Monday, September 14, 2026
MiningNewsTerminal
Monday, September 14, 2026 Admin

VML.V ·

Viscount Completes First Phase of 2026 Silver Cliff Drill Program and Identifies Important Geological Corridor Linking the Kate and Passiflora Areas

Drill Results Corporate Updates

PRESS RELEASE June 3rd , 2026

FOR IMMEDIATE RELEASE

Viscount Completes First Phase of 2026 Silver Cliff Drill Program

and Identifies Important Geological Corridor Linking the Kate

and Passiflora Areas

• Final holes intersect strong phyllic alteration, increasing sulphide intensity, visible galena and localized

massive sulphide mineralization; assays pending

Vancouver, British Columbia – June 3, 2026 – Viscount Mining Corp. ("Viscount" or the "Company")

(TSX VENTURE: VML) (OTCQX: VLMGF) is pleased to announce completion of the first phase of the

core drill campaign at the Silver Cliff Project in Colorado, where the final four drill holes (K26 -05 through

K26-08) encountered widespread hydrothermal alteration, brecciation, manganese -oxide mineralization,

strong sulphide mineralization with increasing intensity, visible galena and localized massive sulphide

veining north of the Kate Resource area. T he Company believes these results support its interpretation that

the mineralized hydrothermal system at Silver Cliff extends beyond the current Kate Silver resource area

and northward toward the Passiflora porphyry target and the Ben West volcanic complex, potentially

indicating proximity to a larger mineralized system.

Notably, hole K26-08 intersected a localized massive-sulphide vein together with visible galena and possible

chalcopyrite, associated with strong pyrite mineralization and alteration. All mineralization described in this

release is based on visual examination of drill core only. Assays for the 2026 program are pending. Visual

estimates are inherently imprecise, are not a substitute for laboratory assays, and should not be relied upon

as an indication of grade or economic mineralization (see “Cautionary Note Regarding Visual Estimates”

below).

Viscount Mining Corp. June 3, 2026 Press Release

2 of 9

Figure 1. Silver Cliff drill hole location and area map.

2026 Program Highlights

• Completed four final holes (K26-05 to K26-08) testing both resource-expansion targets around the Kate

deposit and new district-scale structural targets to the north.

• Intersected multiple zones of phyllic alteration, silicification and hydrothermal brecciation along major

structural corridors.

• Observed visually increasing sulphide intensity with depth, including a localized massive-sulphide vein

in hole K26-08.

• Identified visible galena and possible chalcopyrite in K26-08, consistent with the Company’s base -

metal and porphyry-related exploration model.

• Assays for all holes are pending and will be released once received, compiled and interpreted.

Viscount Mining Corp. June 3, 2026 Press Release

3 of 9

Jim MacKenzie, CEO and Director stated “These final holes significantly strengthened our belief that Silver

Cliff hosts a large-scale mineralized hydrothermal system extending well beyond the current Kate resource

area. The increasing sulphide intensity, strong alteration and localized massive sulphi de mineralization

encountered in K26-08 are particularly encouraging and may indicate we are vectoring toward a more robust

mineralized center associated with the Passiflora target. With assays pending and geophysics now underway,

we believe Silver Cliff continues to demonstrate meaningful district-scale discovery potential.

Final Four Holes

The final four core holes of the Kate drill program were designed to test two anomalies identified during the

soil survey north of the Kate Silver resource area. This area has historically received very limited attention,

despite its proximity to the historic Defender mine, a past producer of lead and silver. The first two hole s

(K26-05 and K26-06) tested the more southerly soil anomaly, while the final two holes (K26 -07 and K26-

08) tested a strong anomaly located in the north-west corner of the soil survey.

