TORONTO, Dec. 13, 2018 /CNW/ - Wallbridge Mining Company Limited (TSX:WM, FWB:WC7)

("Wallbridge" or the "Company") is pleased to announce continued positive results from its

underground as well as surface drill programs and to provide an update on the ongoing development

as part of the 35,000-tonne bulk sample and underground exploration program at its 100%-owned

Fenelon Gold Property ("Fenelon" or "Property").

Highlights:

On target to achieve bulk sample production guidance of 35,000 tonnes grading 18-25 grams

per tonne of gold for production of 19,000-26,000 ounces of gold.

Mill recoveries have reached forecast levels.

13,500 tonnes of ore processed at the Camflo Mill in September and November mill runs.

10,000 metres drilled underground in 2018, with visible gold observed in over 50% of drill holes

and approximately 5,000 metres of surface drilling.

Underground and surface drilling to date has been successful at extending known gold zones

and discovering new parallel zones.

Encouraged by exploration results and currently evaluating a substantial exploration program for

2019.

"We are very encouraged by the results from the Fenelon bulk sample to date and confidently

maintain our previous guidance for production of 35,000 tonnes at grades of 18 to 25 grams per

tonne producing 19,000 to 26,000 ounces of gold. The current bulk sample that started in the

second quarter of this year is about halfway completed. Although schedule to reach the bottom

levels is about 4 to 6 weeks behind the original plan due to some additional development, the stope

production in terms of tonnage and grade is very close to our original estimates. The mill recoveries

have now reached forecast levels and we are confident in reaching our targets in all areas of

production and exploration. The benefit of the bulk sample is that it has allowed us to get a head

start on mine development as we test various mining areas and at the same time explore to define

additional ounces not only in the vicinity of the existing planned infrastructure but also to depth."

stated Marz Kord, President & CEO of Wallbridge.

"The exploration drilling we have done over the past year at Fenelon has significantly expanded the

extent of high-grade gold mineralization at shallow depths near infrastructure, has resulted in the

discovery of several new high-grade zones and has improved our understanding of the nature of the

gold mineralization to depth. We are proud of the team at Wallbridge and look forward to further

expanding and de-risking the project and building additional resources and reserves for years to

come."

Bulk Sample Production Update

Following the dewatering of the pit and underground and rehabilitation of existing infrastructure, ramp

Click to view

development began in mid-June which was quickly followed with first stope production in August.

To end of November, production from three stopes as well as historical low-grade ore on site has

generated more than 18,000 ore tonnes of which 13,500 were delivered and processed at the

Camflo Mill during the first two mill runs in September and November. Wallbridge, in its original bulk

sample plans, included the historical low-grade ore as part of the first mill run while milling

performance was optimized. Lessons learned from the first mill run were applied to the second mill

run and recoveries of 96% were achieved.

Two stopes and the historical low-grade ore were part of the first two mill runs. Designed stope

grades ranged from 15.9 to 18.6 grams per tonne of gold and the diluted grades ranged from 13.8

to 14.9 grams per tonne of gold with 4,400 ounces of gold recovered and sold to date.

The next mill runs are scheduled for the months of December, January and February, each with

increasing grades to achieve our target guidance.

"We are very pleased with the results we have achieved to date. Our team continues to focus on

safely delivering the bulk sample, liaising with local and first nation communities and learning as we

move forward. I am excited about our continued exploration activities with the goal of building a long-

lasting operation in the area," stated

Frank Demers

, Vice-President, Mining & Projects.

Fenelon Geology & Exploration

"The underground exposures of mineralized structures along with the rigorous grade control routine

involving detailed mapping, state-of-the-art 3D photogrammetry and high frequency of chip, muck

and test hole sampling is providing us with invaluable information on the geology, the structural

controls and grade variability of the different gold-bearing mineralized zones which will inform future

exploration, resource estimates and production decisions," stated Attila Péntek, Vice-President,

Exploration of Wallbridge. "We are very proud of our geology team, which has managed the bulk

sample grade control as well as the drill programs extremely well and have developed a deep

understanding of the deposit."

The 2018 underground drill program commenced in early June and to date a total of over 10,000

metres have been drilled and visible gold was observed to be present in 50 of the 90 drill holes.

