Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

VZLA.TO ·

Vizsla Expands Napoleon Resource Area to 1,000 Metres With an Average 3.5 Metre Width at 482 g/t AgEq (VZLA-TSX-V)

Resource Estimates

Vizsla Expands Napoleon Resource Area to

1,000 Metres With an Average 3.5 Metre Width

at 482 g/t AgEq

(VZLA-TSX-V)

VANCOUVER, BC,

Sept. 2, 2021

/CNW/ -

Vizsla Silver Corp.

(TSXV: VZLA) (OTCQB: VIZSF)

(

Frankfurt

: 0G3) ("

Vizsla

" or the "

Company

") is pleased to provide results from nineteen new holes

targeting the Napoleon Vein resource area ("

Napoleon

") at its flagship Panuco silver-gold project

("

Panuco

" or the "

Project

") located in

Mexico

.

Highlights

To date, 105 holes drilled within the Napoleon Corridor highlight an average true width of

3.5

metres (mTW) with a weighted average grade of 482 g/t silver equivelant (AgEq)

(161 g/t

Ag, 3.11 g/t Au, 0.45% Pb and 1.3% Zn

)

Step-out drilling extends high-grade mineralization 50 metres to the south, while infill drilling

further demonstrates a continuous panel of mineralization

Notable intercepts include:

NP-21-149

: 1,296 g/t AgEq (185 g/t Ag, 11.35 g/t Au, 0.49 % Pb and 2.25 % Zn) over

5.93 mTW including,

3,647 g/t AgEq (344 g/t Ag, 33.78 g/t Au, 1.17 % Pb and 6.30 % Zn) over 1.89 mTW

NP-21-133

: 1,288 g/t AgEq (188.0 g/t Ag 10.74 g/t Au 1.27 % Pb and 3.47 % Zn) over

1.46 mTW

NP-21-148: 916 g/t AgEq (113.9 g/t Ag, 6.49 g/t Au, 0.78 % Pb and 8.02 % Zn) over 1.40

mTW

Mineralization targeted for resource delineation now extends over 1,000 metres in length, 370

metres deep and remains open to the south and at depth

Note: All numbers are rounded. Silver equivalent is calculated using the following formula: AgEq = ((Au_g/t x 52.48) + (Ag_g/t x 0.5289) + (Pb_ppm x 0.0013) + (Zn_ppm x

0.0013)) / 0.5627. Metal price assumptions are $17.50 oz silver, $1,700 oz gold, $0.75 pound lead and $0.85 pound zinc, recoveries assumptions are 96% gold, 94% silver, 78%

lead and 70% zinc based on similar deposit types.

Vizsla President and CEO

Michael Konnert

commented:

"In only thirteen months since the discovery

of the Napoleon Vein, the zone has grown considerably, now representing a large panel of

continuous mineralization over

1,000m

long with excellent grades over potentially minable widths.

With increased grades and thickness developing down-plunge to the south, Napoleon continues to

be the primary focus for resource delineation at

Panuco

and will no doubt form the backbone of the

Company's maiden resource estimate planned for Q1, 2022."

Longitudinal section from the main Napoleon prospect with all holes labelled and selected

intersections shown. (CNW Group/Vizsla Silver Corp.)

Figure 1:

Longitudinal section from the main Napoleon prospect with all holes labelled and

selected intersections shown.

Plan map of the main Napoleon Corridor resource area with all holes labelled and selected

intersections shown. (CNW Group/Vizsla Silver Corp.)

Figure 2:

Plan map of the main Napoleon Corridor resource area with all holes labelled and

selected intersections shown.

Napoleon Drilling Detail

Recent drilling at Napoleon has locally extended the body of mineralization within an interpreted

shallowly plunging panel to the south. Most of the newly reported holes are from the southern end

of the mineralized zone and continue to show a wide vein with very high grades.

Step-out drill holes NP-21-133,142 and 157 were successful in extending the Napoleon Vein by 50

metres to the south along strike and down plunge from the previously reported fence of holes.

Mineralization remains open to the south and at depth and continues to be the Company's primary

focus for resource drilling.

