Vendetta Provides Project and Corporate Update

Corporate Updates

FOR IMMEDIATE RELEASE July 10, 2019

(VTT2019 – NR # 9)

Vendetta Provides Project and Corporate Update

Vancouver, BC – July 10, 201 9 − Vendetta Mining Corp. (VTT -TSX: V) (“Vendetta” or the

“Company”) is pleased to provide an update on project activities.

Ore Sorting Test Work

The Company has shipped three composites from three previously completed drill holes for sensor-based

ore sorting screening test work ; two holes from Zone 5 and one hole from Zone 2 (both sulphide

mineralisation). Included in each sample was material from both the hanging wall and footwall at below

cut-off grades to simulate mining dilution, at twice the amount of dilution assumed in the PEA mining

study.

If successful, the sensor-based ore sorting will have a material impact on the project economics. The

ore sorting units would be located after the primary crusher, depending upon the mass pull to the sorted

concentrate there will be a corresponding decrease in the size and will be reflected in the capital cost of

the processing plant.

Sensor based sorting is a dry material separation system and as such it is expected to have a material

impact on the quantity of tai ls produced from the flo atation process. The Pegmont project PEA

contemplates using in-pit tails disposal and as a consequence the successful application of ore sorting

could have significant positive impacts on the mining sequencing.

If the screening test s are successful the Company will drill to obtain fresh samples for pilot scale ore

sorting test work. The sorted concentrate would then be sent for metallurgical floatation test work. Each

pilot scale test will be 100 kg and will include ore from each material type from each mineralised Zone.

The results of the pilot scale test work will then be included in the next iteration of the Pegmont Project

mining study.

Field Work

The detailed mapping program on the Pegmont tenements is now half complete and has covered the

Bridge Zone, Burke Hinge Zone, along strike as well as around the large fold structure to the Bonanza

and Airport BIF prospects. The mapping will now form the basis for developing the exploration

programs over these prospects.

Historical drilling at Bonanza returned 5 m at 3.06% Pb and 3.69% Zn as well as 3.4 m @ 2.27% Pb and

3.42% Zn. At the Airport BIF prospect rock chips returned up to 5.01% Pb and 1.1% Zn. These targets

are a high priority as the reconstructed unfolded posi tion of both Bonanza and the Airport BIF places

them into the zinc rich position of the zoned mineralised system, essentially along strike from Zone 5.

The second phase of the mapping program will cover the copper prospect where previous drilling

intersected 3 m @ 3.31% Cu and 0. 57 g/t Au. The second phase will continue down to the southern

boundary of the exploration lease where it is interpreted and where the Pegmont banded ironstone host

unit returns close to surface as evidenced by BIF intersections from historic drilling on the southern

boundary.

Australian Corporate Tax Phased Reduction

The Australian federal government has initiated a progressive reduction in corporate tax rates from the

current 30%. For the annua l turnover contemplated in the Pegmont PEA the tax rate applicable to the

Pegmont Project from July 2020 will be 27.5% with successive reductions of 27% for 2024 – 2025, 26%

for 2025 – 2026 and July 2026 onwards a rate of 25% will apply. These reductions will have a material

positive impact to the after-tax Project NPV and will be captured in the next study phase.

Transition Metallurgical Test Work

To further de -risk the start -up period a variability metallurgical program was commenced on Zone 1 .

Transition material from six previously drilled holes in Main Pit 1 (the second pit to be mined in the

PEA) is being tested . The objective of this test work was to understand the range of possible results

within the transition material, that is material that is predominately lead & zinc sulphide mineralisation

in weathered country rock. Results to date indicate that visually it is possible to distinguish between

oxide, transition and primary styles of mineralisation. Test work is on-going.

Private Placement

The Company continues to work towards closing its previously announced private placement. Directors

Michael Williams and Peter Voulgaris have indicated that they will participate in the next tranche.

About the Pegmont Lead Zinc Project

Vendetta’s 100% owned Pegmont Lead Zinc Project is situated in the Mount Isa – McArthur Mineral

Province, Australia, which hosts one of the world’s richest endowments of lead -zinc-silver

mineralization, including several significant lead-zinc-silver mines.

The current Mineral Resource Estimate at the Project:

Indicated 5,758 Kt @ 6.5% Pb, 2.6% Zn, 11 g/t Ag

Inferred 8,277 Kt @ 5.1% Pb, 2.8% Zn, 8 g/t Ag

The results of a Preliminary Economic Assessment (“PEA”) on Pegmont were released by the Company

by news release dated January 28, 2019. The PEA outlined a 10 -year mine plan that generates a strong

economic return with a (base case) pre-tax IRR of 32% (after tax 24%) and NPV8% of $201M ($128M

after tax) using long term consensus metal prices of $0.91/lb lead, $1.09/lb zinc and $16.50/oz silver.

