Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

WPG.V ·

Gold79 Discovers New High-Grade Zone at Tyro, Intersecting 9.1m of 51.09 g/t Au Within a Broad Zone of Gold Mineralization at Its Gold Chain Project in Arizona

Drill Results

Gold79 Discovers New High-Grade Zone at

Tyro, Intersecting 9.1m of 51.09 g/t Au Within a

Broad Zone of Gold Mineralization at Its Gold

Chain Project in Arizona

Ottawa, Ontario--(Newsfile Corp. - February 28, 2023) - Gold79 Mines Ltd. (TSXV: AUU) (OTCQB:

AUSVF) ("Gold79" or the "Company") is excited to announce the completion of its Phase 2 drilling

campaign and the analytical results from its Gold Chain project in Mojave County, Arizona. The program

consisted of 12 reverse circulation (RC) drill holes totaling 956 metres (m) testing the Tyro, Sheep Trail

and Boulevard mine targets with about 50 percent of the drilling focused on the Tyro vein system.

Highlights from the drilling include:

GC23-23: 44.2m of 2.01 g/t Au - drilled approximately 50m south of the underground mine

workings at Tyro and returned similar grades and mineralization to the underground sampling

previously completed (Figure 1, 2, and 3).

GC23-24: 27.4m of 2.17 g/t Au - drilled approximately 150m south of the underground mine

workings at Tyro and returned similar grades and mineralization to the underground sampling

previously completed (Figure 1, 2, and 4).

GC23-28: 85.3m of 6.23 g/t Au - tested the northwest-southeast trending White Spar fault that

intersects the Tyro vein system at approximately 45 degrees. The hole included two lower grade

zones (61.0m of 0.58 g/t Au and 15.2m at 0.74 g/t Au) with a new high-grade zone in-between of

9.1m at 51.09 g/t Au.

Analytical results for Phase 2 drilling are presented below in Table 1 and 2.

Derek Macpherson, President & CEO, stated, "

We are very pleased with the drill results from Tyro

which confirm a strike length of nearly one kilometre for Tyro and have discovered a new high-grade

zone at this target. Considering that Gold79 has only drilled 28 holes for 2,024m at Gold Chain we are

very pleased with the progress to date. Our next step is to further evaluate the Tyro Vein system as we

believe the strike could exceed two kilometres. Additionally, we plan some follow-up surface work at

Sheep Trail to better understand these results

."

Table 1. Summary of the Phase 2 Gold Chain Drilling Program.

Hole No.

Target

Interval (m)

Width

(m)*

Gold (g/t)

Comments

From

To

Boulevard Mine

4.6

16.8

12.2

0.25

GC23-17

including

24.4

27.4

3.0

1.35

Widespread quartz veinlets

including

61.0

64.0

3.0

0.42

GC23-18

Boulevard Mine

12.2

27.4

15.2

0.33

Widespread quartz veinlets

GC23-19

Boulevard Mine

No Significant Intervals

Sheep Trail Mine

12.2

35.1

22.8

0.24

GC23-20

including

16.8

21.3

4.5

0.63

Widespread quartz veinlets

and

47.2

51.8

4.6

0.28

Sheep Trail Mine

27.4

35.1

8.7

0.27

GC23-21

including

30.5

32.0

1.5

1.08

Widespread quartz veinlets

and

48.8

61.0

12.2

0.29

and

67.1

71.6

4.6

0.24

GC23-22

Sheep Trail Mine

29.0

35.6

6.6

0.62

Widespread quartz veinlets

47.2

54.9

7.7

0.69

Tyro Mine

57.9

102.1

44.2

2.01

GC23-23

including

62.5

67.1

4.6

5.19

Line 400 below pit

including

85.3

93.0

7.6

4.26

Tyro Mine

18.3

44.2

25.9

2.27

GC23-24

including

18.3

25.9

7.6

3.93

Line 300

including

42.7

44.2

1.5

14.53

GC23-25

Tyro Mine

24.4

76.6

51.8

0.28

Line 200

GC23-26

Tyro Mine

3.0

35.0

32.0

0.54

Line 150

GC23-27

Tyro Mine

0.0

18.3

18.3

0.13

Lost hole below void (stope?).

Tyro Mine

0.0

85.3

85.3

6.23

including

0.0

61.0

61.0

0.58

GC23-28

including

61.0

70.1

9.1

51.09

Strong quartz veining

including

65.5

68.6

3.1

151.60

Strong quartz veining

including

65.5

67.1

1.5

282.00

including

70.1

85.3

15.2

0.74

Hole lost at fault

*Reported mineralized intervals are downhole widths. True widths have not been determined at this time.

