Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

WM.TO ·

Wallbridge Intersects 24.61 g/t Gold over 15.00 Metres in the Lower Cayenne Zone, Opening Up New High-Grade Growth Potential

Drill Results

WALLBRIDGE MINING COMPANY LIMITED  TSX: WM  www.wallbridgemining.com 

129 Fielding Road Lively ON P3Y 1L7  t: 705‐682‐9297  f: 1‐888‐316‐4156  e  [email protected] 

Wallbridge Intersects 24.61 g/t Gold over 15.00 Metres in the Lower Cayenne Zone,

Opening Up New High-Grade Growth Potential

Toronto, Ontario – August 11, 2020 – Wallbridge Mining Company Limited (TSX:WM) (“Wallbridge” or the

“Company”) is pleased to announce an intersection of 24.61 g/t Au over 15.00 metres from the Lower Cayenne Zone,

expanding the high-grade domain of this zone by 260 metres down-dip to a vertical depth of 825 metres.

The Company today reports partial assay results of two surface drill holes (FA-20-143 and -148), which are part of the

Company’s ongoing, fully-funded 100,000-metre 2020 drill program at its 1 00%-owned Fenelon Gold Property

(“Fenelon” or the “ Property”). Further assay results from th ese drill holes from intervals transecting Area 51 gold

mineralization are pending and will be released separately.

Highlights

Lower Cayenne high-grade domain expanded and showing excellent potential for growth:

FA-20-148 24.61 g/t Au (22.55 g/t Au cut) over 15.00 metres, including 71.37 g/t Au (61.04 g/t Au cut) over 3.00

metres and 29.38 g/t Au over 5.00 metres

This intersection 260 metres vertically below the previously re leased 17.58 g/t Au over 11.04 metres in

hole FA-19-059 (see Figs. 1, 2 and 3).

“This impressive gold intersec tion in hole FA-20-148 demonstrat es that Tabasco-style wide, high-grade domains are also

present in the Lower Cayenne Shear Zone”, stated Attila Péntek, Vice President Exploration of Wallbridge. “Being 260

metres below another strong intersection of Lower Cayenne in ho le FA-19-059, it opens up anot her parallel structure at

depth for high-grade resource growth potential. At a vertical d epth of 825 metres, this is also the deepest intersection of

high-grade and high (>200) metal factor gold mineralization so far at Fenelon.”

Note: Metal factor refers to the gold grade multiplied by core length in metres (Au g/t*metres)

2020 Drilling Program Update

As announced previously, exploration activities at Fenelon were temporarily suspended from March 23 to mid-May, 2020

due to COVID-19 restrictions. The program has been gradually re started in close consultation with the local communities

ensuring the safety of all stakeholders.

Currently, four of six drill rigs are focusing on expanding the Tabasco-Cayenne-Area 51 mineralization on the original

Fenelon Gold Property, carrying out a combination of 50-100-met re step-outs and tighter-spaced in-fill drilling. The

Company estimates approximately 80,000 metres of drilling will be completed as part of this program by year-end, with

approximately 46,000 metres completed to date.

The other two drill rigs are active on the newly-acquired porti on of Fenelon to follow-up on the Reaper and Ripley gold

discoveries made in 2019 and 2020 by Balmoral Resources Ltd. ( “Balmoral”), and to test the extensions of the Tabasco-

WALLBRIDGE MINING COMPANY LIMITED                                                                                                                                                                    TSX| WM

Page | 2                                                                                                                                                                                                              

Cayenne-Area 51 gold system onto this adjacent ground. Wallbridge is planning to complete approximately 20,000 metres

of drilling in 2020 on the newly-acquired ground, with over 9,000 metres completed to date.

Partial assay results of the two surface holes of the 2020 expl oration drill program are re ported in the Tables and Figures

below. All figures and a table with drill hole information of r ecently completed holes are posted on the Company’s

website under “Current Program” at https://www.wallbridgemining.com/s/fenelon.asp.

