Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

VLI.V ·

Vision Lithium Reports High-Grade Cesium Discovery up to 1.94% Cs2O at Sirmac Property

Drill Results

Vision Lithium Reports High-Grade Cesium

Discovery up to 1.94% Cs2O at Sirmac

Property

Val-d'Or, Québec--(Newsfile Corp. - December 2, 2024) -

Vision Lithium Inc

. (TSXV: VLI) (OTCQB:

ABEPF) (FSE: 1AJ2) (the "

Company

" or "

Vision Lithium

") is very pleased to report the discovery of

high-grade cesium mineralization from pegmatite outcrops on its Sirmac property located 40 km west of

Sayona's Moblan lithium deposit and 160 km by road from Chibougamau, Québec.

Yves Rougerie, President & CEO comments: "The very high-grade cesium results suggest these dikes

are highly fractionated LCT (lithium-cesium-tantalum) pegmatites with the potential of hosting economic

cesium mineralization. Although not observed, the mineral pollucite, the principal mineral of cesium, is

likely present. These cesium assay results are amongst the highest ever reported in the province of

Québec. The provincial database of surface rock samples contains over 80,000 cesium assay results of

which only one result is above 1% and less than ten are above 800ppm (ref SIGÉOM)."

Vision's Sirmac property is host to the #5 Dike pegmatite lithium deposit as well as the Clapier lithium

occurrence 6 km to the ENE. A new area of mineralized pegmatites was discovered late in 2024 in the

southern portion of the property, approximately 10 km SE of the #5 Dike. A single visit to the area led to

the discovery of two pegmatite dikes in contact with basalts. The dikes outcrop minimally, and their size

and extent are not currently known. However, spodumene was observed in both dikes and representative

samples of pegmatite and the host rock basalt were taken from each site with the following results:

Table 1. Grab Sample Assay Results

Grab

Sample

Cesium

ppm

Cs

2

O*

%

Lithium

ppm

Li

2

O*

%

Tantalum

ppm

Rubidium

ppm

Pegmatite 1

13,150

1.39

3,230

0.695

201

6,010

Pegmatite 1

18,300

1.94

860

0.185

264

4,610

Basalt 1

179

0.02

410

0.088

1

99

Pegmatite 2

8,410

0.89

2,880

0.620

257

5,370

Basalt 2

1,320

0.14

1,290

0.278

1

961

Note: Cs

2

O% = (Cs ppm/10 000) *1.06; Li

2

O% = (Li ppm/10 000) *2.153

The dikes also exhibit highly anomalous values for lithium, tantalum and rubidium. These results are

similar in many respects to values reported from the producing Tanco mine in Manitoba and the Case

Lake exploration project in eastern Ontario, the two most significant cesium occurrences in Canada.

The highly anomalous values in the basalt samples for cesium and lithium indicate a strong alteration

halo surrounding the pegmatite dikes. This suggests the dikes are potentially larger/wider at depth

and/or along strike.

The exploration program was coordinated with Innovexplo of Val d'Or, Québec who contributed new

interpretations of existing geological models for the property occurrences earlier in the year followed by

field work that included outcrop visits and systematic structural measurements and a reinterpretation of

pegmatite textures from drill core relogging (mainly from Dike #5). Proposals for new exploration

concepts and targets resulted from this work. The new area discovery is also the result of this

coordinated effort. Decades-old historical drilling for base metals in the southern area intersected

pegmatite dikes which were not sampled at the time. Other dikes are likely present under overburden

cover in the vicinity of the new dikes. A whole new corridor/swarm of LCT pegmatite dikes is possible in

this area, fertile for both cesium and/or lithium-tantalum economic deposits. Future exploration will focus

on this area for this obvious potential.

Figure 1: Sirmac property regional location plan

To view an enhanced version of this graphic, please visit:

https://images.newsfilecorp.com/files/11052/232102_79aa4d43c40858dd_001full.jpg

Figure 2: Sirmac property with location of new discovery

To view an enhanced version of this graphic, please visit:

https://images.newsfilecorp.com/files/11052/232102_79aa4d43c40858dd_002full.jpg

Figure 3: Pegmatite dikes 1 & 2 in contact with basalt

To view an enhanced version of this graphic, please visit:

https://images.newsfilecorp.com/files/11052/232102_79aa4d43c40858dd_003full.jpg

Figure 4: Pegmatite 2 with spodumene crystals

To view an enhanced version of this graphic, please visit:

https://images.newsfilecorp.com/files/11052/232102_79aa4d43c40858dd_004full.jpg

QA/QC

The sampling program was planned and supervised by InnovExplo Inc. Samples were transported from

the Sirmac project to the ALS facility in Val-d'Or, Québec by InnovExplo personnel. The 1.5 to 3 kg grab

samples were crushed to 70% less than two millimetres (CRU-31), riffle split, pulverize split to better than

85% passing 75 microns (PUL-31). Samples were assayed for lithium + 33 element by ICP-AES (ME-

MS89L).

The scientific and technical information in this release has been reviewed and approved by Yves

Rougerie, Geologist, President and CEO of the Company. Mr. Rougerie is a "qualified person" as

defined in National Instrument 43-101 -

Standards of Disclosure for Mineral Projects

. The potential

grades of exploration targets disclosed in this news release are conceptual in nature. There has been

insufficient exploration to define a mineral resource, and it is uncertain if further exploration will result in

the target being delineated as a mineral resource.

About Vision Lithium Inc.

