Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

VZLA.TO ·

Vizsla Silver Intercepts 646 G/T Ageq over 10.00 Metres at Napoleon

Drill Results

VIZSLA SILVER INTERCEPTS 646 G/T AGEQ

OVER 10.00 METRES AT NAPOLEON

NYSE: VZLA TSX-V: VZLA

VANCOUVER, BC

,

Aug. 23, 2023

/CNW/ -

Vizsla Silver Corp.

(TSXV: VZLA) (NYSE: VZLA)

(

Frankfurt

: 0G3) ("

Vizsla

" or the "

Company

") is pleased to report results from 11 new drillholes

targeting the southern extension of the Napoleon Vein, at its 100%-owned flagship

Panuco

silver-

gold project ("Panuco") located in

Mexico

. The new drill results are centered on the western portion

of the district and are part of Vizsla's ongoing 90,000 metre resource infill and expansion/discovery-

focused drill program.

Highlights

NP-23-388 returned

646 grams per tonne (g/t) silver equivalent (AgEq) over 10.00 metres

true width (mTW)

(217 g/t silver, 3.03 g/t gold, 1.44 % lead and 5.44 % zinc),

including: 3,625 g/t AgEq over 0.95 mTW (1,590 g/t silver, 25.50 g/t gold, 7.28 % lead and

5.80 % zinc),

and 1,323 g/t AgEq over 0.78 mTW (159 g/t silver, 0.89 g/t gold, 4.97 % lead and 26.70 %

zinc)

NP-23-391 returned

1,568 g/t AgEq over 1.90 mTW

(908 g/t silver, 7.37 g/t gold, 1.62 % lead

and 4.91 % zinc),

including: 2,205 g/t AgEq over 0.65 mTW (1,500 g/t silver, 8.96 g/t gold, 2.05 % lead and

3.98 % zinc)

And

648

g/t AgEq

over 3.20

mTW

(559 g/t silver, 1.53 g/t gold, 0.23 % lead and 0.49 % zinc),

including: 1,720 g/t AgEq over 0.96 mTW (1,500 g/t silver, 3.89 g/t gold, 0.61 % lead and

1.22 % zinc)

NP-23-392 returned

989 g/t AgEq over 2.50 mTW

(527 g/t silver, 3.78 g/t gold, 2.13 % lead

and 4.98 % zinc),

including: 2,465 g/t AgEq over 0.69 mTW (1,500 g/t silver, 9.97 g/t gold, 5.25 % lead and

6.66 % zinc).

"Infill and expansionary drilling targeting the southern extent of Napoleon continues to intersect

high silver and gold grades on both the main vein and its overlapping splay structures,"

commented

Michael Konnert

, President and CEO.

"We have now identified several splay veins

branching off the main Napoleon structure located within both the footwall and hanging wall that

remain open for future expansion. Most notable is the shallow dipping Hanging Wall 4 structure

which returned 646 grams per tonne silver equivalent over ten meters true width and is open down

dip. We continue to view the Napoleon Area as a primary target for future resource growth and

development. Of the six drill rigs currently turning on the property, infill

drilling continues at

Napoleon with one rig. In addition to drilling, we are pleased to announce Vizsla has achieved 1.5

million work hours without a lost time incident at

Panuco

. This is yet another major milestone for

the Company and is a testament to the focus and dedication of every Vizsla employee and

contractor working on the Project."

Figure 1: Plan map of recent drilling along the Napoleon vein. (CNW Group/Vizsla Silver Corp.)

Details of the Napoleon Southern Extent

Infill and step-out (expansionary) drilling completed to date has led to an improved understanding of

the mineralization controls along the Napoleon vein corridor. Observations based on metal zonation

and alteration continue to support the interpretation that the corridor is tilted where the southern

extent of drilling is at the top of the mineralized horizon, near surface (Figure 5).

Previously reported high-grade gold assay values near surface support the model (see press

releases dated

December 16, 2021

and

March 29, 2022

). Infill drilling assay results disclosed in this

news release, show additional high-grade silver and gold values on vein splays at the hanging wall of

the main Napoleon structure. The vein splays are situated between 25 to 120 metres into the

hanging wall and typically contain high lead and zinc concentrations in addition to the precious metal

values. Results from recent drilling suggests that the shallow dipping Hanging Wall 4 splay (HW

splay 4) remains open down dip to the east (Figure 4). Results from hole NP-23-388 warrant follow

up drilling to the east and at depth along Hanging Wall 4 (long section not shown). Vizsla continues

working on structural and 3D geologic modelling to design specific drill holes for the exploration of

the vein splays (HW splay 2 and HW splay 4).

