Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

VRR.V ·

The third drill program is complete at VR’s Hecla-Kilmer copper-gold breccia target with critical metals in Northern Ontario NR-22-06

Exploration Programs

VR RESOURCES LTD.

1500 – 409 Granville St.

Vancouver, BC, Canada, V6C 1T2

Tel: 604-262-1104; [email protected]

TSX.V: VRR; www.vrr.ca

The third drill program is complete at VR’s Hecla-Kilmer copper-gold

breccia target with critical metals in Northern Ontario

NR-22-06

June 7, 2022, Vancouver, B.C.: VR Resources Ltd. (TSX.V: VRR, FSE: 5VR; OTCQB: VRRCF), the "Company",

or “VR”, has successfully completed the third drill program on its Hecla-Kilmer (“H-K”) property and large-

footprint copper-gold breccia target with critical metals located in northern Ontario.

 2,751 m completed in 8 drill holes ranging from 249 – 378 m each; assays pending.

Figure 1. Plan map showing drill hole locations and the outline of the overall multiphase Hecla -Kilmer

intrusive complex plotted on an RTP magnetic base map deriv ed from the ultra-high-resolution drone

magnetic survey expansion completed in March, 2022.

Figure 2. Photograph of drill core at 150 m in drill hole HK22-014. Near complete replacement and

overprint of an alkaline shonkinite host rock by a potassic, fenite alteration consisting of magnetite-

biotite-calcite-amphibole which is most intensely developed around phoscorite (carbonatite) veins with

semi-massive magnetite-apatite.

From VR’s CEO, Dr. Michael Gunning, “The third drill program at Hecla-Kilmer is under our belt, completed

on schedule and on budget, with a metre and hole production that far surpassed our expectations.

As is evident on Figure 1, the 17 drill holes now completed to date in the three successive drill programs at

H-K encompass a full range of targets which include anomalous magnetic lows, magnetic highs, and sharp

magnetic and gravity contacts. Further, the area now covered by drilling spans the northwestern quadrant

of the complex , the south ern rim, and the western margin of the large nepheline syenite intrusion that

forms the central core to the overall multiphase alkaline complex at H-K.

The potassic alteration mineralogy and hydrothermal vein and breccia textures shown in Figure 2 for

Hole 14, together with fluorite veins, are evident in intervals from tens to hundreds of metres long in all

eight drill holes completed in this third drill program at Hecla-Kilmer.

Previous drill holes have intersected REE’s (rare earth elements) and critical metals in hydrothermal

breccia with carbonatite dykes and veins in intervals from 50 to 299 m long, with total REE

concentrations up to 2.3 % TREO. We will comment on the potential for critical metal mineralization in

the relatively more intense and more extensive breccias intersected in this third drill program when

geochemical data become available. We also await the new data to improve our understanding of how

copper and gold relates to sulfide mineralization, and structure, as reported from previous drilling. Drill

core samples were submitted to the laboratories in sequence, as the holes were completed, so we

anticipate data from the early drill holes soon, within the month of June.

We look forward to providing further updates as new data are received and plans are developed for H-K.”

Background

Hecla-Kilmer (“H-K”) is a large and multiphase alkaline intrusive complex with carbonatite. It is 4 – 6 km

in size, Proterozoic in age, and was emplaced along the western margin of the crustal -scale Kapuskasing

structural zone which bisects the Archean Superior Craton in northern Ontario.

VR RESOURCES LTD.

1500 – 409 Granville St.

Vancouver, BC, Canada, V6C 1T2

Tel: 604-262-1104; [email protected]

TSX.V: VRR; www.vrr.ca

A shallow, six -hole diamond drill program was completed in 1970 as part of a regional base metal

exploration program by Ashland Oil and Elgin Petroleum. One hole was abandoned, and a scant 854 m

were completed in total in the other five holes, all on magnetic highs in the outer concentric zones of the

complex. There is no record of drill core sampling or geochemical data. Selco Exploration Company

completed two drill holes in 1981 on peripheral magnetic highs as part of a regional diamond exploration

program; they intersected altered ultra-basic rocks and black breccia in the outer, concentric zones of the

multiphase complex at H -K. After th is historical drilling, a regional airborne magnetic survey was

completed in 1993 for ongoing diamond exploration, and it provided a high-resolution of detail for the

entire H-K complex.