Additionally, systematic grid drilling on 50 metre centers has now largely infilled the remaining

untested areas to the north, highlighting a continuous zone of mineralization. In total, mineralization is

defined over a strike length of 1,000 metres and to a depth of 370 metres.

To date, 105 holes completed within the Napoleon resource area highlight an average vein width of

3.5 metres with a weighted average grade of 482g/t AgEq (161 g/t silver, 3.11 g/t gold, 0.45% lead

and 1.3% zinc). This represents a 9% increase in weighted average grade and a 0.5 metre

reduction in average width since the last update (see press release dated

April 6, 2021

). Average

weighting does not include grade capping, total length and depths are estimations and all holes are

included resulting in inclusion of potentially non-economic material.

An average specific gravity of 2.72 has been calculated from 49 samples after rejecting outliers.

Relative to the last update, both silver (155 to 161 g/t) and gold (2.74 to 3.11 g/t) grades have

increased, with the later largely attributable to a significantly higher gold/silver ratio observed at the

southern end of the resource drilling area.

Moving forward, Vizsla will complete wider, 100 metre step-out holes in this area to better define the

potential edge of mineralization. This will allow for more spatial data to be incorporated into the

Project's resource database ahead of the drilling cut-off date for inclusion in the maiden resource

estimate (planned for Q1, 2022).

Complete table of Napoleon Resource Area Intersections

Drillhole

From

To

Estimated

true

width

Gold

Silver

Lead

Zinc

Silver Equivalent

Comment

(m)

(m)

(m)

(g/t)

(g/t)

(%)

(%)

(g/t)

NP-21-121

No Significant Results

NP-21-124

261.1

263.0

1.48

0.77

30.0

0.16

0.45

113.9

NP-21-126

82.0

84.95

1.16

0.66

100.1

0.03

0.08

158.1

NP-21-128

No Significant Results

NP-21-129

63.0

64.65

0.84

1,209.9

0.25

0.70

1,237.3

Hangingwall

Incl.

64.35

64.65

4.58

5,750.0

1.34

3.67

5,947.5

And

96.05

97.05

0.57

0.35

65.6

0.05

0.11

98.1

Napoleon

NP-21-133

248.25

250.6

1.46

10.74

188.0

1.27

3.47

1,288.0

NP-21-135

322.0

324.1

1.26

0.61

126.1

0.06

1.66

215.5

NP-21-140

69.5

73.8

2.58

0.42

66.7

0.19

0.74

123.7

Napoleon

And

77.35

81.0

2.19

1.73

60.3

0.40

0.75

244.3

NP-21-142

289.5

295.7

3.01

3.62

40.4

0.80

3.98

485.7

NP-21-145

328.4

333.25

3.40

3.10

109.9

1.20

1.11

445.8

NP-21-148

339.2

340.6

1.40

6.49

113.9

0.78

8.02

915.5

Incl.

340.0

340.3

0.11

25.2

365

2.71

22.90

3,285.0

NP-21-149

210.45

218.6

5.93

11.35

184.6

0.49

2.25

1,295.6

Incl.

211.85

214.45

1.89

33.78

343.6

1.17

6.30

3,646.5

NP-21-151

217.55

220.5

1.53

1.88

56.3

0.10

0.47

241.1

NP-21-154

165.45

169.55

2.37

0.31

27.2

0.20

0.70

75.6

NP-21-155

248.0

257.0

6.33

1.79

51.7

0.17

1.14

246.2

Incl.

253.0

256.55

2.50

3.03

63.9

0.24

2.42

403.6

Incl.

256.0

256.55

0.39

6.21

58.3

0.50

3.05

715.9

NP-21-157

391.5

401.6

3.96

1.79

81.5

0.76

5.22

382.0

NP-21-159

147.85

153.0

4.28

0.23

28.6

0.27

0.76

71.7

NP-21-161

280.75

286.5

3.43

0.98

19.8

0.14

0.62

127.7

NP-21-162

129.25

136.5

5.61

0.43

92.2

0.15

0.34

137.8

Table 1:

Drillhole intersections from the Napoleon Vein Resource area not previously reported.

