Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

VO.V ·

ValOre Metals Corp. (“ValOre”; the “Company”; TSX‐V: VO; OTC: KVLQF

Corporate Updates

July 13, 2021

Vancouver, B.C. ValOre Metals Corp. (“ValOre”; the “Company”; TSX‐V: VO; OTC: KVLQF;

FRANKFURT: KEQ0) today provided an update from Chairman & CEO, Jim Paterson, on first half year

(“H1”) 2021 goals and accomplishments related to advancing ValOre’s 100%-owned Pedra Branca

Platinum Group Element (“PGE”) Project in northeastern Brazil.

2021 Focus

ValOre issued over 20 news releases documenting accomplishments in calendar 2020, and with our

dramatically increased exploration activities at Pedra Branca, we have already issued 20 news releases

in the first half of this year alone, including the following areas of focus:

⋅ Team building continues with the addition of highly experienced directors, advisors, technical experts

and Pedra Branca project staff;

⋅ Successful fundraising efforts have enabled an expanded and more productive exploration program .

ValOre’s ability to increase Community Engagement levels has been aided by a more solid financial

footing;

⋅ Resource expansion drilling has been very successful at Trapia (Trapia 1 and Trapia 2) , with Santo

Amaro drilling to commence this month;

⋅ Target advancement drilling has defined near -surface PGE mineralization at Esbarro NW and Cana

Brava, with all assays pending for Santo Amaro South (5 of 5 drill holes have intercepted the target

ultramafic rocks);

⋅ Discovery drilling generated positive assay results in all three holes at Trapia South;

⋅ Over 2,700 metres (“m”) remain in the core program, including all drilling at the C-04 and Santo Amaro

targets, and on-going follow-up drilling at Trapia 1;

⋅ ValOre’s exploration methodology has generated new targets and PGE discoveries;

⋅ Work related to mineralogy, mineral processing and metallurgy continues to provide options for Pedra

Branca future development;

⋅ A comprehensive mineralogical characterization study was completed in H1 2021, and a multi-faceted

follow-up metallurgical testwork program has commenced, including: reverse floatation, hot cyanide

leach, hot ferricyanide leach, and bottle roll tests.

Team Built - In 2020, ValOre added considerable depth and technical talent to the team. This trend

continued in H1 2021, with announcements (March 26 and June 1) detailing appointments of Darren

Klinck as Director, Ian Pritchard and Luis Azevedo as Advisors, Colin Smith as V.P. Exploration, Thiago

Diniz as Exploration Manager, and Marina Carvalho as Lead Administrator.

Successful Fundraising - On February 17, the Company announced the closing of a private placement

of gross proceeds of CAD$8.33 million which enabled the Company to fully extinguish the outstanding

operating line of credit and attracted some very strong and long-term shareholders, including 20%

participation by company insiders.

Community Engagement - We strive to have a positive impact on the communities surrounding Pedra

Branca, and in particular, the wonderful people of Capitão Mor. Our efforts in 2020 and 2021 remain

focused on supporting the local medical clinic and schools with donations of supplies when called for, and

as the project activity level scales up, we have been able to increase the hiring levels and business

partnerships with local residents.

Exploration Success - In H1 2021, ValOre’s team successfully advanced the Pedra Branca PGE project

on multiple fronts. We have drilled 3,263 of the planned 6,000 metres diamond drill (“DDH”) program

comprised of resource expansion, target advancement and discovery drilling. Samples from 11 diamond

drill holes have been sent for assays, with assays pending for 4 holes from Trapia 2. Follow-up drilling at

Trapia 1 is on-going, drilling at the C-04 target has commenced, and drilling at Santo Amaro will be

initiated this month.

A highlight from resource expansion drilling at Trapia 1 in H1 2021 was drill hole DD21TU21, which

returned 71.90 m grading 1.29 grams per tonne palladium + platinum + gold (“g/t 2PGE+Au”) from 134.95

m, including 1.55 m grading 10.82 g/t 2PGE+Au from 167.75 m (June 30 release).

On July 12, we announced highlights from discovery drilling activities at Pedra Branca which included a

PGE discovery at Trapia South, and near surface zones of mineralization in areas proximal to existing 43-

101 inferred resources, such as Esbarro NW target. In addition, compelling exploration potential is being

established at the underexplored Massape target, which hosts PGE mineralization in 3 of 5 historical drill

holes. ValOre has conducted extensive 2021 geological mapping, prospecting, Trado® auger drilling and

trenching, as we work to advance the target towards a drill-ready stage (assays pending for Trado® and

trench samples).

In H1 2021, a total of 38 reverse circulation (“RC”) drill holes in 1,828 m have been drilled, with assay results

received for 22 holes, and a total of 113 Trado® auger holes have been drilled, with assay results received

for 92 holes.