The opportunity for VR is to be the first company to apply modern IOCG and carbonatite mineral deposit

models to explore the multiphase H-K complex and hydrothermal breccia system as a whole, and to use

new exploration technologies not previously available when the historic drilling was done.

VR completed the first airborne EM survey over H -K in June, 2020, using the state -of-the-art VTEM+

system of Geotech Ltd. Flown at 100 m line spacing over a 6 x 7 km survey block for a total of 450 line -

km, the data provide a high resolution of detail. The Company also completed an independent, 3 -D

inversion of both magnetic and EM data , for improved modeling of the complex in three dimensions . A

detailed, ground-based gravity survey covering an area of 1.5 x 3.5 km was completed in the winter season

of 2021, with high-resolution data generated from 597 stations on an equant grid spacing of 100 m.

VR completed four drill holes for a total of 1,971 m in October, 2020, targeting the northern MVI (magnetic

inversion) anomaly at H-K. The Company followed up that drilling in October, 2021, with the completion

of five additional holes for a total of 2,604 m, targeting the high contrast, 3.5 mGal gravity anomaly that

is co-spatial with, but slightly offset from the MVI magnetic anomaly. Fluorite-carbonate hydrothermal

breccia was discovered, coming to surface and hosted in a high temperature, sulfide-bearing calc-potassic

alteration system, and containing broad intersections up to 299 m long of critical metals, with copper and

gold locally. There are four different styles of mineralization evident: 1. REE’s and critical metals in

hydrothermal breccia veined a nd brecciated carbonatite dykes (Holes 2, 4, 5, 8 and 9); 2. lithium

mineralization in hydrothermal breccia (Holes 2 and 9); 3. copper sulfide in veinlets with iron and silica

(Hole 2), and; 4. elevated hydrothermal gold related to syenite porphyry dykes (Holes 2, 6, 8 and 9).

A state-of-the-art, ultra-high resolution drone magnetic survey was completed in the fall of 2021, and

expanded in March of 2022, in order to: 1. cover the entire complex at H -K, and; 2. identify vectors for

how best to follow up on the hydrothermal breccia intersections with critical metals and gold in the first

two drill programs. The final survey is 3.4 x 4.5 km in size, comprising 121 lines at both 25 and 50 m line-

spacing for a total of 410 line-km. The survey produces a very high resolution of data because of the tight

line spacing, the low “tree-top” flight altitude of just 30 metres above ground, and a computerized flight

control paired with a new, very high sensitivity potassium-vapour magnetometer.

Technical Information

Summary technical and geological information for the Company’s various exploration properties is

available at the Company’s website at www.vrr.ca.

VR submitted all drill core samples for geochemical assay to the ALS Global Ltd. (“ALS”) laboratory facilities

in Timmins, Ontario, with final geochemical analytical work done at the ALS laboratory located in North

Vancouver, BC., including lithium borate fusion, ICP-MS and ICP-AES analyses for base metals, trace

VR RESOURCES LTD.

1500 – 409 Granville St.

Vancouver, BC, Canada, V6C 1T2

Tel: 604-262-1104; [email protected]

TSX.V: VRR; www.vrr.ca

elements and full-suite REE analysis, and gold determination by atomic absorption on fire assay. Analytical

results are subject to industry-standard and NI 43-101 compliant QAQC sample procedures externally by

the Company and internally at the laboratory as described by ALS.

Technical information for this news release has been prepared in accordance with the Canadian regulatory

requirements set out in National Instrument 43-101. Justin Daley, P.Geo., Exploration Manager and Chief

Geologist at VR and a non-independent Qualified Person oversees and/or participates in all aspects of the

Company’s mineral exploration projects, and the content of this news release has been reviewed on

behalf of the Company by the CEO, Dr. Michael Gunning, P.Geo., a non-independent Qualified Person.

About the Hecla-Kilmer Property

The Hecla-Kilmer complex is located 23 km northwest of the Ontario hydro-electric facility at Otter Rapids,

the Ontario Northland Railway, and the northern terminus of Highway 634 which links the region to the

towns of Cochrane and Kapuskasing to the south, located on the northern Trans-Canada Highway.

The H-K property is large. It consists of 224 mineral claims in one contiguous block approximately 6 x 7

km in size and covering 4,617 hectares. The property is owned 100% by VR. There are no underlying

annual lease payments on the property, nor are there any joint venture or back -in interests. There is an

industry-standard royalty attached to the property, including a buy-back provision in favour of VR.

