Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

WDO.TO ·

Wesdome Announces 2017 Second Quarter Production Results at Eagle River Mine and Update on Kiena Exploration Ramp

Production Results

Wesdome Announces 2017 Second Quarter Production Results

at Eagle River Mine and Update on Kiena Exploration Ramp

TORONTO, July 12, 2017 (GLOBE NEWSWIRE) -- Wesdome Gold Mines Ltd. (TSX:WDO) ( “Wesdome” or

the “Company”) today announces second quarter 2017 ( “Q2”) gold production results of 12,529 ounces

bringing year to date produced ounces to 27,691 ounces.

Mr. Duncan Middlemiss, President and CEO commented, “Second quarter production results of 12,529

ounces were in line with budget. In the first half of the year, 27,691 ounces have been produced, indicating

we are well on track to meet this year ’s production guidance of 52,000 – 58,000 ounces. During the

quarter, we completed development on the 844 metre level in the 300E Zone. This new production area of

the mine displays above historic average widths and grades, and we expect to be producing from the 303

Lens in the fourth quarter of this year. This development, combined with recent successes in the 300W and

7 Zones bode well for increasing the average grades of our mineral reserves and our near term annual

production profiles. ”

The Company’s guidance remains unchanged at 52,000 – 58,000 ounces for 2017. Ounces sold were

13,030 ounces at an average sales price of CAD$1715 per ounce, (revenue of CAD$22.3 M) exceeding

the Company’s internal forecast of CAD$1550 per ounce.

UPDATE ON KIENA EXPLORATION RAMP

The Company also wishes to announce that it has selected CMAC -Thyssen Mining Group Inc. ( “CMAC”) as

the contractor to drive the exploration ramp at Kiena. CMAC is mobilizing equipment at the Kiena site and

ramp development is expected to begin on or before August 1, 2017.

TECHNICAL DISCLOSURE

The technical and scientific disclosure in this press release has been compiled, reviewed, and approved by

Philip Ng, P. Eng, Chief Operating Officer of Wesdome and “Qualified Person ”as defined in National

Instrument 43-101 -Standards of Disclosure for Mineral Projects .

ABOUT WESDOME

Wesdome Gold Mines is in its 30 th year of continuous gold mining operations in Canada.  The Company is

100% Canadian focused with a pipeline of projects in various stages of development.  The Eagle River

Tonnes

Milled (t)

Head

Grade

(g/t)

Average Mill

Recovery Rate

(%)

Gold

Produced

(ounces)

Eagle River Mine 34,960 9.8 96.3 10,597

Mishi Open Pit 39,117 1.8 83.1 1,932

Q2 2017 Production 74,077 5.6 94.0 12,529

Complex in Wawa, Ontario is currently producing gold from two mines, the Eagle River Underground Mine

and the Mishi Open pit, from a central mill.  Wesdome is actively exploring its brownfields asset, the Kiena

Complex in Val d ’Or, Quebec.  The Kiena Complex is a fully permitted former mine with a 930 metre shaft

and 2,000 tonne per day mill.  The Company has further upside at its Moss Lake gold deposit, located 100

kilometres west of Thunder Bay, Ontario, which is being explored and evaluated to be developed in the

appropriate gold price environment.  The Company has approximately 133.9 million shares issued and

outstanding and trades on the Toronto Stock Exchange under the symbol “WDO.”

This news release contains “forward-looking information ” which may include, but is not limited to,

statements with respect to the future financial or operating performance of the Company and its projects.

Often, but not always, forward -looking statements can be identified by the use of words such as “plans”,

“expects”, “is expected”, “budget”, “scheduled”, “estimates”, “forecasts”, “intends”, “anticipates”, or “believes”

or variations (including negative variations) of such words and phrases, or state that certain actions, events

or results “may”, “could”, “would”, “might” or “will” be taken, occur or be achieved. Forward -looking

statements involve known and unknown risks, uncertainties and other factors which may cause the actual

results, performance or achievements of the Company to be materially different from any future results,

performance or achievements expressed or implied by the forward -looking statements. Forward -looking

statements contained herein are made as of the date of this press release and the Company disclaims any

obligation to update any forward -looking statements, whether as a result of new information, future events

or results or otherwise. There can be no assurance that forward -looking statements will prove to be

accurate, as actual results and future events could differ materially from those anticipated in such

statements. The Company undertakes no obligation to update forward -looking statements if circumstances,

management’s estimates or opinions should change, except as required by securities legislation.

Accordingly, the reader is cautioned not to place undue reliance on forward -looking statements. The

Company has included in this news release certain non -IFRS performance measures, including, but not

limited to, mine operating profit, mining and processing costs and cash costs. Cash costs per ounce reflect

actual mine operating costs incurred during the fiscal period divided by the number of ounces produced. 

These measures are not defined under IFRS and therefore should not be considered in isolation or as an

alternative to or more meaningful than, net income (loss) or cash flow from operating activities as

determined in accordance with IFRS as an indicator of our financial performance or liquidity. The Company

believes that, in addition to conventional measures prepared in accordance with IFRS, certain investors use

this information to evaluate the Company's performance and ability to generate cash flow

For further information, please contact:

Duncan Middlemiss

President and CEO

416-360-3743   ext. 29

[email protected]

or

Lindsay Carpenter Dunlop

VP Investor Relations

416-360-3743   ext. 25

[email protected]

8 King St. East, Suite 811

Toronto, ON, M5C 1B5

Toll Free: 1-866-4-WDO-TSX

Phone: 416-360-3743, Fax: 416-360-7620

Website: www.wesdome.com