Figure 2: Longitudinal section of the Napoleon Main Vein with mineral resources along main

Napoleon and the overlapping hanging wall splays. (CNW Group/Vizsla Silver Corp.)

Figure 3: Longitudinal section of the Hanging Wall 2 (HW 2) Vein splay with mineral resources along

main Napoleon and the overlapping hanging wall splays. (CNW Group/Vizsla Silver Corp.)

Figure 4: Cross section highlighting recent drill intercepts on Napoleon main and vein splays. (CNW

Group/Vizsla Silver Corp.)

Figure 5: Napoleon Vein Corridor Exploration Model Longitudinal Section with pierce points on

Napoleon main. (CNW Group/Vizsla Silver Corp.)

Drillhole

From

To

Downhole

Length

Estimated

True

width

Ag

Au

Pb

Zn

AgEq

Vein

(m)

(m)

(m)

(g/t)

(g/t)

(g/t)

%

%

(g/t)

NP-23-365A

No significant values

HW 7

NP-23-365A

No significant values

HW 2

NP-23-365A

454.65

455.15

0.5

0.45

178

8.33

0.07

0.17

736

Napoleon

NP-23-365A

No significant values

FW 1

NP-23-365A

496.5

497.5

1

0.85

290

1.71

1.05

1.56

473

FW 2

NP-23-370

346.1

346.65

0.55

0.45

597

0.72

0.02

0.04

606

HW 6

NP-23-370

No significant values

HW 2

NP-23-370

432.05

433.25

1.2

1

349

1.58

0.05

0.13

437

Napoleon

NP-23-374

303.9

306.05

2.15

1.7

90

0.95

0.02

0.03

149

HW 7

NP-23-374

No significant values

HW 2

NP-23-374

527.9

529.25

1.35

1

34

0.32

0.02

0.02

173

Napoleon

NP-23-374

No significant values

FW 2

NP-23-374

585.8

586.25

0.45

0.45

433

2.92

0.83

1.19

667

FW 3

NP-23-378

555

556

1

0.9

1,135

1.29

1.14

4.74

1,348

HW 2

NP-23-378

563.8

569

5.2

4.3

73

1.42

0.46

1.24

223

Napoleon

Includes

566.9

568

1.1

0.91

284

1.92

1.44

3.28

555

NP-23-378

575.9

577.5

1.6

1.1

1,805

16.56

0.2

0.38

2,817

FW 1

Includes

576.5

577.5

1

0.69

2,780

26.1

0.29

0.55

4,376

NP-23-378

588

588.6

0.6

0.46

184

1.48

0.6

15.9

865

FW 2

NP-23-380

317.05

322.45

5.4

4.1

111

0.64

0.01

0.01

147

HW 7

NP-23-380

554.2

555.7

1.5

1.35

551

1.08

1.29

6.23

849

HW 2

NP-23-380

581.25

581.7

0.45

0.4

346

2.21

0.8

4.29

650

Napoleon

NP-23-383

No significant values

HW 7

NP-23-383

616.15

618.1

1.95

1.27

207

2.37

4.43

14.37

1,005

HW 2

Includes

616.8

617.8

1

0.65

270

4.15

8.4

23.2

1,621

NP-23-383

636.25

637

0.75

0.7

154

1.37

1.04

4.21

419

Napoleon

NP-23-386

140.9

141.85

0.95

0.78

218

0.24

0.21

0.43

241

HW 7

NP-23-386

410.35

410.75

0.4

0.3

430

1.59

0.08

0.22

517

HW 2

NP-23-386

414.35

415.6

1.25

0.85

177

0.73

0.11

0.25

226

Napoleon

NP-23-386

536.8

537.25

0.45

0.4

444

10.3

0.46

1.11

1,162

FW 3

NP-23-388

No significant values

HW 5

NP-23-388

426.25

437.8

11.55

10

217

3.03

1.44

5.44

646

HW 4

Includes

434.8

435.9

1.1

0.95

1,590

25.5

7.28

5.8

3,625

Includes

435.9

436.8

0.9

0.78

159

0.89

4.97

26.7

1,323

NP-23-388

556.8

559

2.2

1.95

31

0.59

1.46

6.36

343

HW 2

NP-23-388

No significant values

Napoleon

NP-23-391

No significant values

HW 7

NP-23-391

420.1

424.1

4

3.2

559

1.53

0.23

0.49

648

HW 2

Includes

422.35

423.55

1.2

0.96

1,500

3.89

0.61

1.22

1,720

NP-23-391

No significant values

Napoleon

NP-23-391

483.6

484.85

1.25

1

64

0.72

0.81

0.77

160

FW 1

NP-23-391

526.15

528.2

2.05

1.9

908

7.37

1.62

4.91

1,568

