Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

WLF.V ·

Wolfden’s Pickett Mt. Delivers on Silver-Rich FWZ and a New Stringer Zone Stringer Zone returns 17.14% ZnEq over 8.8 metres and FWZ yields 285.1 oz/t AgEq over 0.3 metres

Drill Results

1

Wolfden’s Pickett Mt. Delivers on Silver-Rich FWZ and a New Stringer Zone

Stringer Zone returns 17.14% ZnEq over 8.8 metres and FWZ yields 285.1 oz/t AgEq over 0.3 metres

Thunder Bay, Ontario, February 22, 2021 - Wolfden Resources Corporation (WLF.V) (“Wolfden” or the “Company”)

is pleased to announce additional positive drill results from its wholly owned Pickett Mountain Property in Northeastern

Maine. Results include all assays for the final six holes (see Figure 1) that targeted the Footwall Zone (FWZ) that was

discovered approximately150-200 metres north of the Pickett Mt. deposit. This massive to semi massive sulphide to

stringer sulphide lens continues to deliver better than expected silver values. The results to date exhibit continuity and

exceptional grades that suggest th e FWZ lens could potentially add significant resources to the overall project if the

planned drill holes as indicated on Figure 1. yields positive results.

Exceptional Silver Assay Results

These final holes returned some exceptional assay results from the FWZ including a new record high value of 172.4%

ZnEq that includes 23.6% Zn, 13.5% Pb, 3.61% Cu, 204 Oz/t Ag and 0.14 Oz/t Au over 0.3 metre in hole G-056

extension. Although narrow, this high -grade zone displays enough continuity that management believes has the

potential to be mined from underground via shrinkage stoping. Additional +1000 g/t silver (>30 oz/t Ag) intersections

were also returned from holes PM20 -13 and PM20-15. The FWZ, is situated 150 to 200 metres north of the current

mineral resource and has been intersected over a panel that is 800 m by 200 m is size. Additional drilling will be carried

as soon as practically possible to further test the extents and continuity this lens (see Figure 1. Longitudinal section of

the FWZ Lens).

New Stringer Zone Discovery

In addition to the FWZ sulphide zone , stringer-type mineralization has been intersected in holes situated 150 -200

metres north of the West Lens, and south of the FWZ with intercepts including 17.14% ZnEq over 8.8 m (true width

unknown). This type of zinc-rich, quartz-porphyry-hosted massive sulphide stringer zone mineralization was discovered

in the final two drill holes of the fall program. The zone remains open and will be a top priority in the next drill program.

“The addition of this silver-rich zone and strong stringer -type mineralization that is situat ed in close proximity to the

well-defined, high-grade East and West lenses, can only add to the current positive economics of the project that was

demonstrated in the September 14, 2020 Preliminary Economic Assessment,” stated Ron Little, President and CEO of

Wolfden. “The high-grade nature of the stringer and FWZ mineralization, underscores the obvious exploration upside

of the project and continued will commence as soon as possible to further test the limits of these two new lenses of

mineralization.”

FWZ Technical Details

Significant silver-enriched FWZ drill results include 172% ZnEq over 0.3 m in hole G-056ext (MS), 52.9% ZnEq over

0.75 m in hole PM20-07 (MS), 7.4% ZnEq over 19.2 m in hole PM20-13 (stringer SMS), 9.8% ZnEq over 1.9 m in

hole G-040X (stringer), 4.2% ZnEq over 12.2 m in hole PM20-15, 6.1% ZnEq and 6.4% ZnEq over 3.4 m and 2.6 m,

respectively, in hole PM20-16 and 5.0% ZnEq over 13.8 m in hole PM20-17. A color-contoured long-section of the FWZ

is presented in Figure 1, along with proposed drill hole pierce points. A summary of select intercepts is presented in

Table 1 along with more details presented in Table 3.

These intercepts lie along a 200 metre by 800 metre panel of silver -enriched base metal that lies from 150 to 200

metres in the footwall of the East and West Lens massive sulphide zones (Figure 1).

The FWZ is hosted by a moderately to intensely chlorite -altered polymictic felsic debris flow that lies at the contact

between a felsic quartz porphyry unit and a felsic volcanic dome complex with the felsic dome below the West lens

containing magnetite and hematite. Under the W est Lens, the FWZ dips 50 degrees to the north and under the East

Lens, the FWZ dips steep to moderate to the south.

