Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

WDO.TO ·

Wesdome Announces Exploration Drilling at the Eagle River Mine Extends the High Grade 303 Lens an Additional 300 Metres Down Plunge and Remains Open

Exploration Programs

Wesdome Announces Exploration Drilling at the Eagle River Mine Extends the

High Grade 303 Lens an Additional 300 Metres Down Plunge and Remains

Open

TORONTO, Oct. 29, 2019 -- Wesdome Gold Mines Ltd. (TSX: WDO) (“Wesdome” or the “Company”) today announces results

from the ongoing underground exploration drilling program at the Company’s wholly-owned Eagle River Mine in Wawa, Ontario.

The Company is continuing to develop the 303 Lens that was initially discovered in 2015. This continued development has

demonstrated the good continuity of the gold mineralization up and down plunge and highlights the consistent high grades and

widths in the 303 Lens as a result of local folding. The 303 Lens, initially defined from the 750 m-level to 1,000 m-level has now

been extended an additional 300m down plunge to the 1,300 m-level, while continuing to illustrate above average widths and

grades (Figure 1 and 2, Table 1)

Highlights of the recent drilling are listed below and summarized in Table 1.

No. 303 Lens

• Hole 925-E-104: 92.8 g/t Au over 11.1 m core length (37.2 g/t Au cut, 6.4 m true width)

• Hole 925-E-106: 70.0 g/t Au over 11.5 m core length (48.1 g/t Au cut, 7.4 m true width)

• Hole 925-E-87: 72.2 g/t Au over 10.8 m core length (42.8 g/t Au cut, 5.4 m true width) 

All assays cut to 140.0 g/t Au. True widths are estimated.

Mr. Duncan Middlemiss, President and CEO commented, "We are pleased with our ongoing exploration efforts at the Eagle

River Mine, in particular the continued expansion of the high grade 303 Lens that has provided above average reserve grades

over 2019 and planned into 2020. This additional expansion of the 303 Lens an additional 300 metres down plunge provides an

opportunity to mine these high grades well into the future with additional mine development. We expect to include the results

into the existing resource and reserves base at year end.”

“Elsewhere, we are continuing to aggressively explore the Eagle River deposit with five underground and one surface drill rigs

to extend the known 7 East and 311 West zones that are proximal to existing development and infrastructure and testing for

parallel zones of mineralization in the eastern portion of the mine diorite. And on surface, we continue to test the recently

discovered Falcon zones where there exists good potential to define higher grade and wider zones of gold mineralization that

would be near mine infrastructure.”

TECHNICAL DISCLOSURE

The sampling of, and assay data, from surface drill core is monitored through the implementation of a quality assurance -

quality control (QA-QC) program designed to follow industry best practice. Samples are transported in sealed bags to AGAT

Laboratories in Timmins Ontario for preparation. Pulps are transported to Mississauga, Ontario for gold assay by fire assay

with AAS finish. Samples with high grade gold are further assayed with a gravimetric finish and by metallic screen assay

where visible gold is present. Wesdome inserts blanks and certified standards in the sample sequence for quality control.

For underground drilling, the sampling of, and assay data from, underground drill core is monitored through the implementation

of a quality assurance - quality control (QA-QC) program designed to follow industry best practice. Samples are transported in

sealed bags to Eagle River Mine assay office in Wawa, Ontario. Samples are analyzed for gold using standard fire assay

technique with gravimetric finish. Wesdome inserts blanks and certified reference standard in the sample sequence for quality

control.

The technical content of this release has been compiled, reviewed and approved by Michael Michaud, P.Geo., Vice President,

Exploration of the Company and a "Qualified Person" as defined in National Instrument 43-101 -Standards of Disclosure for

Mineral Projects.

ABOUT WESDOME

Wesdome Gold Mines is in its 30 th year of continuous gold mining operations in Canada.  The Company is 100% Canadian

focused with a pipeline of projects in various stages of development.  The Eagle River Complex in Wawa, Ontario is currently

producing gold from two mines, the Eagle River Underground Mine and the Mishi Open pit, from a central mill.  Wesdome is

actively exploring its brownfields asset, the Kiena Complex in Val d’Or, Quebec.  The Kiena Complex is a fully permitted

former mine with a 930 metre shaft and 2,000 tonne per day mill.  The Company has further upside at its Moss Lake gold

deposit, located 100 kilometres west of Thunder Bay, Ontario, which is being explored and evaluated to be developed in the

appropriate gold price environment.  The Company has approximately 137.2 million shares issued and outstanding and trades

on the Toronto Stock Exchange under the symbol “WDO.”

