Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

WPG.V ·

West Point Gold Intersects 41.15m of 0.83 g/t Au and 22.86m of 1.43 g/t Au at Gold Chain Project, Arizona

Drill Results

West Point Gold Intersects 41.15m of 0.83 g/t

Au and 22.86m of 1.43 g/t Au at Gold Chain

Project, Arizona

Vancouver, British Columbia--(Newsfile Corp. - April 3, 2025) - West Point Gold Corp. (TSXV: WPG)

(OTCQB: WPGCF) (FSE: LRA0) ("West Point Gold" or the "Company") is pleased to announce the

most recent drill results from its ongoing drill program at the Tyro Main Zone, Gold Chain Project,

Arizona. This release contains the assays for three reverse circulation drill holes, GC25-37, GC25-40

and GC25-41, totaling 548.6m.

Highlights:

Hole GC25-37 intersected 41.15m of 0.83 g/t Au, including 28.96m of 0.98 g/t Au and 1.52m of

5.47 g/t Au.

Hole GC25-41 intersected 10.67m of 1.86 g/t Au, including 1.53m of 10.87 g/t Au.

GC25-41 also intersected mineralization in a separate zone higher in the system, returning 22.86m

of 1.43 g/t Au, including 3.05m of 4.56 g/t Au.

Results continue to suggest that mineralization is much broader than initially thought. As a maiden

resource definition program drill holes were strategically placed between or beneath previous

drilling and expanded the mineralized zone to depth (Figure 1).

Tyro Main Zone is open at depth, northeast towards Frisco Graben, and southwest.

Assays are pending for an additional 11 completed drill holes (approximately 1,720m), and the drill

program is ongoing.

"The 2025 drill program continues to demonstrate the potential of Tyro is at least in line, if not better,

than the previously announced exploration target at grades that remain significantly above the

nearest operating open-pit mine",

stated CEO Quentin Mai.

"Our ability to expand the current drill

program to 5,000 metres, based on recent warrant exercises, should provide a steady stream of drill

results over the next two months or so as the ongoing drill program moves the Company closer to a

maiden resource at Tyro."

Figure 1: Preliminary Tyro Main Zone Long Section showing results from the 2025 RC drill

program, previous drill results, trenches and 200 Level Sampling

To view an enhanced version of this graphic, please visit:

https://images.newsfilecorp.com/files/5717/247187_8a01cbba944f1ab1_002full.jpg

Notes:

Drill holes GC21-13 to GC21-16 released October 25, 2021 (

link here

)

Underground chip-channel sampling results released April 28, 2022 (

link here

)

Drill holes GC23-23 to GC23-28 released February 28, 2023 (

link here

)

Surface trench results released July 11, 2024 (

link here

)

Drill holes GC24-30 to GC24-31 released January 15, 2025 (

link here

) and updated February 24, 2025 (

link here

)

Drill holes GC24-29, GC24-32 to GC24-36 released January 23, 2025

(link here

) and updated February 24, 2025 (

link here

)

Drill holes GC25-38 and GC25-39 released March 19, 2025 (

link here

)

Table 1: Drill Results

Holes

From (m)

To (m)

Width (m)

Grade (g/t Au)

GC25-37

50.29

91.44

41.15

0.83

incl.

53.34

82.30

28.96

0.98

incl.

79.25

80.77

1.52

5.47

GC25-40

146.30

178.31

32.01

0.17

GC25-41

92.96

103.63

10.67

1.86

incl.

92.96

94.49

1.53

10.87

and

141.73

164.59

22.86

1.43

incl.

147.83

161.54

13.71

1.83

incl.

156.97

160.02

3.05

4.56

Notes:

All widths shown are downhole; true width is approximately 60-70% of downhole width.

Figure 2: Plan View of Tyro Main Zone Showing Drill Holes, Trenches and Surface Samples

(gold)

To view an enhanced version of this graphic, please visit:

https://images.newsfilecorp.com/files/5717/247187_8a01cbba944f1ab1_003full.jpg

Summary

The H1 2025 drill program has been designed to provide the data necessary for a potential maiden

resource from the Tyro Main Zone while at the same time increasing the Company's understanding of the

mineralization. The program is currently planned for 5,000m but may expand based on success and

available funds. The results in this release are from three holes (548.6m), an additional 11 drill holes

have been completed, and assays are pending (1,720m). Drilling is ongoing.