2

Table 1. FWZ New Drill Intercept Highlights

Hole-ID From

m

To

m

Total

m

True

width

m

ZnEq

%*

AgEq

oz/t*

Zn

%

Pb

%

Cu

%

Ag

g/t

Au

g/t Comment

G-040ext 505.0 506.9 1.90 1.79 9.8 16.2 3.5 2.0 0.6 162.4 0.17 FWZ Stringer

G-040ext 539.1 541.8 2.19 2.06 4.0 6.7 0.5 0.3 0.1 150.3 0.19 FWZ Stringer

G-056ext 532.2 532.5 0.30 0.24 172.4 285.1 23.6 13.5 3.6 6360 4.36 FWZ MS

G-056ext 579.9 583.6 3.67 2.94 6.3 10.4 2.0 1.1 0.2 109.1 0.56 FWZ Stringer

PM20-13 138.0 157.2 19.20 15.52 7.4 12.2 2.7 1.5 0.4 126.9 0.18 FWZ

string/SMS

Incl. 156.0 157.2 1.20 1.00 50.5 83.5 8.9 5.0 2.6 1545 1.35 SMS

PM20-15 92.6 104.7 12.20 9.89 4.2 6.9 1.2 0.7 0.2 93.2 0.08 FWZ

string/MS

PM20-16 131.0 146.5 15.54 12.60 3.6 5.9 1.1 0.6 0.2 74.8 0.11 FWZ

string/MS

Incl. 131.0 134.4 3.40 2.76 6.1 10.1 1.7 0.8 0.2 155.7 0.14 FWZ

string/MS

Incl. 140.8 143.4 2.64 2.14 6.4 10.6 2.1 1.2 0.4 116.4 0.19 FWZ Stringer

Incl. 143.4 146.5 3.14 2.55 3.0 5.0 0.6 0.4 0.1 84.7 0.15 FWZ Stringer

PM20-17 123.6 146.9 23.30 18.86 3.8 6.4 0.6 0.4 0.1 100.9 0.49 FWZ Stringer

Incl. 126.6 140.4 13.80 11.17 5.0 8.2 0.7 0.4 0.1 139.4 0.64 FWZ Stringer

*The metal prices used to determine Zinc Equivalent (%ZnEq) and AgEq oz/t grades are US$1.20/pound for zinc, US$1.00/pound

for lead, US$2.50/pound for copper, US$16.00/troy ounce for silver, and US$1200/troy ounce for gold.

QP Stringer Zone Details

Multiple intervals of quartz porphyry hosted, zinc/lead-enriched, pyrite-poor, massive sulphide stringers, returned up to

11.11% Zn, 4.34% Pb, 1.03% Cu, 11.84 g/t Ag and 0.03 g/t Au over 8.8 metres (true width unknown). This style of

mineralization was intersected in two holes approximately 15 to 23 metres apart along the southern contact of a strongly

altered felsic quartz porphyry unit. Additional drilling will be required to determine the extent of this type of

mineralization.

Table 2. QP Stringer Zone Intercept Highlights

Hole-ID From

m

To

m

Total

m

ZnEq

%

Zn

%

Pb

%

Cu

%

Ag

g/t

PM20-16 228.8 233.5 4.72 4.72 2.82 1.58 0.19 8.29

PM20-16 248.7 257.5 8.78 17.14 11.11 4.34 1.03 11.84

PM20-16 267.0 278.5 11.51 6.3 4.07 2.14 0.17 3.32

PM20-16 283.1 288.1 5.0 4.07 2.79 1.45 0.01 1.63

PM20-17 250.4 256.7 6.3 3.64 2.52 1.09 0.06 3.13

PM20-17 266.8 272.8 6.0 3.61 2.44 1.16 0.07 1.57

PM20-17 280.7 292.5 11.84 3.29 2.06 1.22 0.06 3.08

Note: True Width unknown at this time. Gold values insignificant.

Other holes of interest

Hole PM20-13, intersected the West Lens horizon at a depth of 750 metres in a 30 m west step-out from the modelled

envelope. Several, narrow, pyrite -rich intervals of massive sulphide were intersected with the best interval returning

0.11% Zn, 0.03% Pb, 0.68% Cu, 13.74 g/t Ag and 0.25 g/t Au over 1.23 m (0.56 m true width).

