Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

VZLA.TO ·

Vizsla Silver Announces Significant Increase IN Contained Ounces and Increase IN Grade of Indicated Category to 551 G/T Ageq IN Updated Mineral Resources Estimate

Resource Estimates

VIZSLA SILVER ANNOUNCES SIGNIFICANT

INCREASE IN CONTAINED OUNCES AND

INCREASE IN GRADE OF INDICATED

CATEGORY TO 551 G/T AGEQ IN UPDATED

MINERAL RESOURCES ESTIMATE

VANCOUVER, BC

,

Jan. 8, 2024

/CNW/ -

Vizsla Silver Corp.

(NYSE: VZLA) (TSXV: VZLA)

(

Frankfurt

: 0G3) ("

Vizsla Silver

" or the "

Company

") is pleased to announce an updated mineral

resource estimate ("

Updated

Mineral Resource Estimate

") for its flagship, 100% owned

Panuco

silver-gold project (the "

Project

" or "

Panuco

") located in

Sinaloa, Mexico

. The Updated Mineral

Resource Estimate was completed by

Allan Armitage

, Ph.D., P.Geo., of SGS Geological Services.

Highlights of the Updated Mineral Resource Estimate, including a comparison to the

previous mineral resource estimate released in

January 2023

:

48.7% increase in indicated mineral resources from 104.8 to 155.8 Moz AgEq

48.7% increase in inferred mineral resources from 114.1 to 169.6 Moz AgEq

17% increase in average indicated mineral resource grade from 437 to 511 g/t AgEq

New addition of La Luisa containing 4.0 Moz AgEq indicated and 25.3 Moz AgEq of

Inferred Resources

Key Statistics:

The Updated Mineral Resource represents less than 10% of the known vein strike of the

newly consolidated district

90% of the value of the Updated Mineral Resource Estimate is comprised of precious

metals, including 56% from silver

A total of 11 epithermal veins were included in the Updated Mineral Resource Estimate

Total all-in exploration cost of

US$0.32

/oz AgEq discovered

Indicated Mineral Resources

are estimated at 9.5 million tonnes ("Mt") grading 289 grams per

tonne ("g/t") silver, 2.41 g/t gold, 0.27% lead, and 0.84% zinc (

511 g/t silver equivalent

("AgEq")).

The Updated Mineral Resource Estimate includes indicated mineral resources of 88.2 million ounces

("Moz") of silver, 736 thousand ounces ("koz") of gold, 25.4 kilotonnes ("kt") of lead, and 79.9 kt of

zinc (

155.8 Moz AgEq

).

Inferred Mineral Resources

are estimated at 12.2 Mt grading 239 g/t silver, 1.93 g/t gold, 0.29%

lead, and 1.03% zinc (

433 g/t AgEq

). The Updated Mineral Resource Estimate includes inferred

mineral resources of 93.7 Moz of silver, 758 koz of gold, 35.4 kt of lead, and 125.3 kt of zinc (

169.6

Moz AgEq

).

The Updated Mineral Resource Estimate is centred on the western portion of

Panuco

,

encompassing ~8 km of the known 86 km of cumulative vein strike in the district. The Updated

Mineral Resource Estimate includes 178 new infill/expansion holes (100,222 metres) completed by

Vizsla Silver between

September 2022

and

September 2023

. In total, the Updated Mineral

Resource Estimate is based on a total drill database of 822 holes (302,931 metres) completed by

Vizsla Silver since

November 2019

.

"We are pleased to announce another significant resource update milestone for the high-grade

Panuco

silver gold district,"

commented

Michael Konnert

, President and CEO

. "Although

substantial, this update represents only a moment in time at the Project, as drills continue to turn in

2024."

"The Project's indicated resource now stands at 88 million ounces of silver and 736 thousand

ounces of gold, while the inferred resource contains 94 million ounces of silver and 758 thousand

ounces of gold. This represents a 49% increase in both indicated and inferred ounces and a 17%

increase in indicated grade relative to the previous estimate. Resource focused drilling throughout

2023 was successful in converting almost half of the

January 2023

inferred resource to the

indicated category while exploration drilling added new resources at both

Copala

and Napoleon.

The bulk of this year's resource growth came from the Napoleon Area, largely driven by the

inclusion of La Luisa, which added an additional 25Moz AgEq in inferred mineralization."