Figure 1. Fenelon Gold, Plan View

WALLBRIDGE MINING COMPANY LIMITED                                                                                                                                                                    TSX| WM

Page | 3                                                                                                                                                                                                              

Figure 2. Fenelon Gold, Cross Section 10275_E

WALLBRIDGE MINING COMPANY LIMITED                                                                                                                                                                    TSX| WM

Page | 4                                                                                                                                                                                                              

Figure 3. Fenelon Gold, Cayenne Zone Longitudinal Section

WALLBRIDGE MINING COMPANY LIMITED                                                                                                                                                                    TSX| WM

Page | 5                                                                                                                                                                                                              

Table 1. Wallbridge Fenelon Gold Property, 2020 Drill Assay Highlights, Tabasco‐Cayenne Zones [1] 

Drill Hole  From  To  Length  Au  Au Cut(2)  VG(3)  Zone/Corridor  Section  

   (m)  (m)  (m)  (g/t)  (g/t)          

FA‐20‐143  878.70  885.95  7.25  4.35  4.35  VG  Tabasco  9900 

Including…  881.20  883.00  1.80  11.00  11.00  VG  Tabasco  9900 

FA‐20‐143  904.00  905.00  1.00  12.39  12.39  VG  Tabasco  9900 

FA‐20‐143  966.00  984.00  18.00  1.83  1.83  VG  Tabasco  9900 

Including…  975.65  981.40  5.75  4.26  4.26  VG  Tabasco  9900 

FA‐20‐143  994.15  1001.15  7.00  1.19  1.19  VG  Cayenne  9900 

FA‐20‐148  884.00  908.50  24.50  1.92  1.92  VG  Tabasco  10275 

Including…  884.00  889.00  5.00  5.49  5.49  VG  Tabasco  10275 

And…  905.50  908.50  3.00  5.06  5.06     Tabasco  10275 

FA‐20‐148  946.00  947.50  1.50  5.62  5.62     Tabasco  10275 

FA‐20‐148  993.00  1008.00  15.00  24.61  22.55  VG  Cayenne  10275 

Including…  993.00  996.00  3.00  71.37  61.04  VG  Cayenne  10275 

And…  1001.00  1006.00  5.00  29.38  29.38  VG  Cayenne  10275 

(1) Table includes only highlight assay results received since the latest press release on Tabasco-Cayenne Zone results dated July 13, 2020.

(2) Au assays cut at 140 g/t

(3) Intervals containing visible gold ("VG").

Note: True widths are estimated to be 50-80% of the reported core length intervals

Assay QA/QC and Qualified Persons

Drill core samples from the ongoing drill program at Fenelon ar e cut and bagged either on site or by contractors and

transported to either SGS Canada Inc. or ALS Canada Ltd. for an alysis. Samples, along with standards, blanks and

duplicates included for quality assurance and quality control, were prepared and analyzed at SGS Canada Inc. or ALS

Canada Ltd. laboratories. Samples are crushed to 90% or 95% les s than 2mm. A 1kg riffle split is pulverized to >95%

passing 106 microns or 85% passing 75 microns. 50g samples are analyzed by fire assay and AAS. At SGS, samples

>10g/t Au are automatically analyzed by fire assay with gravime tric finish or screen metallic analysis. To test for coarse

free gold and for additional quality assurance and quality control, Wallbridge requests screen metallic analysis for samples

containing visible gold. These and future assay results may var y from time to time due to re-analysis for quality assurance

and quality control.

The Qualified Person responsible for the technical content of t his press release is Evan Slater, P.Geo., M.Sc., Senior

Project Geologist of Wallbridge.

WALLBRIDGE MINING COMPANY LIMITED                                                                                                                                                                    TSX| WM

Page | 6                                                                                                                                                                                                              

About Wallbridge Mining

Wallbridge is establishing a pipeline of projects that will sup port sustainable 100,000 ounce-plus annual gold production

as well as organic growth through exploration and scalability.

