Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

VZLA.TO ·

Vizsla expands Napoleon with multiple high- grade intercepts at Panuco project, Mexico VZLA-TSX-V

Exploration Programs

Vizsla expands Napoleon with multiple high-

grade intercepts at Panuco project, Mexico

VZLA-TSX-V

VANCOUVER, BC

,

Oct. 6, 2020

/CNW/ -

Vizsla Resources Corp.

(TSX-V: VZLA) (OTCQB:

VIZSF) (

Frankfurt

: 0G3) ("

Vizsla

" or the "

Company

") is pleased to provide results from sixteen new

holes at the Napoleon prospect at the

Panuco

silver-gold project ("

Panuco

" or the "

Project

") in

Mexico. These results expand the discovery to the south and at depth where it remains open

beneath wide intercepts.

Drilling Highlights

NP-20-25

449 g/t silver equivalent

(254.7 grams per tonne ("g/t") silver, 2.02 g/t gold, 0.31% lead and

0.61% zinc) over 15.3 metres ("m") true width from

124.7 m

including;

4,341 g/t silver equivalent

(2790.0 g/t silver, 17.0 g/t gold, 1.88 % lead and 3.88 % zinc)

over

0.70 m

true width from

127.5 m

and,

3,560 g/t silver equivalent

(1915.0 g/t silver, 18.2 g/t gold, 1.15 % lead and 1.57 % zinc)

over

0.73 m

true width downhole from

145.2 m

NP-20-27

1,696 g/t silver equivalent

(869.9 g/t silver, 8.70 g/t gold, 0.85% lead and 2.02 % zinc) over

2.58 m

true width from

116.55m

including:

2,807 g/t silver equivalent

(1395.0 g/t silver, 14.8 g/t gold, 1.56 % lead and 3.43 % zinc)

over

0.74 m

true width from

117.95 m

and,

755 g/t silver equivalent

(415.0 g/t silver, 2.90 g/t gold, 2.01 % lead and 2.07 % zinc) over

2.01 m

true width from

106.35 m

including:

1,180 g/t silver equivalent

(725.0 g/t silver, 4.83 g/t gold, 0.82 % lead and 1.24 % zinc)

over

0.54 m

true width from

107.25 m

Note: All numbers are rounded, and widths represent downhole lengths. Silver equivalent is

calculated using the following formula: Silver-equivalent = ((Au_g/t x 52.48) + (Ag_g/t x 0.5289) +

(Pb_ppm x 0.0013) + (Zn_ppm x 0.0013)) / 0.5627). Metal price assumptions are

$17.50

g/t silver,

$1,700

g/t gold,

$0.75

pound lead and

$0.85

pound zinc, recoveries assumptions are 96% gold,

94% silver, 78% lead and 70% zinc based on similar deposit types. The Company is disclosing

results on a silver equivalent basis due to the overall silver dominant nature of mineralization at the

Panuco

project.

Vizsla President and CEO,

Michael Konnert

, commented: "

Recent drilling continues to grow the

Napoleon discovery area where the best new intercepts are from the deepest holes completed.

Mineralization has been extended to the south over

50m

and is completely open at depth. The

broad intercepts in NP-20-25 and NP-20-27 as well as the internal high-grade veins increase the

possibility of both open pit and underground mining scenarios. The Company's aggressive

exploration program is targeting three vein corridors in the district and it is exciting to see the

benefit of systematic drilling around our multiple discoveries, particularly the addition of

significantly more mineralization at Napoleon

."

Longitudinal section, looking west, from the Napoleon prospect with all holes labelled and significant

intersections shown. (CNW Group/Vizsla Resources Corp.)

Figure 1:

Longitudinal section, looking west, from the Napoleon prospect with all holes

labelled and significant intersections shown. All figures including a plan map can be found at the

Company's website.

Click here

.

Napoleon Drilling

detail

Drilling has continued to expand the known extents of mineralization at Napoleon. The Company is

systematically stepping out from the better intercepts and the mineralization remains open. Recent

drilling has been expanding the vein above the discovery hole area and then drilling will pivot to test

beneath the very high grade intersection in NP-20-07 and beneath holes NP-20-13, NP-20-25 and

NP-20-27.

The Napoleon structure is hosted in weakly magnetic microdiorite and trends roughly north – south

for over

2000 m

of strike. The structure hosts two main quartz veins that are separated by 10 to

20m

, and dips steeply to the east. Between the two main veins are a series of smaller splay veins

with variable orientations, that are related to opening along the structure under strike slip

movement. The two main veins have a variable true width of 0.4 to

15.3 m

and are usually hosted

next to the main fault structure, though occasionally also occur outside of the fault.

The footwall fault is usually characterized by a zone of milled breccia, while the hanging wall fault

appears to have seen less movement. The two main veins are multi-episodal quartz veins, with

sections of massive white to grey quartz as well as local brecciation with clasts of grey quartz, white

vein quartz and / or wallrock fragments. The grey quartz is discoloured due to the presence of very

fine grained argentite. A later breccia cuts these earlier phases that is grey quartz supporting

polymictic clasts of grey and white quartz along with strong chlorite and fine to medium grained

pyrite, sphalerite and galena. Other smaller quartz veins have been cut in both the hanging wall and

footwall that appear to be splays with less continuity.

