Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

XTG.TO ·

Xtra-Gold Definition Drilling Continues to Intersect Robust Gold Grades at Boomerang, Including 2.13 g/t Gold over 10.0 Metres in Upper Shoots, 2.19 g/t Gold over 18.0 Metres in Main Lower Shoot, and 1.50 g/t Gold over 17.0 Metres in Footwall Shoot

Drill Results

Xtra-Gold Definition Drilling Continues to

Intersect Robust Gold Grades at Boomerang,

Including 2.13 g/t Gold over 10.0 Metres in

Upper Shoots, 2.19 g/t Gold over 18.0 Metres

in Main Lower Shoot, and 1.50 g/t Gold over

17.0 Metres in Footwall Shoot

Toronto, Ontario--(Newsfile Corp. - June 11, 2024) -

Xtra-Gold Resources Corp. (TSX: XTG)

(OTCQB: XTGRF) ("Xtra-Gold" or the "Company")

, is pleased to announce further positive assay

results for an additional 17 diamond core boreholes totalling 5,469.5 metres ("m") from its current

exploration drilling program on the Company's wholly-owned Kibi Gold Project, located in the Kibi -

Winneba greenstone belt (the "Kibi Gold Belt"), in Ghana, West Africa. Today's drilling results include 13

drill holes (4,666.5 m) dedicated to the further definition / expansion of the Boomerang gold system and

4 scout drill holes (803 m) targeting prospective litho-structural settings generated by recently completed

3D VTEM / TMI inversion-modelling. The current drilling forms part of an aggressive in-house drilling

initiative focussing on multiple resource expansion targets occupying the south-western (Zone 3) portion

of the mineralization-hosting 1

st

-order F2 synclinorium fold structure; over 1 km beyond the limits of the

currently defined Mineral Resource Estimate (the "2021 MRE", see the Company's news release of

November 1, 2021).

Present drilling efforts successfully: continued to delineate the extent of the stacked Upper Shoots gold

mineralization package across an approximately 75 m - 150 m cross-plunge distance; further defined

the robust down-plunge continuity of the main Lower Shoot and Footwall Shoot gold mineralization; and

identified a new "blind" prospective diorite body within the core of the mineralization-controlling

synclinorium fold structure, to the north of the Boomerang gold system.

Assay results reported are provided in Table 1 below and include the following highlights:

Definition Drilling (Boomerang - "Upper Shoots" Mineralization Package)

10.0 m at 2.13 grams per tonne gold ("g/t Au"), including 3.0 m at 4.31 g/t Au, from 200 m; and 5.0

m at 1.49 g/t Au from 248 m in KBDD24554

10.0 m at 0.81 g/t Au, including 4.5 m at 1.37 g/t Au, from 26 m; and 22.0 m at 1.17 g/t Au,

including 2.0 m at 6.54 g/t Au, from 67 m in KBDD24546

3.0 m at 6.39 g/t Au from 227 m in KBDD24548

3.0 m at 3.21 g/t Au from 14.5 m in KBDD23543

8.0 m at 1.22 g/t Au, including 1.5 m at 4.89 g/t Au, from 239 m in KBDD24551

Definition Drilling (Boomerang - Main "Lower Shoot" & Footwall Shoot)

6.0 m at 2.92 g/t Au from 302 m; and 18.0 m at 2.19 g/t Au, including 9.0 m at 3.02 g/t Au, from

331 m in KBDD24545 (Lower Shoot)

31.0 m at 0.62 g/t Au, including 10.0 m at 1.02 g/t Au and 6.0 m at 1.03 g/t Au, from 361 m in

KBDD24554 (Lower Shoot)

17.0 m at 1.50 g/t Au, including 4.0 m at 3.76 g/t Au, from 412 m in KBDD24548; and 14.0 m at

0.80 g/t Au, including 6.0 m at 1.15 g/t Au, from 236 m in KBDD23543 (Footwall Shoot)

Expansion Drilling (Boomerang - Lower Shoot & SW Shoots)

18.0 m at 0.95 g/t Au, including 6.0 m at 1.42 g/t Au, from 316 m in KBDD23542 (Lower Shoot)

6.0 m at 2.97 g/t Au, including 3.0 m at 5.41 g/t Au, from 116 m in KBDD24552 (SW Shoots)

James Longshore, President and CEO remarked: "Our current definition drilling-focused campaign

continues to return positive results.