FW 2

Includes

526.15

526.85

0.7

0.65

1,500

8.96

2.05

3.98

2,205

NP-23-392

408.1

410.65

2.55

2.5

527

3.78

2.13

4.98

989

HW 4

Includes

409.25

409.95

0.7

0.69

1,500

9.97

5.25

6.66

2,465

NP-23-392

450.5

451.5

1

0.95

258

1.62

1.95

15.45

967

HW 3

NP-23-392

No significant values

HW 2

NP-23-392

644.6

646.6

2

1.55

40

1.96

0.62

11.4

602

Napoleon

NP-23-393

258.15

259.2

1.05

0.8

204

3.52

1.42

6.52

706

HW 4

NP-23-393

485.35

486.35

1

0.6

65

0.38

1.34

13.85

627

HW 3

NP-23-393

No significant values

Napoleon

Table 1:

Downhole drill intersections from the holes completed along the Napoleon main and vein splays.

Note: AgEq = Ag g/t x Ag rec. + ((Au g/t x Au Rec x Au price/gram)+

(Pb% x Pb rec. X Pb price/t) + (Zn% x Zn rec. X Zn price/t))/Ag price/gram. Metal price assumptions are $24.00/oz silver, $1,800/oz gold, $2,424.4/t lead and $2,975.4/t zinc.

Metallurgical recoveries assumed are 93% for silver, 90% for gold, 94% for lead and 94% for zinc. Metallurgical recoveries used in this release are from metallurgical test results of

the Napoleon vein (see press release dated February 17, 2022).

Drillhole

Easting

Northing

Elevation

Azimuth

Dip

Depth

NP-23-365A

403,888

2,586,230

434

270

-49

636.0

NP-23-370

403,891

2,586,232

434

258

-40

534.0

NP-23-374

403,967

2,586,189

467

267

-43

621.0

NP-23-378

403,967

2,586,189

467

268

-52

674.0

NP-23-380

403,967

2,586,189

467

268

-56

702.0

NP-23-383

403,967

2,586,189

467

270

-60

750.0

NP-23-386

403,856

2,586,035

450

271

-60

582.0

NP-23-388

403,849

2,586,432

477

253

-68

705.0

NP-23-391

403,854

2,586,086

449

271

-63

558.0

NP-23-392

403,849

2,586,432

477

270

-61

738.0

NP-23-393

403,683

2,586,973

480

251

-57

582.0

Table 2:

Napoleon vein drillhole details. Coordinates in WGS84, Zone 13.

Safety Milestone

Vizsla Silver is proud to report that it has achieved 1.5 million work hours without any lost time

incidents at

Panuco

. The Company commends the safety department, employees, and contractors

for their ongoing focus on the safety culture build over the life of the project and ensuring safe work

conditions at the work sites.

About the

Panuco

project

The newly consolidated

Panuco

silver-gold project is an emerging high-grade discovery located in

southern

Sinaloa, Mexico

, near the city of Mazatlán. The 7,189.5-hectare, past producing district

benefits from over 86 kilometres of total vein extent, 35 kilometres of underground mines, roads,

power, and permits.

The district contains intermediate to low sulfidation epithermal silver and gold deposits related to

siliceous volcanism and crustal extension in the Oligocene and Miocene. Host rocks are mainly

continental volcanic rocks correlated to the Tarahumara Formation.

The Panuco Project hosts an estimated in-situ indicated mineral resource of 104.8 Moz AgEq and an

in-situ inferred resource of 114.1 Moz AgEq. An updated NI 43-101 technical report titled "Technical

Report on the Mineral Resource Estimate Update for the Panuco Ag-Au-Pb-Zn Project, Sinaloa

State,

Mexico

" was filed on SEDAR on

March 10, 2023

, with an effective date of

January 19, 2023

was prepared by Allan Armitage, Ph. D., P. Geo., Ben Eggers, MAIG, P.Geo. and Yann Camus,

P.Eng. of SGS Geological Services.