For further information, please contact:  

Duncan Middlemiss    or  Lindsay Carpenter Dunlop

President and CEO    VP Investor Relations

416-360-3743  ext. 2029    416-360-3743  ext. 2025

[email protected]      [email protected] 

220 Bay Street, Suite 1200    

Toronto, ON, M5J 2W4    

Toll Free: 1-866-4-WDO-TSX 

Phone: 416-360-3743, Fax: 416-360-7620 

Website: www.wesdome.com    

This news release contains “forward-looking information” which may include, but is not limited to, statements with respect to

the future financial or operating performance of the Company and its projects. Often, but not always, forward-looking

statements can be identified by the use of words such as “plans”, “expects”, “is expected”, “budget”, “scheduled”, “estimates”,

“forecasts”, “intends”, “anticipates”, or “believes” or variations (including negative variations) of such words and phrases, or

state that certain actions, events or results “may”, “could”, “would”, “might” or “will” be taken, occur or be achieved. Forward-

looking statements involve known and unknown risks, uncertainties and other factors which may cause the actual results,

performance or achievements of the Company to be materially different from any future results, performance or achievements

expressed or implied by the forward-looking statements. Forward-looking statements contained herein are made as of the date

of this press release and the Company disclaims any obligation to update any forward-looking statements, whether as a result

of new information, future events or results or otherwise. There can be no assurance that forward-looking statements will prove

to be accurate, as actual results and future events could differ materially from those anticipated in such statements. The

Company undertakes no obligation to update forward-looking statements if circumstances, management’s estimates or

opinions should change, except as required by securities legislation. Accordingly, the reader is cautioned not to place undue

reliance on forward-looking statements. The Company has included in this news release certain non-IFRS performance

measures, including, but not limited to, mine operating profit, mining and processing costs and cash costs. Cash costs per

ounce reflect actual mine operating costs incurred during the fiscal period divided by the number of ounces produced.  These

measures are not defined under IFRS and therefore should not be considered in isolation or as an alternative to or more

meaningful than, net income (loss) or cash flow from operating activities as determined in accordance with IFRS as an

indicator of our financial performance or liquidity. The Company believes that, in addition to conventional measures prepared in

accordance with IFRS, certain investors use this information to evaluate the Company's performance and ability to generate

cash flow.

Drilling Composites

Table 1

Drilling Composites – 303 lens

Hole From

(m)

To

(m)

Width

(m)

True

Width

(m)

Au

(Uncut)

(g/t)

Au

(Cut 140)

g/t

925-E-22 263.60 265.55 1.95 1.49 1.23 1.23

925-E-43 240.40 242.00 1.60 1.50 0.33 0.33

925-E-44 265.20 266.80 1.60 1.50 16.02 16.02

925-E-45 290.20 292.35 2.15 1.52 0.40 0.40

925-E-48 238.40 240.50 2.10 1.48 49.44 49.04

925-E-49 226.35 229.25 2.90 2.05 43.28 43.28

925-E-50 190.85 193.00 2.15 1.52 21.33 21.33

925-E-66 254.00 260.20 6.20 4.38 64.42 58.13

925-E-69 300.60 305.20 4.60 2.64 48.73 44.49

925-E-70 383.25 399.10 15.85 9.09 12.21 12.21

925-E-72 311.05 313.20 2.15 1.52 23.13 20.92

925-E-73 379.25 381.90 2.65 1.52 0.22 0.22

925-E-86 308.10 315.60 7.50 3.75 24.88 21.43

925-E-87 360.00 370.75 10.75 5.37 72.17 42.82

925-E-101 274.60 276.45 1.85 1.52 18.10 18.10

925-E-102 283.40 290.30 6.90 4.44 28.84 27.05

925-E-103 290.60 299.70 9.10 7.88 6.22 6.22

925-E-104 356.70 367.80 11.10 6.37 92.80 37.23

925-E-105 357.55 361.95 4.40 1.50 10.48 10.48

925-E-106 393.40 404.90 11.50 7.39 69.83 48.11

925-E-108 378.40 383.70 5.30 4.98 69.50 54.16

Figures 1 and 2 are available at:

https://www.globenewswire.com/NewsRoom/AttachmentNg/35e35892-0657-483c-8a71-1d624766cc38

https://www.globenewswire.com/NewsRoom/AttachmentNg/ef798d6a-5870-4dfd-a8ce-d482ddc0a64a 

PDF available: http://ml.globenewswire.com/Resource/Download/fed59ebc-5872-4f6d-b1d6-d7dbbad9845e