"What's most impressive is that although we continue to expand the Project's mineral inventory

year after year, our current resource still accounts for less than 10% of the known veins we have in

the district. Going forward, we will focus on de-risking and advancing the high-grade resource in

the west towards development, taking advantage of the Project's incredible infrastructure, while

simultaneously hunting for the next epicenter of mineralization in the central and eastern portions

of the district. This is an outstanding achievement that comes as a result of hard work and

perseverance. I want to thank everyone from the entire Vizsla team, including our contractors and

local communities, and look forward to another successful year in 2024."

Vizsla Silver will be hosting a webcast to discuss the Updated Mineral Resource Estimate at

10:00am PT on Thursday, January 11th, 2024.

To register, please click

here

.

A technical report is being prepared on the Updated Mineral Resource Estimate in accordance with

National Instrument 43-101 ("

NI-43-101

") and will be available on the Company's website and

SEDAR within 45 days of the date of this release. The effective date of the Updated Mineral

Resource Estimate is September 1, 2023.

Panuco Project Resource Summary (150 g/t AgEq cut-off)

Updated MRE

Previous MRE

Variance

Resource Class

Indicated

Inferred

Indicated

Inferred

Indicated

Inferred

Tonnes (MT)

9.5

12.2

7.5

7.2

2.0

5.0

Au g/t

2.41

1.93

2.12

2.14

0.29

-0.21

Ag g/t

289

239

243

304

46

-65

Pb %

0.27

0.29

0.23

0.19

0.04

0.10

Zn %

0.84

1.03

0.71

0.54

0.13

0.49

AgEq (g/t)

511

433

437

491

74

-58

AuEq (g/t)

6.81

5.76

5.82

6.55

0.99

-0.79

Au (koz)

736

758

508

496

228

262

Ag (koz)

88,192

93,653

58,330

70,672

29,862

22,981

Pb (kt)

56.0

35.4

17.2

13.7

38.8

21.7

Zn (kt)

79.9

125.3

53.3

38.9

26.6

86.4

1

AgEq (koz)

155,841

169,647

104,793

114,113

51,048

55,534

2

AuEq (koz)

2,076

2,261

1,404

1,516

672

745

Panuco Project Indicated & Inferred Mineral Resource Summary by Vein (150 g/t AgEq cut-

off)

Classification

Tonnes

Average Grade

Contained Metal

Ag

Au

Pb

Zn

AgEq

Au Eq

Ag

Au

Pb

Zn

1

AgEq

2

AuEq

(Mt)

(g/t)

(g/t)

( %)

( %)

(g/t)

(g/t)

(koz)

(koz)

(kt)

(kt)

(koz)

(koz)