Tyro Results

The results from drill holes GC23-23 and GC23-24 are consistent with the results from the Tyro 200 level

sampling program (

see Gold79 press release from April 28, 2022

) about 50 - 150m north and 60m

vertically above (Figure 1). Following from the well-defined geologic model north of Line 300, where the

vein system is near vertical, the mineralized zone is estimated to have a true width of 20m to 30m. On

Lines 850 to 1000, approximately 500m to the NE, similar grades and widths were identified in the 2021

drilling program (

see Gold79 press release from October 25, 2021

). The suspected continuity along the

Tyro vein system is best portrayed in longitudinal section (see Figure 1). Geologic sections for both

holes are shown in Figures 2 and 3.

Figure 1. Longitudinal section of the Tyro vein showing pierce points, sample data and mine

workings; section is located on Figure 2.

To view an enhanced version of this graphic, please visit:

https://images.newsfilecorp.com/files/5717/156365_736e2559649d3936_001full.jpg

Recent surface mapping, in conjunction with the Phase 2 drill results, has confirmed that the Tyro vein

system is traversed by a N20W mineralized fault zone (White Spar fault) at about Line 300. Holes GC23-

25 and GC23-26 were drilled south of this structure, on Lines 200 and 150, respectively, and

encountered a broad zone (see Table 1) of silicification and quartz veining/breccia with significant gold

values (i.e. GC23-26 returned 32m of 0.54 g/t Au). Both holes intersected quartz veining distinct from the

veining observed north of Line 300. Surface mapping and sampling here identified a mineralization style

(along with lower gold grades) distinct from gold mineralization north of the fault. It is likely that the White

Spar fault has served as both a pre- and post-mineral structure guiding gold-bearing fluids and offsetting

the gold zone downwards south of the fault (see Figures 1 and 6).

The final hole in this campaign, GC23-28, was drilled N50E and roughly perpendicular to the previous

holes (Figure 1). The goal was to traverse a swarm of N20-50W veins associated with the White Spar

fault (Figures 2 and 6). The hole encountered a relatively high percentage of quartz vein to a total depth

of 85.3m and higher than expected grades. The results, summarized in Table 1, suggest that this

structural intersection could play an important role and will be a focus of future exploration.

Additional

detailed mapping of this area is planned to be completed in the near-term.

Figure 2. Geologic map of the Tyro vein system showing section lines, Phase 1 and Phase 2

drill hole collars/traces and structural setting; see Figure 6 for additional detail.

To view an enhanced version of this graphic, please visit:

https://images.newsfilecorp.com/files/5717/156365_736e2559649d3936_002full.jpg

Robert Johansing, Vice President, Exploration, states, "

The recognition of this transverse structure and

its likely relation to high-grade gold values presents Gold79 with a vector defined by the intersection of

the Tyro structure, a northwest-trending structural corridor and multiple rhyolite dikes. To date, we have

focused on defining a +1.5 g/t vein system but now recognize an opportunity for higher grades as

demonstrated by drill hole GC23-28.

"

Figure 3. Section L400 showing GC23-23 results and relative position of the Tyro 200L and

open pit.

To view an enhanced version of this graphic, please visit:

https://images.newsfilecorp.com/files/5717/156365_736e2559649d3936_003full.jpg

Figure 4. Section L300 showing GC23-24 results and relative position to the White Spar fault.

To view an enhanced version of this graphic, please visit:

https://images.newsfilecorp.com/files/5717/156365_736e2559649d3936_004full.jpg

Figure 5. Preliminary geologic section along drill holes GC23-27 and GC23-28 showing revised

geologic interpretation with high gold grades developed in the hanging wall of the White Spar

fault.

To view an enhanced version of this graphic, please visit:

https://images.newsfilecorp.com/files/5717/156365_736e2559649d3936_005full.jpg

Figure 6. Initial geologic map of the intersection of the Tyro vein system with the White Spar

fault showing drill holes and section lines.

To view an enhanced version of this graphic, please visit:

https://images.newsfilecorp.com/files/5717/156365_736e2559649d3936_006full.jpg

Figure 7. Geologic map of the core area of the Gold Chain project showing select Phase 2 drill

holes and Phase 1 drill holes.

To view an enhanced version of this graphic, please visit:

https://images.newsfilecorp.com/files/5717/156365_736e2559649d3936_007full.jpg

Phase 2 Drilling at the Sheep Trail and Boulevard Mine Areas

Six scout-type holes, ranging from 70.1 to 111.3 m in depth, were drilled across the footwall contact of

the rhyolite dike where historical mining has occurred at both the Boulevard and Sheep Trail mines

(Figure 6). All holes traversed broad zones of quartz veining hosting anomalous gold values (Table 1)

with gold values up to 1.35 g/t (3.1m) but did not reflect the elevated grades observed at the surface. The

strength of the veining and alteration in both the drill holes and surface exposures require additional work

to better understand the mineralization at this target.