The Company is currently advanci ng the exploration and developm ent of its 100%-owned Fenelon Gold Property, which

is located along the Detour-Fenelon Gold Trend, an emerging gol d belt in northwestern Québec with an ongoing, fully

funded 100,000-metre exploration drill program in 2020.

As announced on May 22, 2020, Wallbridge has completed the Plan of Arrangement whereby the Company acquired all

of the issued and outstanding shares of Balmoral, in an all-sto ck transaction. The Balmoral transaction secures for

Wallbridge a buffer of several kilometres surrounding its rapid ly expanding Fenelon discovery providing room for

growth, as well as future mine development flexibility. The tra nsaction also significantly expands Wallbridge's land

holdings in Québec along the Detour-Fenelon Gold Trend (from 10 .5 km 2 to 739.0 km 2), improving the Company's

potential for further discoveries in this under-explored belt.

Wallbridge is also pursuing additional advanced-stage projects which would add to the Company's near-term project

pipeline. Wallbridge is also the operator of, and a 17.8% share holder in, Loncan Canada Inc., a privately-held company

with a large portfolio of nickel, copper, and platinum-group metals (PGM) projects in Ontario's Sudbury Basin.

For further information please visit the Company's website at www.wallbridgemining.com or contact:

Wallbridge Mining Company Limited

Marz Kord, P. Eng., M. Sc., MBA

President & CEO

Tel: (705) 682-9297 ext. 251

Email: [email protected]

Victoria Vargas, B.Sc. (Hon.) Economics, MBA

Investor Relations Advisor

Email: [email protected]

This press release may contain forward-looking statements (including "forward-looking information" within the meaning of

applicable Canadian securities legislation and "forward-looking statements" within the meanin g of the US Private Securities

Litigation Reform Act of 1995) relating to , among other things, the operations of Wallbridge and the environment in which it

operates. Generally, forward-looking statements can be identified by the use of words such as "plans", "expects" or "does not

expect", "is expected", "budget", "scheduled", "estimates", "forecasts", "intends", "anticipates" or "does not anticipate", or

"believes", or variations of such words and phrases or statements that certain actions, events or results "may", "could", "would",

"might" or "will be taken", "occur" or "be achieved". Wallbridge has relied on a number of assumptions and estimates in

making such forward-looking statements, including, without limitation, the costs associated with the development and operation of

its properties. Such assumptions and estimates are made in light of the trends and conditions that are considered to be relevant and

reasonable based on information available and the circumstances existing at this time. A number of risk factors may cause actua l

results, level of activity, performance or outcomes of such explor ation and/or mine development to be materially different from

those expressed or implied by such forward-looking statements including, without limitation, whether such discoveries will resu lt

in commercially viable quantities of such mineralized materials, the possibility of changes to project parameters as plans cont inue

to be refined, the ability to execute planned exploration and fu ture drilling programs, the need for additional funding to cont inue

exploration and development efforts, changes in general economic, market and business conditions, and those other risks set forth

in Wallbridge's most recent annual information form under the heading "Risk Fact ors" and in its other public filings. Forward-

looking statements are not guarantees of future performance and such information is inherently subject to known and unknown

risks, uncertainties and other factors that are difficult to predict and may be beyond the control of Wallbridge. Although

Wallbridge has attempted to identify important risks and factors that could ca use actual actions, events or results to differ

WALLBRIDGE MINING COMPANY LIMITED                                                                                                                                                                    TSX| WM

Page | 7                                                                                                                                                                                                              

materially from those described in forwar d-looking statements, there may be other fa ctors and risks that cause actions, events or

results not to be as anticipated, estimated or intended. Consequently, undue reliance should not be placed on such forward-looking

statements. In addition, all forward-looking statements in this press release are given as of the date hereof.

Wallbridge disclaims any intention or obligation to update or revi se any forward-looking statements, whether as a result of new

information, future events or otherwise, save and except as may be required by appli cable securities laws. The forward-looking

statements contained herein are expressly qualified by this disclaimer.