Indicated

Copala

4.5

380

2.46

0.08

0.15

573

7.64

55,201

358

3.7

6.9

83,270

1,110

Tajitos

0.6

358

2.24

0.12

0.21

538

7.18

7,295

46

0.7

1.3

10,953

146

Cristiano

0.2

581

3.37

0.25

0.43

858

11.45

3,961

23

0.5

0.9

5,851

78

Copala Area

Total

5.4

385

2.48

0.09

0.17

580

7.74

66,457

427

5.0

9.2

100,074

1,343

Napoleon

3.3

162

2.39

0.52

1.73

425

5.66

17,276

255

17.2

57.4

45,223

603

Napoleon HW

0.4

164

1.72

0.42

1.53

365

4.87

2,259

24

1.8

6.5

5,029

67

Luisa

0.3

177

2.56

0.39

2.01

459

6.12

1556

22

1.1

5.5

4,027

54

Josephine

0.1

221

2.88

0.39

1.11

492

6.56

491

6

0.3

0.8

1,092

15

Cruz

0.0

144

2.01

0.37

1.71

373

4.97

153

2

0.1

0.6

396

5

NP Area

Total

4.1

164

2.34

0.50

1.72

421

5.66

21,735

309

20.4

70.7

55,767

743

Total

Indicated

9.5

289

2.41

0.27

0.84

511

6.81

88,192

736

25.4

79.9

155,841

2,076

Inferred

Copala

3.2

332

1.77

0.12

0.20

476

6.34

33,722

179

3.7

6.2

48,320

644

Tajitos

1.0

365

2.04

0.22

0.39

540

7.21

12,260

69

2.3

4.0

18,140

242

Cristiano

0.7

443

2.54

0.15

0.29

650

8.66

10,213

59

1.1

2.0

14,974

200

Copala Area

Total

4.9

355

1.94

0.15

0.25

515

6.86

56,195

307

7.1

12.3

81,434

1,081

Napoleon

3.2

137

1.64

0.45

1.76

342

4.57

14,045

168

14.4

55.9

35,063

467

Napoleon HW

0.8

220

2.17

0.59

2.02

479

6.39

5,976

59

5.0

17.0

13,027

174

La Luisa

2.0

159

2.13

0.30

1.51

386

5.15

10,439

139

6.0

30.8

25,326

338

Josephine

0.2

161

2.05

0.33

1.00

364

4.85

1161

15

0.7

2.2

2,618

35

Cruz

0.3

170

3.75

0.31

1.48

519

6.91

1698

37

1.0

4.6

5,169

69

NP Area

Total

6.6

157

1.97

0.41

1.68

383

5.10

33,319

418

27.1

110.6

81,203

1,082

San Antonio

0.3

226

1.30

0.01

0.03

325

4.33

2,038

12

0.0

0.1

2,936

39

*Animas

0.4

169

1.68

0.29

0.60

327

4.37

2,101

21

1.1

2.3

4,074

54

Total

Inferred

12.2

239

1.93

0.29

1.03

433

5.76

93,653

758

35.4

125.3

169,647

2,261

*Animas is Rosarito and Cuevillas veins

Panuco Project Indicated & Inferred Mineral Resource Sensitivity Table

Classification

Tonnes

Average Grade

Contained Metal

COG AgEq

Ag

Au

Pb

Zn

AgEq

AuEq

Ag

Au

Pb

Zn

1

AgEq

2

AuEq

(Mt)

(g/t)

(koz)

( %)

( %)

(g/t)

(g/t)

(koz)

(koz)

(kt)

(kt)

(koz)

(koz)

Indicated:

300

5.58

415

3.41

0.31

0.96

718

9.57

74,501

612

17.2

53.5

128,810

1,716

250

6.54

375

3.09

0.3

0.95

653

8.70

78,809

651

19.5

62.2

137,286

1,830

200

7.86

331

2.75

0.29

0.9

581

7.75

83,610

694

22.2

70.8

146,774

1,958

150

9.48

289

2.41

0.27

0.84

511

6.81

88,192

736

25.4

79.9

155,841

2,076

120

10.75

263

2.2

0.25

0.79

467

6.22

91,066

759

26.8

85.3

161,308

2,149

100

11.74

246

2.05

0.24

0.75

437

5.82

92,965

773

27.7

88.5

164,833

2,195

Inferred:

300

6.47

355

2.82

0.36

1.23

634

8.34

73,931

587

23.1

79.4

131,930

1,734

250

7.9

317

2.54

0.34

1.17

565

7.51

80,365

644

26.8

92.1

143,338

1,908

200

9.7

278

2.24

0.32

1.12

499

6.66

86,784

698

30.9

108.4

155,748

2,076

150

12.19

239

1.93

0.29

1.03

433

5.76

93,653

758

35.4

125.2

169,647

2,261

120

14.04

216

1.75

0.28

0.97

393

5.25

97,502

791

38.6

136.1

177,648

2,368

100

15.47

201

1.63

0.26

0.92

367

4.89

99,985

812

40.8

142.9

182,671

2,433

Note:

1

AgEq = Ag ppm + (((Au ppm x Au price/gram) + (Pb% x Pb price/t) + (Zn% x Zn price/t))/Ag price/gram). Metal price assumptions are $24.00/oz silver, $1,800/oz gold, $2,425/t lead

and $2,976/t zinc.

2

AuEq = Au ppm + (((Ag ppm x Ag price/gram) + (Pb% x Pb price/t) + (Zn% x Zn price/t))/Au price/gram). Metal price assumptions are $24.00/oz silver, $1,800/oz gold, $2,425/t lead

and $2,976/t zinc.

Panuco Project Updated Mineral Resource Estimate Notes:

The classification of the Updated Mineral Resource Estimate into indicated and inferred mineral

resources is consistent with current 2014 CIM Definition Standards for Mineral Resources and

Mineral Reserves. The effective date for the Updated Mineral Resource Estimate is

September

1, 2023

.

