required by applicable securities statutes or regulation, the Company expressly

disclaims any intent or obligation to update publicly forward-looking information, whether as a result of new

information, future events or otherwise.

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies

of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

Further information is available at www.transitionmetalscorp.com or by contacting:

Scott McLean

President and CEO

Transition Metals Corp.

Tel: (705) 669-1777