Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

WAM.V ·

Western Alaska Minerals Commences Drilling at Illinois Creek Ag -Zn-Pb CRD, Alaska

Exploration Programs

NEWS RELEASE

Western Alaska Minerals Commences Drilling at Illinois Creek Ag -Zn-Pb CRD, Alaska

TUCSON, ARIZONA, US – June 18, 2024 - Western Alaska Minerals (the "Company " or " WAM ")

(TSXV: “WAM”) is pleased to announce that drilling has commenced on its 100% owned Illinois Creek

property in western Alaska. Initial drilling is focused on new target zones to expand and link together

mineralization along 6 to 8 km of this silver-rich carbonate replacement (“CRD”) system.

Highlights:

● OBJECTIVE: Tie the individual zones of the CRD system together, beginning with “ LH” and

“Warm Springs priority areas, then linking them to the “Illinois Creek Mine ” zone.

● BUDGETED PROGRAM: 4,000m of diamond core drilling with potential to expand.

● DRILL TARGETS are located along approximately 5 km of an 8 km long, SW-NE oriented trend

connecting the Waterpump Creek, Warm Springs and Illinois Creek Mine systems. Initial

targets lie 2.5 km (LH Zone) and 5 km (WS Zone) respectively, from the high- grade

Waterpump Creek silver -zinc-lead NI 43 -101 inferred resource containing 74.9 Moz at 980

g/t AgEq* (See Press Release dated April 2, 2024), with later drilling tentatively planned near

the Illinois Creek Mine zone, which lies anther 2 km along the trend.

o Target Zone #1: “LH” strongly resembles Waterpump Creek with historic high-grade

oxide intercepts lying up-dip from the target zone and similar surrounding geophysical and

soil geochemical signatures.

o Target Zone #2: “WARM SPRINGS ” (“WS”) lies close to the past -producing Illinois

Creek gold mine, interpreted to lie near the source of the system. WS also shows

historic high-grade oxide intercepts up -dip from the target zone and similar geophysical

and soil geochemical signatures to Waterpump Creek.

● STRATEGIC LOGISTICS, MAXIMIZING EFFICIENCY: Drilling will be executed by 2, 12 hour

shifts of drillers operating two Company-owned, high capacity (Discovery HD) drill rigs set up

on the widespread target zones. D rilling will alternate between the zones, permitting the

technical team to fully in corporate the results of each drill hole into planning of the next,

while greatly reducing drill rig move time and expense.

CEO, Kit Marrs stated, “ Original continuity of mineralization is a hallmark of CRDs and the high

grades and lateral consistency of mineralization shown by our new resource study tells us that there

should be potent mineralization extending across Illinois Creek from Waterpump to the old open pit

mine, which we think marks the source of the system. We are excited to undertake linking the known

mineralization zones along this trend through aggressive step-outs guided by our exploration model,

mineralization cut in historic drilling and our recent geophysical and geochemical studies.” Mr. Marrs

continued, “Drillers and technical crews arrived during the first week of June and began testing the

LH zone right on schedule on June 6th.”

As of June 15th, the first hole targeting the LH zone is nearing completion with drill production on track

(54.8 m/day versus 55 m/day budgeted). Updates and assay results will be published as they

become available.

*Inferred resource is based on an AgEq cut-off grade of 200 g/t based on metal prices of US$24.00/oz Ag,

US$1.00/lb Pb, and US$1.30/lb Zn and metal recoveries of 75% Ag, 70% Pb, and 84% Zn. Formula used for

AgEq cut-off grade is (Ag g/t x 0.75) + (Pb%/100 × 1998.99) + (Zn%/100 × 3118.47). AgEq values for the inferred

resource grade and total ounces are not subject to metal recovery.

Click here to view Sr. Project Geologist, Sage Langston -Stewart, summarizing the drilling strategy

from the camp core shack.

Figure 1: Plan map of the step out target areas, LH and Warm Springs, indicated with red stars.