Initially, drilling has mainly targeted the high-grade shoots down to 5130 Level (~120 m depth),

which is the lowermost level being developed during the 2018 bulk sample program. Stopes that are

part of the bulk sample were drilled-off to a nominal 6 to

7 m

spacing and the drill results have

validated the geological model and proven the continuity of high-grade shoots. Consistent high-grade

intersections from this stope in-fill drill program support the 18 to 25 g/t gold estimated grade for the

35,000-tonne bulk sample with previously announced highlights including (see Wallbridge Press

Releases from

July 25, 2018

to

November 20, 2018

):

18-1035-019:

137.63 g/t gold over 4.85 metres

in the Naga Viper zone

18-1035-005:

48.81 g/t gold over 6.13 metres

in the Naga Viper zone

18-1035-017:

50.31 g/t gold over 10.13 metres

in the Chipotle zone

18-1035-013:

144.96 g/t gold over 2.12 metres

in the Chipotle zone

This year's program also successfully delineated a high-grade shoot in the Habanero Zone, which

was discovered as part of the Company's 2017 surface drilling. The high-grade domain in this

mineralized structure has shown excellent continuity with over 20 drill intersections yielding grades

between 6.29 to 122.35 g/t gold over mineable width. Previously announced highlights include (see

Wallbridge Press Releases from

September 19, 2018

to

November 20, 2018

):

54.45 g/t gold over

7.79 metres

in 18-0990-011,

122.35 g/t gold over 2.95 metres

in 18-0990-007,

41.02 g/t gold

over 5.52 metres

in 18-0990-010. Also, in the West extension area, the Paprika zone has provided

some respectable intersections including previously announced

134.57 g/t gold over 1.70 metres

in

18-0990-017 and

35.91 g/t gold over 3.42 metres

in 18-1030-009.

Currently, underground drilling is targeting the main high-grade shoots down-plunge to

200 m

depth. Since the last press release (see

Wallbridge Press Release dated

November 20, 2018

),

highlights of received assay results are as follows:

18-1000-007:

11.22 g/t gold over 10.10 metres

, including

42.91 g/t gold over 2.35 metres

in the

Habanero zone

18-1110-004:

13.62 g/t gold over 4.27 metres

in the Naga Viper zone

18-1130-004:

6.23 g/t gold over 4.88 metres

, including

39.35 g/t gold over 0.60 metres

in the

Naga Viper zone

"In addition to confirming our geological model and delineating the bulk sample stopes, the

underground drill program has been very successful in discovering additional ounces proximal to the

mine workings that we will be able to put into production with very minimal additional development,"

stated Attila Péntek, Vice-President, Exploration of Wallbridge.

Surface drilling is also underway with two drill rigs and so far approximately 5,000 metres have been

drilled in 15 drill holes. This program is aimed at following known mineralized zones and expand

resources to 300-400 metres depth as well as further away from the mine workings.

Mineralized zones containing chalcopyrite, an indicator mineral for the gold-bearing system, were

intersected in seven of the drill holes and visible gold was observed in drill hole FA-18-038 at a

vertical depth of 325 metres, making this the deepest occurrence of visible gold-bearing

mineralization drilled so far at Fenelon. Other deep holes drilled so far (FA-18-040, -044 and -047)

confirm the depth extensions of gabbroic host lithologies and the mineralized shear zones.

Assay results from 15 underground drill holes and 13 surface drill holes are pending.

A summary of the drill hole results from the underground drilling can be viewed on the

Company website

.

Table 1. Wallbridge Fenelon Gold Property 2018 Underground drill hole information*

Drill Hole ID

Local grid

E

Local grid

N

Elevation

Length

(Metres)

Azimuth

Dip

VG/CP**

Note

18-1120-004

10644

]

