Wallbridge Announces the Filing of a Final Base Shelf Prospectus and an Amended and Restated Technical Report
WALLBRIDGE MINING COMPANY LIMITED TSX: WM www.wallbridgemining.com
129 Fielding Road Lively ON P3Y 1L7 t: 705-682-9297 f: 1-888-316-4156 e: [email protected]
Wallbridge Announces the Filing of a Final Base Shelf Prospectus and
an Amended and Restated Technical Report
Toronto, Ontario – December 29, 2023 – Wallbridge Mining Company Limited (TSX:WM,
OTCQX:WLBMF) (“Wallbridge” or the “Company”) has filed a final short form base shelf
prospectus (the “ Shelf Prospectus”) with the securities regulatory authorities in each of the
provinces and territories of Canada. As previously announced, t he Shelf Prospectus will allow
Wallbridge to offer from time to time over a 25 -month period up to $50 million of equity, debt or
certain other securities ( collectively, the “ Securities”). The Company currently has no plans to
undertake a financing in connection with the Shelf Prospectus.
Concurrently with the filing of the Shelf Prospectus, the Company filed an amended technical
report entitled “Amended and Restated: NI 43-101 Technical Report for the Detour-Fenelon Gold
Trend Property and Preliminary Economic Assessment of the Fenelon Gold Project, Quebec,
Canada” (the “ Amended Technical Report ”). The Amended Technical Report addresses
comments raised by staff of the Ontario Securities Commission (the “ OSC”) in connection with
the OSC’s review of the Company’s Shelf Prospectus. The Amended Technical Report contains
no material differences to the technical report filed on August 10, 2023 (the “ August Report”)
and there are no differences with respect to the mineral resource estimates, the preliminary
economic assessment (“PEA”) or the conclusions contained in the August Report.
A summary description of the changes to the Amended Technical Report include:
• Deletion of certain disclosure with respect to a “Blue Sky Scenario” regarding the Detour-
Fenelon Gold Trend Property’s potential.
• Deletion of certain appendices providing additional disclosure regarding the electrical and
ventilation infrastructure of the Fenelon Gold (“Fenelon”) project.
A copy of the Amended Technical Report may be found on SEDAR+ at www.sedarplus.ca and
the Company’s website at https://wallbridgemining.com.
About Wallbridge Mining
Wallbridge is focused on creating value through the exploration and sustainable development of
gold projects along the Detour-Fenelon Gold Trend while respecting the environment and
communities where it operates.
Wallbridge’s flagship project, Fenelon, is located on the highly prospective Detour-Fenelon Gold
Trend Property in Québec’s Northern Abitibi region. An updated mi neral resource estimate
completed in January 2023 yielded significantly improved grades and additional ounces at the
100%-owned Fenelon and Martiniere projects, incorporating a combined 3.05 million ounces of
indicated gold resources and 2.35 million ounce s of inferred gold resources. Fenelon and
Martiniere are located within an 830 square kilometre exploration land package controlled by
Wallbridge. In addition, Wallbridge believes that the extensive land package is extremely
WALLBRIDGE MINING COMPANY LIMITED
TSX| WM
2 P a g e
prospective for the discovery of additional gold deposits.
Wallbridge has reported a positive PEA on its 100% -owned Fenelon gold Project with an
estimated average annual gold production of 212,000 ounces over 12.3 years (see Wallbridge ’s
press release of June 26, 2023).
Wallbridge also holds a 1 5.9% interest in the common shares of Archer Exploration Corp.
(“Archer”) as a result of the sale of the Company’s portfolio of nickel assets in Ontario and Québec
in November of 2022.
The scientific and technical content of this new s release has been reviewed and approved by
Francois Chabot., Eng., the Company’s Manager of Technical Services, a "Qualified Person" as
defined in National Instrument 43-101 - Standards of Disclosure for Mineral Projects (“NI 43-101”).
For further information please visit the Company’s website at https://wallbridgemining.com/ or
contact:
Wallbridge Mining Company Limited
Brian Penny, CPA, CMA
Interim CEO
Tel: (416) 716-8346
Email: [email protected]
Victoria Vargas, B.Sc. (Hon.) Economics, MBA
Capital Markets Advisor
Email: [email protected]
ON BEHALF OF THE BOARD OF DIRECTORS
Brian Penny
Interim CEO
Cautionary Note Regarding Forward-Looking Information
The information in this document may contain forward -looking statements or information
(collectively, “FLI”) within the meaning of applicable Canadian securities legislation. FLI is based
on expectations, estimates, projections, and interpretations as at the date of this document.