Complete table of Napoleon drill hole intersections

Drillhole

From

To

Est.

True

Width

Gold

Silver

Lead

Zinc

Silver Equivalent

Comment

(m)

(m)

(m)

(g/t)

(g/t)

(%)

(%)

(g/t)

NP-20-06

43.72

44.9

0.84

1.21

99.1

0.03

0.06

207.6

Main vein.

Hit Mining Void

NP-20-12

88.5

93.8

3.81

1.09

77.5

0.12

0.32

184.3

Main vein

And

98.05

99.55

1.23

0.15

13.0

0.02

0.08

28.7

Footwall vein

NP-20-13

Results delayed pending QA/QC

NP-20-14

111.85

116.3

3.03

0.45

4.7

0.01

0.08

48.8

Main vein

NP-20-15

No Significant Result

NP-20-16

90.5

92.55

1.66

0.88

145.5

0.05

0.16

223.8

Main vein

Incl.

91.15

91.85

0.57

1.87

347.0

0.07

0.23

507.6

NP-20-17

86

91

3.78

0.58

75.30

0.24

0.49

141.9

Main vein

NP-20-20

96.65

97.25

0.40

1.08

73.40

3.38

16.1

622.1

Main vein

And

103

103.3

0.20

0.50

41.70

0.20

0.80

109.0

Footwall vein

NP-20-22

95

98.1

2.35

1.61

145.9

0.41

1.06

321.4

Main vein

NP-20-23

107.6

117.65

5.70

0.60

69.6

0.51

1.58

169.5

Main vein

NP-20-25

124.7

150

15.3

2.02

254.7

0.31

0.61

448.7

Main vein

Incl.

127.5

128.65

0.70

17.00

2,790.0

1.88

3.88

4,341.4

And

145.2

146.4

0.73

18.20

1,915.0

1.15

1.57

3,560.3

NP-20-27

95.7

135.2

21.0

1.54

158.4

0.33

0.62

315.0

Includes Dilution

Incl.

106.35

109.5

2.01

2.9

415

2.01

2.07

754.7

Hanging wall

Incl.

107.25

108.1

0.54

4.83

725

0.82

1.24

1,179.7

And

116.55

121.4

2.58

8.70

869.9

0.85

2.02

1,695.9

Main Vein

Incl.

117.95

119.35

0.74

14.80

1,395.0

1.56

3.43

2,807.0

And

131.5

133.3

1.11

1.46

113.7

0.10

0.09

247.6

Footwall vein

Table 1:

Downhole drill intersections from the holes completed at the Napoleon Discovery.

Drillholes NP-20-19, NP-20-21, NP-20-24 and NP-20-26 where drilled at Papayo prospect (1km

north on the Napoleon vein) and will be reported separately. A complete table of results can be

found at the Company's website.

Click here

.

Note: All numbers are rounded and widths represent downhole lengths. Silver equivalent is

calculated using the following formula: Silver-equivalent = ((Au_g/t x 52.48) + (Ag_g/t x 0.5289) /

0.5627). Metal price assumptions are

$17.50

g/t silver and

$1,700

g/t gold, recoveries assumptions

are 96% gold and 94% silver, based on similar deposit types.

Drill Collar Information

Prospect

Drillhole

Easting

Northing

Elevation

Dip

Azimuth

Hole Depth

Napoleon

NP-20-06

403,355

2,587,421

506

-60

258

150

NP-20-12

403,419

2,587,284

471

-44

260

136

NP-20-13

403,421

2,587,286

471

-52

298

161

NP-20-14

403,420

2,587,285

471

-51

282

194

NP-20-15

403,420

2,587,285

471

-59

282

167

NP-20-16

403,406

2,587,369

486

-43

292

156

NP-20-17

403,406

2,587,369

486

-47

275

126

NP-20-20

403,406

2,587,369

485

-57

275

144

NP-20-22

403,406

2,587,369

485

-52

293

143

NP-20-23

403,409

2,587,367

485

-60

295

145

NP-20-25

403,409

2,587,367

485

-55

311

183

NP-20-27

403,406

2,587,369

485

-63

274

180

Table 3:

Drill hole details. Coordinates in WGS84, Zone 13.

About the

Panuco

project

Vizsla has an option to acquire 100% of the recently consolidated 9,386.5 Ha Panuco district in

southern

Sinaloa, Mexico

, near the city of Mazatlán. The option allows for the acquisition of over 75

km of total vein extent, a 500 tpd mill, 35 kms of underground mines, tailings facilities, roads, power

and permits.

The district contains intermediate to low sulfidation epithermal silver and gold deposits related to

siliceous volcanism and crustal extension in the Oligocene and Miocene. Host rocks are mainly

continental volcanic rocks correlated to the Tarahumara Formation.