Hole PM20-14, was drilled 350 metres to the west of PX -001, which had returned a 207 m intercept of stringer -type

base metal mineralization. Generally low grade stringer mineralization grading from 0.37 to 2.81% ZnEq over 0.94 to

11.7 m, was intersected.

3

About Wolfden and the Pickett Mountain Project

Wolfden is an exploration and development company focused strategic and precious metals deposits in good

jurisdictions. Its wholly owned Pickett Mountain Project is one of the highest -grade polymetallic projects in North

America (Zn, Pb, Cu, Ag, Au). This relatively advanced project is well -located near excellent infrastructure that will

support straight forward development as detailed in a Preliminary Economic Assessment date September 14, 2020.

For further information please contact Ron Little, President & CEO, at (807) 624 -1136 or Rahim Lakha, Corporate

Development at (416) 414-9954.

The information in this news release has been reviewed and approved by Don Dudek, P. Geo., VP Exploration and

Ron Little P.Eng., President and CEO, who are Qualified Persons’ under National Instrument 43-101. The metal prices

used to determine Zinc Equivalent (ZnEq)* grades are US$1.20/pound for zinc, US$1.00/pound for lead,

US$2.50/pound for copper, US$16.00/troy ounce for silver, and U S$1200/troy ounce for gold. For further information

on the project, see technical report entitled "National Instrument 43 -101 Technical Report, Preliminary Economic

Assessment Pickett Mountain Project, Penobscot County, Maine, USA” dated September 14, 2020 on Sedar.

Wolfden adheres to strict Quality Assurance and Quality Control protocols including routine insertion of blanks and

certified reference standards in each sample batch of drill core that is sent to the lab for analyses. Drill core samples

are split in half using a diamond saw with one half saved for reference and the other half shipped via secure transport

to Activation Laboratories sample preparation facility in Fredericton, New Brunswick. Core samples are analyzed for

zinc, lead, copper and silver utilizing 4-acid dissolution followed by ICP-OES (Code 8). Gold is analyzed by fire assay

(30 g) utilizing AA finish (Code 1A2) and samples with over 5 g/t are analyzed by fire assay with gravimetric finish (Code

1A3). Silver over 100 g is analyzed by fire assay with gravimetric finish (Code 8-Ag).

Cautionary Statement Regarding Forward-Looking Information

This press release contains forward -looking information (within the meaning of applicable Canadian securities legislation) that

involves various risks and uncertainties regarding future events. Such forward -looking information includes statements based on

current expectations involving a number of risks and uncertainties and such forward-looking statements are not guarantees of future

performance of the Company, and include, without limitation, statements relating to the completion of the Offering, the use of

proceeds of the Offering, metal price assumptions, cash flow forecasts, projected capital and operating costs, metal or miner al

recoveries, mine life and production rates, and other assumptions used in Preliminary Economic Assessment dated September 14,

2020, information about future activities at the Pickett Mountain Project that include plans to complete additional drilling an d pre-

permitting (rezoning petition), the results of the Preliminary Economic Assessment dated September 14, 2020, the potential upside

of the Pickett Mt. Project, and the timing and commencement of future drill programs in Maine, Manitoba and New Brunswick. There

are numerous risks and uncertainties that could cause actual results and the Company's plans and objectives to differ materia lly

from those expressed in the forward -looking information in this news release, including without limitation, the follo wing risks and

uncertainties: (i) risks inherent in the mining industry; (ii) regulatory and environmental risks; (iii) results of exploration activities and

development of mineral properties; (iv) risks relating to the estimation of mineral resources; (v) stock market volatility and capital

market fluctuations; and (vi) general market and industry conditions. Actual results and future events could differ materiall y from

those anticipated in such information. This forward -looking information is based on est imates and opinions of management on the

date hereof and is expressly qualified by this notice. Risks and uncertainties about the Company's business are more fully discussed

in the Company's disclosure materials filed with the securities regulatory authori ties in Canada at www.sedar.com. The Company

assumes no obligation to update any forward-looking information or to update the reasons why actual results could differ from such

information unless required by applicable law.

Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture

Exchange) accepts responsibility for the adequacy or accuracy of this release.