Hole-by-Hole Summary

Hole K26-05 — Structural Corridor Target (Completed Depth: 276 feet / 84.1 metres)

K26-05 was designed to test a major north–south structural corridor north of the Kate resource, near

Colorado Quarry Road. The hole intersected broken to brecciated rhyolite with manganese -oxide, limonite

and hematite staining associated with multiple frac ture sets, before transitioning into a strongly altered

phyllic zone characterized by silicification, angular hydrothermal -breccia textures and finely disseminated

sulphides.

The Company notes that phyllic alteration of this type is commonly associated with porphyry- related

hydrothermal systems and is comparable to alteration ’s observed near the historic Passiflora and Defender

mines in the Silver Cliff district. The hole terminated at 276 feet (84 metres) while remaining within the

alteration zone.

It was drilled to the north along a north- trending fault zone that hosts three shafts along trend. The hole

encountered very muddy overburden from surface to approximately 14 feet, below which competent rock

was intersected. The core contained a few breccia zones together with disseminated sulphides visually

estimated at approximately 8% to 15% over its 276- foot (84-metre) length (visual estimate only — not an

assay).

Hole K26-06 — Follow-Up Structural Test (Completed Depth: 300 feet / 91.4 metres)

K26-06 was drilled as a follow -up along the same north–south structural corridor. Due to significant near -

surface clay alteration, the Company adjusted the drill orientation to better penetrate the target zone. The

hole intersected persistent phyllic alter ation, brecciation and finely disseminated pyrite over substantial

intervals, consistent with a broad hydrothermal alteration system extending northward from the Kate

resource.

It was drilled to the north-west from the same drill location and showed phyllic alteration. The intensity of

the alteration diminished as the hole progressed, which the Company interprets as the hole becoming more

distal to the heat source.

Viscount Mining Corp. June 3, 2026 Press Release

4 of 9

Hole K26-07 — Ben West Volcanic Rim Target (Completed Depth: 500 feet / 152.4 metres)

K26-07 tested the southern rim of the Ben West volcanic complex within the Miocene-aged Tbb rim-breccia

unit. The hole provided important geological information on the volcanic and structural architecture linking

the Kate and Passiflora areas. The Company believes the Ben West complex may represent a hydrothermal

centre capable of focusing mineralizing fluids across the district.

K26-07 and K26-08 were drilled to test the strongest soil anomaly, located in the north- west corner of the

soil survey. K26-07 was drilled vertically. The hole intersected the volcanic rim breccia and exhibited strong

phyllic alteration, with some sulphide zones logged as almost solid.

Hole K26-08 — Increasing Sulphide Intensity and solid pyrite veins (Completed Depth: 500 feet / 152.4

metres)

K26-08 was among the most geologically encouraging holes of the 2026 program. Drilling encountered a

distinct oxidized-to-unoxidized transition at approximately 68 feet (20.7 metres), below which the visual

intensity of sulphide mineralization increased substantially. Logged features include

• Increasing sulphide intensity with depth

• Visible galena and possible chalcopyrite

• Sulphide-rich breccia zones

• A localized massive sulphide vein at depth

• Strong phyllic alteration associated with major structural corridors

• A localized solid pyrite vein approximately one foot (0.3 metres) in length at approximately 486 feet

(148.1 metres)

Viscount Mining Corp. June 3, 2026 Press Release

5 of 9

Figure 3. K28-08 core photo starting at 578 to 604ftTD (176.2 – 184.1m). The rock can be described as blocky to competent,

variable medium gray, felsic to intermediate in composition, local breccia textures, skinny bands of massive pyritic sulfide locally,

finely disseminated brassy pyritic sulfide more common, also occurring along select fractures, blebby to stringer (>15%).

With increasing depth, sulphides were observed visually as disseminations, fracture-fill, stringers, blebs and

localized massive-sulphide veins. The Company believes these features may reflect increasing proximity to

a more strongly mineralized portion of the system. As noted above, these are visual observations only and

remain subject to confirmation by assay.

