Wallbridge Extends Martiniere Gold Mineralization to the East
WALLBRIDGE MINING COMPANY LIMITED TSX: WM www.wallbridgemining.com
129 Fielding Road Lively ON P3Y 1L7 t: 705-682-9297 f: 1-888-316-4156 e: [email protected]
Wallbridge Extends Martiniere Gold Mineralization to the East
Toronto, Ontario – June 08, 2023 – Wallbridge Mining Company Limited (TSX: WM, OTCQX:
WLBMF) (“Wallbridge” or the “Company”) today announced that it has extended gold
mineralization at the Company’s 100%-owned Martiniere Gold project (“ Martiniere”) 300 metres
east of the existing Mineral Resource Estimate (“ MRE”) footprint. The results build upon step-out
hole (MR-22-036) completed in late 2022, which identified the presence of significant gold
mineralization east of the main deposit (see press release dated Oct. 12, 2022 and Fig. 1).
Attila Péntek, Wallbridge’s Vice President, Exploration, commented:
“We are excited to report that all of our follow -up holes in the M1 Target area to date have
encountered gold mineralization, validating the potential to significantly expand the footprint of the
Martiniere deposit to the east. Since commencing our exploration work at Martiniere in 2021, we
have doubled the MRE at the project, and these results continue to reinforce the large size potential
of the Martiniere gold system. In addition, a recently completed high-resolution airborne magnetic
survey is providing valuable information to further improve the success of our property-wide
targeting as we continue to follow up on these strong results.”
Highlights
• MR-23-041 (a 300-metre undercut of MR-22-036) intersected 5.15 g/t Au over 4.00 metres,
including 9.28 g/t Au over 1.55 metres.
• MR-23-042, collared 250 metres to the east of MR-22-036, intersected 1.63 g/t Au over
19.35 metres, including 6.96 g/t Au over 2.30 metres.
• New drill holes confirm increased presence of porphyritic intrusive rocks towards the east,
similar to the Bug Lake Porphyry, one of the main controls on gold mineralization at
Martiniere.
Martiniere Exploration Program Underway
Prior to the temporary suspension of operations due to forest fires the Company had three drill rigs
operating on its Detour-Fenelon Gold Trend property: two at its Martiniere gold project and one that
was in the process of moving from Fenelon to Grasset East to test favorable target areas on this
eastern, unexplored part of the land package. At Martiniere, additional holes are planned to continue
testing the M1 Target following the results announced today.
So far, Wallbridge has completed over 10,000 meters of drilling at Martiniere as part of its 2023
exploration program. Assays results are being released today for three drill holes from the 2023
Martiniere drill program and two holes completed at the end of 2022. Assay results for 14 drill holes
testing other exploration targets at Martiniere are currently pending (Fig. 2).
In addition to the drilling campaign, a high-resolution airborne magnetic survey was completed over
Martiniere (Fig. 2), which is providing valuable information for drill targeting through the identification
of potential host rocks and gold-bearing structures property wide.
Assay QA/QC and Qualified Persons
Drill core samples from the ongoing drill program at Martiniere are cut and bagged either on-site or
by contractors and transported to SGS Canada Inc. for analysis. Samples, including standards and
WALLBRIDGE MINING COMPANY LIMITED
TSX| WM
2|P a g e
blanks for quality assurance and quality control, were prepared and analyzed at the laboratories.
Samples are crushed to 90% less than 2mm. A 1kg riffle split is pulverized to 85% passing 75
microns. 50g samples are analyzed by fire assay and AAS or ICP. Samples >10g/t Au are
automatically analyzed by fire assay with gravimetric finish or screen metallic analysis. To test for
coarse free gold and ad ditional quality assurance and quality control, Wallbridge requests screen
metallic analysis for samples containing visible gold. These and future assay results may vary from
time to time due to re-analysis for quality assurance and quality control.
The Qualified Person responsible for the technical content of this press release is Christopher Kelly,
M.Sc., P.Geo., Senior Geologist of Wallbridge.
