Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

VLI.V ·

ABE Resources Obtains TSXV Conditional Approval to Acquire Sirmac Lithium Property from Nemaska Lithium and Discusses Historical Estimates

Mergers & Acquisitions Property Options & Staking

ABE Resources Obtains TSXV Conditional Approval to

Acquire Sirmac Lithium Property from Nemaska Lithium and

Discusses Historical Estimates

VAL-D'OR, QC

,

Jan. 5, 2018

/CNW/ - Further to its news release dated

December 14, 2017

, ABE Resources Inc. (TSXV: ABE) (OTC:

ABEPF) "

Company

" or "

ABE

") is pleased to announce that it has obtained the conditional acceptance of the TSX Venture Exchange (the

"

TSXV

") to acquire the Sirmac lithium property (the "

Sirmac Property

") from Nemaska Lithium Inc. ("

Nemaska Lithium

") pursuant to the

asset purchase agreement entered into between the parties on

December 13, 2017

(the "

Transaction

").

In connection with the Transaction, ABE has received an independent technical report on the Sirmac Property (the "

Technical Report

") from

Nemaska Lithium, dated

January 15, 2014

, prepared by qualified persons

Guy Desharnais

, Ph.D., P.Geo.,

Jean-Philippe Paiement

, M.Sc.,

P.Geo, and Jonathan Gagné, P.Eng. in accordance with National Instrument 43-101 –

Standards of Disclosure for Mineral Projects

("

NI 43-

101

"), which will be updated and filed in advance of the closing of the Transaction.

The Transaction remains subject to the final approval of the TSXV and to standard closing conditions, including the filing of the updated Technical

Report. A copy of the updated Technical Report will be available under the Company's profile on SEDAR at

www.sedar.com

in advance of the

closing of the Transaction.

The Company is further pleased to present certain historical estimates and additional information on the Sirmac Property based on work

performed by Nemaska Lithium in 2012. The technical information discussed below is derived from the existing Technical Report and previous

news releases of Nemaska Lithium.

The Sirmac Property consists of 24 mining claims having a total area of approximately 1,100 hectares located approximately 180 kilometres

North-West of

Chibougamau

, in the province of Québec.

Channel Samples

In 2012, Nemaska Lithium conducted a successful exploration campaign. In total, 9 sites were mechanically stripped for a surface area of

approximately 13,000 m2. There were 29 channels completed over 739 metres for a total of 506 samples (selected results below, for full results

see the Nemaska Lithium news release dated

November 5, 2012

).

Seven channels samples spaced every 25 metres were taken from Dyke #5. Five of the seven channel results reported grades of 1.41% Li

2

O or

higher with the best results coming from:

SIR-12-R02 grading 1.73% Li

2

O over

16.5m

SIR-12-R05 grading 1.68% Li

2

O over

27 m

In addition, two channels (SIR-12-R14 & SIR-12-R15) were completed on the newly found West extension (Laurisha extension) of Dyke #5.

Results from these channels included:

SIR-12-R14 grading 1.87% Li

2

O over

4.5 m

SIR-12-R15 grading 1.48% Li

2

O over

6.6 m

Also at about

200m

NNE of Dyke #5 (Dyke 0+00), three channels were completed (SIR-12-R16 - SIR-12-R18). The results were:

SIR-12-R16 grading 1.46% Li

2

O over

4.05 m

SIR-12-R17 grading 1.69% Li

2

O over

7.5 m

SIR-12-R18 grading 1.79% Li

2

O over

3 m

Drill Program

Also as part of the same exploration program, Nemaska Lithium completed a diamond drill campaign of 72 shallow drill holes (

3,414.5 m

). A total

of 1,953 samples, including quality control samples (13%), were sent to the lab for assay (selected results below, for full results see the Nemaska

Lithium news release dated

November 13, 2012

).

Drill results from this program reported multiple intersections over 2% Li

2

O. More specifically, Nemaska Lithium intersected mineralization of up

to 2.98% Li

2

O. This grade approaches the grade found at the Greenbushes deposit, which is the highest grade hard rock lithium deposit in the

world.