A key takeaway from these holes is the through-going swarm of sub-parallel quartz-calcite-adularia veins

enveloped by broad zones of quartz stockwork which comprise the Main Tyro zone. Increased drill hole

density permits the improved definition of the host rocks, structural controls, vein-related alteration and

grade variability. Gold grades exceeding the target grade (plus 2 g/t Au) continue to appear over

meaningful widths with multiple plus 5 g/t Au intervals within the results.

Hole GC25-37

Hole GC25-37 was drilled between and below Holes GC23-23 and GC23-24 (Figure 1). Results from

this hole continue to demonstrate a several-metre-wide hydrothermal breccia, partially developed on the

Tyro 200 Level, hosted within a broad envelope of quartz stockwork. These mineralized packages are

defined by strong propylitic alteration and moderate to strong silicification.

Figure 3: Hole GC25-37 Cross Section

To view an enhanced version of this graphic, please visit:

https://images.newsfilecorp.com/files/5717/247187_figure3.jpg

Hole GC25-40

This hole was drilled about 80 metres beneath hole GC24-30 (89.5m at 1.08 g/t Au) and over 120

metres beneath the Tyro Mine 200 Level. Despite having similar geologic characteristics and

intersecting a wide zone of quartz veining, weaker gold values were encountered than the hole above.

Closer inspection of hole GC24-30 (core) and surface geologic mapping, a south-dipping, low angle

(~35

o

) fault projects between the two holes on this section (Figure 4) and merits closer inspection.

Additionally, hole GC25-37 traversed considerable widths of metamorphic rocks (i.e. amphibolite and

garnet gneiss) which may impact fracture development. The Company believes that further drilling in this

area is required since the metamorphic rocks are restricted in the extent and interpreted to be xenoliths.

Figure 4: Hole GC25-40 Cross Section

To view an enhanced version of this graphic, please visit:

https://images.newsfilecorp.com/files/5717/247187_figure4.jpg

Hole GC25-41

This hole was drilled about 60 metres beneath hole GC24-31 (50.63m at 0.53 g/t Au) and over 85

metres beneath the Tyro Mine 200 Level. This hole revealed multiple zones of mineralization within a

broad zone of quartz veinlets; the overall width of the veining is similar to the nearby holes, but higher

grades are reporting to footwall and hanging wall structure, returning distinct footwall and hanging wall

zones within the structure hosting Tyro. The local presence of amphibolite lenses within the granitic

terrain may have a bearing on the vein's structural behaviour.

Figure 5: Hole GC25-41 Cross Section

To view an enhanced version of this graphic, please visit:

https://images.newsfilecorp.com/files/5717/247187_figure5.jpg

Figure 6: Looking North at the Historical Tyro Open-Pit

To view an enhanced version of this graphic, please visit:

https://images.newsfilecorp.com/files/5717/247187_8a01cbba944f1ab1_007full.jpg

Qualified Person

Robert Johansing, M.Sc. Econ. Geol., P. Geo., the Company's Vice President, Exploration is a qualified

person ("QP") as defined by NI 43-101 and has reviewed and approved the technical content of this

press release. Mr. Johansing has also been responsible for overseeing all phases of the drilling program

including logging, labelling, bagging and transport from the project to American Assay Laboratories of

Sparks, Nevada.

Samples were then dried, crushed and split, and pulp samples were prepared for

analysis. Gold was determined by fire assay with an ICP finish, over limit samples were determined by

fire assay and gravimetric finish. Silver plus 15 other elements were determined by Aqua Regia ICP-

AES (IM-2A16), over limit samples were determined by fire assay and gravimetric finish. Both certified

standards and blanks were inserted on site along with duplicates, standards and blanks inserted by

American Assay. Standard sample chain of custody procedures were employed during drilling and

sampling campaigns until delivery to the analytical facility.

About West Point Gold Corp.