WALLBRIDGE MINING COMPANY LIMITED
TSX| WM
3|P a g e
Figure 1. Martiniere Gold Property, Plan View
WALLBRIDGE MINING COMPANY LIMITED
TSX| WM
4|P a g e
Figure 2. Martiniere Gold Project, Total Magnetic Survey (TMI)
WALLBRIDGE MINING COMPANY LIMITED
TSX| WM
5|P a g e
Table 1. Martiniere Gold Property, Recent Drill Assay Highlights (1,4)
Drill Hole From To Length Au Au Cut(2) VG(3) Zone/Corridor
(m) (m) (m) (g/t) (g/t)
South of Bug Lake South Zone
MR-22-039 181.00 182.50 1.50 0.78 0.78 New Zones
MR-22-039 204.00 205.50 1.50 0.81 0.81 New Zones
Target 1- Eastern Extension
MR-22-038 362.00 363.10 1.10 1.61 1.61 New Zones
MR-22-038 485.10 486.40 1.30 1.84 1.84 New Zones
MR-23-040 384.00 385.50 1.50 2.69 2.69 New Zones
MR-23-040 450.00 451.50 1.50 1.45 1.45 New Zones
MR-23-040 485.50 488.50 3.00 0.72 0.72 New Zones
MR-23-041 231.00 231.50 0.50 2.52 2.52 VG New Zones
MR-23-041 234.00 235.50 1.50 1.20 1.20 New Zones
MR-23-041 253.50 255.00 1.50 0.73 0.73 New Zones
MR-23-041 298.80 299.55 0.75 1.27 1.27 New Zones
MR-23-041 302.00 303.00 1.00 1.99 1.99 New Zones
MR-23-041 390.80 392.70 1.90 1.66 1.66 New Zones
MR-23-041 444.75 445.60 0.85 1.71 1.71 New Zones
MR-23-041 465.00 466.50 1.50 0.69 0.69 New Zones
MR-23-041 554.15 559.00 4.85 0.83 0.83 New Zones
MR-23-041 560.60 564.60 4.00 5.15 5.15 VG New Zones
Including… 560.60 562.15 1.55 9.28 9.28 VG New Zones
MR-23-042 136.00 137.50 1.50 0.82 0.82 New Zones
MR-23-042 154.00 155.00 1.00 4.08 4.08 New Zones
MR-23-042 254.65 274.00 19.35 1.63 1.63 New Zones
Including 266.60 268.90 2.30 6.96 6.96 New Zones
Note: There is currently insufficient information available from these new zones to estimate the true widths of
intersections.
(1) Table includes only assay results received since the latest press release dated October 12, 2022
(2) Au cut (high-grade capping) at: 25 g/t Au
(3) Intervals containing visible gold (‘VG”)
(4) Metal factor of at least 0.95 g/t*m
All figures and a table with drill hole information of recently completed holes are posted on the
Company’s website under “Current Program” at https://wallbridgemining.com/our-
projects/martiniere/
About Wallbridge Mining
Wallbridge is focused on creating value through the exploration and sustainable development of
gold projects along the Detour -Fenelon Gold Trend while respecting the environment and
communities where it operates.
Wallbridge’s flagship project, Fenelon Gold (“ Fenelon”), is located on the highly prospective
Detour-Fenelon Gold Trend Property in Québec’s Northern Abitibi region. An updated mineral
resource estimate completed in January 2023 yielded significantly improved grades and additional
ounces at the 100%-owned Fenelon and Martiniere projects, incorporating a combined 3.05 million
WALLBRIDGE MINING COMPANY LIMITED
TSX| WM
6|P a g e
ounces of indicated gold resources and 2.35 million ounces of inferred gold resources.
Fenelon and Martiniere are located within an 830 km 2 exploration land package controlled by
Wallbridge. The Company believes that these two deposits have good potential for economic
development, especially given their proximity to existing hydro -electric power and transportation
infrastructure. In addition, Wallbridge believes that the extensive land package is extremely
prospective for the discovery of additional gold deposits.
Wallbridge also holds a 19.9% interest in the common shares of Archer Exploration Corp. (“Archer”)
as a result of the sale of the Company’s portfolio of nickel assets in Ontario and Québec in November
of 2022.
Wallbridge will continue to focus on its core Detour -Fenelon Gold Trend Property while enabling
shareholders to participate in the potential economic upside in Archer.
For further information please visit the Company’s website at www.wallbridgemining.com or contact:
Wallbridge Mining Company Limited
Marz Kord, P. Eng., M. Sc., MBA
President & CEO
Tel: (705) 682‒9297 ext. 251
Email: [email protected]
Victoria Vargas, B.Sc. (Hon.) Economics, MBA
Investor Relations Advisor
Email: [email protected]
WALLBRIDGE MINING COMPANY LIMITED
TSX| WM
7|P a g e
Cautionary Note Regarding Forward-Looking Information
This press release contains forward-looking statements or information (collectively, “FLI”) within the meaning
of applicable Canadian securities legislation. FLI is based on expectations, estimates, projections, and
interpretations as at the date of this press release.
All statements, other than statements of historical fact, included herein are FLI that involve various risks,
assumptions, estimates and uncertainties. Generally, FLI can be identified by the use of statements that
include words such as “seeks”, “believes”, “anticipates”, “plans”, “continues”, “budget”, “scheduled”,
“estimates”, “expects”, “forecasts”, “intends”, “projects”, “predicts”, “proposes”, "potential", “targets” and
variations of such words and phrases, or by statements that certain actions, events or results “may”, “will”,
“could”, “would”, “should” or “might”, “be taken”, “occur” or “be achieved.”
FLI herein includes but is not limited to: statements regarding the potential future performance of Archer
common shares; future drill results; the Company’s ability to convert inferred resources into measured and
indicated resources; environmental matters; stak eholder engagement and relationships; parameters and
methods used to estimate the MRE’s at the Fenelon Gold (defined below) and Martiniere (defined below)
properties (collectively the “Deposits”); the prospects, if any, of the Deposits; future drilling at the Deposits;
and the significance of historic exploration activities and results.
