Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

VZLA.TO ·

Vizsla Expands Tajitos By 40% to 800 Metres, Hitting 3,374 g/t AgEq Over 1.5 mTW at Panuco (VZLA-TSX-V)

Corporate Updates

Vizsla Expands Tajitos By 40% to 800 Metres,

Hitting 3,374 g/t AgEq Over 1.5 mTW at

Panuco

(VZLA-TSX-V)

VANCOUVER, BC

,

Oct. 14, 2021

/CNW/ -

Vizsla Silver Corp.

(TSXV: VZLA) (OTCQB: VIZSF)

(

Frankfurt

: 0G3) ("

Vizsla

" or the "

Company

") is pleased to provide results from 23 new drill holes

targeting the Tajitos Vein resource area ("

Tajitos

") at its 100%-owned, flagship Panuco silver-gold

project ("

Panuco

" or the "

Project

") located in

Mexico

.

Highlights

CS-21-66

: 115 metre step to the southwest:

3,374 grams per tonne (g/t) silver equivalent (AgEq) (2,607 g/t silver and 9.90 g/t gold)

over 1.5 metres true width (mTW) from

348.3 m

and;

793.9 g/t AgEq (599.7 g/t silver and 2.47 g/t gold) over 1.3 down hole width from

175.45m

CS-21-77

: 165 metre step to the northeast:

354 g/t AgEq (216 g/t silver and 1.62 g/t gold) over 4.95 mTW from

348.3 m

and;

1,582 g/t AgEq (1,115 g/t silver and 5.73 g/t gold) over 0.7 down hole width from

159.7 m

CS-21-37

: 1,643 g/t AgEq (960 g/t silver and 7.94 g/t gold) over 1.34 mTW from

207.3 m

CS-21-50

: 807 g/t AgEq (615 g/t silver and 2.46 g/t gold) over 1.99 mTW from

251.4 m

Note: All numbers are rounded. Silver equivalent is calculated using the following formula: Silver-equivalent = ((Au_g/t x 52.48) + (Ag_g/t x 0.5289)) / 0.5627. Metal price

assumptions are $17.50 ounce silver and $1,700 ounce gold, recoveries assumptions are 96% gold and 94% silver, based on similar deposit types.

Vizsla President and CEO

Michael Konnert

commented:

"

Tajitos

continues to exceed our high

expectations with large step out holes now expanding the target resource area to over 800 metres

in total strike length. Mineralization remains open in both directions along strike and at depth,

where elevated precious to base metal ratios continues to highlight significant potential for further

expansion. The Company currently has three rigs focused on

Tajitos

and will continue to take bold

step-outs ahead of declaring the Project's maiden resource in Q1, 2022."

Figure 1: Longitudinal section from Tajitos vein, looking to the northwest. All new holes are labelled

and selected intersections are shown. (CNW Group/Vizsla Silver Corp.)

Figure 2: Plan map of the Tajitos resource drilling area along the Cinco Senores Vein Corridor.

(CNW Group/Vizsla Silver Corp.)

Tajitos Drilling detail

Resource drilling targeting the Tajitos Vein, located along the Cinco Senores Vein Corridor (Figures

1 & 2), approximately

500m

east of the Napoleon Vein, has significantly expanded the Zone's

mineralized footprint, now measuring 800 metres along strike and to a depth of 300 metres below

surface. Drilling will now progress using a grid pattern on 100-metre centers (previously 50-metre

centers) due to increased confidence in local controls to mineralization and the potential to rapidly

add tonnage ahead of the data cut-off for inclusion in the maiden project resource.

Step-out drilling to the southwest intersected 3,374 g/t silver equivalent over a true width of 1.4

metres in one of the deepest holes completed to date at

Tajitos

(CS-21-66). This intercept is

located approximately 150 metres from the nearest drill hole (115 metres along strike) and remains

open in all directions. Infill drilling between this intercept and the main panel of mineralization has

been completed and assays remain pending.

To the northeast, step-out hole CS-21-77 was similarly successful, intersecting the vein with

increased width; 4.9 metres true width grading 354 g/t silver equivalent. This intercept is open in all

directions and the company interprets it to be part of another potential zone of dilation observed

along the Tajitos Vein. Step outs to depth and further to the northeast continue to define a broad

mineralized structure (assays remain pending for these holes).