Technical Discussion

2024 drilling is focused on finding additional bodies of high-grade sulphide mineralization similar to

those of the Waterpump Creek Resource (See Press Release of April 2, 2024 ) along the 6 to 8 km

trend between WPC and the historic Illinois Creek Mine, which is believed to lie proximal to the

system’s source. Targets are based on an updated geologic model generated through compiling

2022 CSAMT and 2023 3D IP geophysical surveys, historic up -dip oxide drill intercepts, and soil

geochemistry similar to those marking Waterpump Creek. The 4,000 meters will be allocated

alternately between the two zones described below with the later season drilling expected to focus

on the areas with the most promising early results.

LH zone:

The LH zone lies to the south-southwest of the WPC resource within the same carbonate sequence

and exhibits very similar CRD-style alteration and geophysical signatures as that found at the high-

grade WPC mineral resource. NovaGold’s 2006 drilling tested to the east of strong Pb-Zn soil

anomalies and intersected oxidized Pb-Zn oxide mineralization within and below an aquitard schist

unit analogous to that which occurs above the WPC deposit. The planned 2024 drill holes will be

targeted farther down dip, below the level of oxidation and within the favorable carbonate

stratigraphy.

2023 WAM exploration drilling in LH zone to the north of the NovaGold drilling, closer to the WPC

resource, showed abundant strong CRD-style alteration, characterized by broad zones of “fugitive”

carbonate veins, sanding (de-calcification), and tan carbonates (siderite/ankerite) in nearly all drill

holes. Similar alteration was found along two previously recognized favorable carbonate horizons

capped by schist units.

3D inversion modelling and interpretation of the high -resolution 3 -D resistivity and induced

polarization survey (“3D IP”) revealed two distinct north- south domains: 1) a conductive (<25 ohm-

m) zone, that can be used as a proxy for alteration and 2) a near vertical, very conductive (<5 ohm-

meter) domain that likely reflects the southerly continuation of the WPC fault- the main structural

control on Waterpump Creek mineralization. Both features are farther down- dip (to the east) from

the historical drilling and will be the target of 2024 drilling. The conductive (<25 ohm -m) domain

increases in size to the south and west of LH towards the Illinois Creek mine and the Warm Springs

zone described below.

Warm Springs zone:

The Warm Springs target zone lies to the east of the past-producing Illinois Creek oxide Au-Ag mine,

containing an NI 43 -101 compliant Au-Ag resource, and along trend to wards the LH prospect and

WPC resource. Here, Anaconda and Echo Bay defined an extensive, shallowly-dipping (“IC East

Manto”) gossan up to 60 meters thick with highly anomalous Pb and Zn that lies beneath an

impermeable greenstone plate in the same carbonate horizon as the IC deposit. Th is oxide

mineralization is exposed at surface near the east end of the IC East Manto as the “Warm Springs

Siliceous B reccia.” A similar , but unoxidized breccia composed of massive pyrite (sulfide) and

anomalous Pb-Zn was intersected below the greenstone by two WAM holes (IC22 -01 and IC22-02)

that lie 800 and 1000 meters to east respectively. Although the 2023 3D IP survey did not extend this

far south, the broadening conductor (<25 ohm-m) modelled at LH projects towards these holes and

the IC East Manto. The combined evidence points to a voluminous hydrothermal system that has

only been touched by a few holes to date. The 2024 drill program include s several holes to test the

sulfide potential of this target.

In addition, WAM’s 2022 CSAMT geophysical survey defined an east-northeast structure dubbed the

“Warm Springs Fault” (WSF) that likely truncates the East IC Manto down-dip to the south, creating

a very attractive target possibly similar to South 32’s large-scale Hermosa deposit where a major

structure offsets the Central Manto Oxide deposit from the Taylor Deeps Sulfide.

**The IC resource estimate consists of 253 Koz Au, 9.5Moz Ag and an inferred estimate of 104Koz Au, 3.8Moz

Ag For complete resource disclosure at Illinois Creek, click here.

Figure 2: Cross section of the current geologic model at Illinois Creek

Figure 3. Images of the high-capacity drill in operation at the LH target, June 2024

Figure 4: Simplified CRD model (modified after Megaw, 1988; 1998, 2020) showing interpreted

positions of mineralization known at the Illinois Creek project. Note the shift in metal dominance

from the distal mantos at WPC (Ag-Pb-Zn) toward the intrusion/porphyry at the past-producing IC

mine area (Au-Ag-Cu). (Slide #23 of the Company’s May 2024 corporate presentation, available at

http://www.westernalaskaminerals.com).