Vision Lithium Inc. is a junior exploration company focused on exploring and developing high quality

mineral assets including lithium and copper in Canada. The Company is led by skilled and qualified

mineral exploration experts and business professionals with a deep understanding of the battery

materials market, which is driven by lithium-ion batteries. Vision Lithium completed a positive PEA on its

Sirmac lithium project in 2023. The PEA is available on the Company's website at

www.visionlithium.com

and on

SEDAR+.

The Company is committed to discovering new, world-class

assets and bringing these assets to production, starting with its advanced Sirmac lithium property in

Québec and Godslith lithium property located in Manitoba, and a group of base metal rich Ni-Cu-Co

and/or Cu-Zn-Ag-Au properties in eastern Québec and New Brunswick.

For further information on the Company, please visit our website at

www.visionlithium.com

or contact us

at

[email protected]

.

NEITHER THE TSXV NOR ITS REGULATION SERVICES PROVIDER (AS THAT TERM IS

DEFINED IN THE POLICIES OF THE TSXV) ACCEPTS RESPONSIBILITY FOR THE ADEQUACY

OR ACCURACY OF THIS RELEASE.

For additional information, please contact:

Victor Cantore

Executive Chairman

Tel: +1 514-831-3809

Email:

[email protected]

Yves Rougerie

President and Chief Executive Officer

Tel: +1 819-316-0474

Email:

[email protected]

CAUTIONARY STATEMENT REGARDING FORWARD-LOOKING INFORMATION: All statements, other

than statements of historical fact, contained in this press release including, but not limited to those

describing the impact of the foregoing on the Sirmac Project economics, PEA results (as such results

are set out in the various tables featured above, and are commented in the text of this press release),

including NPV and IRR, the estimated value of the Sirmac Project, operations development scenarios for

the Sirmac Project, commercial and technical parameters, the attractive economics for the Sirmac

Project, life-of-mine plans, market trends, future lithium prices, the impact of the Sirmac Project on the

local communities, including job creation, the timelines and costs related to the various initiatives,

deliverables and milestones described in this news release and their expected results, the Company’s

expected financial and operational performance, the nature of relationships with stakeholders such as

the local community including the Mistissini Cree First Nation, mineral resource estimates (including

assumptions and estimates used in preparing the mineral resource estimates), the general business

and operational outlook of the Company, the Company’s future growth and business prospects, the

Company’s initiatives and goals, and those statements which are discussed under the “About Vision

Lithium Inc.” paragraph and elsewhere in the news release which essentially describe the Company’s

outlook and objectives, constitute “forward-looking information” or “forward-looking statements”

(collectively, “forward-looking statements”) within the meaning of applicable Canadian securities laws,

and are based on expectations, estimates and projections as of the time of this news release. Forward-

looking statements are necessarily based upon a number of estimates and assumptions that, while

considered reasonable by the Company as of the time of such statements, are inherently subject to

significant business, economic and competitive uncertainties and contingencies. These estimates and

assumptions may prove to be incorrect. Moreover, these forward-looking statements were based upon

various underlying factors and assumptions, including the current technological trends, the business

relationship between the Company and its stakeholders, the ability to operate in a safe and effective

manner, the timely delivery and installation at estimated prices of the equipment supporting the

production, assumed sale prices for DSO, the accuracy of any mineral resource estimates, future

currency exchange rates and interest rates, political and regulatory stability, prices of commodity and

production costs, the receipt of governmental, regulatory and third party approvals, licenses and permits

on favorable terms, sustained labor stability, stability in financial and capital markets, availability of

equipment and critical supplies, spare parts and consumables, the various tax assumptions, the Sirmac

Project permits’ status, all economic and operational projections relating to the project, local

infrastructures, the Company’s business prospects and opportunities and estimates of the operational

performance of the equipment, and are not guarantees of future performance.

Forward-looking statements are subject to known or unknown risks and uncertainties that may cause

actual results to differ materially from those anticipated or implied in the forward-looking statements.

Risk factors that could cause actual results or events to differ materially from current expectations

include, among others, delays in the scheduled delivery times of equipment, the ability of the Company to

successfully implement its strategic initiatives and whether such strategic initiatives will yield the

expected benefits, the availability of financing or financing on favorable terms for the Company, the

dependence on commodity prices, the impact of inflation on costs, the risks of obtaining the necessary

permits, the operating performance of the Company’s assets and businesses, competitive factors in the

lithium mining and production industry, changes in laws and regulations affecting the Company’s

businesses, political and social acceptability risk, environmental regulation risk, currency and exchange

rate risk, technological developments, the impacts of the global COVID-19 pandemic and the

governments’ responses thereto, and general economic conditions, as well as earnings, capital

expenditure, cash flow and capital structure risks and general business risks. Unpredictable or unknown

factors not discussed in this cautionary statement could also have material adverse effects on forward-

looking statements.

Many of these uncertainties and contingencies can directly or indirectly affect, and could cause, actual

results to differ materially from those expressed or implied in any forward-looking statements. There can

be no assurance that forward-looking statements will prove to be accurate, as actual results and future

events could differ materially from those anticipated in such statements. Forward-looking statements are

provided for the purpose of providing information about management’s expectations and plans relating

to the future. The Company disclaims any intention or obligation to update or revise any forward-looking

statements or to explain any material difference between subsequent actual events and such forward-

looking statements, except to the extent required by applicable law.

To view the source version of this press release, please visit

https://www.newsfilecorp.com/release/232102