4

Figure 1. FWZ Longitudinal Section - situated ~200 metres north of the East- West Lens Longitudinal Section

5

Table 3. Significant New Pickett Mt. Drill Intercepts

Hole-ID From To Length

Estimated

True width Zn eq Zn % Pb % Cu % Ag gpt Au gpt Comment

G-040ext 504.95 506.85 1.90 1.79 9.82 3.5 1.97 0.61 162.44 0.17 FWZ Stringer

G-040ext 519.60 523.60 3.19 ? 0.91 0.47 0.26 0 7.03 0.06 Stringer

G-040ext 539.10 541.80 2.19 2.06 4.04 0.48 0.25 0.08 150.33 0.19 FWZ Stringer

G-056ext 532.15 532.45 0.30 0.24 172.4 23.6 13.5 3.61 6,360 4.36 FWZ

G-056ext 579.90 583.57 3.67 2.94 6.26 2.01 1.05 0.21 109.11 0.56 Stringer

PM20-13 138.00 157.20 19.20 15.52 7.4 2.7 1.45 0.36 126.86 0.18 FWZ strger/SMS

Incl. 138.00 148.00 10.00 8.10 6.21 3.12 1.64 0.36 40.34 0.14 FWZ Stringer

Incl. 148.00 156.00 8.00 6.50 2.43 1.28 0.68 0.03 22.26 0.05 FWZ Stringer

Incl. 156.00 157.20 1.20 1.00 50.45 8.85 5.04 2.58 1545 1.35 SMS

PM20-13 169.20 176.70 7.50 ? 0.66 0.36 0.19 0.03 4.15 nsv Stringer

PM20-13 232.95 237.60 4.65 ? 1.58 0.69 0.33 0.21 7.76 0.024 Stringer

PM20-13 242.60 244.00 1.40 ? 1.92 1.17 0.75 0.008 5.4 0.007 Stringer

PM20-13 257.00 264.55 7.55 ? 3.06 2.09 1.07 nsv 4.43 0.025 Stringer/MS

PM20-13 296.10 296.40 0.30 ? 2.83 2.1 0.82 0 1.5 0.01 Stringer

PM20-13 306.80 307.10 0.30 ? 8.73 2.5 7.22 0.01 8.4 0.02 Stringer

PM20-13 372.50 373.35 0.85 ? 4.14 2.34 1.94 0.02 4.4 0.04 Stringer

PM20-13 502.00 505.00 3.00 ? 1.51 1.08 0.13 0.09 3.87 0.03 Stringer

PM20-13 689.00 691.30 2.30 ? 1.73 1.59 0.01 0.04 0.50 0.03 Stringer

PM20-13 767.72 769.65 1.93 ? 0.94 0.02 0.2 0.27 8.44 0.02 Stringer

PM20-13 820.95 822.18 1.23 0.56 2.18 0.11 0.03 0.68 13.79 0.25 West Lens

PM20-13 825.75 831.68 5.93 2.69 1.25 0.45 0.24 0.16 7.83 0.08 West Lens

PM20-14 74.37 77.10 2.73 ? 0.87 0.48 0.23 0.05 3.22 0.03 Stringer

PM20-14 125.76 126.70 0.94 ? 2.81 2.09 0.12 0.27 1.70 0.02 Stringer

PM20-14 140.00 149.40 9.40 ? 0.68 0.51 0.05 0.05 0.70 0.01 Stringer

PM20-14 155.40 158.40 3.00 ? 0.86 0.7 0.03 0.03 0.67 0.04 Stringer

PM20-14 182.80 194.50 11.70 ? 0.37 0.24 0.07 0.03 0.32 0.01 Stringer

PM20-14 203.50 205.50 2.00 ? 0.96 0.57 0.31 0.05 0.9 0.02 Stringer

PM20-15 87.50 89.50 2.00 ? 1.95 0.54 0.73 0.01 28.55 0.16 Stringer

PM20-15 92.55 104.73 12.18 9.90 4.20 1.24 0.71 0.21 93.18 0.08 FWZ

incl 92.55 98.30 5.75 4.67 1.86 0.94 0.56 0.04 16.63 0.03 FWZ