About Vizsla Silver

Vizsla Silver is a Canadian mineral exploration and development company headquartered in

Vancouver, BC

, focused on advancing its flagship, 100%-owned

Panuco

silver-gold project located

in

Sinaloa, Mexico

. To date, Vizsla has completed over 250,000 metres of drilling at

Panuco

leading

to the discovery of several new high-grade veins. For 2023, Vizsla has budgeted +90,000 metres of

resource/discovery-based drilling designed to upgrade and expand the mineral resource, as well as

test other high priority targets across the district.

Quality Assurance / Quality Control

Drill core samples were shipped to ALS Limited in

Zacatecas

,

Zacatecas, Mexico

and in

North

Vancouver, Canada

for sample preparation and for analysis at the ALS laboratory in

North

Vancouver

and rock samples were shipped to SGS Lab in

Durango Mexico

for sample preparation

and analysis. The ALS Zacatecas,

North Vancouver

facilities and SGS lab are ISO 9001 and

ISO/IEC 17025 certified. Silver and base metals were analyzed using a four-acid digestion with an

ICP finish and gold was assayed by 30-gram fire assay with atomic absorption ("AA") spectroscopy

finish. Over limit analyses for silver, lead and zinc were re-assayed using an ore-grade four-acid

digestion with AA finish.

Control samples comprising certified reference samples, duplicates and blank samples were

systematically inserted into the sample stream and analyzed as part of the Company's quality

assurance / quality control protocol.

Qualified Person

In accordance with NI 43-101,

Martin Dupuis

, P.Geo., COO, is the Qualified Person for the

Company and has reviewed and approved the technical and scientific content of this news release.

Information Concerning Estimates of Mineral Resources

The scientific and technical information in this news release was prepared in accordance with NI 43-

101 which differs significantly from the requirements of the U.S. Securities and Exchange

Commission (the "SEC"). The terms "measured mineral resource", "indicated mineral resource" and

"inferred mineral resource" used herein are in reference to the mining terms defined in the Canadian

Institute of Mining, Metallurgy and Petroleum Standards (the "CIM Definition Standards"), which

definitions have been adopted by NI 43-101. Accordingly, information contained herein providing

descriptions of our mineral deposits in accordance with NI 43-101 may not be comparable to similar

information made public by other U.S. companies subject to

the United States

federal securities laws

and the rules and regulations thereunder.

You are cautioned not to assume that any part or all of mineral resources will ever be converted into

reserves. Pursuant to CIM Definition Standards, "inferred mineral resources" are that part of a

mineral resource for which quantity and grade or quality are estimated on the basis of limited

geological evidence and sampling. Such geological evidence is sufficient to imply but not verify

geological and grade or quality continuity. An inferred mineral resource has a lower level of

confidence than that applying to an indicated mineral resource and must not be converted to a

mineral reserve. However, it is reasonably expected that the majority of inferred mineral resources

could be upgraded to indicated mineral resources with continued exploration. Under Canadian rules,

estimates of inferred mineral resources may not form the basis of feasibility or pre-feasibility

studies, except in rare cases. Investors are cautioned not to assume that all or any part of an

inferred mineral resource is economically or legally mineable. Disclosure of "contained ounces" in a

resource is permitted disclosure under Canadian regulations; however, the SEC normally only

permits issuers to report mineralization that does not constitute "reserves" by SEC standards as in

place tonnage and grade without reference to unit measures.

Canadian standards, including the CIM Definition Standards and NI 43-101, differ significantly from

standards in the SEC Industry Guide 7. Effective

February 25, 2019

, the SEC adopted new mining

disclosure rules under subpart 1300 of Regulation S-K of the United States Securities Act of 1933,

as amended (the "SEC Modernization Rules"), with compliance required for the first fiscal year

beginning on or after

January 1, 2021

. The SEC Modernization Rules replace the historical property

disclosure requirements included in SEC Industry Guide 7. As a result of the adoption of the SEC

Modernization Rules, the SEC now recognizes estimates of "measured mineral resources",

"indicated mineral resources" and "inferred mineral resources". Information regarding mineral

resources contained or referenced herein may not be comparable to similar information made public

by companies that report according to U.S. standards. While the SEC Modernization Rules are

purported to be "substantially similar" to the CIM Definition Standards, readers are cautioned that

there are differences between the SEC Modernization Rules and the CIM Definitions Standards.