K26-08 was originally planned to be drilled to the north-west; however, following the results of K26-07, the

hole was instead drilled toward the north- east. Like K26 -07, it intersected the volcanic rim breccia and

exhibited strong phyllic alteration, with some sulphide zones logged as almost solid. The hole also

intersected metallic-looking crystals that were not identified in the field; these are expected to be identifiable

once geochemical results are received.

Given the strong gold and silver values returned from soil sampling in this area, the Company believes the

pyrite may be the host for gold and silver. This is a preliminary interpretation based on visual core logging

and soil geochemistry only; it has not been confirmed by assay of the drill core, which is pending.

Geological Interpretation

Viscount Mining Corp. June 3, 2026 Press Release

6 of 9

The 2026 drill program indicates that hydrothermal alteration and visible mineralization extend beyond the

current Kate Silver resource boundary and continue northward toward the Passiflora area and the Ben West

volcanic complex. Across multiple holes, targeting expansion potential north of the Kate Resource the

program intersected:

• broad zones of phyllic alteration, silicification and hydrothermal brecciation

• Observed increasing sulphide intensity with depth across multiple holes

• Hole K26-08 encountered visible galena, possible chalcopyrite and localized pyrite veins

• Geological indicators suggest vectoring toward a larger mineralized system associated with the

Passiflora target

• Assays pending for all holes

The Company believes these characteristics are consistent with a vertically and laterally extensive

hydrothermal system with the potential to host both near-surface silver mineralization and deeper porphyry-

related mineralization. This interpretation is pr eliminary and based on visual core logging; it has not been

confirmed by assay results or by a mineral resource estimate. Assays from the 2026 holes are pending and

will be released once received, compiled and interpreted.

Cautionary Note Regarding Visual Estimates

Readers are cautioned that the descriptions of mineralization in this news release are based on visual

observation and visual estimates from drill core only. Visual estimates of mineral or sulphide abundance are

inherently imprecise and unreliable as a measure of grade. Mineralization observed in drill core may not be

representative of mineralization on the property, and the presence of sulphides, galena, chalcopyrite or other

minerals does not necessarily indicate the presence of economically recoverable mineralization. No assay or

analytical results are available for the 2026 drill holes as at the date of this news release. The Company

cautions that visual estimates should not be relied upon and that actual grades, widths and continuity of

mineralization can only be determined by laboratory assay of sampled drill core, which is pending.

True widths of the intervals described have not been determined, and reported lengths are downhole (core)

lengths.

Viscount Mining Corp. June 3, 2026 Press Release

7 of 9

Figure 5. The Rosor Exploration geophysical crew has mobilized and arrived at the Silver Cliff Project survey area.

The Company has now completed its 2026 drill campaign and is advancing toward the next phase of

exploration at Silver Cliff. Assays from all 2026 drill holes are currently pending and will be released once

received, compiled and interpreted. In parallel, R osor Exploration has mobilized to commence a district -

scale geophysical survey designed to further define structural corridors and prioritize follow-up drill targets

along the emerging Kate –Passiflora trend. The Company believes the integration of drilling , soil

geochemistry and geophysical data will significantly enhance targeting as it continues to evaluate the broader

district-scale hydrothermal system and the potential for deeper porphyry-related mineralization.

The Company also announces that its Board of Directors has approved the granting of 7,375,000 stock

options to directors, management and consultants pursuant to the Company’s stock option plan. The options

are exercisable at a price of $0.50 per share for a period of five years and remain subject to applicable

regulatory approvals.

Quality Assurance/Quality Control ("QA/QC") Measures, Chain of Custody

All Viscount's drilling to date has been core. The Company has implemented a rigorous quality

assurance/quality control program at the Silver Cliff project. Core is retrieved from the drill site to a locked

storage facility, where it is logged on site by Christina Ricks, project geologist, and then cut by independent

geologists. Half of the core is bagged, and standards, blanks and duplicates are frequently inserted into the

sample stream. These are then boxed and shipped via USPS to Skyline Labs in Tucson, Arizona for sample

preparation and analysis. Pulps and rejects will then be retrieved and stored with the split core at the

Company's locked facility.