All figures are rounded to reflect the relative accuracy of the estimate and numbers may not add

due to rounding.

All mineral resources are presented undiluted and in situ, constrained by continuous 3D

wireframe models, and are considered to have reasonable prospects for eventual economic

extraction.

Mineral resources are not mineral reserves. Mineral resources which are not mineral reserves,

do not have demonstrated economic viability. An Inferred Mineral Resource has a lower level of

confidence than that applying to an Indicated Mineral Resource and must not be converted to a

Mineral Reserve. It is reasonably expected that the majority of Inferred Mineral Resources

could be upgraded to Indicated Mineral Resources with continued exploration.

The database comprises a total of 822 drill holes for 302,931 metres of drilling completed by

Vizsla Silver between

November 2019

and

September 2023

.

The mineral resource estimate is based on 28 three-dimensional ("3D") resource models,

constructed in Leapfrog, representing the Napoleon area (15 wireframes), the

Copala

area (7

wireframes),

Tajitos

(1 wireframe), Animas (5 wireframes) and

San Antonio

(1 wireframe).

Silver, gold, lead and zinc were estimated for each mineralization domain in the Panuco Project.

Blocks within each mineralized domain were interpolated using 1.5 metre capped composites

assigned to that domain. To generate grade within the blocks, the inverse distance squared

(ID

2

) interpolation method was used for all domains. All estimates are based on variable block

dimensions (by deposit area) and estimation search parameters (by domain).

Average density values were assigned per zone based on 1,919 samples analysed by ALS in

Zacatecas, Mexico

or inhouse with 5% checks by ALS.

It is envisioned that the Panuco Project deposits may be mined using underground mining

methods. Mineral resources are reported at a base case cut-off grade of 150 g/t AgEq. The

mineral resource grade blocks were quantified above the base case cut-off grade, below

surface and within the constraining mineralized wireframes.

The base-case AgEq Cut-off grade considers metal prices of

$24.00

/oz Ag,

$1800

/oz Au,

$2425

/t Pb and

$2976

/t Zn and considers metal recoveries of 93% for silver, 90% for gold,

94% for Pb and 94% for Zn.

The base case cut-off grade of 150 g/t AgEq considers a mining cost of

US$45.00

/t rock and

processing, treatment and refining, transportation and G&A cost of

US$50.00

/t of mineralized

material.

The Updated Mineral Resource Estimate may be materially affected by environmental,

permitting, legal, title, taxation, socio-political, marketing, or other relevant issues.

The Company remains well-funded for its ongoing +65,000 metre 2024 drill program with four drill

rigs designed to upgrade and expand the Project's resource base and test high priority targets

located in the west, central and eastern areas of the district. Dependent on ongoing exploration

success, the Company plans to publish a further update to the Updated Mineral Resource Estimate

in the second half of 2024.

Discovery Costs

To date, the Company has incurred an aggregate of approximately

US$103.0 million

in exploration

expenditures over the life of the Project. This equates to an estimated discovery cost per silver

equivalent ounce of

US$0.32

for resources defined in the Updated Mineral Resource Estimate.

About the

Panuco

project

The newly consolidated

Panuco

silver-gold project is an emerging high-grade discovery located in

southern

Sinaloa, Mexico

, near the city of Mazatlán. The 7,189.5 hectare, past producing district

benefits from over 86 kilometres of total vein extent, 35 kilometres of underground mines, roads,

power, and permits.

The district contains intermediate to low sulfidation epithermal silver and gold deposits related to

siliceous volcanism and crustal extension in the Oligocene and Miocene. Host rocks are mainly

continental volcanic rocks correlated to the Tarahumara Formation.

About Vizsla Silver

Vizsla Silver is a Canadian mineral exploration and development company headquartered in

Vancouver, BC

, focused on advancing its flagship, 100%-owned

Panuco

silver-gold project located

in

Sinaloa, Mexico

. To date, Vizsla Silver has completed over 310,000 metres of drilling at

Panuco

leading to the discovery of several new high-grade veins. For 2024, Vizsla Silver is focused on de-

risking the resource base located in the western portion of the district ahead of a development

decision. Additionally, Vizsla has budgeted +65,000 metres of resource/discovery-based drilling

designed to upgrade and expand the Project's mineral resource, as well as test other high priority

targets across the district.

