Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

VZLA.TO ·

Vizsla Announces Multiple Intersections, Including 667 g/t Silver Eq Over 1.3m, in First Drilling Results from the Panuco Silver Project, Mexico (VZLA-TSX-V)

Drill Results

Vizsla Announces Multiple Intersections, Including 667 g/t Silver Eq

Over 1.3m, in First Drilling Results from the Panuco Silver Project,

Mexico

(VZLA-TSX-V)

VANCOUVER, March 9, 2020 /CNW/ - Vizsla Resources Corp. (TSX-V:

VZLA) ("Vizsla" or the "Company") is pleased to announce initial results from the

Company's maiden drill program at the Panuco silver-gold district in Mexico. Four holes

have tested beneath the historic workings along the Animas Corridor and three at the

new Paloma vein discovery. These results are the first set from an aggressive 14,500

metre drilling program that will continue throughout 2020.

Drilling Highlights

• 3.55 metres grading 364 g/t silver equivalent ("AgEq") (264.3 g/t silver and 1.25

g/t gold) in hole AMS-20-06 – Paloma Vein including:

o 677 g/t AgEq(474.0 g/t silver and 2.54 g/t gold) over 1.3 metres

• 2.6 metres grading 404 g/t AgEq** (45.1 g/t silver, 2.45 g/t gold, 1.2% lead and

3.0% Zinc) in hole AMS-20-04 – Animas Vein;

Note: All numbers are rounded, and widths represent downhole lengths. True widths

are estimated at between 75-100% of downhole lengths. Silver equivalent is calculated

by multiplying the gold grade by 80 and adding it to the silver grade. One example (**)

has a modified Silver equivalent calculation due to high gold and zinc values and is

calculated separately using the following prices (Au: $1,400 per ounce, Ag: $17.5 per

ounce, Pb: $0.85 per pound, Zn: $1.05 per pound). All calculations assume 100%

metallurgical recovery.

"These results mark an excellent start for Vizsla's drilling program. We are seeing see

high grades of silver and gold in both our drilling and sampling activities. The Company

has drilled veins up to 11.3 metres wide and our new Paloma discovery is also showing

excellent widths and grades."

"The team in Mexico has made remarkable progress since January and these drill holes

are only the start of a comprehensive exploration program. In the near term we will

continue drilling multiple targets in order to establish drilling priorities. Being the first

consolidation of the district, it is essential that Vizsla understand the many historic veins

at depth." President and CEO, Michael Konnert commented, adding "The Company will

be adding a second drill rig in April in order to accelerate testing of the more than twenty

priority targets on the property."

Complete Table of Drillhole Intersections

Prospect Drillhole FROM

(m)

To

(M)

Width

(m)

Silver

(g/t)

Gold

(g/t)

Lead

(%)

Zinc

(%)

Silver

Equivalent

(g/t)

La Pipa AMS-19-01A No Significant Intersection

AMS-19-02 73.0 76.0 3.0 125.3 0.59 172.3

Mariposa AMS-20-03 198.0 201.0 3.0 64.0 0.72 121.4

AMS-20-04 195.0 206.3 11.3 51.4 0.82 117.3

Incl. 195.0 197.0 2.0 115.5 0.83 177.9

And 203.7 206.3 2.6 45.1 2.46 1.2 3.0 404.0**

Paloma AMS-20-05 30.5 31.2 0.7 142.0 1.05 226.0

AMS-20-06 15.3 18.85 3.55 264.4 1.25 364.5

Incl. 16.5 17.8 1.3 474.0 2.54 677.2

AMS-20-07 19.9 20.4 0.5 62.9 0.27 84.7

Table 1: Downhole drill intersections from the first seven holes completed at

Panuco. All numbers are rounded and widths represent downhole lengths. True widths

are estimated at between 70-100% of downhole lengths. Silver equivalent is calculated

by multiplying the gold grade by 80 and adding it to the silver grade. One example (**)

has a modified Silver equivalent calculation due to high gold and zinc values and is

calculated separately using the following prices (Au: $1,400 per ounce, Ag: $17.5 per

ounce, Pb: $0.85 per pound, Zn: $1.05 per pound). All calculations assume 100%

metallurgical recovery.