Following the receipt of several outstanding assays surrounding the step-out holes detailed above,

Vizsla intends to provide an updated average width and weighted average grade for the Tajitos Vein.

CS-21-77 has also identified an additional parallel vein in the hanging wall of

Tajitos

, marked by

elevated precious metals grades (0.7 metres downhole width grading 1,582 g/t silver equivalent.

This vein appears to be restricted to the northeast zone and has been intersected by all step-out

holes to the northeast of, and vertically below hole CS-21-77.

Infill drilling centered on the core area of

Tajitos

has significantly improved the overall understanding

of the Zone's controls to mineralization. The high-grade body of mineralization first intercepted in

hole CS-21-01 is observed to pinch to the southwest of holes CS-20-06 and CS-20-11, particularly

as the host lithology changes from Andesite to Diorite. Here, average vein thickness and grade are

observed to decrease before the vein widens and grade lifts again away from the contact.

Additionally, a notable change in dip direction observed in the southwest, with an axis from hole CS-

21-48 to CS-21-47, may be responsible for local grade variability, with relatively higher grades

intercepted above and below this change. Holes CS-21-23 and CS-21-50 are good examples of the

mineralization returning to higher grades beneath and to the southwest of this change in orientation.

There are currently 10 drill rigs turning at

Panuco

: four centered on Napoleon resource drilling, three

on

Tajitos

resource drilling, two focused on expanding the Josephine prospect and one testing EM

geophysics targets.

Complete table of

Tajitos

drill hole intersections

Drillhole

From

To

Length

True

Width

GOLD

SILVER

Silver

Equivalent

Comment

(m)

(m)

(m)

(g/t)

(g/t)

(g/t)

CS-21-34

351

353.5

2.5

1.38

1.16

79

182

CS-21-35

No Significant values

Ands/Dior cont.

CS-21-37

207.3

209.2

1.9

1.34

7.94

960

1,643

Incl.

207.3

208.5

1.2

0.85

12.05

1,465

2,501

And

223.2

223.9

0.70

4.16

2,082

2,345

Foot wall

Incl.

223.2

223.5

0.30

9.01

4,590

5,155

CS-21-38

No Significant values

Ands/Dior cont.

CS-21-39

No Significant values

CS-21-41

226.65

229.5

2.85

2.15

1.09

188

278

CS-21-42

No Significant values

CS-21-44

261.25

263.1

1.8

1.38

2.83

527

759

Incl.

261.25

262

0.75

0.57

3.17

639

896

CS-21-45

No Significant values

Ands/Dior cont.

CS-21-46

182.5

183.1

0.5

0.46

0.17

92

103

CS-21-47

313.6

322.3

8.7

0.51

99

141

Hanging wall

Incl.

313.6

314.7

1.1

1.78

418

558.9

And

401.2

401.8

0.55

0.43

0.16

35

48

Ands/Dior cont.

CS-21-48

No Significant values

Dip change

CS-21-49

176.05

184.5

8.45

2.56

304

524

Hanging wall

Incl.

179.45

181.0

1.55

8.27

816

1,538

And

358.7

363.5

4.75

3.14

0.12

23

33

CS-21-50

251.4

254.3

2.85

1.99

2.46

615

807

Incl.

251.4

252.4

1.0

0.70

6.45

1,640

2,143

CS-21-51

373.85

375.7

1.85

0.97

0.16

62

73

CS-21-52

291.75

293.0

1.25

0.86

3.37

315

610

CS-21-53

333.2

335.45

2.25

2.04

0.33

51

79

Dip change

CS-21-54

No Significant values

CS-21-55

No Significant values

Dip change

CS-21-57A

No Significant values

Dip change

CS-21-59A

269.55

271.6

2.05

1.39

3.26

73

372

Cs-21-66

175.45

176.8

1.3

2.47

600

794

Hanging wall

And

348.3

350.5

2.2

1.50

9.90

2,607

3,374

CS-21-77

159.7

160.4

0.7

5.73

1,115

1,582

Hanging wall

And

182.9

187.9

4.95

4.38

1.62

216

354

Table 1:

Downhole drill intersections from the holes completed at the Tajitos Vein on the Cinco Senores Vein Corridor

.