Quality Assurance / Quality Control

Drill core and rock samples were shipped to ALS Limited in

Zacatecas

,

Zacatecas, Mexico

and in

North Vancouver, Canada

for sample preparation and for analysis at the ALS laboratory in

North

Vancouver

. The ALS Zacatecas and

North Vancouver

facilities are ISO 9001 and ISO/IEC 17025

certified. Silver and base metals were analyzed using a four-acid digestion with an ICP finish and

gold was assayed by 30-gram fire assay with atomic absorption ("AA") spectroscopy finish. Over

limit analyses for silver, lead and zinc were re-assayed using an ore-grade four-acid digestion with

AA finish.

Control samples comprising certified reference samples, duplicates and blank samples were

systematically inserted into the sample stream and analyzed as part of the Company's

quality assurance/ quality control protocol.

Qualified Person

The Updated Mineral Resource Estimate was completed by

Allan Armitage

, Ph.D., P.Geo., of SGS

Geological Services. Mr. Armitage is an independent Qualified Person as defined by NI 43-101. Mr.

Armitage has reviewed and approved the technical contents of this news release.

Information Concerning Estimates of Mineral Resources

The scientific and technical information in this news release was prepared in accordance with NI 43-

101 which differs significantly from the requirements of the U.S. Securities and Exchange

Commission (the "

SEC

"). The terms "measured mineral resource", "indicated mineral resource" and

"inferred mineral resource" used herein are in reference to the mining terms defined in the Canadian

Institute of Mining, Metallurgy and Petroleum Standards (the "CIM Definition Standards"), which

definitions have been adopted by NI 43-101. Accordingly, information contained herein providing

descriptions of our mineral deposits in accordance with NI 43-101 may not be comparable to similar

information made public by other U.S. companies subject to

the United States

federal securities laws

and the rules and regulations thereunder.

You are cautioned not to assume that any part or all of the mineral resources will ever be converted

into reserves. Pursuant to CIM Definition Standards, "inferred mineral resources" are that part of a

mineral resource for which quantity and grade or quality are estimated on the basis of limited

geological evidence and sampling. Such geological evidence is sufficient to imply but not verify

geological and grade or quality continuity. An inferred mineral resource has a lower level of

confidence than that applying to an indicated mineral resource and must not be converted to a

mineral reserve. However, it is reasonably expected that the majority of inferred mineral resources

could be upgraded to indicated mineral resources with continued exploration. Under Canadian rules,

estimates of inferred mineral resources may not form the basis of feasibility or pre-feasibility

studies, except in rare cases. Investors are cautioned not to assume that all or any part of an

inferred mineral resource is economically or legally mineable. Disclosure of "contained ounces" in a

resource is permitted disclosure under Canadian regulations; however, the SEC normally only

permits issuers to report mineralization that does not constitute "reserves" by SEC standards as in

place tonnage and grade without reference to unit measures.

The SEC adopted new mining disclosure rules Pursuant to subpart 1300 of Regulation S-K of the

United States Securities Act of 1933, as amended (the "SEC Modernization Rules"). As a result of

the adoption of the SEC Modernization Rules, the SEC now recognizes estimates of "measured

mineral resources", "indicated mineral resources" and "inferred mineral resources". As an eligible

issuer under the Multijurisdictional Disclosure System the Company is exempt from compliance with

the SEC Modernization Rules and information regarding mineral resources contained or referenced

herein may not be comparable to similar information made public by companies that report according

to the SEC Modernization Rules. While the SEC Modernization Rules are purported to be

"substantially similar" to the CIM Definition Standards, readers are cautioned that there are

differences between the SEC Modernization Rules and the CIM Definitions Standards. Accordingly,

there is no assurance any mineral resources that the Company may report as "measured mineral

resources", "indicated mineral resources" and "inferred mineral resources" under NI 43-101 would be

the same had the Company prepared the resource estimates under the standards adopted under

the SEC Modernization Rules.

Contact Information:

For more information and to sign-up to the mailing list, please contact:

Michael Konnert

, President and Chief Executive Officer

Tel: (604) 364-2215

Email:

[email protected]

Website:

www.vizslasilvercorp.ca

Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in

policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this

release.