West Point Gold Corp. (formerly Gold79 Mines Ltd.) is a publicly listed company focused on gold

discovery and development at four prolific Walker Lane Trend projects covering Nevada and Arizona,

USA.

West Point Gold is focused on developing a maiden resource at its Gold Chain project in Arizona,

while JV partner Kinross is advancing the Jefferson Canyon project in Nevada.

For further information regarding this press release, please contact:

Aaron Paterson, Corporate Communications Manager

Phone: +1 (778) 358-6173

Email:

[email protected]

Stay Connected with Us:

LinkedIn:

linkedin.com/company/west-point-gold

X (Twitter):

@westpointgoldUS

Facebook:

www.facebook.com/Westpointgold/

Website:

westpointgold.com/

FORWARD-LOOKING STATEMENTS:

Certain statements contained in this press release constitute forward-looking information. These

statements relate to future events or future performance. Forward-looking statements include estimates

and statements that describe the Company's future plans, objectives or goals, including words to the

effect that the Company or management expects a stated condition or result to occur. The use of any of

the words "could", "intend", "expect", "believe", "will", "projected", "estimated" and similar expressions

and statements relating to matters that are not historical facts are intended to identify forward-looking

information and are based on the Company's current belief or assumptions as to the outcome and timing

of such future events including, among others, assumptions about future prices of gold, silver, and other

metal prices, currency exchange rates and interest rates, favourable operating conditions, political

stability, obtaining government approvals and financing on time, obtaining renewals for existing licenses

and permits and obtaining required licenses and permits, labour stability, stability in market conditions,

availability of equipment, availability of drill rigs, and anticipated costs and expenditures. The Company

cautions that all forward-looking statements are inherently uncertain, and that actual performance may be

affected by a number of material factors, many of which are beyond the Company's control. Such factors

include, among other things: risks and uncertainties relating to West Point Gold's ability to complete any

payments or expenditures required under the Company's various option agreements for its projects; and

other risks and uncertainties relating to the actual results of current exploration activities, the

uncertainties related to resources estimates; the uncertainty of estimates and projections in relation to

production, costs and expenses; risks relating to grade and continuity of mineral deposits; the

uncertainties involved in interpreting drill results and other exploration data;

the potential for delays in

exploration or development activities; uncertainty related to the geology, grade and continuity of mineral

deposits; the possibility that future exploration, development or mining results may vary from those

expected; statements about expected results of operations, royalties, cash flows, financial position may

not be consistent with the Company's expectations due to accidents, equipment breakdowns, title and

permitting matters, labour disputes or other unanticipated difficulties with or interruptions in operations,

fluctuating metal prices, unanticipated costs and expenses, uncertainties relating to the availability and

costs of financing needed in the future and regulatory restrictions, including environmental regulatory

restrictions. The possibility that future exploration, development or mining results will not be consistent

with adjacent properties and the Company's expectations; operational risks and hazards inherent with

the business of mining (including environmental accidents and hazards, industrial accidents, equipment

breakdown, unusual or unexpected geological or structural formations, cave-ins, flooding and severe

weather); metal price fluctuations; environmental and regulatory requirements; availability of permits,

failure to convert estimated mineral resources to reserves; the inability to complete a feasibility study

which recommends a production decision; the preliminary nature of metallurgical test results; fluctuating

gold prices; possibility of equipment breakdowns and delays, exploration cost overruns, availability of

capital and financing, general economic, political risks, market or business conditions, regulatory

changes, timeliness of government or regulatory approvals and other risks involved in the mineral

exploration and development industry, and those risks set out in the filings on SEDAR made by the

Company with securities regulators. Although the Company believes that the assumptions and factors

used in preparing the forward-looking information in this corporate press release are reasonable, undue

reliance should not be placed on such information, which only applies as of the date of this news release,

and no assurance can be given that such events will occur in the disclosed time frames or at all. The

Company expressly disclaims any intention or obligation to update or revise any forward-looking

statements whether as a result of new information, future events or otherwise, other than as required by

applicable securities legislation.

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the

policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this

release.

To view the source version of this press release, please visit

https://www.newsfilecorp.com/release/247187