ValOre received encouraging assay results and reports from targeted exploration programs across the

property, including geological mapping and prospecting, 157 rock samples (February 24), 417 soil

samples (February 24), 6 trenches (March 23), and rhodium assays from resampled historical and 2020

ValOre drill core (March 2 and May 6).

Project Advancement - Our work related to mineralogy, processing and metallurgy has provided positive

initial results which gives us the encouragement and impetus to commence additional testing. (January

13). A comprehensive mineralogical characterization study was completed in H1 2021, and a multi-

faceted follow-up metallurgical testwork program has commenced which includes: reverse floatation, hot

cyanide leach, hot ferricyanide leach, and bottle roll tests.

On July 6, ValOre announced the increase to the Pedra Branca land holdings by 29% through the

acquisition of 16,000 hectares.

Thank you! In what has already been a productive and successful H1 2021, I would like to thank our

shareholders, team members, service providers and the people in the communities surrounding Pedra

Branca for their support. We look to continue the momentum for the balance of 2021!

On behalf of the Board of Directors,

“Jim Paterson”

James R. Paterson, Chairman and CEO

ValOre Metals Corp.

Qualified Person (QP)

The technical information in this news release has been prepared in accordance with Canadian regulatory

requirements set out in NI 43- 101 and reviewed and approved by Colin Smith, P.Geo., ValOre’s QP and

Vice President of Exploration.

Quality Control/Quality Assurance (“QA/QC”) and Grade Interval Reporting

CLICK HERE for a summary of ValOre’s policies and procedures related to QA/QC and grade interval

reporting.

About ValOre Metals Corp.

ValOre Metals Corp. (TSX ‐V: VO) is a Canadian company with a portfolio of high‐ quality exploration

projects. ValOre’s team aims to deploy capital and knowledge on projects which benefit from substantial

prior investment by previous owners, existence of high- value mineralization on a large scale, and the

possibility of adding tangible value through exploration, process improvement, and innovation.

In May 2019, ValOre announced the acquisition of the Pedra Branca Platinum Group Elements (PGE)

property, in Brazil, to bolster its existing Angilak uranium, Genesis/Hatchet uranium and Baffin gold projects

in Canada.

The Pedra Branca PGE Project comprises 51 exploration licenses covering a total area of 55,984 hectares

(138,339 acres) in northeastern Brazil. At Pedra Branca, 5 distinct PGE+Au deposit areas host, in

aggregate, a current Inferred Resource of 1,067,000 ounces 2PGE+Au contained in 27.2 million tonnes

grading 1.22 g/t 2PGE+Au (CLICK HERE for ValOre’s July 23, 2019 news release). All the currently known

Pedra Branca inferred PGE resources are potentially open pittable.

Comprehensive exploration programs have demonstrated the "District Scale" potential of ValOre’s Angilak

Property in Nunavut Territory, Canada that hosts the Lac 50 Trend having a current Inferred Resource of

2,831,000 tonnes grading 0.69% U 3O8, totaling 43.3 million pounds U 3O8. For disclosure related to the

inferred resource for the Lac 50 Trend uranium deposits, pleas e CLICK HERE for ValOre's news release

dated March 1, 2013.

ValOre’s team has forged strong relationships with sophisticated resource sector investors and par tner

Nunavut Tunngavik Inc. (NTI) on both the Angilak and Baffin Gold Properties. ValOre was the first company

to sign a comprehensive agreement to explore for uranium on Inuit Owned Lands in Nunavut Territory and

is committed to building shareholder value while adhering to high levels of environmental and safety

standards and proactive local community engagement.

For further information about ValOre Metals Corp., or this news release, please visit our website at

valoremetals.com or contact Investor Relations at 604.653.9464, or by email at [email protected].

ValOre Metals Corp. is a proud member of Discovery Group. For more information please visit:

discoverygroup.ca

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the

policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

This news release contains “forward-looking statements” within the meaning of applicable securities laws.

Although ValOre believes that the expectations reflected in its forward-looking statements are reasonable,

such statements have been based on factors and assumptions concerning future events that may prove to

be inaccurate. These fact ors and assumptions are based upon currently available information to ValOre.

Such statements are subject to known and unknown risks, uncertainties and other factors that could

influence actual results or events and cause actual results or events to differ materially from those stated,

anticipated or implied in the forward-looking statements. A number of important factors including those set

forth in other public filings could cause actual outcomes and results to differ materially from those expressed

in these forward-looking statements. Factors that could cause the actual results to differ materially from

those in forward-looking statements include the future operations of ValOre and economic factors. Readers

are cautioned to not place undue reliance on for ward-looking statements. The statements in this press

release are made as of the date of this release and, except as required by applicable law, ValOre does not

undertake any obligation to publicly update or to revise any of the included forward- looking statements,

whether as a result of new information, future events or otherwise. ValOre undertakes no obligation to

comment on analyses, expectations or statements made by third parties in respect of ValOre, or its financial

or operating results or (as applicable), their securities.