In addition to further delineating the robust down-plunge continuity of

the main Lower Shoot and Footwall Shoot gold mineralization, the drilling continues to define the

geometry and extent of the Upper Shoots mineralization package. The latest results returned multiple

significant gold intercepts from the Upper Shoots target, with this overlying, stacked, multi-shoot

mineralization package potentially contributing to a stripping ratio reduction in a future open pit mining

scenario. We are also very pleased with the results of our ongoing scout drilling initiative, with the

identification of a new prospective diorite body to the north of the Boomerang gold system validating our

3D litho-structural modelling efforts. We remain confident that further new gold discoveries will be made

with continued scout drilling targeting modelled second-order fold structures within the northern footprint

area of the mineralization-controlling 1

st

-order F2 synclinorium fold structure."

Today's Kibi Gold Project drill results correspond to the latest 17 drill holes (5,469.5 m) of an ongoing

exploration initiative targeting multiple resource expansion opportunities within the south-western (Zone

3) portion of the gold mineralization-hosting 1

st

-order F2 synclinorium fold structure, including: 8

definition drill holes (3,079 m) collared along two SW-trending drill fences, designed to further test the

down-plunge continuity of the stacked, NE-plunging, Boomerang gold system mineralization shoots

between existing NW-SE drill-sections; 5 expansion drill holes (1,587.5 m) targeting the south-western

strike-extension and south-eastern lateral continuity of the Boomerang gold system; and 4 scout drill

holes (803 m) to further define the litho-structural setting of recently 3D VTEM / TMI inversion-modelling

generated targets.

The present 17 diamond core boreholes were completed by the Company's in-house drilling crews from

early December 2023 to mid-April 2024, including: 16 new holes (KBDD23541 - KBDD24555, including

KBDD23543A) and one hole-extension (KBDD12228). With hole KBDD12228 re-entered / extended by

76.0 m, to a final depth of 414.5 m, to follow up on the deep, high-grade intercept recently yielded by

KBDD23536 (see the Company's news release of December 20, 2023). Drill results for a total of 149

holes (32,438 m) have been reported to date for the ongoing Zone 3 resource expansion drill program

initiated following the database close-out date for the current 2021 MRE.

Exploration significant auriferous drill intercepts are presented in Table 1 below, with a drill plan (Figure

1) and collar / drill hole details (Table 2), available at:

(Figure 1_Zone 3 Drill Plan_June 2024)

(Table 2_Drill Collar Info_June 2024)

Table 1: Significant Drill Intercepts

Boomerang Resource Expansion Target & Zone 3 Scout Drilling

Kibi Gold Project / December 2023 - April 2024

Hole ID

From

(metres)

To

(metres)

Core

Length

(metres)

Gold

Grams

Per Tonne

Zone ID / Target

KBDD12228

(1)

No Significant Intercept

Boomerang - Deep

KBDD23541

176.0

180.0

4.0

1.31

Boomerang - Upper Shoots System

and

301.0

318.0

17.0

0.33

Boomerang - Lower Shoot

including

302.0

303.0

1.0

1.56

and

331.0

355.0

24.0

0.54

Boomerang - Lower Shoot

including

334.0

337.0

3.0

1.25

KBDD23542

186.0

194.0

8.0

0.80

Boomerang - Upper Shoots System

and

231.0

243.0

12.0

0.27

Boomerang - Upper Shoots System

and

316.0

334.0

18.0

0.95

Boomerang - Lower Shoot

including

317.0

323.0

6.0

1.42

KBDD23543A

13.0

16.0

3.0

1.98

Boomerang - Upper Shoots System

and

76.0

83.0

7.0

0.65

Boomerang - Upper Shoots System

including

77.0

79.0

2.0

1.36

KBDD23543

14.5

17.5

3.0

3.21

Boomerang - Upper Shoots System

and

78.0

82.0

4.0

1.71

Boomerang - Upper Shoots System

including

81.0

82.0

1.0

4.78

and

93.0

95.0

2.0

1.59

Boomerang - Upper Shoots System

and

128.0

130.0

2.0

1.72

Boomerang - Upper Shoots System

and

205.0

209.0

4.0

0.64

Boomerang - Lower Shoot

and

236.0

250.0

14.0

0.80

Boomerang - Footwall Shoot

including

237.0

243.0

6.0

1.15

and incl.