Quality Assurance / Quality Control

Drill core and rock samples were shipped to ALS Limited in

Zacatecas

,

Zacatecas, Mexico

and in

North Vancouver, Canada

for sample preparation and for analysis at the ALS laboratory in

North

Vancouver

. The ALS Zacatecas and

North Vancouver

facilities are ISO 9001 and ISO/IEC 17025

certified. Silver and base metals were analyzed using a four-acid digestion with an ICP finish and

gold was assayed by 30-gram fire assay with atomic absorption ("AA") spectroscopy finish. Over

limit analyses for silver, lead and zinc were re-assayed using an ore-grade four-acid digestion with

AA finish.

Control samples comprising certified reference samples, duplicates and blank samples were

systematically inserted into the sample stream and analyzed as part of the Company's quality

assurance / quality control protocol.

Qualified Person

The Company's disclosure of technical or scientific information in this press release has been

reviewed and approved by

Stewart Harris

, P.Geo., an independent consultant for the Company. Mr.

Harris is a Qualified Person as defined under the terms of National Instrument 43-101.

Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in

policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this

release.

SPECIAL NOTE REGARDING FORWARD LOOKING STATEMENTS

This news release includes certain "Forward–Looking Statements" within the meaning of the United

States Private Securities Litigation Reform Act of 1995 and "forward–looking information" under

applicable Canadian securities laws. When used in this news release, the words "anticipate",

"believe", "estimate", "expect", "target", "plan", "forecast", "may", "would", "could", "schedule" and

similar words or expressions, identify forward–looking statements or information. These forward–

looking statements or information relate to, among other things: the development of

Panuco

,

including drilling activities; future mineral exploration, development and production; and completion of

a maiden drilling program.

Forward–looking statements and forward–looking information relating to any future mineral

production, liquidity, enhanced value and capital markets profile of Vizsla, future growth potential for

Vizsla and its business, and future exploration plans are based on management's reasonable

assumptions, estimates, expectations, analyses and opinions, which are based on management's

experience and perception of trends, current conditions and expected developments, and other

factors that management believes are relevant and reasonable in the circumstances, but which may

prove to be incorrect. Assumptions have been made regarding, among other things, the price of

silver, gold and other metals; no escalation in the severity of the COVID-19 pandemic; costs of

exploration and development; the estimated costs of development of exploration projects; Vizsla's

ability to operate in a safe and effective manner and its ability to obtain financing on reasonable

terms.

These statements reflect Vizsla's respective current views with respect to future events and are

necessarily based upon a number of other assumptions and estimates that, while considered

reasonable by management, are inherently subject to significant business, economic, competitive,

political and social uncertainties and contingencies. Many factors, both known and unknown, could

cause actual results, performance or achievements to be materially different from the results,

performance or achievements that are or may be expressed or implied by such forward–looking

statements or forward-looking information and Vizsla has made assumptions and estimates based

on or related to many of these factors. Such factors include, without limitation: the Company's

dependence on one mineral project; precious metals price volatility; risks associated with the

conduct of the Company's mining activities in

Mexico

; regulatory, consent or permitting delays; risks

relating to reliance on the Company's management team and outside contractors; risks regarding

mineral resources and reserves; the Company's inability to obtain insurance to cover all risks, on a

commercially reasonable basis or at all; currency fluctuations; risks regarding the failure to generate

sufficient cash flow from operations; risks relating to project financing and equity issuances; risks

and unknowns inherent in all mining projects, including the inaccuracy of reserves and resources,

metallurgical recoveries and capital and operating costs of such projects; contests over title to

properties, particularly title to undeveloped properties; laws and regulations governing the

environment, health and safety; the ability of the communities in which the Company operates to

manage and cope with the implications of COVID-19; the economic and financial implications of

COVID-19 to the Company; operating or technical difficulties in connection with mining or

development activities; employee relations, labour unrest or unavailability; the Company's

interactions with surrounding communities and artisanal miners; the Company's ability to successfully

integrate acquired assets; the speculative nature of exploration and development, including the risks

of diminishing quantities or grades of reserves; stock market volatility; conflicts of interest among

certain directors and officers; lack of liquidity for shareholders of the Company; litigation risk; and

the factors identified under the caption "Risk Factors" in Vizsla's management discussion and

analysis. Readers are cautioned against attributing undue certainty to forward–looking statements or

forward-looking information. Although Vizsla has attempted to identify important factors that could

cause actual results to differ materially, there may be other factors that cause results not to be

anticipated, estimated or intended. Vizsla does not intend, and does not assume any obligation, to

update these forward–looking statements or forward-looking information to reflect changes in

assumptions or changes in circumstances or any other events affecting such statements or

information, other than as required by applicable law.

SOURCE

Vizsla Resources Corp.

View original content to download multimedia:

http://www.newswire.ca/en/releases/archive/October2020/06/c6292.html

%SEDAR: 00045314E

For further information:

and to sign-up to the mailing list, please contact: Michael Konnert,

President and Chief Executive Officer, Tel: (604) 364-2215, Email: [email protected]

CO: Vizsla Resources Corp.

CNW 06:00e 06-OCT-20