incl 98.30 98.60 0.30 0.24 90.18 21.60 12.50 5.69 2330.00 0.69 FWZ

incl 98.60 104.73 6.13 4.98 2.18 0.52 0.27 0.1 55.52 0.1 FWZ

PM20-15 109.75 117.00 7.25 ? 1.02 0.52 0.32 0 5.57 0.08 Stringer

PM20-16 115.70 131.00 15.30 ? 1.59 0.87 0.51 0.03 8.41 0.04 Stringer

PM20-16 131.00 146.54 15.54 12.6 3.56 1.12 0.59 0.16 74.77 0.11 FWZ Stringer

Incl. 131.00 134.40 3.40 2.76 6.08 1.73 0.78 0.22 155.65 0.14 FWZ Stringer

Incl. 134.40 140.76 6.36 5.16 1.3 0.66 0.38 0.04 9.31 0.04 FWZ Stringer

Incl. 140.76 143.40 2.64 2.14  6.4 2.09 1.15 0.39 116.43 0.19 FWZ Stringer

Incl. 143.40 146.54 3.14 2.55 3.02 0.58 0.36 0.13 84.74 0.15 FWZ Stringer

PM20-16 199.30 206.70 7.40 ? 1.95 1.06 0.89 0.02 3.94 0.02 Stringer

PM20-16 219.25 225.30 6.05 ? 1.38 0.89 0.48 0.01 1.41 0.02 Stringer

PM20-16 228.76 233.48 4.72 ? 4.72 2.82 1.58 0.19 8.29 0.01 QP stringer

PM20-16 234.48 248.72 14.24 ? 0.9 0.55 0.32 0.03 0.8 0.01 Stringer

PM20-16 248.72 257.50 8.78 ? 17.14 11.11 4.34 1.03 11.84 0.03 QP stringer

PM20-16 257.50 264.50 7.00 ? 1.02 0.64 0.37 0.02 0.56 0.01 Stringer

PM20-16 266.96 278.47 11.51 ? 6.3 4.07 2.14 0.17 3.32 0.02 QP stringer

PM20-16 278.47 283.05 4.58 ? 1.29 0.86 0.34 0.06 0.58 0.01 Stringer

PM20-16 283.05 288.05 5.00 ? 4.07 2.79 1.45 0.01 1.63 0.01 QP stringer

PM20-16 288.05 292.25 4.20 ? 2.09 1.63 0.5 0.01 0.61 0 Stringer

PM20-17 112.10 123.60 11.50 ? 1.55 0.91 0.51 0.01 5.79 0.06 Stringer

PM20-17 123.60 146.90 23.30 18.86 3.84 0.61 0.39 0.11 100.85 0.49 FWZ Stringer

Incl. 123.60 126.60 3.00 2.43 2.34 0.47 0.25 0.13 60.87 0.14 FWZ Stringer

Incl. 126.60 140.40 13.80 11.17  4.96 0.7 0.44 0.11 139.36 0.64 FWZ Stringer

Incl. 140.40 146.90 6.50 5.26 2.16 0.5 0.35 0.09 37.55 0.31 FWZ Stringer

PM20-17 179.57 180.93 1.36 ? 1.95 0.01 0.01 0.88 3.38 0.02 Stringer

PM20-17 214.90 216.50 1.60 ? 2.79 1.57 1.29 0.03 3.06 0.02 Stringer

PM20-17 236.37 239.50 3.13 ? 1.43 1 0.43 0.01 0.98 0.02 Stringer

PM20-17 250.35 256.65 6.30 ? 3.64 2.52 1.09 0.06 3.13 0.01 QP stringer

PM20-17 256.65 266.75 10.10 ? 0.97 0.65 0.31 0.02 0.67 0.01 Stringer

PM20-17 266.75 272.75 6.00 ? 3.61 2.44 1.16 0.07 1.57 0.02 QP stringer

PM20-17 272.75 280.66 7.91 ? 1.68 1.05 0.65 0.02 1.04 0.02 Stringer

PM20-17 280.66 292.50 11.84 ? 3.29 2.06 1.22 0.06 3.08 0.02 QP stringer

PM20-17 292.50 296.80 4.30 ? 2.05 1.73 0.26 0.01 1.88 0.03 Stringer

PM20-17 305.40 309.40 4.00 ? 1.3 0.7 0.35 0.14 1.15 0.01 Stringer