Qualified Person

The Qualified Person who reviewed and approved the technical disclosure in this release is Andrew

West, Certified Professional Geologist, a Qualified Person as defined under National Instrument 43-

101. Mr. West is the Vice President for Western Alaska Minerals with a MS in Geology and 30 years of

experience in mineral resources, mine, and exploration. He is a Certified Professional Geologist with

the American Institute of Professional Geologists (AIPG CP-11759).

His review verified the technical data disclosed, including geology, sampling, analytical and QA/QC

data underlying this news release, including reviewing the reports of ALS, methodologies, results,

and all procedures undertaken for quality assurance and quality control in a manner consistent with

industry practice.

About WAM

Our mission is to advance a mineable and scalable CRD, ultimately reshaping the mineral landscape

of western Alaska and establishing a new CRD district.

WAM’s CRD system encompasses the (past producing) Illinois Creek gold -silver mine, the

Waterpump Creek high- grade silver -lead-zinc deposit, open to the north, and the Honker gold

prospect. Twenty-five kilometers northeast of the Illinois Creek CRD lies the Round Top copper and

the TG North CRD prospects. All prospects were originally discovered by Anaconda Minerals Co. in

the early 1980’s. WAM’s 100% owned claims cover 73,120 acres (114.25 square miles or 29,591

hectares), approximately 45 km east of an ocean barge-compatible section of the Yukon River. Since

2010, WAM, along with its precursor company, Western Alaska Copper & Gold, reassembled the

Anaconda land package and has been engaged in exploring the district.

Headquartered in both Alaska and Arizona, WAM brings together a team of seasoned professionals

with a shared vision of pioneering new frontiers in mineral exploration. Our strategic approach is

underpinned by cutting -edge technology, innovative techniques, and a deep understanding of the

geological intricacies of the region.

On behalf of the Company

“Kit Marrs”

Kit Marrs

President & CEO

Phone: 520-200-1667

For further information please contact:

Vanessa Bogaert, Director of Corporate Communications/IR at

[email protected]

Or visit our website at: www.westernalaskaminerals.com

Forward Looking Information

This news release contains "forward-looking information" within the meaning of applicable

Canadian securities legislation. "Forward-looking information" includes, but is not limited to,

statements with respect to the activities, events or developments that the Company expects or

anticipates will or may occur in the future. Generally, but not always, forward-looking

information and statements can be identified by the use of words such as "plans", "expects", "is

expected", "budget", "scheduled", "estimates", "forecasts", "intends", "anticipates", or "believes"

or the negative connotation thereof or variations of such words and phrases or state that certain

actions, events or results "may", "could", "would", "might" or "will be taken", "occur" or "be

achieved" or the negative connation thereof.

Such forward-looking information and statements are based on numerous assumptions,

including among others, Although the assumptions made by the Company in providing forward-

looking information or making forward-looking statements are considered reasonable by

management at the time, there can be no assurance that such assumptions will prove to be

accurate and actual results and future events could differ materially from those anticipated in

such statements.

Important factors that could cause actual results to differ materially from the Company's plans

or expectations include risks relating to market conditions, metal prices, and risks relating to

general economic, market or business conditions, uninsured risks, regulatory changes, defects in

title, availability of personnel, materials, and equipment on a timely basis, accidents or

equipment breakdowns, unanticipated environmental impacts on operations and costs to remedy

same, and other exploration or other risks detailed herein and from time to time in the filings

made by the Company with securities regulators. Although the Company has attempted to

identify important factors that could cause actual results to differ materially from those

contained in the forward-looking information or implied by forward-looking information, there

may be other factors that cause results not to be as anticipated, estimated or intended. There can

be no assurance that forward-looking information and statements will prove to be accurate, as

actual results and future events could differ materially from those anticipated, estimated or

intended. Accordingly, readers should not place undue reliance on forward-looking statements

or information.

Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in

the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of

this release.