Note: All numbers are rounded. Silver equivalent is calculated using the following formula: AgEq = ((Au_g/t x 52.48) + (Ag_g/t x 0.5289) + (Pb_ppm x 0.0013) + (Zn_ppm x

0.0013)) / 0.5627. Metal price assumptions are $17.50 oz silver, $1,700 oz gold, $0.75 pound lead and $0.85 pound zinc, recoveries assumptions are 96% gold, 94% silver, 78%

lead and 70% zinc based on similar deposit types.

Drill Collar Information

Prospect

Drillhole

Easting

Northing

Elevation

Dip

Azimuth

Hole Depth

Napoleon

NP-21-121

403439

2586871

421

-40.0

241.0

267.8

NP-21-124

403174

2587114

526

-43.7

91.9

292.5

NP-21-126

403439

2586871

421

-60.0

241.0

250.5

NP-21-127

403458

2587634

488

-63.0

272.0

381.0

NP-21-128

403174

2587114

526

-48.0

90.6

329.3

NP-21-129

403439

2586871

421

-68.0

241.0

367.5

NP-21-133

403570

2586903

466

-50.0

255.0

301.5

NP-21-135

403170

2587114

527

-52.0

89.5

391.5

NP-21-140

403344

2587120

477

-40.0

44.0

120.0

NP-21-142

403570

2586903

466

-56.0

255.0

340.5

NP-21-145

403188

2587055

530

-57.0

89.0

382.0

NP-21-148

403570

2586903

466

-60.0

255.0

384.0

NP-21-149

403515

2587021

449

-50.0

263.0

251.0

NP-21-151

403279

2587057

497

-66.4

92.5

255.0

NP-21-154

403283

2587061

498

-60.5

92.5

261.0

NP-21-155

403515

2587021

449

-58.0

270.0

301.7

NP-21-157

403570

2586903

466

-65.0

255.0

435.0

NP-21-159

403283

2587061

498

-49.5

92.5

190.5

NP-21-161

403515

2587021

449

-63.5

263.0

310.8

NP-21-162

403283

2587061

498

-40.0

84.7

162.0

Table 2:

Drill hole details. Coordinates in WGS84, Zone 13

Webinar

Vizsla Silver would like to invite interested shareholders to join

Michael Konnert

, President and CEO,

and

Eric Coffin

, HRA Advisories, for a webinar detailing the progress on resource/exploration drilling

at its flagship

Panuco

silver-gold project.

The webinar will take place today at

11:00 am PDT

/ 2:00 pm EDT. Management will be available

to answer questions following the presentation. Online registration and participation details may be

found at the following link:

https://register.gotowebinar.com/register/8102399458831429901

About the

Panuco

project

The newly consolidated

Panuco

silver-gold project is an emerging high-grade discovery located in

southern

Sinaloa, Mexico

, near the city of Mazatlán. The 9,386.5-hectare, past producing district

benefits from over 75 kilometres of total vein extent, a 500 ton per day mill, 35 kilometres of

underground mines, tailings facilities, roads, power and permits.

The district contains intermediate to low sulfidation epithermal silver and gold deposits related to

siliceous volcanism and crustal extension in the Oligocene and Miocene. Host rocks are mainly

continental volcanic rocks correlated to the Tarahumara Formation.

Quality Assurance / Quality Control

Drill core and rock samples were shipped to ALS Limited in

Zacatecas

,

Zacatecas, Mexico

and in

North Vancouver, Canada

for sample preparation and for analysis at the ALS laboratory in North

Vancouver. The ALS Zacatecas and

North Vancouver

facilities are ISO 9001 and ISO/IEC 17025

certified. Silver and base metals were analyzed using a four-acid digestion with an ICP finish and

gold was assayed by 30-gram fire assay with atomic absorption ("AA") spectroscopy finish. Over

limit analyses for silver, lead and zinc were re-assayed using an ore-grade four-acid digestion with

AA finish.

Control samples comprising certified reference samples, duplicates and blank samples were

systematically inserted into the sample stream and analyzed as part of the Company's quality

assurance / quality control protocol.

Qualified Person

The Company's disclosure of technical or scientific information in this press release has been

reviewed and approved by

Martin Dupuis

, P.Geo., Vice President of Technical Services for Vizsla

Silver. Mr. Dupuis is a Qualified Person as defined under the terms of National Instrument 43-101.

Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in

policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this

release.

SPECIAL NOTE REGARDING FORWARD LOOKING STATEMENTS

This news release includes certain "Forward–Looking Statements" within the meaning of the United

States Private Securities Litigation Reform Act of 1995 and "forward–looking information" under

applicable Canadian securities laws. When used in this news release, the words "anticipate",

"believe", "estimate", "expect", "target", "plan", "forecast", "may", "would", "could", "schedule" and

similar words or expressions, identify forward–looking statements or information. These forward–

looking statements or information relate to, among other things: the development of

Panuco

,

including drilling programs and mobilization of drill rigs; future mineral exploration, development and

production; and completion of a maiden drilling program.

Forward–looking statements and forward–looking information relating to any future mineral

production, liquidity, enhanced value and capital markets profile of Vizsla, future growth potential for

Vizsla and its business, and future exploration plans are based on management's reasonable

assumptions, estimates, expectations, analyses and opinions, which are based on management's

experience and perception of trends, current conditions and expected developments, and other

factors that management believes are relevant and reasonable in the circumstances, but which may

prove to be incorrect. Assumptions have been made regarding, among other things, the price of

silver, gold and other metals; no escalation in the severity of the COVID-19 pandemic; costs of

exploration and development; the estimated costs of development of exploration projects; Vizsla's

ability to operate in a safe and effective manner and its ability to obtain financing on reasonable

terms.

These statements reflect Vizsla's respective current views with respect to future events and are

necessarily based upon a number of other assumptions and estimates that, while considered

reasonable by management, are inherently subject to significant business, economic, competitive,

political and social uncertainties and contingencies. Many factors, both known and unknown, could

cause actual results, performance or achievements to be materially different from the results,

performance or achievements that are or may be expressed or implied by such forward–looking

statements or forward-looking information and Vizsla has made assumptions and estimates based

on or related to many of these factors. Such factors include, without limitation: the Company's

dependence on one mineral project; precious metals price volatility; risks associated with the

conduct of the Company's mining activities in

Mexico

; regulatory, consent or permitting delays; risks

relating to reliance on the Company's management team and outside contractors; risks regarding

mineral resources and reserves; the Company's inability to obtain insurance to cover all risks, on a

commercially reasonable basis or at all; currency fluctuations; risks regarding the failure to generate

sufficient cash flow from operations; risks relating to project financing and equity issuances; risks

and unknowns inherent in all mining projects, including the inaccuracy of reserves and resources,

metallurgical recoveries and capital and operating costs of such projects; contests over title to

properties, particularly title to undeveloped properties; laws and regulations governing the

environment, health and safety; the ability of the communities in which the Company operates to

manage and cope with the implications of COVID-19; the economic and financial implications of

COVID-19 to the Company; operating or technical difficulties in connection with mining or

development activities; employee relations, labour unrest or unavailability; the Company's

interactions with surrounding communities and artisanal miners; the Company's ability to successfully

integrate acquired assets; the speculative nature of exploration and development, including the risks

of diminishing quantities or grades of reserves; stock market volatility; conflicts of interest among

certain directors and officers; lack of liquidity for shareholders of the Company; litigation risk; and

the factors identified under the caption "Risk Factors" in Vizsla's management discussion and

analysis. Readers are cautioned against attributing undue certainty to forward–looking statements or

forward-looking information. Although Vizsla has attempted to identify important factors that could

cause actual results to differ materially, there may be other factors that cause results not to be

anticipated, estimated or intended. Vizsla does not intend, and does not assume any obligation, to

update these forward–looking statements or forward-looking information to reflect changes in

assumptions or changes in circumstances or any other events affecting such statements or

information, other than as required by applicable law.

SOURCE

Vizsla Silver Corp.

View original content to download multimedia:

http://www.newswire.ca/en/releases/archive/September2021/02/c0024.html

%SEDAR: 00045314E

For further information:

For more information and to sign-up to the mailing list, please contact:

Michael Konnert, President and Chief Executive Officer, Tel: (604) 364-2215, Email:

[email protected], Website: www.vizslasilvercorp.ca

CO: Vizsla Silver Corp.

CNW 06:30e 02-SEP-21