Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

XTM.V ·

Transition and Aldershot Report Initial Assay Results from Drilling at Gowganda

Drill Results

Transition and Aldershot Report Initial Assay Results from Drilling at Gowganda

Sudbury, February 28, 2017 – Transition Metals Corp. (XTM – TSX.V) (“Transitio n”) and Aldershot Resources

Ltd. (“Aldershot” or the “Company”) (TSXV:ALZ Frank furt: ASL1.F US: ALZTF.PK), are pleased to report o n

initial assay results from drilling completed on th e Gowganda Gold project located 75 kilometres south west of

Kirkland Lake Ontario. The results are from the fir st two, of eleven completed holes for which additio nal assay

results remain pending. Holes TMH-17-022 and TMH-17 -023 were drilled to test for a down plunge

continuation of stockwork veining exposed at surfac e in the vicinity of the Annie’s Ladder showing. Bo th holes

intersected intervals of strong alteration and elevated gold which is summarized below in Table 1.

Table 1.

*Gold values are reported in grams per tonne.

** Length intervals are actual widths in metres and may not be representative of true thickness

President and CEO of Aldershot Minerals Jeremy Cadd y commented that “Aldershot is pleased with the initial

assay results from the first two holes of the progr am and we are looking forward additional results as they

become available over the coming weeks.”

President and CEO of Transition Metals, Scott McLea n commented; “We consider these results to be

encouraging as they further validate the potential of a mineralizing system with similarities to other known

economic deposits in the region in terms of style of mineralization, alteration and geologic setting.”

Collar location and orientation for completed holes is presented below in Table 2. Figure 1 presents a map

depicting the location of completed holes. Figure 2 presents a cross section depicting the location of holes

TMH-17-022 and TMH-17-023.

Hole From (m) To (m) Length (m) Au (g/t)

TMH-17-022 45.1 48.5 3.40 1.37

including 48.1 48.5 0.40 4.24

and 55.6 58.6 3.00 1.22

and 75.7 81.6 5.90 1.43

including 80.3 81.6 1.30 3.79

TMH-17-023 110.4 119.5 9.10 1.24

including 114.6 117 2.40 3.04

including 115.6 116.4 0.80 4.29

Table 2.

About the Gowganda Gold Project:

The project is focused on Archean greenstone overla in by Proterozoic sediments of the Cobalt Embayment

located south of the Round-Lake Batholith in the so uth-western part of the prolific Abitibi greenstone belt. A

short animated video that introduced Aldershot and the Haultain project may be viewed at:

http://iresourcemedia.com/companies/aldershot/. Gold mineralization on the property is in part cont rolled by

the emplacement of syenitic intrusions that are loc ally altered and mineralized. High grade, nugget l ike gold

mineralization occurs within quartz veining within the altered syenite.

To earn a 51% interest in the Property, Aldershot has committed to funding $400,000 worth of exploration on

property in year one and must incur cumulative work expenditures totaling $2.0 million by the third anniversary

of the agreement. In addition, Aldershot must issue 1,500,000 common shares to Transition on signing

(received), and provide an additional $450,000 worth of Aldershot shares to Transition by the second

anniversary date, subject to exchange approvals to earn its initial interest. During the course of the initial stage

of the Option, Transition has agreed to serve as program Operator, dedicating its team and expertise to

overseeing work programs funded by Aldershot. Upon earning an initial 51% interest, Aldershot may opt to

acquire an additional 24% interest in the Property (for a total of 75%) by completing a feasibility study within 3

years. Upon Aldershot earning its 51% or 75% interest in the Property as the case may be, a Joint Venture

would be formed, with each party being required to fund work programs on the property to maintain its

respective interest.

Qualified Person

The technical elements of this press release have been approved by Mr. Greg Collins, P.Geo., a Qualified

Person under National Instrument 43-101. All core samples were half sawn at a controlled location by

Company representatives under the supervision of Mr. Steve Flank, P.Geo, and transported directly by the

company to the lab. Transition Metals employs in-house QA/QC procedures that conform to industry best

practices. All analytical work performed on core samples was conducted at ALS-Chemex with sample

preparation completed in Sudbury, Ontario and analyses completed in North Vancouver, B.C. The quality

system used by ALS-Chemex complies with international standards ISO 9001:2000 and ISO 17025:2005.

