Wolfden Submits Re-Zoning Application for a Mine at the Pickett Mt. Project in Maine
Wolfden Submits Re-Zoning Application for a Mine
at the Pickett Mt. Project in Maine
Thunder Bay, Ontario, January 23, 2023 - Wolfden Resources Corporation (WLF .V) (“Wolfden” or the “Company”)
is pleased to announce that its wholly owned subsidiary Wolfden Mt. Chase LLC, has submitted an application to the
Maine Land Use Planning Commission (LUPC) in order to re -zone a 374 acre parcel of its wholly owned 7,135 acre
Pickett Mountain Project land holdings in Northern Maine, from a General Management (M-GN) designation to Planned
Development (D-PD) in T6 R6 WELS. The proposed purpose of the D -PD rezoning is to allow for the construction,
operation and reclamation of a state of the art, small foot print underground metallic mineral mine in a manner that is
fully protective of the environment.
The Project is located several miles off of State Route 11, in an area of very low population density, north of the Town
of Patten and includes a 1200 tonne per day underground mining operation with a 10-15 year mine life. The mine and
other supporting infrastructure will require a steady-state work force of roughly 272 direct employees and contractors.
The mined ore, rich in zinc, copper, lead, silver and gold and will be processed at a different location (not in T6 R6) and
therefore is outside of the scope of the application. Moreover, the technical analysis for each component of the Project
and each aspect for the protection of natural resources, demonstrate that the Project is feasible and consistent with the
values prioritized by the LUPC.
“We are very pleased to submit this application where the technical studies to date indicate the operation will be fully
protective of the surrounding natural resources and associated recreational activities, the neighboring communities and
the State of Maine,” stated, Jeremy Ouellette, VP Project Development. “In addition, we have hosted public meetings
and information sessions in many of the surrounding towns that have resulted in growing community interest as
members appreciate the protective nature of Maine’s Chapter 200 mining regulations and their right to be heard in the
mine permitting process.” Several neighboring towns have passed ordinances or resolutions, by public vote, in support
of the Project, subject to the prerequisite regulatory approvals.
The Project represents a significant opportunity for new economic growth in an area of the State where much of the
economy is based on timber harvesting. Wolfden has been working with residents and businesses in the region to
ensure that the Project is responsive to the needs of the region and will benefit the people who live and work there.
The Project will be developed, operated, and reclaimed in accordance with regulations that ensure protection of the
surrounding environment.
The re-zoning application is subject to and will be reviewed under the Commission’s Chapter 10 and Chapter 12 rules.
Chapter 12 requires a public hearing to be held by the Commission in the area of the project before a final decision on
the application.
A copy of the petition and more information about the process is available for download from the LUPC project-specific
webpage and the Company’s website.
Pickett Mountain Mineral Resource Estimate
NOVEMBER 17, 2021 - MINERAL RESOURCE STATEMENT
Category Tonnes % Zn % Pb % Cu g/t Ag g/t Au Density % ZnEq
Indicated 2,724,000 8.91 3.83 1.22 97.2 0.8 3.84 17.72
Inferred 3,593,600 9.27 3.83 1.00 105.4 0.7 3.81 17.65
Metal prices used for the estimate: US$1.20/lb Zn, $2.50/lb Cu, $1.00/lb Pb, $16.00/oz Ag, and $1,200/oz/Au,
using a 7% cutoff grade that equates to an approximate NSR cut-off of $139/tonne at the same metal prices. An
average recovery of 75% for all metals was assumed based on preliminary metallurgical testing. The deposit remains
open at depth and into the footwall (north) where continued expansion and infill diamond drilling has the potential
to further upgrade and expand the mineral resource
About Wolfden
Wolfden is an exploration and development company focused on high-margin metallic mineral deposits including base,
precious and strategic metals. Its wholly owned Pickett Mountain Project is one of the highest -grade polymetallic
projects in North America (Zn, Pb, Cu, Ag, Au) and its two nickel sulphide deposits in Manitoba represent significant
development projects with the potential to be domestic sources of ethically produced base and critical metals for the
expansion of renewable energy in North America.
For further information please contact Ron Little, President & CEO, at (807) 624-1136 or Jeremy Ouellette, VP Project
Development, at (807) 624-1134.
The information in this news release has been reviewed and approved by Jeremy Ouellette, VP Project Development,
Don Dudek, P . Geo., VP Exploration and Ron Little, P.Eng., President and CEO, all of whom are Qualified Person s’
under National Instrument 43-101. The mineral resource estimate has been prepared, supervised, and reviewed by
an Independent qualified person (“QP”) Finley Bakker, P. Geo. of A-Z Mining Consultants and has an effective date of
November 17, 2021. The Mineral Resource estimate was classified into indicated and inferred categories in
accordance with CIM Definition Standards on Mineral Resources and Reserves adopted by the CIM Council on May
10, 2014.
Cautionary Statement Regarding Forward-Looking Information
This press release contains forward -looking information (within the meaning of applicable Canadian securities legislation) that
involves various risks and uncertainties regarding future events, including the expected use of the net proceeds of the Financing.
Such forward-looking information includes statements based on current expectations involving a number of risks and uncertainties
and such forward-looking statements are not guarantees of future performance of the Company, and include, without limitation,
metal price assumptions, cash flow forecasts, permit and community and other regulatory approvals, and the timing and completion
of exploration programs in Manitoba , Maine, New Brunswick and the respective drill results . There are numerous risks and
uncertainties that could cause actual results and the Company's plans and objectives to differ materially from those expresse d in
the forward-looking information in this news release, including without limitation, the following risks and uncertainties: (i) risks
inherent in the mining industry; (ii) regulatory and environmental risks; (iii) results of exploration activities and development of mineral
properties; (iv) risks relating to the estimation of mineral resources; (v) stock market volatility and capital market fluctuations; and (vi)
general market and industry conditions. Actual results and future events could differ materially from those anticipated in su ch
information. This forward-looking information is based on estimates and opinions of management on the date hereof and is expressly
qualified by this notice. Risks and uncertainties about the Company's business are more fully discussed in the Company's disclosure
materials filed with the securities regulatory authorities in Canada at www.sedar.com. The Company assumes no obligation to update
any forward-looking information or to update the reasons why actual results could differ from such information unless required by
applicable law.
Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture
Exchange) accepts responsibility for the adequacy or accuracy of this release.