Accordingly, there is no assurance any mineral resources that the Company may report as

"measured mineral resources", "indicated mineral resources" and "inferred mineral resources" under

NI 43-101 would be the same had the Company prepared the resource estimates under the

standards adopted under the SEC Modernization Rules.

Website:

www.vizslasilvercorp.ca

Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in

policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this

release.

SPECIAL NOTE REGARDING FORWARD LOOKING STATEMENTS

This news release includes certain "Forward

Looking Statements" within the meaning of the United

States Private Securities Litigation Reform Act of 1995 and "forward

looking information" under

applicable Canadian securities laws. When used in this news release, the words "anticipate",

"believe", "estimate", "expect", "target", "plan", "forecast", "may", "would", "could", "schedule" and

similar words or expressions, identify forward

looking statements or information. These forward

looking statements or information relate to, among other things: the exploration, development, and

production at

Panuco

, including plans for resource/discovery-based drilling, designed to upgrade and

expand the maiden resource.

Forward

looking statements and forward

looking information relating to any future mineral

production, liquidity, enhanced value and capital markets profile of Vizsla, future growth potential for

Vizsla and its business, and future exploration plans are based on management's reasonable

assumptions, estimates, expectations, analyses and opinions, which are based on management's

experience and perception of trends, current conditions and expected developments, and other

factors that management believes are relevant and reasonable in the circumstances, but which may

prove to be incorrect. Assumptions have been made regarding, among other things, the price of

silver, gold, and other metals; no escalation in the severity of the COVID-19 pandemic; costs of

exploration and development; the estimated costs of development of exploration projects; Vizsla's

ability to operate in a safe and effective manner and its ability to obtain financing on reasonable

terms.

These statements reflect Vizsla's respective current views with respect to future events and are

necessarily based upon a number of other assumptions and estimates that, while considered

reasonable by management, are inherently subject to significant business, economic, competitive,

political and social uncertainties and contingencies. Many factors, both known and unknown, could

cause actual results, performance, or achievements to be materially different from the results,

performance or achievements that are or may be expressed or implied by such forward

looking

statements or forward-looking information and Vizsla has made assumptions and estimates based

on or related to many of these factors. Such factors include, without limitation: the Company's

dependence on one mineral project; precious metals price volatility; risks associated with the

conduct of the Company's mining activities in

Mexico

; regulatory, consent or permitting delays; risks

relating to reliance on the Company's management team and outside contractors; risks regarding

mineral resources and reserves; the Company's inability to obtain insurance to cover all risks, on a

commercially reasonable basis or at all; currency fluctuations; risks regarding the failure to generate

sufficient cash flow from operations; risks relating to project financing and equity issuances; risks

and unknowns inherent in all mining projects, including the inaccuracy of reserves and resources,

metallurgical recoveries and capital and operating costs of such projects; contests over title to

properties, particularly title to undeveloped properties; laws and regulations governing the

environment, health and safety; the ability of the communities in which the Company operates to

manage and cope with the implications of COVID-19; the economic and financial implications of

COVID-19 to the Company; operating or technical difficulties in connection with mining or

development activities; employee relations, labour unrest or unavailability; the Company's

interactions with surrounding communities and artisanal miners; the Company's ability to successfully

integrate acquired assets; the speculative nature of exploration and development, including the risks

of diminishing quantities or grades of reserves; stock market volatility; conflicts of interest among

certain directors and officers; lack of liquidity for shareholders of the Company; litigation risk; and

the factors identified under the caption "Risk Factors" in Vizsla' management discussion and

analysis. Readers are cautioned against attributing undue certainty to forward

looking statements or

forward-looking information. Although Vizsla has attempted to identify important factors that could

cause actual results to differ materially, there may be other factors that cause results not to be

anticipated, estimated or intended. Vizsla does not intend, and does not assume any obligation, to

update these forward

looking statements or forward-looking information to reflect changes in

assumptions or changes in circumstances or any other events affecting such statements or

information, other than as required by applicable law.

SOURCE

Vizsla Silver Corp.

View original content to download multimedia:

http://www.newswire.ca/en/releases/archive/August2023/23/c3851.html

%SEDAR: 00045314E

For further information:

and to sign-up to the mailing list, please contact: Michael Konnert,

President and Chief Executive Officer, Tel: (604) 364-2215, Email: [email protected]

CO: Vizsla Silver Corp.

CNW 08:00e 23-AUG-23