Drill Program Detail

Drill holes AMS-19-01A and AMS-19-02 were drilled to test the downdip extension of

the La Pipa oreshoot that has seen extensive mining. The first hole intersected historic

workings and a footwall vein over 5.5m at 135.0m downhole. Deeper in the hole a 2.0m

wide quartz-amethyst vein was intersected at 241.5m downhole. The second hole was

completed 77m downdip on the same section and intersected a shallow hanging wall

vein with 3 metres grading 172.3 g/t AgEq and a zone of low-grade veinlets in the

projection of the Animas Vein.

Two drill holes were drilled to test the downdip extension of the Mariposa oreshoot that

has also seen extensive mining. The first hole, AMS-20-03, intersected a 3.55m wide

vein surrounded by a broad stockwork zone with generally low-grade mineralization up

to a best sub-interval of 3 metres at 121.4 g/t AgEq from 199m downhole. Stepping 40m

downdip in hole AMS-20-04 the vein widens to 11.3m grading 117.3g/t AgEq including a

significantly higher-grade subinterval grading 404.0 g/t AgEq**. This intersection is open

and will be the focus of step-out drilling to the north, south and at depth.

The La Pipa and Mariposa oreshoots are developed along part of the Animas Corridor

which is a major fault zone trending NW – SE and dipping moderately to the SW. The

hangingwall sequence is pyroclastic volcanics that were mainly deposited in water

which overlay an intrusive suite that in this area is mainly diorite. The main alteration is

propylitic with some local silicification associated with the veining. The Mariposa

section (Figure 2) is located about 120 metres to the NW of the La Pipa section.

Drill holes AMS-20-05, AMS-20-06 and AMS-20-07 tested beneath the discovery

outcrop on the newly discovered Paloma vein. All holes intersected the vein at shallow

depth with vein widths varying from 0.5m to 3.55m. Hole AMS-20-05 tested directly

beneath the discovery outcrop and intersected a 70cm wide vein. AMS-20-06 was

planned to test the vein 50m along strike to the north but due to intersecting the vein at

a shallower depth than expected is only a 20m stepout, it contains the best intersection

of 3.55m grading 364.5 g/t AgEq. Hole AMS-20-07 drilled underneath AMS-20-06 and

the vein narrows to a 50cm intersection. Drilling at Paloma has only tested a small

portion of the vein and drilling will focus on stepping out from the current holes and

drilling projected vein intersection targets identified in mapping.

The Paloma vein is another NW trending vein but is vertical and appears to be a

hangingwall splay off the main Animas Corridor. It has white massive quartz with local

bands of fine-grained grey sulphides, has been brecciated along the fault zone and in

the location drilled is hosted in diorite.

Figure 1: Plan map of drilling completed at the Panuco project (CNW Group/Vizsla

Resources Corp.)

Progress Update

Vizsla continues to explore the property through mapping and sampling in addition to

discovery drilling. The mapping and sampling crews have completed detailed mapping

of the Animas and the Corden Del Oro corridors. Over the next few months detailed

mapping will extend to the Napoleon and Cinco Senores corridors in advance of drilling.

Drilling is currently underway at the Honduras vein and the Company intends to drill

over twenty prospects in order to prioritize targets for potential resource definition

drilling in the future. A second rig is planned to start at the beginning of April to test

targets within the Corden del Oro corridor.

Shareholders can expect both additional drilling and sampling results in the coming

months.

Figure 2: Cross section through the Mariposa prospect (CNW Group/Vizsla Resources

Corp.)

About the Panuco Project

Vizsla has an option to acquire 100% of the newly consolidated 9,386.5 Ha Panuco

district in southern Sinaloa, Mexico, near the city of Mazatalan. The option allows for the

acquisition of over 75 km of total vein extent, a 500 tpd mill, 35 kms of underground

mines, tailings facilities, roads, power and permits.

The district contains intermediate to low sulfidation epithermal silver and gold deposits

related to siliceous volcanism and crustal extension in the Oligocene and Miocene. Host

rocks are mainly continental volcanic rocks correlated to the Tarahumara Formation.