All statements, other than statements of historical fact, included herein are FLI that involve various
risks, assumptions, estimates and uncertainties. Generally, FLI can be identified by the use of
statements that include, but are not limited to, words such as “seeks”, “believes”, “anticipates”,
“plans”, “continues”, “budget”, “scheduled”, “estimates”, “expects”, “forecasts”, “intends”,
“projects”, “predicts”, “proposes”, "potential", “targets” and variations of such words and phrases,
or by statements that certain actions, events or results “may”, “will”, “could”, “would”, “should” or
“might”, “be taken”, “occur” or “be achieved.”
FLI in this document may include, but is not limited to: statements regarding the Shelf Prospectus,
the effectiveness and timing thereof and any future offerings; the Company’s exploration plans;
the future prospects of Wallbridge; statements regarding the results of the Fenelon preliminary
economic assessment; the potential future performance of Archer common shares; future drill
WALLBRIDGE MINING COMPANY LIMITED
TSX| WM
3 P a g e
results; the Company’s ability to convert inferred resources into measured and indicated
resources; parameters and methods used to estimate the MRE’s at the Fenelon and Martiniere
properties (collectively the “Deposits”); the prospects, if any, of the Deposits; future drilling at the
Deposits; and the significance of historic exploration activities and results.
FLI is designed to help you understand management’s current views of its near- and longer-term
prospects, and it may not be appropriate for other purposes. FLI by their nature are based on
assumptions and involve known and unknown risks, uncertai nties and other factors which may
cause the actual results, performance, or achievements of the Company to be materially different
from any future results, performance or achievements expressed or implied by such FLI. Although
the FLI contained in this document is based upon what management believes, or believed at the
time, to be reasonable assumptions, the Company cannot assure shareholders and prospective
purchasers of securities of the Company that actual results will be consistent with such FLI, as
there may be other factors that cause results not to be as anticipated, estimated or intended, and
neither the Company nor any other person assumes responsibility for the accuracy and
completeness of any such FLI. Except as required by law, the Company does not undertake, and
assumes no obligation, to update or revise any such FLI contained in this document to reflect new
events or circumstances. Unless otherwise noted, this document has been prepared based on
information available as of the date of this docum ent. Accordingly, you should not place undue
reliance on the FLI, or information contained herein.
Furthermore, should one or more of the risks, uncertainties or other factors materialize, or should
underlying assumptions prove incorrect, actual results may vary materially from those described
in FLI.
Assumptions upon which FLI is based, without limitation, include: the results of exploration
activities, the Company’s financial position and general economic conditions; the ability of
exploration activities to accurately predict mineralization; the accuracy of geological modelling;
the ability of the Company to complete further exploration activities; the legitimacy of title and
property interests in the Deposits; the accuracy of key assumptions, parameters or methods used
to estimate the MREs and in the PEA; the ability of the Company to obtain required approvals;
geological, mining and exploration technical problems; and failure of equipment or processes to
operate as anticipated. Risks and uncertainties about Wallbridge's business are discussed in the
disclosure materials filed with the securities regulatory authorities in Canada, which are available
at www.sedarplus.ca.
Cautionary Notes to United States Investors
Wallbridge prepares its disclosure in accordance with NI 43 -101 which differs from the
requirements of the U.S. Securities and Exchange Commission (the " SEC"). Terms relating to
mineral properties, mineralization and estimates of mineral reserves and mineral resources and
economic studies used herein are defined in accordance with NI 43-101 under the guidelines set
out in CIM Definition Standards on Mineral Resou rces and Mineral Reserves, adopted by the
Canadian Institute of Mining, Metallurgy and Petroleum Council on May 19, 2014, as amended.
NI 43-101 differs significantly from the disclosure requirements of the SEC generally applicable
to US companies. As such, the information presented herein concerning mineral properties,
mineralization and estimates of mineral reserves and mineral resources may not be comparable
WALLBRIDGE MINING COMPANY LIMITED
TSX| WM
4 P a g e
to similar information made public by U.S. companies subject to the reporting and disclosure
requirements under the U.S. federal securities laws and the rules and regulations thereunder.