DDH Easting (m) Northing (m) Length (m) Az (deg) Dip (de g)

TMH-17-022 517590 5279800 93.4 240 -45

TMH-17-023 517645 5279830 198.0 240 -45

TMH-17-024 517213 5280028 86.0 220 -45

TMH-17-025 517213 5280028 98.0 220 -60

TMH-17-026 517256 5279802 111.0 230 -45

TMH-17-027 517256 5279802 92.0 230 -60

TMH-17-028 516901 5279815 54.0 235 -50

TMH-17-028a 516901 5279815 183.0 180 -55

TMH-17-029 517425 5279875 123.0 235 -50

TMH17-030 517556 5279773 172.0 25 -57

TMH17-031 517340 5279860 207.0 230 -60

11 Holes 1417.4 metres

About Transition Metals Corp

Transition Metals Corp (XTM -TSX.V) is a Canadian-based, multi-commodity project generator that specializes

in converting new exploration ideas into Canadian discoveries. The award-winning team of geoscientists has

extensive exploration experience in established, emerging and historic mining camps and actively develops

and tests new ideas for discovering mineralization in places that others have not looked, which often allows the

company to acquire properties inexpensively. The team is rigorous in its fieldwork and combines traditional

techniques with newer ones to help unearth compelling prospects and drill targets. Transition uses the project

generator business model to acquire and advance multiple exploration projects simultaneously, thereby

maximizing shareholder exposure to discovery and capital gain. Joint venture partners earn an interest in the

projects by funding a portion of higher-risk drilling and exploration, allowing Transition to conserve capital and

minimize shareholder’s equity dilution. The Company has an expanding portfolio that currently includes more

than 25 gold, copper, nickel and platinum projects primarily in Ontario, Nunavut, British Columbia, Minnesota

and Saskatchewan.

About Aldershot

Aldershot is engaged in the acquisition and exploration of gold properties. The Company relinquished its

uranium properties in Utah in 2015 due to the low uranium price. The Company has signed an option and joint

venture agreement with Transition Metals for the Gowganda Gold Project as highlighted above. The mission of

Aldershot is to find and develop a gold property to create wealth for shareholders. This is being achieved by

identifying quality gold properties and exploring those that have the highest potential for future discoveries,

sale or development of existing mineral resources into mineable reserves. On a regular basis management will

rationalize all of its core mineral property holdings to maintain percentage ownership by funding the exploration

work. Management will sell its properties when it feels value for shareholders has been created and

management is able to obtain fair value for the assets.

The Company is a publicly listed corporation whose shares are traded on the Venture Exchange of the Toronto

Stock Exchange under the symbol ALZ. The Company’s registered office is located at 409 – 221 West

Esplanade, North Vancouver, BC, V7M 3J3 and its head office is located at 303 – 1006 Beach Avenue,

Vancouver, BC V6E 1T7.

Cautionary Note on Forward-Looking Information

Except for statements of historical fact contained herein, the information in this news release consti tutes

“forward-looking information” within the meaning of Canadian securities law. Such forward-looking info rmation

may be identified by words such as “plans”, “propos es”, “estimates”, “intends”, “expects”, “believes”, “may”,

“will” and include without limitation, statements r egarding estimated capital and operating costs, exp ected

production timeline, benefits of updated developmen t plans, foreign exchange assumptions and regulator y

approvals. There can be no assurance that such statements will prove to be accurate; actual results and future

events could differ materially from such statements . Factors that could cause actual results to differ materially

include, among others, metal prices, competition, r isks inherent in the mining industry, and regulator y risks.

Most of these factors are outside the control of the Company. Investors are cautioned not to put undue reliance

on forward-looking information. Except as otherwise required by applicable securities statutes or regulation, the

Company expressly disclaims any intent or obligatio n to update publicly forward-looking information, w hether

as a result of new information, future events or otherwise.

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies

of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

Further information is available at www.transitionmetalscorp.com or by contacting:

Scott McLean

President and CEO

Transition Metals Corp.

Tel: (705) 669-0590

Figure 1. Drill hole Location Sketch and Geological Interpretation – Haultain Discovery Area,

Gowganda Gold Project, Ontario

Figure 2. Section A-A’ Looking Northwest