WESTERN COPPER AND GOLD PROVIDES

INFRASTRUCTURE UPDATE

VANCOUVER, BC

,

April 10, 2025

/CNW/ - Western Copper and Gold Corporation ("Western" or the "Company")

(TSX: WRN) (NYSE American: WRN) is pleased to provide an update on several infrastructure initiatives supporting

the development of its

Casino

Copper-Gold Project ("

Casino

Project").

Sandeep Singh

, President and Chief Executive Officer, stated: "Infrastructure is obviously a key piece of the puzzle to

bring the

Casino

Project into production. Reciprocally, the

Casino

Project is an important lynchpin to improve the

infrastructure of the

Yukon

and the neighboring north. The required initiatives will take time to unfold, but we are

pleased with the overall direction of travel with respect to infrastructure and with the

Yukon

government's commitment

to sustainable mining.

Further, these past several weeks have clearly been disruptive and volatile from an overall economic standpoint. But

that volatility has also underscored two specific positive aspects of the

Casino

Project. First, we have often said that

the copper-gold commodity mix makes our project highly resilient. That resilience has shown itself to be incredibly

valuable in the last year as the gold price has risen nearly

US$750

per ounce. Second, we believe that the

groundswell of support politically for mining, and a growing understanding of its role in a more self-reliant Canadian

economy, also bodes well for the

Casino

Project."

B.C.-Yukon Grid Connect Project

On

September 17, 2024

, Natural Resources Canada ("NRCan") conditionally approved

$40 million

in funding to

advance pre-feasibility work for a high-voltage transmission energy corridor connecting the isolated

Yukon

electrical

grid to the North American grid in

British Columbia

. Western is pleased to report that the conditions for this funding

have been met by the Yukon Development Corporation ("YDC"), an entity of the Government of

Yukon

, which

included a 25% YDC funding commitment over and above the

$40 million

from NRCan. Subsequently, a contribution

agreement with NRCan was officially signed in

Ottawa

on

February 14, 2025

, where project planning activities have

since commenced. With its significant industrial load, the

Casino

Project is central to the concept behind the grid

connection – its advancement signals confidence in the

Casino

Project's potential and its role in shaping the

Yukon's

future infrastructure. While Western continues to advance LNG as the

Casino

Project's base case power solution, the

Company looks forward to working alongside YDC and First Nations to help make the grid connection a success.

Yukon Resource Gateway Project

On

March 22, 2025

, the Government of

Yukon

announced the inclusion of the Dempster Highway in the Yukon

Resource Gateway Project ("Gateway Project"), expanding the scope of the initiative to include Arctic security and

regional connectivity. Whilst positive for the

Yukon

, a portion of funding previously allocated to the

Casino

Copper-

Gold Access Road has been redirected to support this near-term priority. Western remains in close collaboration with

the

Yukon

government, and discussions on future funding are expected to advance as the project moves through the

environmental assessment process, which includes the road.

Port of Skagway Transportation Study

Western has completed an updated transportation study evaluating options for shipping concentrate from the

Casino

Project to the Port of Skagway ("Skagway"). The study, conducted in collaboration with the Municipality of

Skagway and the Government of

Yukon

, assessed both bulk and containerized transportation methods, assessed

infrastructure requirements at Skagway, and provided feasibility-level capital and operating cost estimates across

multiple scenarios. Several promising transportation alternatives were identified, with costs broadly in-line with, or

lower than, the Company's 2022 feasibility study estimates.

ABOUT WESTERN COPPER AND GOLD CORPORATION

Western Copper and Gold Corporation is developing the

Casino

Project,

Canada's

premier copper-gold mine in the

Yukon Territory

and one of the most economic greenfield copper-gold mining projects in the world. For more

information, visit

www.westerncopperandgold.com

.

The Company is committed to working collaboratively with our First Nations and local communities to progress the

Casino

Project, using internationally recognized responsible mining technologies and practices.

On behalf of the board,

"Sandeep Singh"

Sandeep Singh

President and CEO

Western Copper and Gold Corporation

Cautionary Note Regarding Forward-Looking Statements

This news release includes certain "forward-looking information" and "forward-looking statements" (collectively

"forward-looking statements") within the meaning of applicable Canadian and

United States

securities legislation

including the United States Private Securities Litigation Reform Act of 1995. These forward-looking statements are

made as of the date of this news release. Forward-looking statements are frequently, but not always, identified by

words such as "expects", "anticipates", "believes", "plans", "projects", "intends", "estimates", "envisages",

"potential", "possible", "strategy", "goals", "opportunities", "objectives", or variations thereof or stating that certain

actions, events or results "may", "could", "would", "might" or "will" be taken, occur or be achieved, or the negative

of any of these terms and similar expressions. Such forward-looking statements herein include statements

regarding the timing, funding, and progress of infrastructure initiatives, including the B.C.-Yukon Grid Connect

Project, the Yukon Resource Gateway Project, and transportation options to the Port of Skagway. These statements

are based on current information and interpretations, which may evolve as discussions with governments continue

and additional technical and environmental work is undertaken.

Forward-looking statements involve known and unknown risks, uncertainties and other factors that may cause

actual events to be materially different from those expressed or implied by such statements. Such factors include

but are not limited to the risk of unforeseen challenges in advancing the

Casino

project, potential impacts on

operational continuity, changes in general market conditions that could affect the Company's performance; and

other risks and uncertainties disclosed in the Company's annual information form and Form 40-F for the most

recently completed financial year and its other publicly filed disclosure documents.

Forward-looking statements are based on assumptions management believes to be reasonable, including but not

limited to the timely advancement of infrastructure initiatives, the continued support and collaboration of the

Yukon

government and other stakeholders, the availability of funding for such initiatives, and such other assumptions and

factors as set out herein, and in the Company's annual information form and Form 40-F for the most recently

completed financial year and its other publicly filed disclosure document.

Although the Company has attempted to identify important factors that could cause actual results to differ materially

from those contained in forward-looking statements, other factors may cause results to be materially different from

those anticipated, described, estimated, assessed or intended. These forward-looking statements represent the

Company's views as of the date of this news release. There can be no assurance that any forward-looking

statements will be accurate, as actual results and future events could differ materially from those anticipated in

such statements. Accordingly, readers should not place undue reliance on forward-looking statements. The

Company does not intend to and does not assume any obligation to update forward-looking statements other than

as required by applicable law.

View original content to download multimedia:

https://www.prnewswire.com/news-releases/western-copper-and-gold-provides-infrastructure-update-302425236.html

SOURCE

Western Copper and Gold Corporation

View original content to download multimedia:

http://www.newswire.ca/en/releases/archive/April2025/10/c6007.html

%SEDAR: 00023684E

For further information:

For more information, please contact: Cameron Magee, Director, Investor Relations &

Corporate Development, Western Copper and Gold Corporation, 437-219-5576 or

[email protected]

CO: Western Copper and Gold Corporation

CNW 07:30e 10-APR-25