The PEA indicated a strong sensitivity to metal prices and US$:A$ exchange rate with a pre-tax IRR of

37% (after tax 27%) and NPV8% of $249M ($158M after tax), using metal prices as of January 22, 2019

of $0.94/lb lead, $1.25/lb zinc and $15.30/oz silver and US$:A$ of $0.71.

The PEA identified f urther project enhancements and Vendetta has identified several high prior ity

exploration targets.

About Vendetta Mining Corp.

Vendetta Mining Corp. is a Canadian junior exploration company engaged in acquiring, exploring, and

developing mineral properties with an emphasis on lead and zinc. It is currently focused on advancing

the Pegmont Lead Zinc project in Australia. Additional information on the Company can be found at

www.vendettaminingcorp.com.

Technical Disclosure

Peter Voulgaris, MAIG, MAusIMM, a Director of Vendetta, a "qualified person" as defined by NI 43-

101 – Standards of Disclosure for Mineral Projects . Mr. Voulgaris has reviewed and approved the

technical content of this press release, and consents to the information provided in the form and context

in which it appears.

For details of the Pegmont Project including the effective date of the resource estimate, quality control

measures applied, key assumptions, parameters and methods used to estimate the mineral resources set

forth herein and any known legal, political, environmental or other risks that could materially affect the

potential development of the mineral resource estimate, please refer to the technical report entitled

“Technical Report – Pegmont Mineral Resource Update and PEA” dated effective January 21, 2019 and

available under the Company’s profile at www.sedar.com.

The Preliminary Economic Assessment (PEA) referred to herein, is preliminary in nature and includes

inferred mineral resources that are considered too speculative g eologically to have the economic

considerations applied to them that would enable them to be categorized as mineral reserves, and there

is no certainty that the preliminary economic assessment will be realized.

ON BEHALF OF THE BOARD OF DIRECTORS

“Michael Williams”

Michael Williams

President & CEO

Forward Looking Information

The TSX Venture Exchange does not accept responsibility for the adequacy or accuracy of this release.

This release includes certain statements and information that may be deemed to be “forward‐looking statements”

or “forward looking information” within the meaning of the applicable Canadian Securities laws. All statements

in this release, other than statements of historical facts are forward looking statements or information, including

without limitation, statements or information regarding the completion of the Offering , the use of proceeds of the

Offering, estimated project economics, including but not l imited to, mill recoveries, payable metals produced,

production rates, payback time, capital and operating and other costs, IRR and mine plan; expected upside from

additional exploration; expected capital requirements and timing ; and other future events or developments.

Forward-looking statements include statements that are predictive in nature, are reliant on future events or

conditions, Forward‐looking statements are often, but not always, identified by the use of words such as "seek",

"anticipate", "pla n", "continue", "estimate", "expect”, “may", "will", "project", "predict", "potential",

"targeting”, “intend", "could", "might", "should", "believe” and similar expressions.

These statements involve known and unknown risks, uncertainties and other factors that may cause actual results

or events to differ materially from those anticipated. Although the Company believes the expectations expressed

in such forward‐looking statements are based on reasonable assumptions, such statements are not guarantees of

future performance and actual results or developments may differ materially from those in the forward‐looking

statements.

Factors that could cause actual results to differ materially from those in forward‐looking statements include, but

are not limited to, the failure to complete the Offering on the proposed terms , changes in commodities prices;

changes in expected mineral production performance; unexpected increases in capital costs; exploitation and

exploration results; continued availability of capital and financing; differing results and recommendations in the

PEA; and general economic, market or business conditions.

In addition, forward‐looking statements are subject to various risks, including but not limited to operational risk;

political risk; currency risk; capital cost inflation risk; that data is incomplete or inaccurate; the limitations and

assumptions within drilling, engineering and socio‐economic studies relied upon in preparing the PEA; and

receipt of regulatory and other approvals and/or consents in respect of the Offering in particular. There can be

no assurance that the Offering will be completed on their terms or at all.

The reader is referred to the Company’s filings with the Canadian securities regulators for disclosure regarding

these and other risk factors, accessible through Vendetta Mining’s profile at www.sedar.com

There is no certainty that any forward‐looking statement will prove to be accurate and investors should not place

undue reliance upon forward‐looking statements. The Company does not undertake to provide updates to any of

the forward‐looking statements in this release, except as required by law.