242.0

243.0

1.0

2.86

and

348.0

355.0

7.0

1.29

Boomerang - New Mineralization

including

352.0

353.0

1.0

3.96

KBDD24544

No Significant Intercept

Double 19 - SW Target

KBDD24545

302.0

308.0

6.0

2.92

Boomerang - Lower Shoot

including

303.0

305.0

2.0

4.74

and

331.0

349.0

18.0

2.19

Boomerang - Lower Shoot

including

336.0

345.0

9.0

3.02

and

366.0

371.0

5.0

0.97

Boomerang - Footwall Shoot

KBDD24546

26.0

36.0

10.0

0.81

Boomerang - Upper Shoots System

including

27.5

32.0

4.5

1.37

and

67.0

89.0

22.0

1.17

Boomerang - Upper Shoots System

including

83.0

85.0

2.0

6.54

and

162.0

180.5

18.5

0.26

Boomerang - Footwall Shoot

and

190.0

201.0

11.0

0.28

Boomerang - Footwall Shoot

and

290.0

292.0

2.0

5.38

Boomerang - New Mineralization

KBDD24547

No Significant Intercept

New Diorite Body

KBDD24548

34.0

40.0

6.0

0.49

Boomerang - Upper Shoots System

and

227.0

230.0

3.0

6.39

Boomerang - Upper Shoots System

and

243.0

245.0

2.0

1.32

Boomerang - Upper Shoots System

and

351.5

354.5

3.0

1.74

Boomerang - Lower Shoot

and

364.0

369.0

5.0

2.20

Boomerang - Lower Shoot

including

365.0

366.0

1.0

3.99

and

412.0

429.0

17.0

1.50

Boomerang - Footwall Shoot

including

413.0

417.0

4.0

3.76

KBDD24549

62.5

82.7

20.2

0.33

Boomerang - SW Shoots

including

81.3

82.7

1.4

1.67

and

104.0

108.0

4.0

1.09

Boomerang - SW Shoots

and

151.0

154.0

3.0

1.94

Boomerang - SW Shoots

and

211.0

222.5

11.5

0.60

Boomerang - SW Shoots

including

213.0

214.0

1.0

3.94

KBDD24550

No Significant Intercept

New Diorite Body

KBDD24551

239.0

247.0

8.0

1.22

Boomerang - Upper Shoots System

including

239.0

240.5

1.5

4.89

and

261.0

264.0

3.0

1.16

Boomerang - Upper Shoots System

including

263.0

264.0

1.0

2.81

KBDD24552

79.0

82.0

3.0

1.50

Boomerang - SW Shoots

and

116.0

122.0

6.0

2.97

Boomerang - SW Shoots

including

116.0

119.0

3.0

5.41

KBDD24553

16.5

18.0

1.5

3.33

Double 19 - SW Target

KBDD24554

200.0

210.0

10.0

2.13

Boomerang - Upper Shoots System

including

201.0

204.0

3.0

4.31

and

248.0

253.0

5.0

1.49

Boomerang - Upper Shoots System

including

249.0

250.0

1.0

2.94

and

361.0

392.0

31.0

0.62

Boomerang - Lower Shoot

including

361.0

371.0

10.0

1.02

including

403.0

409.0

6.0

1.03

KBDD24555

89.0

98.0

9.0

0.52

Boomerang - SW Shoots

including

96.5

98.0

1.5

1.68

and

195.5

209.0

13.5

0.67

Boomerang - SW Shoots

including

207.5

209.0

1.5

2.95

(1)

Hole #KBDD12228 originally drilled to a depth of 173.0 m in 2012; extended by 165.5 m to a depth of 338.5 m in December 2022; and re-entered

/ extended by 76.0 m to a final depth of 414.5 m in January 2024. See Company's news releases of August 21, 2012, and December 21, 2022, for

significant drill intercepts in upper (previously drilled) section of drill hole.

Notes:

Reported intercepts are core-lengths; true width of mineralization is unknown at this time.

"Significant" intercepts meet following criteria: minimum metal factor (grade x length) of 2.5; with minimum 0.25 g/t gold average grade over interval.

Intercepts also constrained with a 0.25 g/t gold minimum cut-off grade at top and bottom of intercept, with no upper cut-off applied, and maximum of

five (5) consecutive samples of internal dilution (<0.25 g/t gold). All internal intervals above 15 g/t gold indicated.

Recently completed 3D VTEM / TMI inversion models-based litho-structural modelling work, conducted

by Tect Geological Consulting of South Africa, indicates that the gold mineralization within the Zone 2 -

Zone 3 MRE footprint area occupies a licence-scale, 1

st

-order F2 synclinorium fold structure. Deposits

are characterized by tensional arrays of auriferous quartz-carbonate veins typically hosted within or

spatially associated with F1 or F2 folded / strained diorite units, and/or metasedimentary rock - diorite

contacts, with the diorite bodies having an interpreted Belt-type granitoid affinity.