Qualified Person

The scientific and technical information contained in this news release has been reviewed and approved by

Harald Hoegberg, C. P.G., an independent consulting geologist who is a "Qualified Person" (QP) as such

term is defined under National Instrument 43-101 — Standards of Disclosure for Mineral Projects ("NI 43-

101"). On-site geological logging and field supervision of the 2026 program is being conducted by Christina

Ricks, project geologist. Visual descriptions of drill core are qualitative observations only and are not a

substitute for laboratory assay data. Mineral identifications made in hand- specimen are subject to

confirmation by laboratory analysis. Readers are cautioned that mineralization observed in drill core may

not be representative of the deposit as a whole, and that assay results, once received, may differ materially

from visual estimates. Historic results are not necessarily indicative of mineralization that may be returned

by the 2026 program.

About Viscount Mining Corp.

Viscount Mining Corp. is a project generator and mineral exploration company focused on advancing high-

quality silver, gold and copper assets in the western United States. The Company’s portfolio includes the

Silver Cliff silver project in Colorado and the Cherry Creek multi-metal district in Nevada.

Silver Cliff Project — Colorado

Silver Cliff is located in the historic Hardscrabble Silver District and comprises 96 lode claims with year -

round paved access and established local infrastructure. The Project covers a large volcanic caldera system

recognized for its silver, gold and base-metal potential, and contains two principal areas of focus:

Viscount Mining Corp. June 3, 2026 Press Release

8 of 9

• Kate Deposit (Silver Resource Area): the Kate deposit hosts a near -surface silver mineral resource

estimated in accordance with NI 43-101 and prepared by an independent qualified person. Investors are

encouraged to review the full technical report, available under the Company’s profile on SED AR+ at

www.sedarplus.ca, for resource categories, tonnes, grades and the assumptions and methodology on

which the estimate is based.

• Passiflora Porphyry Target: historical and modern drilling indicate extensive hydrothermal alteration

consistent with a large porphyry system. Drilling by Viscount in hole PF -23-03A intersected a 843.9-

metre downhole interval of gold-copper mineralization, which the Company interprets as lying on the

periphery of a potentially larger intrusive centre. The reported length is a downhole (core) length; true

width has not been determined, and readers are referred to the Company’s news release dated [insert

original release date] and its filings on SEDAR+ for the associated assay results and details.

Mineralization remains open in multiple directions.

Cherry Creek Project — Nevada

Cherry Creek comprises 219 unpatented and 9 patented claims in a historic mining district approximately

50 miles north of Ely, Nevada. The property includes more than 20 past-producing mines and hosts several

styles of mineralization, including silver -gold veins, carbonate-replacement (CRD) zones, jasperoids and

porphyry-related alteration. The district is 100% controlled by Viscount and is considered prospective for

multi-metal discoveries within the broader mineralized system.

For additional information regarding the above properties and other corporate information, please visit the

Company’s website at www.viscountmining.com.

On Behalf of the Board of Directors

“Jim MacKenzie”

Jim MacKenzie President, Chief Executive Officer and Director

For further information, please contact:

Viscount Investor Relations

Email: [email protected]

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the

policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

Forward-Looking Statements

This news release contains certain “forward -looking statements” and “forward -looking information” within the

meaning of applicable Canadian securities legislation. Forward -looking statements include, but are not limited to,

statements regarding the Company’s exploration plans and objectives; the interpretation of drill results and the

geological model at Silver Cliff; the potential size, continuity, grade and character of mineralization (including any

porphyry-related mineralization); the expectation that assay results will be received, compiled and disclosed; and the

potential of the Silver Cliff and Cherry Creek projects. Forward-looking statements are frequently identified by words

such as “plans”, “expects”, “is expected”, “budget”, “scheduled”, “estimat es”, “forecasts”, “intends”, “anticipates”,