Like the Ranoke property, H-K is located on provincial crown land, with mineral rights administered by the

Ontario Ministry of Northern Development, Mines, Natural Resources and Forestry (“MNDM”). There are

no annual payments, but the MNDM requires certain annual exploration expenditures and reporting. The

property falls within the traditional territories of the Moose Cree and Taykwa Tagamou First Nations.

About VR Resources

VR is an established junior exploration company focused on greenfields opportunities in copper, gold and

critical metals (TSX.V: VRR; Frankfurt: 5VR; OTC QB: VRRCF). VR is the continuance of 4 years of active

exploration in Nevada by a Vancouver-based private company. The diverse experience and proven track

record of its Board in early-stage exploration, discovery and M&A is the foundation of VR. The Company

focuses on underexplored, large-footprint mineral systems in the western United States and Canada, and

is well-financed for its exploration strategies and co rporate obligations. VR owns its properties outright

and evaluates new opportunities on an ongoing basis, whether by staking or acquisition.

The Company continues its normal course of business in 202 2 within the framework of modified

exploration programs in response to the COVID -19 pandemic, with the goal of ensuring the health and

safety of staff and project personnel.

ON BEHALF OF THE BOARD OF DIRECTORS:

“Michael H. Gunning”

____________________________

Dr. Michael H. Gunning, PhD, PGeo

President & CEO

VR RESOURCES LTD.

1500 – 409 Granville St.

Vancouver, BC, Canada, V6C 1T2

Tel: 604-262-1104; [email protected]

TSX.V: VRR; www.vrr.ca

For general information please use the following:

Website: www.vrr.ca

Email: [email protected]

Phone: 604-262-1104

Forward Looking Statements

This press release contains forward -looking statements. Forward -looking statements are typically

identified by words such as: believe, expect, anticipate, intend, estimate, postulate and similar

expressions or those which, by their nature, refer to future events. Forward looking statements in this

release include those related to the companies upcoming plans, such as “We will comment on the

potential significance of the overall more intense and more extensive breccias intersected in this third drill

program fro REE and critical metal concentrations as geochemical assays become available ”, and “VR

evaluates new opportunities on an ongoing basis, whether by staking or acquisition.”

This news release contains statements a nd/or information with respect to mineral properties and/or

deposits which are adjacent to and/or potentially similar to the Company’s mineral properties, but which

the Company has no interest in nor rights to explore. Readers are cautioned that mineral de posits on

similar properties are not necessarily indicative of mineral deposits on the Company’s properties.

Although the Company believes that the use of such statements is reasonable, there can be no assurance

that such statements will prove to be accurate, and actual results and future events could differ materially

from those anticipated in such statements. The Company cautions investors that any forward -looking

statements by the Company are not guarantees of future performance, and that actual results may differ

materially from those in forward-looking statements. Trading in the securities of the Company should be

considered highly speculative. All of the Company’s public disclosure filings may be accessed via

www.sedar.com and readers are urged to review these materials.

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in Policies of the TSX Venture Exchange) accepts

responsibility for the adequacy or accuracy of this release.

VR RESOURCES LTD.

1500 – 409 Granville St.

Vancouver, BC, Canada, V6C 1T2

Tel: 604-262-1104; [email protected]

TSX.V: VRR; www.vrr.ca

Figure 1. Drill hole locations relative to the outline of the overall multiphase intrusive complex at H-K, plotted on an

RTP magnetic base map derived from the ultra-high-resolution drone magnetic survey expanded in March 2022.

VR RESOURCES LTD.

1500 – 409 Granville St.

Vancouver, BC, Canada, V6C 1T2

Tel: 604-262-1104; [email protected]

TSX.V: VRR; www.vrr.ca

Figure 2. Photograph of drill core at 150 m in drill hole HK22-014. Nearly complete replacement of alkaline shonkinite host rock by potassic, fenite alteration

consisting of magnetite-biotite-calcite-amphibole which is most intense around phoscorite (carbonatite) veins with semi-massive magnetite-apatite. Hydrothermal-

magmatic shatter breccia and quench textures are evident. Similar hydrothermal vein, breccia, replacement and alteration textures, together with fluorite, are

evident in intervals from tens to hundreds of metres long in all eight drill holes completed in the third drill program at Hecla-Kilmer in April-May 2022.