10954

5214

72

202

-17

CP

Further Assays pending

18-1110-002

10636

10959

5214

102

204

-41

VG

Further Assays pending

18-1110-003

10636

10959

5214

75

205

-17

CP

Assays pending

18-5175-001

10580

10986

5177

210

239

-36

CP

Further Assays pending

18-5175-002

10580

10986

5177

150

242

-26

VG

Further Assays pending

18-5175-003

10580

10986

5177

156

232

-34

CP

Assays pending

18-5175-004

10580

10986

5177

156

226

-35

CP

Assays pending

18-5175-005

10580

10986

5177

130

221

-28

VG

Assays pending

18-5175-006

10580

10986

5177

147

212

-37

CP

Assays pending

18-5175-007

10580

10986

5177

205

228

-43

CP

Assays pending

18-5175-008

10580

10986

5177

180

220

-41

CP

Assays pending

18-5175-009

10580

10986

5177

207

210

-48

Assays pending

18-5175-010

10580

10986

5177

160

195

-42

CP

Assays pending

18-5175-011

10580

10986

5177

200

191

-48

CP

Assays pending

18-5175-021

10580

10986

5177

132

242

-19

VG

Assays pending

*

Table includes only underground holes for which assays are pending. For earlier holes please refer to tables in previous press releases.

**

Intervals containing visible gold ("VG") or chalcopyrite-bearing mineralized shear zone ("CP").

Table 2. Wallbridge Fenelon Gold Property 2018 Surface drill hole information*

Drill Hole ID

Local

grid E

Local grid

N

Elevation

Length

(Metres)

Azimuth

Dip

VG/CP**

Note

FA-18-034

10224

10828

5258

192

25

-55

Assays pending

FA-18-035

10224

10828

5258

228

25

-62

Assays pending

FA-18-037

10458

11053

5260

201

234

-47

CP

Further assays pending

FA-18-038

10458

11053

5260

586

240

-54

VG

Assays pending

FA-18-039

10752

10825

5257

263

25

-50

CP

Assays pending

FA-18-040

10459

11054

5261

528

246

-48

Assays pending

FA-18-041

10752

10825

5262

201

32

-62

CP

Assays pending

FA-18-042

10752

10825

5262

243

10

-72

CP

Assays pending

FA-18-043

10752

10825

5262

222

55

-60

Assays pending

FA-18-044

10750

1130

5260

651

195

-51

CP

Assays pending

FA-18-045

10242

10807

5257

204

25

-50

Assays pending

FA-18-046

10242

10807

5257

225

25

-57

Assays pending

FA-18-047***

10634

11123

5260

498

210

-60

CP

Assays pending

FA-18-048

10242

10807

5257

372

17

-70

Assays pending

FA-18-049

10242

10807

5257

185

39

-51

Assays pending

*

Table includes only underground holes for which assays are pending. For earlier holes please refer to tables in previous press releases.

**

Intervals containing visible gold ("VG") or chalcopyrite-bearing mineralized shear zone ("CP").

***

Drilling of this hole is currently underway, length of hole will be updated in future press releases once completed

Wallbridge's Fenelon Gold Property is located in northwestern

Quebec

proximal to the Sunday Lake

Deformation Zone ("SLDZ") which hosts the Detour Gold Mine in

Ontario

, and Balmoral Resources'

gold deposits at Martiniere. The Fenelon Gold Property hosts the Discovery Zone gold deposit and

surrounding 4 km strike length of a gold-hosting secondary splay of the SLDZ.

Since acquiring the property in late 2016, Wallbridge has completed an updated resource estimate

and a positive pre-feasibility study on the existing resource (see

Wallbridge Press Release dated

February 02, 2017

). In addition, Wallbridge has completed surface

exploration drilling campaigns and is currently drilling from underground as part of its 35,000-tonne

bulk sample at Fenelon. Drilling to date has significantly extended existing zones and discovered

several new parallel zones.

Drill core samples from the ongoing drill program at Fenelon were cut and bagged on site and

transported to SGS Canada Inc. Samples, along with standards, blanks, and duplicates included for

quality assurance and quality control, were prepared and analyzed at SGS Canada Inc. laboratories.

Samples are crushed to 90% less than 2mm. A 1kg riffle split is pulverized to >95% passing 106

microns. 50g samples are analyzed by fire assay and AAS. Samples >10g/t Au are automatically

analyzed by fire assay with gravimetric finish or screen metallic analysis. To test for coarse free gold

and for additional quality assurance and quality control, Wallbridge requests screen metallic analysis

for samples containing visible gold. These and future assay results may vary from time to time due

to re-analysis for quality assurance and quality control.

The Qualified Persons responsible for the technical content of this press release are

Marz Kord

, P.

