Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

VRR.V ·

VR continues to advance its KSZ strategy for large iron oxide – copper – gold systems in northern Ontario NR-24-14

Corporate Updates

VR RESOURCES LTD.

1500 – 409 Granville St.

Vancouver, BC, Canada, V6C1T2

Tel: 778-731-9292; [email protected]

TSX.V: vrr www.vrr.ca

VR continues to advance its KSZ strategy for large iron oxide – copper – gold

systems in northern Ontario

NR-24-14

August 20, 2024 , Vancouver, B.C.: VR Resources Ltd. (TSX.V: VRR, FSE: 5VR; OTCQB: VRRCF), the

"Company", or “VR”, continues to advance its Kapuskasing Structural Zone (“KSZ”) regional exploration

strategy for critical metals in northern Ontario.

From VR’s CEO, Dr. Michael Gunning, “The recent sale of the Hecla-Kilmer REE discovery (“H-K”) highlights

the success of the KSZ strategy, and frees -up the Company to advance its other properties in the district,

shown in Figure 1, and also to evaluate new properties and new opportunities. Our primary focus continues

to be on the potential of the KSZ to host Iron-oxide copper-gold (“IOCG”) systems.

Our discovery of cobbles of specularite breccia with sulfide in the Mattagami River in 2018 led to the

intersection of specularite vein breccia in our first hole at our Ranoke property. The subsequent discoveries

of REE- bearing apatite in an IOA system with carbonatite at Hecla- Kilmer, and then diamond- bearing

kimberlite at Northway highlight the multi-commodity discovery potential of the KSZ district.

The Halfway property discussed below is the next target for discovery in our ongoing KSZ strategy. We

know what to do. We have seven years of expertise working with the regional data. We have experience

in applied magnetic survey technologies. We understand the IOCG-IOA model in this district. And we have

the conviction to get our hands dirty on the ground, as the photos in this news release attest.”

Context. VR Resources’ R EE discovery within the Hecla-Kilmer alkaline-carbonatite complex was the result

of the Company’s KSZ district-scale exploration strategy which began in 2018. H-K’s unique REE-enriched

apatite mineralization with magnetite belongs to an iron oxide apatite (IOA) hydrothermal mineral system

which forms at the deeper, higher temperature end of the IOA – IOCG spectrum.

The ongoing strategy is focused on identifying large hydrothermal-magmatic mineral systems with critical

metals like copper and gold associated with the deep crustal structures of the KSZ . To evaluating large-

scale geophysical and geochemical anomalies anchored by KSZ structures, VR leverages:

• State-of-the-art exploration technologies.

• Modern IOCG mineral deposit models.

• In-house expertise to manage and analyze large regional data sets, and;

• In-house expertise for cost effective exploration in the district.

A historic drill hole at Halfway reports iron and copper sulphides in a breccia with magnetite adjacent to

a high-level alkaline intrusion. The property is located 7 km to the southeast of H-K and is centered on a

1.5 km in diameter magnetic high evident on regional magnetic maps (Figure 2). The anomaly is proximal

to, but very different from, the large and complexly zoned magnetic anomaly at H-K. Importantly, Halfway

is located just 10 km from active rail, hydro -electric infrastructure, and highway access at Otter Rapids ,

where the Company has based its exploration camp since 2018.

Going Forward. We are targeting the potential at Halfway to host structurally controlled copper-gold

mineralization (IOCG). That potential is illustrated by VR’s discovery of cobbles of sulfide -bearing,

hematite-cemented hydrothermal breccia in the Mattagami River during the maiden 2018 reconnaissance

drill program for the regional KSZ strategy. One of the cobbles is shown in Figure 3a; it is located roughly

VR RESOURCES LTD.

1500 – 409 Granville St.

Vancouver, BC, Canada, V6C1T2

Tel: 778-731-9292; [email protected]

TSX.V: vrr www.vrr.ca

midway between Halfway and the Ranoke Property where our work began, and where stockwork

specularite (iron oxide) and veins were intersected in drill core (Figure 3b).

The Company has met with several geophysical service companies to evaluate the use of new, ultra- high

resolution, full tensor magnetic technology to better define internal structures and external boundaries

of the Halfway anomaly. We will continue to scope opportunities for a survey this fall, knowing we have

the ability to l everage our accumulated expertise gained over the past seven years exploring the large

magnetic anomalies at our Ranoke, H-K and Northway properties in order to optimize results at Halfway.

Location Matters

Halfway is located just 10 km from Otter Rapids, with access from Highway 634, active rail (Ontario

Northern), and hydro-electric power (dam) servicing the provincial grid. The Company has based its

regional exploration out of a camp at Otter Rapids since 2018. The Trans-Canada highway and CN national

rail line are 140 km to the south, at Cochrane.

All of the properties in the KSZ strategy shown in Figure 1 and outside the recently sold H -K property

where VR retains a strategic royalty purchase option , are owned 100% by VR. They are located on

provincial crown land. Mineral rights are managed by the provincial Ontario Ministry of Mines. Exploration

permitting is on a 30 -day process. There are no annual payments for the properties , but the Ministry

requires certain annual exploration expenditures and reporting (ie. mineral assessment reports) in order

to maintain the mineral claim in good standing.

The properties fall within the Moose Cree and Taykwa Tagamou First Nations traditional territories.

Technical Information

Summary technical and geological information for the Company’s various exploration properties is

available at the Company’s website at www.vrr.ca.