Note: All numbers are rounded. Silver equivalent is calculated using the following formula: Silver-equivalent = ((Au_g/t x 52.48) + (Ag_g/t x 0.5289)) / 0.5627. Metal price

assumptions are $17.50 ounce silver and $1,700 ounce gold, recoveries assumptions are 96% gold and 94% silver, based on similar deposit types.

Drill Collar Information

Prospect

Drillhole

Easting

Northing

Elevation

Dip

Azimuth

Hole

Depth

Tajitos

CS-21-34

404,353

2,586,793

600

-66

299

381

CS-21-35

404,280

2,586,736

564

-61

322

251

CS-21-37

404,279

2,586,735

564

-68

296

300

CS-21-38

404,280

2,586,736

564

-70

328

360

CS-21-39

404,417

2,587,022

521

-74

280

305

CS-21-41

404,456

2,586,929

527

-60

302

276

CS-21-42

404,456

2,586,929

527

-69

303

306

CS-21-44

404,458

2,586,923

526

-59

284

305

CS-21-45

404,544

2,586,776

529

-37

299

399

CS-21-47

404,544

2,586,776

529

-45

298

431

CS-21-48

404,341

2,586,524

582

-41

307

291

CS-21-49

404,353

2,586,793

600

-73

304

389

CS-21-50

404,341

2,586,524

582

-52

309

363

CS-21-51

404,353

2,586,792

600

-74

275

386

CS-21-52

404,341

2,586,524

582

-60

315

315

CS-21-53

404,364

2,586,657

601

-57

309

366

CS-21-54

404,340

2,586,524

582

-66

315

378

CS-21-55

404,364

2,586,657

601

-64

310

384

CS-21-57A

404,364

2,586,657

601

-62

300

387

CS-21-58

404,320

2,586,484

586

-70

312

414

CS-21-59A

404,364

2,586,657

601

-68

299

372

CS-21-66

404,277

2,586,414

590

-69

270

392

CS-21-77

404,504

2,587,123

549

-49

297

288

Table 2:

Drill hole details. Coordinates in WGS84, Zone 13.

About the

Panuco

project

The newly consolidated

Panuco

silver-gold project is an emerging high-grade discovery located in

southern

Sinaloa, Mexico

, near the city of Mazatlán. The 6,754.1-hectare, past producing district

benefits from over 75 kilometres of total vein extent, a 500 ton per day mill, 35 kilometres of

underground mines, tailings facilities, roads, power and permits.

The district contains intermediate to low sulfidation epithermal silver and gold deposits related to

siliceous volcanism and crustal extension in the Oligocene and Miocene. Host rocks are mainly

continental volcanic rocks correlated to the Tarahumara Formation.

Note: Two new claims have been acquired adding 149.9 hectares of new area. 4,103.5 hectares

previously reported as part of the

Panuco

project have been removed from the total hectares due to

4 claims being located at a significant distance from the project. These hectares remain as 100%

owned by Vizsla Silver.

Quality Assurance / Quality Control

Drill core and rock samples were shipped to ALS Limited in

Zacatecas

,

Zacatecas, Mexico

and in

North Vancouver, Canada

for sample preparation and for analysis at the ALS laboratory in

North

Vancouver

. The ALS Zacatecas and

North Vancouver

facilities are ISO 9001 and ISO/IEC 17025

certified. Silver and base metals were analyzed using a four-acid digestion with an ICP finish and

gold was assayed by 30-gram fire assay with atomic absorption ("AA") spectroscopy finish. Over

limit analyses for silver, lead and zinc were re-assayed using an ore-grade four-acid digestion with

AA finish.

Control samples comprising certified reference samples, duplicates and blank samples were

systematically inserted into the sample stream and analyzed as part of the Company's quality

assurance / quality control protocol.

Qualified Person

The Company's disclosure of technical or scientific information in this press release has been

reviewed and approved by

Martin Dupuis

, P.Geo., Vice President of Technical Services for Vizsla

Silver. Mr. Dupuis is a Qualified Person as defined under the terms of National Instrument 43-101.

Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in

policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this

release.

SPECIAL NOTE REGARDING FORWARD LOOKING STATEMENTS

This news release includes certain "Forward-Looking Statements" within the meaning of the United

States Private Securities Litigation Reform Act of 1995 and "forward-looking information" under

applicable Canadian securities laws. When used in this news release, the words "anticipate",

"believe", "estimate", "expect", "target", "plan", "forecast", "may", "would", "could", "schedule" and

similar words or expressions, identify forward-looking statements or information. These forward-

looking statements or information relate to, among other things: the development of

Panuco

,

including drilling programs and mobilization of drill rigs; future mineral exploration, development and

production; and completion of a maiden drilling program.

Forward-looking statements and forward-looking information relating to any future mineral

production, liquidity, enhanced value and capital markets profile of Vizsla, future growth potential for

Vizsla and its business, and future exploration plans are based on management's reasonable

assumptions, estimates, expectations, analyses and opinions, which are based on management's

experience and perception of trends, current conditions and expected developments, and other

factors that management believes are relevant and reasonable in the circumstances, but which may

prove to be incorrect. Assumptions have been made regarding, among other things, the price of

silver, gold and other metals; no escalation in the severity of the COVID-19 pandemic; costs of

exploration and development; the estimated costs of development of exploration projects; Vizsla's

ability to operate in a safe and effective manner and its ability to obtain financing on reasonable

terms.

These statements reflect Vizsla's respective current views with respect to future events and are

necessarily based upon a number of other assumptions and estimates that, while considered

reasonable by management, are inherently subject to significant business, economic, competitive,

political and social uncertainties and contingencies. Many factors, both known and unknown, could

cause actual results, performance or achievements to be materially different from the results,

performance or achievements that are or may be expressed or implied by such forward–looking

statements or forward-looking information and Vizsla has made assumptions and estimates based

on or related to many of these factors. Such factors include, without limitation: the Company's

dependence on one mineral project; precious metals price volatility; risks associated with the

conduct of the Company's mining activities in

Mexico

; regulatory, consent or permitting delays; risks

relating to reliance on the Company's management team and outside contractors; risks regarding

mineral resources and reserves; the Company's inability to obtain insurance to cover all risks, on a

commercially reasonable basis or at all; currency fluctuations; risks regarding the failure to generate

sufficient cash flow from operations; risks relating to project financing and equity issuances; risks

and unknowns inherent in all mining projects, including the inaccuracy of reserves and resources,

metallurgical recoveries and capital and operating costs of such projects; contests over title to

properties, particularly title to undeveloped properties; laws and regulations governing the

environment, health and safety; the ability of the communities in which the Company operates to

manage and cope with the implications of COVID-19; the economic and financial implications of

COVID-19 to the Company; operating or technical difficulties in connection with mining or

development activities; employee relations, labour unrest or unavailability; the Company's

interactions with surrounding communities and artisanal miners; the Company's ability to successfully

integrate acquired assets; the speculative nature of exploration and development, including the risks

of diminishing quantities or grades of reserves; stock market volatility; conflicts of interest among

certain directors and officers; lack of liquidity for shareholders of the Company; litigation risk; and

the factors identified under the caption "Risk Factors" in Vizsla's management discussion and

analysis. Readers are cautioned against attributing undue certainty to forward-looking statements or

forward-looking information. Although Vizsla has attempted to identify important factors that could

cause actual results to differ materially, there may be other factors that cause results not to be

anticipated, estimated or intended. Vizsla does not intend, and does not assume any obligation, to

update these forward–looking statements or forward-looking information to reflect changes in

assumptions or changes in circumstances or any other events affecting such statements or

information, other than as required by applicable law.

SOURCE

Vizsla Silver Corp.

View original content to download multimedia:

http://www.newswire.ca/en/releases/archive/October2021/14/c5173.html

%SEDAR: 00045314E

For further information:

For more information and to sign-up to the mailing list, please contact:

Michael Konnert, President and Chief Executive Officer, Tel: (604) 364-2215, Email:

[email protected], Website: www.vizslasilvercorp.ca

CO: Vizsla Silver Corp.

CNW 09:28e 14-OCT-21