Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

WDO.TO ·

Wesdome Announces Continued Development of the 300E Zone at the Eagle River Mine Zone Confirms Strong Grades and Continuity

Corporate Updates

Wesdome Announces Continued Development of the 300E Zone at the Eagle

River Mine Zone Confirms Strong Grades and Continuity

TORONTO, June 11, 2018 (GLOBE NEWSWIRE) -- Wesdome Gold Mines Ltd.

(TSX:WDO) (“Wesdome” or the “Company”) today announces continued underground

drifting results from ongoing development at the 300E Zone located at the Company’s

Eagle River Mine near Wawa, Ontario.

The Company is continuing to develop and explore the 300E Zone initially discovered

in 2015. The 300 Zone is located 300-400 metres north of the main 8 Zone structure,

which has provided the bulk of the Eagle River Mine’s production over the last twenty

years.  It consists of two areas, 300W and 300E zones (see Figure 1).  The 300E area

consists of a series of tabular to pipe -like quartz vein systems with strong folding

leading to localized widths and grades that are wider as well as higher in grade (303

Lens). To date, diamond drilling has traced the structure from 750 metre depth to

1,000 metre depth and it remains open up and down plunge.

In order to confirm the strong grades and continuity of the 300E Zone, initial drifting

was completed on the 844mL (meter level) development and announced in a press

release dated May 31, 2017. Subsequent development on the 864m Level within the

300E Zone has continued to confirm the continuity of the strong grades and the

geometry of the mineralized zones between drifts and the encompassing drill holes.

Lens 303 returned 50.5 g/t Au over an average width of 8.6 metres and over a strike

length of 20.1 metres. Results from development on the following subzones on the

864mL are highlighted below and illustrated in Figure 2. 

864mL DRIFT HIGHLIGHTS

                  *grades cut to 140 g/t Au

The combined strike length of the subzones is 155.4 metres with a weighted average width of 2.8 metres, and cut and uncut gold grades of

19.6 g/t Au and 28.3 g/t Au, respectively.

Mr. Duncan Middlemiss, President and CEO commented, “This continued development on the 864mL of the 300E Zone demonstrates the

good continuity of the gold mineralization up and down plunge and highlights the tremendous grades and widths in the 303 Lens as a result

of local folding. We continue to develop this production area that displays above historic average widths and grades and that this area will

continue to be significant production area for the Eagle River Mine going forward. Production in the second half of 2018 will include higher

volumes of ore from this area. We expect to continue our mine wide exploration program keying in on the potential extensions of all of these

zones. The similarity between the 844m Level development and the 864m Level development is uncanny, and gives us early indication to

the continued strength of mineralization in this area.”

In addition, initial exploration drilling completed down plunge of the 300E Zone has returned encouraging results including:

844-E-174: 12.54 (12.54) g/t Au over 1.5 m

844-E-172  59.48 (65.23) g/t over 1.5 m

844-E-170  9.15 (9.15) g/t Au over 1.5 m

Figure One

Eagle River Mine Longitudinal Section (Looking

North)

Figure Two

864 Metre Level Development

Lens

Strike Length

(m)

Average Width

(m)

Uncut Grade

(g/t Au)

Cut Grade*

(g/t Au)

300B 14.3 1.7 19.8 19.8

300C 22.8 1.5 24.6 13.3

301N 30.1 2.2 22.5 14.8

301 51.1 2.0 28.3 21.2

302 17.0 1.7 24.0 24.0

303 20.1 8.6 50.5 26.2

*grades cut to 140 g/t Au

The initial interpretation indicates that the mineralization intersected by drilling over 100 metres away from the known 300E Zone could be

another subzone of gold mineralization and will be subject of ongoing exploration. An exploration drift is being established on the 925mL in

order to test this, and other areas, at the Eagle River Mine.

TECHNICAL DISCLOSURE

The sampling of, and assay data from, drill core is monitored through the implementation of a quality assurance - quality control (QA-QC)

program designed to follow industry best practice. Samples are transported in sealed bags to Eagle River Mine assay office in Wawa,

Ontario. Samples are analyzed for gold using standard fire assay technique with gravimetric finish. Wesdome inserts blanks and certified

reference standard in the sample sequence for quality control.

The technical content of this release has been compiled, reviewed and approved by Michael Michaud, P.Geo., Vice President, Exploration of

the Company and a "Qualified Person" as defined in National Instrument 43-101 -Standards of Disclosure for Mineral Projects.

ABOUT WESDOME

Wesdome Gold Mines has had over 30 years of continuous gold mining operations in Canada.  The Company is 100% Canadian focused

with a pipeline of projects in various stages of development.  The Eagle River Complex in Wawa, Ontario is currently producing gold from

two mines, the Eagle River Underground Mine and the Mishi Open pit, from a central mill.  Wesdome is actively exploring its brownfields

asset, the Kiena Complex in Val d’Or, Quebec.  The Kiena Complex is a fully permitted former mine with a 930 metre shaft and 2,000 tonne

per day mill.  The Company has further upside at its Moss Lake gold deposit, located 100 kilometres west of Thunder Bay, Ontario..  The

Company has approximately 133.9 million shares issued and outstanding and trades on the Toronto Stock Exchange under the symbol

“WDO.”

For further information, please contact:

Duncan Middlemiss   

President and CEO  

416-360-3743   ext. 29   

[email protected]                                                     

or 

Lindsay Carpenter Dunlop

VP Investor Relations

416-360-3743   ext. 25

[email protected]

8 King St. East, Suite 811

Toronto, ON, M5C 1B5

Toll Free: 1-866-4-WDO-TSX

Phone: 416-360-3743, Fax: 416-360-7620

Website: www.wesdome.com

This news release contains “forward-looking information” which may include, but is not limited to, statements with respect to the future

financial or operating performance of the Company and its projects. Often, but not always, forward-looking statements can be identified by

the use of words such as “plans”, “expects”, “is expected”, “budget”, “scheduled”, “estimates”, “forecasts”, “intends”, “anticipates”, or

“believes” or variations (including negative variations) of such words and phrases, or state that certain actions, events or results “may”,

“could”, “would”, “might” or “will” be taken, occur or be achieved. Forward-looking statements involve known and unknown risks,

uncertainties and other factors which may cause the actual results, performance or achievements of the Company to be materially different

from any future results, performance or achievements expressed or implied by the forward-looking statements. Forward-looking

statements contained herein are made as of the date of this press release and the Company disclaims any obligation to update any

forward-looking statements, whether as a result of new information, future events or results or otherwise. There can be no assurance that

forward-looking statements will prove to be accurate, as actual results and future events could differ materially from those anticipated in

such statements. The Company undertakes no obligation to update forward-looking statements if circumstances, management’s estimates

or opinions should change, except as required by securities legislation. Accordingly, the reader is cautioned not to place undue reliance on

forward-looking statements.

Photos accompanying this announcement are available at

http://www.globenewswire.com/NewsRoom/AttachmentNg/70a5a81b-cdc6-426b-a9f5-a2972d570fe6

http://www.globenewswire.com/NewsRoom/AttachmentNg/e15b26b3-a908-4199-bd31-441253d796eb