Over 20 significant gold

occurrences hosted by Belt (Dixcove)- and Basin (Cape Coast)-type granitoids are known in Ghana,

with a number constituting significant deposits.

These deposits represent a relatively new style of gold

mineralization for orogenic gold deposits within the West African Birimian terrain.

Belt-type intrusion-

hosted gold deposits include Newmont Mining's Subika deposit at their Ahafo mine and Asante Gold's

Chirano deposit (formerly Kinross Mining) within the Sefwi gold belt, as well as the former Golden Star

Resources' Hwini-Butre deposit at the southern extremity of the Ashanti gold belt.

Today's drilling results encompass 8 SW-trending definition drill holes, including: 2 additional holes at

the northeast extremity of the existing SW Drill Fence 1 (KBDD24545 / 548); and 6 holes on the SW Drill

Fence 2, a newly initiated (one previous hole), parallel drill fence located approximately 120 m to the

southeast (KBDD23541 / 543 / 543A & KBDD24546 / 551 / 554). These SW-tending drill fences were

designed to dissect the NE-plunging, stacked, multi-shoot Boomerang gold system with the aim of

further defining the geometry / down-plunge continuity of the mineralization shoots at the approximate

mid-point between the existing NW-SE drill sections. With the expanded SW Drill Fence 1 (11 holes)

now testing the NE-plunging gold system over approximately 715 m strike and 525 m down-plunge

distances, respectively. See the Company's news releases of September 8, 2023, and December 20,

2023, for the assay results for the remaining 12 holes along the respective drill fences.

Boreholes KBDD24545 and KBDD25548, in addition to further testing the down-plunge geometry /

continuity of the stacked Upper Shoots, main Lower Shoot, and Footwall Shoot gold mineralization, were

also designed to follow up on the deep, high-grade intercept recently yielded by hole KBDD23536.

With

these two definition drill holes (-55

o

& -65

o

), collared from the same position at the northeast extremity of

the SW Drill Fence 1, returning the following mineralized intercepts from the main Lower Shoot: 6.0 m

grading 2.92 g/t Au and 18.0 m grading 2.19 g/t Au, including 9.0 m at 3.02 g/t Au, from down-hole

depths of 302.0 m and 331.0 m respectively in KBDD24545; and 3.0 m grading 1.74 g/t Au and 5.0 m

grading 2.20 g/t Au from down-hole depths of 351.5 m and 364.0 m respectively in KBDD24548 (~70 m

down-plunge of the KBDD24545 intercept). Drill intercepts from the Footwall Shoot returned from these

two boreholes, include: 5.0 m grading 0.97 g/t Au from a down-hole depth of 366.0 m in KBDD24545;

and 17.0 m grading 1.50 g/t Au, including 4.0 m at 3.76 g/t Au, from a down-hole depth of 412.0 m in

KBDD24548 (~80 m down-plunge of the KBDD24545 intercept). KBDD24548 also returned a selected

intercept from the Upper Shoots mineralization zone of 3.0 m grading 6.39 g/t Au from a down-hole

depth of 227.0 m. These two boreholes, in addition to the KBDD11228 hole-extension, failed to yield any

significant gold intercepts down-plunge (~30 m - 100 m) of the previously reported high-grade intercept

grading 9.29 g/t Au over 9.0 m, including 4.5 m at 16.94 g/t Au, and including 0.8 m at 81.59 g/t Au, from

a down-hole depth of 400.0 m in hole KBDD23536 (see the Company's news release of December 20,

2023).

The 7-hole (-50

o

to -65

o

) SW Drill Fence 2, including previously reported hole KBDD23539, in addition

to the present KBDD23541 / 543 / 543A and KBDD24546 / 551 / 554 boreholes, tested the south-

eastern, down-dip margin of the NE-plunging Boomerang gold system over approximately 475 m strike

and 225 m down-plunge distances, respectively. All present holes (6) yielded multiple (2 - 7) exploration

significant mineralized intercepts corresponding to the Upper Shoots, Lower Shoot, and Footwall Shoot,

and including the discovery of a new gold mineralization zone at depth below the Footwall Shoot. Hole