Some of the best diamond drill hole results from Dyke #5 included:

SIR-12-01 grading 1.30% Li

2

O over

35.05 m

, including 2.30% Li

2

O over

12.35 m

SIR-12-03 grading 1.19% Li

2

O over

32.35 m

, including 2.06% Li

2

O over

9.0 m

SIR-12-17 grading 1.53% Li

2

O over

32.2 m

, including 2.56% Li

2

O over

6.0 m

SIR-12-21 grading 1.43% Li

2

O over

32.1 m

, including 2.58% Li

2

O over

10.5 m

SIR-12-23 grading 1.40% Li

2

O over

29.4 m

, including 2.01% Li

2

O over

10.5 m

SIR-12-32 grading 1.67% Li

2

O over

5.0 m

, including 2.98% Li

2

O over

2.7 m

The Laurisha Extension (West of Dyke #5). Three holes were drilled:

SIR-12-18 grading 1.27% Li

2

O over

5.7 m

SIR-12-19 grading 1.50% Li

2

O over

4.1 m

SIR-12-20 grading 1.69% Li

2

O over

5.0 m

On the North Extension of Dyke #5, a total of 12 holes were reported. The best results were:

SIR-12-45 grading 1.16% Li

2

O over

7.6 m

SIR-12-46 grading 0.94% Li

2

O over

7.0 m

, including 1.41% Li

2

O over

3.0 m

SIR-12-49 grading 1.15% Li

2

O over

19.8 m

SIR-12-50 grading 1.04% Li

2

O over

13.5 m

, including 1.99% Li

2

O over

6.0 m

SIR-12-61grading 1.15% Li

2

O over

7.8 m

, including 2.27% Li

2

O over

3.3 m

On Dyke 0+00 (

200 m

NNE of Dyke #5) one hole was reported at

SIR-12-63 grading 1.43% Li

2

O over

10.5 m

A site visit was conducted by the co-authors of the existing Technical Report, Messrs. Paiement and Desharnais, in

December 2012

. The visit

enabled the authors to view the core storing facilities and the stripped area of the Sirmac Property deposit and to familiarize themselves with the

region. The data verification was done on 4 major points: (i) validation of the database and relations between each table (collars, deviations,

lithologies, and assays); (ii) quality control/quality assurance ("

QA/QC

") data analysis; (iii) checks of the drill hole collars using GPS; and (iv)

independent control sampling.

Historical Estimates

The existing Technical Report includes the following historical estimates for the Sirmac Property:

Table 1: Historical Estimates for the Sirmac Property with 0.50% Li

2

O Cut-Off Grade

Cut-Off Grade

Li

2

O%

(1)

Category

(1)(2)

Tonnage (t)

(1)(3)

Average Grade

Li

2

O%

(1)

Average Grade

Ta

2

O

5

(ppm)

(1)(4)

0.50

Measured

185,000

1.40

70

0.50

Indicated

79,000

1.40

80

0.50

Inferred

40,000

1.10

60

Notes

:

(1)

Effective date of December 2013.

(2)

The historical estimates were calculated using the Canadian Institute of Mining, Metallurgy and Petroleum (CIM) Definitions Standards for mineral resources in accordance

with NI 43-101. Mineral resources which are not mineral reserves do not have demonstrated economic viability. Inferred mineral resources are exclusive of the measured

and indicated resources.

(3)

Bulk density of 2.70 t/m

3

is used. Rounded to the nearest thousand.

(4)

Ta

2

O

5

mineralization has yet to demonstrate recoverability and potential for economic extraction.

While the Company considers these historical estimates to be relevant to investors, as they may indicate the presence of mineralization, a

qualified person has not done sufficient work for ABE to classify the historical estimates as current "mineral resources" or "mineral

reserves" (as defined in NI 43-101) and the Company is not treating these historical estimates as current "mineral resources" or

"mineral reserves".