SPECIAL NOTE REGARDING FORWARD LOOKING STATEMENTS

This news release includes certain "Forward

Looking Statements" within the meaning of the United

States Private Securities Litigation Reform Act of 1995 and "forward

looking information" under

applicable Canadian securities laws. When used in this news release, the words "anticipate",

"believe", "estimate", "expect", "target", "plan", "forecast", "may", "would", "could", "schedule" and

similar words or expressions, identify forward

looking statements or information. These forward

looking statements or information relate to, among other things: the exploration, development, and

production at

Panuco

, including drilling programs, the mobilization of drill rigs

;

and the potential for

underground mining methods; the preparation of a technical report on the Updated Mineral Resource

Estimate; and the potential further update to the Updated Mineral Resource Estimate in the second

half of 2023.

Forward

looking statements and forward

looking information relating to any future mineral

production, liquidity, enhanced value and capital markets profile of Vizsla Silver, future growth

potential for Vizsla Silver and its business, and future exploration plans are based on management's

reasonable assumptions, estimates, expectations, analyses and opinions, which are based on

management's experience and perception of trends, current conditions and expected developments,

and other factors that management believes are relevant and reasonable in the circumstances, but

which may prove to be incorrect. Assumptions have been made regarding, among other things, the

price of silver, gold, and other metals; no escalation in the severity of the COVID-19 pandemic;

costs of exploration and development; the estimated costs of development of exploration projects;

Vizsla Silver's ability to operate in a safe and effective manner and its ability to obtain financing on

reasonable terms.

These statements reflect Vizsla Silver's respective current views with respect to future events and

are necessarily based upon a number of other assumptions and estimates that, while considered

reasonable by management, are inherently subject to significant business, economic, competitive,

political and social uncertainties and contingencies. Many factors, both known and unknown, could

cause actual results, performance, or achievements to be materially different from the results,

performance or achievements that are or may be expressed or implied by such forward

looking

statements or forward-looking information and Vizsla Silver has made assumptions and estimates

based on or related to many of these factors. Such factors include, without limitation: the Company's

dependence on one mineral project; precious metals price volatility; risks associated with the

conduct of the Company's mining activities in

Mexico

; regulatory, consent or permitting delays; risks

relating to reliance on the Company's management team and outside contractors; risks regarding

mineral resources and reserves; the Company's inability to obtain insurance to cover all risks, on a

commercially reasonable basis or at all; currency fluctuations; risks regarding the failure to generate

sufficient cash flow from operations; risks relating to project financing and equity issuances; risks

and unknowns inherent in all mining projects, including the inaccuracy of reserves and resources,

metallurgical recoveries and capital and operating costs of such projects; contests over title to

properties, particularly title to undeveloped properties; laws and regulations governing the

environment, health and safety; the ability of the communities in which the Company operates to

manage and cope with the implications of COVID-19; the economic and financial implications of

COVID-19 to the Company; operating or technical difficulties in connection with mining or

development activities; employee relations, labour unrest or unavailability; the Company's

interactions with surrounding communities and artisanal miners; the Company's ability to successfully

integrate acquired assets; the speculative nature of exploration and development, including the risks

of diminishing quantities or grades of reserves; stock market volatility; conflicts of interest among

certain directors and officers; lack of liquidity for shareholders of the Company; litigation risk; and

the factors identified under the caption "Risk Factors" in Vizsla Silver's management discussion and

analysis. Readers are cautioned against attributing undue certainty to forward

looking statements or

forward-looking information. Although Vizsla Silver has attempted to identify important factors that

could cause actual results to differ materially, there may be other factors that cause results not to

be anticipated, estimated or intended. Vizsla Silver does not intend, and does not assume any

obligation, to update these forward

looking statements or forward-looking information to reflect

changes in assumptions or changes in circumstances or any other events affecting such statements

or information, other than as required by applicable law.

SOURCE

Vizsla Silver Corp.

View original content to download multimedia:

http://www.newswire.ca/en/releases/archive/January2024/08/c6591.html

%SEDAR: 00045314E

For further information:

Michael Konnert, President and Chief Executive Officer, Tel: (604) 364-

2215, Email: [email protected]

CO: Vizsla Silver Corp.

CNW 07:00e 08-JAN-24