KBDD24546, collared at the southwest extremity of the drill fence, returned the following mineralized

intercepts: 10.0 m grading 0.81 g/t Au and 22.0 m grading 1.17 g/t Au, including 2.0 m at 6.54 g/t Au,

from down-hole depths of 26.0 m and 67.0 m respectively (Upper Shoots); 18.5 m grading 0.26 g/t Au

and 11.0 m grading 0.28 g/t Au from down-hole depths of 162.0 m and 190.0 m respectively (Footwall

Shoot); and 2.0 m grading 5.38 g/t Au from a down-hole depth of 290.0 m (New Mineralization). A

mineralized intercept grading 1.29 g/t Au over 7.0 m, including 1.0 m at 3.96 g/t Au, from a down-hole

depth of 352.0 m in KBDD23543, appears to correspond to the down-plunge (~30m) extension of the

lower (new) mineralization zone in KBDD24546. Hole KBDD24554, collared at the northeast extremity

of the SW Drill Fence 2, returned the following mineralized intercepts: 10.0 m grading 2.13 g/t Au,

including 3.0 m at 4.31 g/t Au, and 5.0 m grading 1.49 g/t Au from down-hole depths of 200.0 m and

248.0 m respectively (Upper Shoots); and 31.0 m grading 0.62 g/t Au, including 10.0 m at 1.02 g/t Au

and 6.0 m at 1.03 g/t Au, from a down-hole depth of 361.0 m (Lower Shoot).

Updated 3D litho-structural modelling appears to indicate that the Boomerang resource expansion

target, consisting of a multi-shoot gold system extending over approximately 650 m strike and 750 m

down-plunge distances respectively, occupies a F2 meso-scale (parasitic) fold hinge structure

developed on the north-western limb of the mineralization-controlling 1

st

-order F2 synclinorium fold. With

the mineralization occurring as a NE-plunging system of stacked, flat-lying to concave-shaped, shallow

SE-dipping gold shoots hosted within folded / strained diorite bodies and/or associated

metasedimentary rock - diorite contacts.

Drilling to date has outlined three (4) principal gold shoots,

including the Upper Shoot (s), the Lower Shoot, the Footwall Shoot and the SW Shoot (formerly

Boomerang West), across an approximately 370 m cross-plunge distance. The Lower Shoot, presently

the most prominent mineralization shoot of the Boomerang gold system, has so far been delineated from

practically surface to a down-plunge depth of approximately 500 m along the fold hinge structure

(approximately 345 m vertical depth from surface), and across an approximately 200 m NW-SE lateral

distance.

QA/QC

Yves P. Clement, P. Geo, Vice President, Exploration for Xtra-Gold is acting as the Qualified Person in

compliance with National Instrument 43-101 ("NI 43-101") with respect to this announcement.

He has

prepared and or supervised the preparation of the scientific or technical information in this

announcement and confirms compliance with NI 43-101. All samples in this news release were analyzed

by standard fire assay fusion with atomic absorption spectroscopy finish at the ISO 17025:2005

accredited Intertek Minerals Limited's laboratory in Tarkwa, Ghana. Xtra-Gold has implemented a

rigorous quality assurance / quality control (QA/QC) program to ensure best practices in sampling and

analysis of drill core, trench channel, and saw-cut channel samples, the details of which can be viewed

on the Company's website at

www.xtragold.com

.

About Xtra-Gold Resources Corp.

Xtra-Gold is a gold exploration company with a substantial land position in the Kibi Gold Belt.

The Kibi

Gold Belt, which exhibits many similar geological features to Ghana's main gold belt, the Ashanti Belt,

has been the subject of very limited modern exploration activity targeting lode gold deposits as virtually

all past gold mining activity and exploration efforts focused on the extensive alluvial gold occurrences in

many river valleys throughout the Kibi area.

Xtra-Gold holds 5 Mining Leases totaling approximately 226 sq km (22,600 ha) at the northern extremity

of the Kibi Gold Belt.

The Company's exploration efforts to date have focused on the Kibi Gold Project

located on the Apapam Concession (33.65 sq km), along the eastern flank of the Kibi Gold Belt. The

Kibi Gold Project (Zones 1-3) Mineral Resource Estimate, produced by Xtra-Gold on September 30,

2021, represents the only Mineral Resource ever generated on a lode gold project within the Kibi Gold

Belt. The NI 43-101 Technical Report entitled "Xtra-Gold Resources Corporation Kibi Gold Project",

jointly prepared by Pivot Mining Consultants (Pty) and Tect Geological Consulting, and dated November

16, 2021, is filed under the Company's profile on SEDAR at

www.sedar.com

.