Table 2. Hole Details of the Phase 2 Gold Chain Drilling Program.

Hole No.

Target

Collar Coordinates

Total Hole

Depth (m)

Azimuth

Angle

N (NAD83)

E (NAD83)

GC23-17

Boulevard Mine

3,900,147

732,195

70.1

30

-60

GC23-18

Boulevard Mine

3,900,169

732,132

76.2

30

-60

GC23-19

Boulevard Mine

3,900,095

732,129

111.3

30

-60

GC23-20

Sheep Trail Mine

3,900,374

731,869

80.8

60

-55

GC23-21

Sheep Trail Mine

3,900,375

731,869

74.7

30

-55

GC23-22

Sheep Trail Mine

3,900,446

731,780

79.3

50

-55

GC23-23

Tyro Mine

3,901,070

732,002

106.7

305

-50

GC23-24

Tyro Mine

3,901,020

731,926

67.0

305

-55

GC23-25

Tyro Mine

3,900,899

731,901

94.5

305

-50

GC23-26

Tyro Mine

3,900,874

731,849

91.4

305

-50

GC23-27

Tyro Mine

3,900,962

731,850

18.3

50

-55

GC23-28

Tyro Mine

3,900,968

731,858

85.3

50

-55

Qualified Person / Quality Control and Quality Assurance

Robert Johansing, M.Sc. Econ. Geol., P. Geo., the Company's Vice President, Exploration is a qualified

person ("QP") as defined by NI 43-101 and has reviewed and approved the technical content of this

press release. Mr. Johansing has also been responsible for all phases of the Phase 2 drilling program

including sample collection, labelling, bagging and transport from the project to American Assay

Laboratories of Sparks, Nevada.

Samples were then dried, crushed and split, and pulp samples were

prepared for analysis. Gold was determined by fire assay with an ICP finish, over limit samples were

determined by fire assay and gravimetric finish. Silver plus 34 other elements were determined by Aqua

Regia ICP-AES, over limit samples were determined by fire assay and gravimetric finish. Standard

sample chain of custody procedures were employed during field work and the drilling campaign until

delivery to the analytical facility.

About Gold79 Mines Ltd.

Gold79 Mines Ltd.

is a TSX Venture listed company focused on building ounces in the Southwest USA.

Gold79 holds 100% earn-in option to purchase agreements on three gold projects: the Jefferson Canyon

Gold Project and the Tip Top Gold Project both located in Nevada, USA, and, the Gold Chain Project

located in Arizona, USA. In addition, Gold79 holds a 32.3% interest in the Greyhound Project, Nunavut,

Canada under JV by Agnico Eagle Mines Limited.

For further information regarding this press release contact:

Derek Macpherson, President & CEO

Phone: 416-294-6713

Email:

[email protected]

Website:

www.gold79mines.com

.

Book a 30-minute meeting with our CEO

here

.

FORWARD-LOOKING STATEMENTS:

This press release may contain forward looking statements that are made as of the date hereof and are based on current expectations, forecasts

and assumptions which involve risks and uncertainties associated with our business including any future private placement financing, the

uncertainty as to whether further exploration will result in the target(s) being delineated as a mineral resource, capital expenditures, operating

costs, mineral resources, recovery rates, grades and prices, estimated goals, expansion and growth of the business and operations, plans and

references to the Company's future successes with its business and the economic environment in which the business operates. All such

statements are made pursuant to the 'safe harbour' provisions of, and are intended to be forward-looking statements under, applicable Canadian

securities legislation. Any statements contained herein that are statements of historical facts may be deemed to be forward-looking statements. By

their nature, forward-looking statements require us to make assumptions and are subject to inherent risks and uncertainties. We caution readers

of this news release not to place undue reliance on our forward-looking statements as a number of factors could cause actual results or

conditions to differ materially from current expectations. Please refer to the risks set forth in the Company's most recent annual MD&A and the

Company's continuous disclosure documents that can be found on SEDAR at

www.sedar.com

. Gold79 does not intend, and disclaims any

obligation, except as required by law, to update or revise any forward-looking statements whether as a result of new information, future events or

otherwise.

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange)

accepts responsibility for the adequacy or accuracy of this release.

To view the source version of this press release, please visit

https://www.newsfilecorp.com/release/156365