FLI is designed to help you understand management’s current views of its near - and longer-term prospects,
and it may not be appropriate for other purposes. FLI by their nature are based on assumptions and involve
known and unknown risks, uncertainties and other factors which may cause the actual results, performance,
or achievements of the Company to be materially different from any future results, performance or
achievements expressed or implied by such FLI. Although the FLI contained in this press release is based
upon what management believes, or believed at the time, to be reasonable assumptions, the Company
cannot assure shareholders and prospective purchasers of securities of the Company that actual results will
be consistent with such FLI, as there may be other factors that cause results not to be as anticipated,
estimated or intended, and neither the Company nor any other person assumes responsibility for the
accuracy and completeness of any such FLI. Except as required by law, the Company does not undertake,
and assumes no obligation, to update or revise any such FLI contained herein to reflect new events or
circumstances. Unless otherwise noted, this press release has been prepared based on information available
as of the date of this press release. Accordingly, you should not place undue reliance on the FLI, or
information contained herein.
Furthermore, should one or more of the risks, uncertainties or other factors materialize, or should underlying
assumptions prove incorrect, actual results may vary materially from those described in FLI.
Assumptions upon which FLI is based, without limitation, include: the results of exploration activities, the
Company’s financial position and general economic conditions, the ability of exploration activities to
accurately predict mineralization; the accuracy of geological modelling; the ability of the Company to
complete further exploration activities; the legitimacy of title and property interests in the Deposits; the
accuracy of key assumptions, parameters or methods used to estimate the MREs; the ability of the Company
to obtain required approvals; the results of exploration activities; the evolution of the global economic climate;
metal prices; environmental expectations; community and non-governmental actions; and any impacts of the
COVID-19 pandemic on the Deposits, the Company’s financial position, the Company’s ability to secure
required funding, or operations. In addition to the MD&A, risks and uncertainties about Wallbridge's business
are discussed in the disclosure materials filed with the securities regulatory authorities in Canada, which are
available at www.sedar.com.
Information Concerning Estimates of Mineral Resources
The disclosure relating to the Deposits and MRE’s in this press release and referred to herein was prepared
in accordance with NI 43 -101 which differs from the requirements of the U.S. Securities and Exchange
Commission (the "SEC"). The terms "measured mineral resource", "indicated mineral resource" and "inferred
mineral resource" used in this press release are in reference to the mining terms defined in the Canadian
Institute of Mining, Metallurgy and Petroleum Standards (the "CIM Definition Standards"), which definitions
have been adopted by NI 43 -101. Accordingly, information contained in this press release providing
WALLBRIDGE MINING COMPANY LIMITED
TSX| WM
8|P a g e
descriptions of our mineral deposits in accordance with NI 43 -101 may not be comparable to similar
information made public by other U.S. companies subject to the United States federal securities laws and the
rules and regulations thereunder.
Investors are cautioned not to assume that any part or all mineral resources will ever be converted into
reserves. Pursuant to CIM Definition Standards, "inferred mineral resources" are that part of a mineral
resource for which quantity and grade or quality are estimated on the basis of limited geological evidence
and sampling. Such geological evidence is sufficient to imply but not verify geological and grade or quality
continuity. An inferred mineral resource has a lower level of confidence than that applying to an indicated
mineral resource and must not be converted to a mineral reserve. However, it is reasonably expected that
the majority of inferred mineral resources could be upgraded to indicated mineral resources with continued
exploration. Under Canadian rules, estimates of inferred mineral resources may not form the basis of
feasibility or pre -feasibility studies, except in rare cases. Investors are cautioned not to assume that all or
any part of an inferred mineral resource is economically or legally mineable. Disclosure of "contained
ounces" in a resource is permitted disclosure under Canadian regulations; however, the SEC normally only
permits issuers to report mineralization that does not constitute "reserves" by SEC standards as in place
tonnage and grade without reference to unit measures.
Investors are cautioned that while terms, are substantially similar to CIM Definition Standards, there are
differences in the definitions and standards under subpart 1300 of Regulation S -K of the United States
Securities Act of 1933, as amended (the "SEC Modernization Rules"), with compliance required for the first
fiscal year beginning on or after January 1, 2021. The SEC Modernization Rules replace the historical
property disclosure requirements included in SEC Industry Guide 7. As a result of the adoption of the SEC
Modernization Rules, the SEC now recognizes estimates of "measured mine ral resources," "indicated
mineral resources" and "inferred mineral resources". Information regarding mineral resources contained or
referenced in this press release may not be comparable to similar information made public by companies
that report accordi ng to U.S. standards. While the SEC Modernization Rules are purported to be
"substantially similar" to the CIM Definition Standards, readers are cautioned that there are differences
between the SEC Modernization Rules and the CIM Definitions Standards. Ac cordingly, there is no
assurance any mineral resources that the Company may report as "measured mineral resources", "indicated
mineral resources" and "inferred mineral resources" under NI 43 -101 would be the same had the Company
prepared the resource estimates under the standards adopted under the SEC Modernization Rules.