Eng., M. Sc., MBA, President & CEO and Attila Péntek, P.Geo., Ph.D., Vice President Exploration

for Wallbridge Mining Company Limited.

About Wallbridge Mining

Wallbridge is establishing a pipeline of projects that will support sustainable production and revenue

as well as organic growth through exploration and scalability.

Wallbridge is currently developing its 100%-owned high-grade Fenelon Gold property in

Quebec

with

ongoing exploration and a bulk sample in 2018. Wallbridge is also pursuing other additional

advanced-stage projects which would add to the Company's near-term project pipeline. These

discussions benefit from the operating capabilities Wallbridge demonstrated by safely and efficiently

mining the Broken Hammer deposit in

Sudbury

, which was completed in

October 2015

. As part of

this strategy, the Company recently optioned the Beschefer Project, an advanced gold property with

proven size and grade-potential near Fenelon Gold. Wallbridge is also continuing partner-funded

exploration on its large portfolio of nickel, copper, and PGM projects in

Sudbury, Ontario

, with a

focus on its high-grade Parkin project.

Wallbridge also has exposure to exploration for copper and gold in

Jamaica

and

British Columbia

through its 11.3% ownership of Carube Copper Corp. (CUC:TSX-V, formerly Miocene Resources

Limited, a Wallbridge spin-out of its BC assets).

This press release may contain forward-looking statements (including "forward-looking

information" within the meaning of applicable Canadian securities legislation and "forward-

looking statements" within the meaning of the US Private Securities Litigation Reform Act of

1995) relating to, among other things, the operations of Wallbridge and the environment in

which it operates. Generally, forward-looking statements can be identified by the use of

words such as "plans", "expects" or "does not expect", "is expected", "budget", "scheduled",

"estimates", "forecasts", "intends", "anticipates" or "does not anticipate", or "believes", or

variations of such words and phrases or statements that certain actions, events or results

"may", "could", "would", "might" or "will be taken", "occur" or "be achieved". Wallbridge has

relied on a number of assumptions and estimates in making such forward-looking

statements, including, without limitation, the costs associated with the development and

operation of its properties. Such assumptions and estimates are made in light of the trends

and conditions that are considered to be relevant and reasonable based on information

available and the circumstances existing at this time. A number of risk factors may cause

actual results, level of activity, performance or outcomes of such exploration and/or mine

development to be materially different from those expressed or implied by such forward-

looking statements including, without limitation, whether such discoveries will result in

commercially viable quantities of such mineralized materials, the possibility of changes to

project parameters as plans continue to be refined, the ability to execute planned

exploration and future drilling programs, the need for additional funding to continue

exploration and development efforts, changes in general economic, market and business

conditions, and those other risks set forth in Wallbridge's most recent annual information

form under the heading "Risk Factors" and in its other public filings. Forward-looking

statements are not guarantees of future performance and such information is inherently

subject to known and unknown risks, uncertainties and other factors that are difficult to

predict and may be beyond the control of Wallbridge. Although Wallbridge has attempted to

identify important risks and factors that could cause actual actions, events or results to

differ materially from those described in forward-looking statements, there may be other

factors and risks that cause actions, events or results not to be as anticipated, estimated or

intended. Consequently, undue reliance should not be placed on such forward-looking

statements. In addition, all forward-looking statements in this press release are given as of

the date hereof.

Wallbridge disclaims any intention or obligation to update or revise any forward-looking

statements, whether as a result of new information, future events or otherwise, save and

except as may be required by applicable securities laws. The forward-looking statements

contained herein are expressly qualified by this disclaimer.

SOURCE

Wallbridge Mining Company Limited

View original content to download multimedia:

http://www.newswire.ca/en/releases/archive/December2018/13/c4545.html

%SEDAR: 00010252E

For further information:

please visit the Company's website at www.wallbridgemining.com or

contact: Wallbridge Mining Company Limited, Marz Kord, P. Eng., M. Sc., MBA, President & CEO,

Tel: (705) 682-9297 ext. 251, Email: [email protected]; David Ellis, Investor Relations,

Tel: (416) 704-0937, Email: [email protected]

CO: Wallbridge Mining Company Limited

CNW 07:30e 13-DEC-18