Quality Assurance / Quality Control

Drill core samples were shipped to ALS Limited in Zacatecas, Zacatecas, Mexico for

sample preparation and for analysis at the ALS laboratory in North Vancouver, B.C.,

Canada. The ALS Zacatecas and North Vancouver facilities are ISO 9001 and ISO/IEC

17025 certified. Silver and base metals were analyzed using a four-acid digestion with

an ICP finish and gold was assayed by 30-gram fire assay with atomic absorption ("AA")

spectroscopy finish. Overlimits analyses for silver, lead and zinc were re-assayed using

an ore-grade four-acid digestion with AA finish.

Control samples comprising certified reference samples, duplicates and blank samples

were systematically inserted into the sample stream and analyzed as part of the

Company's quality assurance / quality control protocol.

Qualified Person

Panuco's disclosure of technical or scientific information in this press release has been

reviewed and approved by Stewart Harris, P.Geo. for the Company. Mr. Harris serves

as a Qualified Person under the definition of National Instrument 43-101.

Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is

defined in policies of the TSX Venture Exchange) accepts responsibility for the

adequacy or accuracy of this release.

SPECIAL NOTE REGARDING FORWARD LOOKING STATEMENTS

This news release includes certain "Forward‐Looking Statements" within the meaning of

the United States Private Securities Litigation Reform Act of 1995 and "forward‐looking

information" under applicable Canadian securities laws. When used in this news

release, the words "anticipate", "believe", "estimate", "expect", "target", "plan",

"forecast", "may", "would", "could", "schedule" and similar words or expressions, identify

forward‐looking statements or information. These forward‐looking statements or

information relate to, among other things: the development of Panuco, including

potential drill targets; future mineral exploration, development and production including

the identification of drill targets and continuation of mapping, drilling and sampling

activities; and completion of a maiden drilling program

Forward‐looking statements and forward‐looking information relating to any future

mineral production, liquidity, enhanced value and capital markets profile of Vizsla, future

growth potential for Vizsla and its business, and future exploration plans are based on

management's reasonable assumptions, estimates, expectations, analyses and

opinions, which are based on management's experience and perception of trends,

current conditions and expected developments, and other factors that management

believes are relevant and reasonable in the circumstances, but which may prove to be

incorrect. Assumptions have been made regarding, among other things, the price of

silver, gold and other metals; costs of exploration and development; the estimated costs

of development of exploration projects; Vizsla's ability to operate in a safe and effective

manner and its ability to obtain financing on reasonable terms.

These statements reflect Vizsla's respective current views with respect to future events

and are necessarily based upon a number of other assumptions and estimates that,

while considered reasonable by management, are inherently subject to significant

business, economic, competitive, political and social uncertainties and contingencies.

Many factors, both known and unknown, could cause actual results, performance or

achievements to be materially different from the results, performance or achievements

that are or may be expressed or implied by such forward‐looking statements or forward-

looking information and Vizsla has made assumptions and estimates based on or

related to many of these factors. Such factors include, without limitation: satisfaction or

waiver of all applicable conditions to closing of the Acquisition including, without

limitation, receipt of all necessary approvals or consents and lack of material changes

with respect to Vizsla and Canam and their respective businesses, all as more

particularly set forth in the Acquisition agreement; the synergies expected from the

Acquisition not being realized; business integration risks; fluctuations in general macro‐

economic conditions; fluctuations in securities markets and the market price of Vizsla's

common shares; and the factors identified under the caption "Risk Factors" in Vizsla's

management discussion and analysis. Readers are cautioned against attributing undue

certainty to forward‐looking statements or forward-looking information. Although Vizsla

has attempted to identify important factors that could cause actual results to differ

materially, there may be other factors that cause results not to be anticipated, estimated

or intended. Vizsla does not intend, and does not assume any obligation, to update

these forward‐looking statements or forward-looking information to reflect changes in

assumptions or changes in circumstances or any other events affecting such

statements or information, other than as required by applicable law.

SOURCE Vizsla Resources Corp.

View original content to download multimedia:

http://www.newswire.ca/en/releases/archive/March2020/09/c7604.html

%SEDAR: 00045314E

For further information: and to sign-up to the mailing list, please contact: Michael

Konnert, President and Chief Executive Officer, Tel: (604) 838-4327, Email:

[email protected]

CO: Vizsla Resources Corp.

CNW 03:05e 09-MAR-20