Forward-Looking Statements

The TSX does not accept responsibility for the adequacy or accuracy of this release. No stock

exchange, securities commission or other regulatory authority has approved or disapproved the

information contained herein. This news release includes certain "forward-looking statements". These

statements are based on information currently available to the Company and the Company provides no

assurance that actual results will meet

management's expectations.

Forward- looking statements include

estimates and statements that describe the Company's future plans, objectives or goals, including words

to the effect that the Company or management expects a stated condition or result to occur.

Forward-

looking statements may be identified by such terms as "believes", "anticipates", "expects", "estimates",

"may", "could", "would", "will", or "plan". Since forward-looking statements are based on assumptions

and address future events and conditions, by their very nature they involve inherent risks and

uncertainties. Actual results relating to, among other things, results of exploration, project development,

reclamation and

capital

costs

of

the

Company's mineral

properties, and

the Company's

financial

condition

and

prospects,

could

differ

materially

from

those

currently anticipated

in

such

statements

for

many

reasons

such

as:

changes

in

general

economic conditions and conditions in the financial markets;

changes in demand and prices for minerals; litigation,

legislative,

environmental

and

other

judicial,

regulatory,

political

and

competitive developments; technological and operational

difficulties

encountered

in

connection

with

the activities

of

the Company; and other matters discussed in this news

release.

This list is not exhaustive of the factors that may affect any of the Company's forward-looking

statements. These and other factors should be considered carefully, and readers should not place undue

reliance on the Company's forward-looking statements. The Company does not undertake to update any

forward-looking statement that may be made from time to time by the Company or on its behalf, except

in accordance with applicable securities laws.

Cautionary Note to United States Investors

This news release has been prepared in accordance with the requirements of the securities laws in

effect in Canada, which differ from the requirements of U.S. securities laws. Unless otherwise indicated,

all resource and reserve estimates included in this news release have been prepared in accordance with

National Instrument 43-101 Standards of Disclosure for Mineral Projects ("NI 43-101") and the Canadian

Institute of Mining, Metallurgy, and Petroleum 2014 Definition Standards on Mineral Resources and

Mineral Reserves. NI 43-101 is a rule developed by the Canadian Securities Administrators which

establishes standards for all public disclosure an issuer makes of scientific and technical information

concerning mineral projects. Canadian standards, including NI 43-101, differ significantly from the

requirements of the SEC, and mineral resource and reserve information contained herein may not be

comparable to similar information disclosed by U.S. companies. In particular, and without limiting the

generality of the foregoing, the term "resource" does not equate to the term "reserves". Under U.S.

standards, mineralization may not be classified as a "reserve" unless the determination has been made

that the mineralization could be economically and legally produced or extracted at the time the reserve

determination is made. The SEC's disclosure standards normally do not permit the inclusion of

information concerning "measured mineral resources", "indicated mineral resources" or "inferred

mineral resources" or other descriptions of the amount of mineralization in mineral deposits that do not

constitute "reserves" by U.S. standards in documents filed with the SEC. Investors are cautioned not to

assume that any part or all of mineral deposits in these categories will ever be converted into reserves.

U.S. investors should also understand that "inferred mineral resources" have a great amount of

uncertainty as to their existence and great uncertainty as to their economic and legal feasibility. It cannot

be assumed that all or any part of an "inferred mineral resource" will ever be upgraded to a higher

category. Under Canadian rules, estimated "inferred mineral resources" may not form the basis of

feasibility or pre-feasibility studies except in rare cases. Investors are cautioned not to assume that all or

any part of an "inferred mineral resource" exists or is economically or legally mineable. Disclosure of

"contained ounces" in a resource is permitted disclosure under Canadian regulations; however, the SEC

normally only permits issuers to report mineralization that does not constitute "reserves" by SEC

standards as in-place tonnage and grade without reference to unit measures. The requirements of NI 43-

101 for identification of "reserves" are also not the same as those of the SEC, and reserves reported by

the Company in compliance with NI 43-101 may not qualify as "reserves" under SEC standards.

Accordingly, information concerning mineral deposits set forth herein may not be comparable with

information made public by companies that report in accordance with U.S. standards.

Contact Information

For further information please contact:

James Longshore

Chief Executive Officer

242-363-3864

E-mail:

[email protected]

Website:

www.xtragold.com

NOT FOR DISSEMINATION IN THE UNITED STATES OF AMERICA OR THROUGH U.S. NEWSWIRE

SERVICES

To view the source version of this press release, please visit

https://www.newsfilecorp.com/release/212440