Technical information for this news release has been prepared in accordance with the Canadian regulatory

requirements set out in National Instrument 43 -101. Justin Daley, P.Geo., VP Exploration and a non -

independent Qualified Person oversees all aspects of the Company’s mineral exploration projects, and the

content of this news release has been reviewed on behalf of the Company by the CEO, Dr. Michael

Gunning, P.Geo., a non-independent Qualified Person.

About VR Resources

VR is an established junior exploration company based in Vancouver (TSX.V: VRR; Frankfurt: 5VR; OTCQB:

VRRCF). VR evaluates, explores and advances opportunities in copper, gold and critical metals in Nevada,

USA, and Ontario, Canada, and most recently, a kimberlite breccia pipe discovery in northern Ontario. VR

applies modern exploration technologies and leverages in-house experience and expertise in greenfields

exploration to large-footprint mineral systems in underexplored areas/districts. The foundation of VR is

the proven track record of its Board in early -stage exploration, discovery and M&A. The Company is

financed for its mineral exploration and corporate obligations. VR owns its properties outright and

evaluates new opportunities on an ongoing basis, whether by staking or acquisition.

VR RESOURCES LTD.

1500 – 409 Granville St.

Vancouver, BC, Canada, V6C1T2

Tel: 778-731-9292; [email protected]

TSX.V: vrr www.vrr.ca

ON BEHALF OF THE BOARD OF DIRECTORS:

“Michael H. Gunning”

____________________________

Dr. Michael H. Gunning, PhD, PGeo

President & CEO

For general information please use the following:

Website: www.vrr.ca

Email: [email protected]

Phone: 778-731-9292

Forward Looking Statements

This news release contains statements that constitute "forward -looking statements". Such forward looking

statements involve known and unknown risks, uncertainties and other factors that may cause the Company’s actual

results, performance or achievements, or developments in the industry to differ materially from the anticipated

results, performance or achievements expressed or implied by such forward- looking statements. Forward -looking

statements are statements that are not historical facts and are generally, but not always, identified by the words

"expects," "plans," "anticipates," "believes," "intends," "estimates," "projects," "potential" and similar expressions,

or that events or conditions "will," "would," "may," "could" or "should" occur. Forward-looking statements in this

document include statements concerning VR’s expectations concerning the nature of the magnetic anomaly at the

Halfway property, and all other statements that are not statements of historical fact.

Although the Company believes the forward-looking information contained in this news release is reasonable based

on information available on the date hereof, by their nature forward-looking statements involve assumptions, known

and unknown risks, uncertainties and other factors which may cause our actual results, performance or

achievements, or other future events, to be materially different from any future results, performance or achievements

expressed or implied by such forward-looking statements.

Examples of such assumptions, risks and uncertainties include, without limitation, assumptions, risks and

uncertainties associated with general economic conditions; the Covid- 19 pandemic; adverse industry events; future

legislative and regulatory developments in the mining sector; the Company’s ability to access sufficient capital from

internal and external sources, and/or inability to access sufficient capital on favorable terms; mining industry and

markets in Canada and generally; the ability of the Company to implement its business strategies; competition; and

other assumptions, risks and uncertainties.

The forward-looking information contained in this news release represents the expectations of the Company as of

the date of this news release and, accordingly, is subject to change after such date. Readers should not place undue

importance on forward- looking information and should not rely upon this information as of any other date. While

the company may elect to, it does not undertake to update this information at any particular time except as required

in accordance with applicable laws.

This news release may also contain statements and/or information with respect to mineral properties and/or deposits

which are adjacent to and/or potentially similar to the Company’s mineral properties, but which the Company has

no interest in nor rights to explore. Readers are cautioned that mineral deposits on similar properties are not

necessarily indicative of mineral deposits on the Company’s properties.

Trading in the securities of the Company should be considered highly speculative. All of the Company’s public

disclosure filings may be accessed via www.sedarplus.ca and readers are urged to review them.

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in Policies of the TSX Venture

Exchange) accepts responsibility for the adequacy or accuracy of this release.

-----

VR RESOURCES LTD.

1500 – 409 Granville St.

Vancouver, BC, Canada, V6C1T2

Tel: 778-731-9292; [email protected]

TSX.V: vrr www.vrr.ca

Figure 1. Location of VR’s mineral exploration properties in the Kapuskasing Structural Zone district

(KSZ), northern Ontario, Canada. VR retains a strategic royalty purchase option on the recently sold

Hecla-Kilmer Property.

VR RESOURCES LTD.

1500 – 409 Granville St.

Vancouver, BC, Canada, V6C1T2

Tel: 778-731-9292; [email protected]

TSX.V: vrr www.vrr.ca

Figure 2. The Halfway anomaly shown on a regional, TMI Magnetic map. The anomaly is proximal to, but very

different from, the large and complex magnetic anomaly at the Hecla-Kilmer alkaline complex with carbonatite.

For scale, the Halfway property is approximately 10 km from Otter Rapids and provincial highway 634 shown in the

bottom right of the map.

VR RESOURCES LTD.

1500 – 409 Granville St.

Vancouver, BC, Canada, V6C1T2

Tel: 778-731-9292; [email protected]

TSX.V: vrr www.vrr.ca

Figure 3. VR’s KSZ greenfields exploration strategy for hydrothermal copper -gold breccia systems (IOCG).

Upper: Sawn and polished face of a river cobble discovered on the Mattagami River during a regional prospecting

program in 2018. It is sulfide-bearing, hematite-cemented hydrothermal breccia. It is about 30 km north of the

Halfway property; about half way in between the Company’s Ranoke and Halfway properties shown in Figure 1.

Lower: Crosscutting veins of specularite (iron oxide) in NQ drill core of potassically-altered orthogneiss basement

rock in drill hole RNK-19-001, Ranoke Property.