Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

WLF.V ·

Wolfden Announces Record High-Grade Intercept at Pickett Mt. in Maine 44.1% Zn-Equivalent over 3.1 metres

Drill Results

1

Wolfden Announces Record High-Grade Intercept at Pickett Mt. in Maine

44.1% Zn-Equivalent over 3.1 metres

Thunder Bay, Ontario, September 8, 2020 - Wolfden Resources Corporation (WLF.V) (“Wolfden” or the

“Company”) is pleased to announce an update to its ongoing 5,000 metre drill program and exploration

program at its wholly owned Pickett Mountain Project in Northeastern Maine. Seven holes have been drilled to

date (see Figure 1), to test for potential extensions of the two main lenses of massive sulphide mineralization

that host the mineral resource. Three of the seven holes have intersected massive sulphide mineralization,

including a record high-grade intercept, and two of the holes still have pending assays. The program will move

to test further step-out targets (within 300 to 2000 metres) by late September.

Results received to date highlight hole PM20-02 that targeted the western edge of the West Lens and

surprisingly, returned the highest base metal grade intercept on the property to date with 3.1 metres at

44.05% ZnEq (including 27.93% Zn, 13.98% Pb, 0.83% Cu, 98.1 g/t Ag and 0.66 g/t Au) at a vertical depth

of approximately 200 metres below surface (see Figure 2). True width is estimated at 2.4 metres.

Immediately below the massive sulphide mineralization is a 9-metre stringer-type copper zone that returned

1.32 % Cu and 8.2 g/t Ag. The true width of the copper stringer zone is unknown.

“Results from PM20-02 indicate that there still remains considerable upside in expanding and upgrading the

Pickett Mt. mineral resource,” stated Don Dudek, VP Exploration. “Although much of our focus is on finding

new lenses along trend and in the footwall of the deposit, we will undoubtedly return to an infill and expansion

drill program in due course. Our knowledge of how and where the massive sulphide mineralization was

deposited continues to grow with every drill hole and will be useful in the search for additional resources. ”

The historic hole 77 (as see in Figure 2), which intersected the plane of mineralization about 45 metres to the

west of PM20-02, had an approximate 45-metre wide stringer zone with some Cu-stringer mineralization

zones, but sub-economic sulphides. The western edge of the West Lens mineralization occurs between these

two holes and, depending on the orientation of the feeder zone, which is inferred to be oriented parallel to the

western margin of the West Lens, it may be possible, to add additional higher-grade resources with infill

drilling.

Diamond Drilling Program Outline

Seven of the fifteen planned drill holes have been completed to date as per the drill plan outlined in the Pickett

Mountain Project presentation and on the attached plan map. Those holes that have intersected massive

sulphide and stringer mineralization have been sampled and sent to an independent laboratory for

assessment. Additional assays are pending in the coming weeks and where the total laboratory around time

has been approximately seven to eight weeks. The various holes are designed to test new targets and support

the development of an updated geological model with a goal to discover additional resources proximal to the

Pickett Mountain deposit.

Ground Work

Mapping and sampling (rock and soils) has been completed on the new grids and select target areas within the

30 km belt. Additional reconnaissance-style soil sampling is planned in areas with favorable volcanic rocks

that have no record of any previous work. The goal of this work is to identify new potential basins that could

host massive sulphide mineralization similar to Pickett Mt. Drilling in these areas is planned for this fall.

2

About Wolfden and the Pickett Mountain Project

With the support of major investors Kinross Gold Corporation and Altius Minerals, Wolfden plans to explore

and develop its wholly owned Pickett Mountain Project in Maine, USA, one of the highest-grade polymetallic

projects in North America (Zn, Pb, Cu, Ag, Au). This relatively advanced project is well-located near excellent

infrastructure which will support straight forward development.

Pickett Mountain Mineral Resources* as at January 7, 2019 using a 9% ZnEq cut-off

1. 2.05 Mt at 19.32% ZnEq of Indicated (9.9% Zn, 3.9% Pb, 1.4% Cu, 102 g/t Ag & 0.92 g/t Au)

2. 2.03 Mt at 20.61% ZnEq of Inferred (11.0 % Zn, 4.4% lead, 1.2% Cu, 111 g/t Ag & 0.92 g/t Au)

Upcoming Milestones

3. 5,000 metre exploration drill program underway to further expand resources and discover new zones

4. Preliminary Economic Assessment September 2020

5. Approval of the ongoing rezoning petition in 2021 would be a significant milestone

6. Securing additional high-grade projects and exploration drill targets in Maine

The information in this news release has been reviewed and approved by Don Dudek, P. Geo., VP Exploration,

and Ron Little P.Eng., President and CEO, who are Qualified Persons’ under National Instrument 43-101. The

metal prices used to determine Zinc Equivalent (ZnEq) grades are US$1.20/pound for zinc, US$1.00/pound for

lead, US$2.50/pound for copper, US$16.00/troy ounce for silver, and US$1200/troy ounce for gold. For further

information on the project, see technical report entitled "National Instrument 43-101 Technical Report, Pickett

Mountain Project Resource Estimation Report, Penobscot County, Maine, USA” dated January 7, 2019.

For further information please contact Ron Little, President & CEO, at (807) 624-1136 or Rahim Lakha at

(416) 414-9954

Cautionary Statement Regarding Forward-Looking Information

This press release contains forward-looking information (within the meaning of applicable Canadian securities legislation) that involves

various risks and uncertainties regarding future events. Such forward-looking information includes statements based on current

expectations involving a number of risks and uncertainties and such forward-looking statements are not guarantees of future

performance of the Company, and include, without limitation, statements relating to information about future activities at the Pickett

Mountain Project that include plans to complete a preliminary economic assessment in 2020, receive approval of a rezoning petition by

2021, and secure other high-grade projects and exploration drill targets in Maine. There are numerous risks and uncertainties that could

cause actual results and the Company's plans and objectives to differ materially from those expressed in the forward-looking

information in this news release, including without limitation, the following risks and uncertainties: (i) risks inherent in the mining

industry; (ii) regulatory and environmental risks; (iii) results of exploration activities and development of mineral properties; (iv) risks

relating to the estimation of mineral resources; (v) stock market volatility and capital market fluctuations; and (vi) general market and

industry conditions. Actual results and future events could differ materially from those anticipated in such information. This forward-

looking information is based on estimates and opinions of management on the date hereof and is expressly qualified by this notice.

Risks and uncertainties about the Company's business are more fully discussed in the Company's disclosure materials filed with the

securities regulatory authorities in Canada at www.sedar.com. The Company assumes no obligation to update any forward-looking

information or to update the reasons why actual results could differ from such information unless required by applicable law.

Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture

Exchange) accepts responsibility for the adequacy or accuracy of this release.

3

Figure 1 –2020 Plan Map –Drill hole locations with contoured Zn+Pb+Cusoil values

Figure 2 –East and West Lenses Vertical Longitudinal Section

PM20-02

42.74/3.2m

Hole 7 7