Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

VLX.V ·

Major Metallurgical Testwork Program to Commence on Cambridge Vanadium Samples

Metallurgy & Processing

1

TSX-V Announcement

20 February 2024

Major Metallurgical Testwork Program to Commence on

Cambridge Vanadium Samples

Toronto, Ontario, February 20, 2024 – Velox Energy Materials Inc. (TSXV: VLX) (“Velox” or “the Company”) is

pleased to announce the commencement of a major metallurgical testwork program on vanadium samples

from the Cambridge Vanadium deposit in Queensland.

Highlights

• Appointment of leading process engineers, BHM Process Consultants, to oversee the metallurgical

program across the Cambridge deposit.

• Representative core samples from the recent diamond drilling program selected to assess different

mineralogical zones within the prospective Toolebuc Formation.

• Samples have been submitted to Brisbane Met Labs (BML), an expert in the assessment of North

Queensland vanadium deposits.

• BML has multiple years in the analysis of Vanadium ores from Northern Queensland , which also includes

being awarded an Industry Innovation grant for the establishment of a vanadium pilot plant to process ore

into vanadium pentoxide for the VRFB industry.

• Results from the metallurgical testwork program are expected in mid-2024.

Metallurgical Testwork Program

Perth-based BHM Process Consultants (BHM) have been appointed to oversee the metallurgical testwork

program for the Cambridge Vanadium Project in North Queensland, Australia. BHM has excellent experience

in processing from metallurgical testwork through to flowsheet design and plant commissioning.

A total of 12 composite samples were created from the recent diamond drilling program, from 4 drillholes that

represent the bulk of the defined Cambridge deposit. Each composite represents different mineralogical zones

within the Toolebuc Formation that host the vanadium mineralisation.

The samples will be analysed by Brisbane Met Labs, (BML), an expert in the assessment of North Queensland

Vanadium deposits. In 2021, BML was awarded an Industry Innovation grant by the Department of Industry,

Science and Resources in Australia for the building and commissioning of a Vanadium Pilot Plant to allow

processing of ore into Vanadium Pentoxide for the International Vanadium Redox Flow Battery market.

The results of the metallurgical testwork program are expected in mid-2024 and will be used to guide the next

stages of development of the project.

Velox’s President and CEO, Simon Coyle, commented:

“Velox has been selective in the engagement of metallurgical consultants as well as the laboratory being

utilized, to ensure we have the appropriate knowledge base to perform our maiden met testwork. BML have

significant expertise in the assessment of North Queensland vanadium ores, which provides us with the

confidence we have the best in class to conduct the analysis of our Cambridge Mineral Resource. Velox’s goal

is to have a process flow for our ores that creates world class recoveries, coupled with a low operating cost

base.

“Given the relatively homogenous nature of the Toolebuc Formation across the region, we are confident that the

metallurgical testwork program will deliver positive results and allow us to progress to the next stage of studies.”

2

TSX-V Announcement

20 February 2024

Qualified Persons

The Velox Energy Materials technical information in this news release has been prepared in accordance with the Canadian

regulatory requirements set out in National Instrument 43 -101 (Standards of Disclosure for Mineral Projects) and

reviewed and approved on behalf Velox Energy Materials by Michael Griffiths, FAusIMM, Director & VP Exploration for

Velox Energy Materials, a Qualified Person.

About Velox Energy Materials

Velox Energy Materials is a publicly traded energy materials company developing and progressing high -value

assets in resource and research-friendly jurisdictions. The Company’s priority focus is the advanced NQV

Project in Queensland, Australia. The NQV Project hosts the Cambridge Deposit with an CIM compliant

Indicated Mineral Resource of 61.33 Mt @ 0.34% V 2O5 and 234.6 ppm MoO 3 along with an Inferred Mineral

Resource of 144.87 Mt @ 0.33% V 2O5 (cut-off grade of 0.25% V2O5) and 241.9 ppm MoO 3 (Dufresne et al.,

2022). The Company is targeting shallow, high -grade mineralisation that can be developed using low -cost

mining and processing options.

The Company additionally owns Kotai Energy and the option to acquire 100% of the intellectual property rights

associated with the Solid-State Hydrogen Storage Project from Curtin University in Western Australia. Kotai is

focused on the commercialisation of technology that can produce high-pressure hydrogen following transport

as an inert powder.

In October 2023, the Company acquired a package of tenements that are prospective for lithium in eastern

Quebec.

Please visit our website at www.veloxenergymaterials.com.au for further information.

Approved by the Board of Velox Energy Materials Inc.

Simon Coyle

President & CEO

+1 416-214-7577

Investor Relations Contact

Andrew Rowell

Investor Relations – Australia

M: +61 400 466 226

Email: [email protected]

Forward Looking Statements

Neither the TSX Venture Exchange nor its regulation services provider (as that term is defined in the policies of the TSX

Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

This news release may contain forward-looking statements that are based on the Company’s expectations, estimates and

projections regarding its business and the economic environment in which it operates. Statements about the closing of

the transaction, expected terms of the transaction, the number of securities of Velox Energy Materials that may be issued

in connection with the transaction, and the parties' ability to satisfy closing conditions and receive necessary approvals

are all forward -looking informat ion. These statements are not guarantees of future performance and involve risks and

uncertainties that are difficult to control or predict. Therefore, actual outcomes and results may differ materially from

those expressed in these forward -looking statements and readers should not place undue reliance on such statements.

Statements speak only as of the date on which they are made, and the Company undertakes no obligation to update them

publicly to reflect new information or the occurrence of future events or circumstances, unless otherwise required to do

so by law.