All block modelling, 3D solid generation and geological interpretation was conducted by SGS Geostat. Modelling and block interpolation was

done using Genesis © software. As of

December 2013

, no other deposit in the Sirmac Property has mineral resources stated or estimated. In

order to limit the mineral resources representing "a reasonable prospect of economic extraction", a Whittle © Pit optimization was completed using

the Lerchs-Grossman 3D algorithm. Considering the blocks limited to the optimized pit shell and a cut-off grade of 0.50% Li

2

O, the Sirmac

Property comprises 185kt of measured resources at 1.40% Li

2

O, 79kt of indicated resources at 1.40% Li

2

O, and 40kt of inferred resources at

1.10% Li

2

O (see Table 1 above). These historical estimates of mineral resources do not represent mining reserves since they have not shown

economic viability.

The existing Technical Report confirms that all sample assay results were independently monitored through a QA/QC program including the

insertion of blind standards, blanks and the reanalysis of duplicate samples at a second umpire laboratory. The results of the QA/QC program and

the resampling program indicate that the sample database is of sufficient accuracy and precision to be used for the generation of the historical

estimates.

"It is these high-grade results that sparked our interest in Sirmac and we quickly recognized it as an underexplored property," commented

Yves

Rougerie

, President and CEO of ABE Resources. "Nemaska Lithium's work clearly demonstrates that there are multiple lithium bearing pegmatite

dykes at Sirmac. We already have historical estimates on dyke #5, from which to base our initial exploration work. This resource is based on very

shallow drilling, and after visting the property I believe that Dyke #5 still holds ample potential for additional tonnage at depth and along strike. In

addition, there are a number of other mineralized dykes on the property that warrant follow-up drilling as well as numerous dykes which have been

identified and have yet to be explored. Armed with this kind of data I am confident that ABE can put together a targeted cost-effective exploration

program that can quickly deliver results. The macro picture for lithium battery materials remains very strong, driven by the adoption of lithium ion

batteries in electric vehicles, energy storage and consumer products. New sources of lithium are required to fulfill this growing demand."

The scientific and technical information in this release has been reviewed and approved by

Yves Rougerie

, Geologist, President and CEO of the

Company. Mr. Rougerie is a "qualified person" as defined in NI 43-101.

Option Grant

The Company also announces that it granted 100,000 incentive stock options to a consultant of the Company on

December 27, 2017

, pursuant to

the Company's incentive stock option plan. Each option is exercisable into one common share of ABE at a price of

$0.55

per share for a period of

5 years from the date of grant. 25% of the options vest immediately, 25% will vest 6 months after the date of grant, and the remaining 50% will

vest 12 months following the date of grant.

About ABE Resources Inc.

ABE Resources Inc. is a Québec mineral exploration company focused on the discovery and development of mineral deposits of economic

potential primarily in the province of Québec. ABE is actively exploring the Dôme

Lemieux

copper property and has recently signed a definitive

agreement with Nemaska Lithium Inc. to acquire a 100% interest in the Sirmac lithium property, both of which are located in the province of

Québec,

Canada

.

Neither the TSXV nor its Regulation Services Provider (as that term is defined in the policies of the TSXV) accepts responsibility for

the adequacy or accuracy of this release.

CAUTIONARY STATEMENT REGARDING FORWARD-LOOKING INFORMATION: This news release includes certain "forward-

looking statements" under applicable Canadian securities legislation. Forward-looking statements include, but are not limited to, statements with

respect to: the historical estimates, the estimates of cut-off grade and other factors underlying the historical estimates, the potential to extend the

historical estimates to other portions of the Sirmac Property, the Company's plans for further drilling and exploration, the Company's ability to

obtain all required approvals to complete the Transaction; and the business and operations of the Company upon completion of the proposed

Transaction. Forward-looking statements are necessarily based upon a number of estimates and assumptions that, while considered reasonable,

are subject to known and unknown risks, uncertainties, and other factors which may cause the actual results and future events to differ materially

from those expressed or implied by such forward-looking statements. Such risks and other factors include, but are not limited to: the historical

estimates of mineral resources may never become mineral reserves and do not have demonstrated economic viability; the assumptions made to

calculate the historical estimates may turn out to the inaccurate; additional drilling and exploration may lead to a determination that there is no

potentially viable mine plan for the Sirmac Property; general business, economic, competitive, political and social uncertainties; delay or failure to

receive board, shareholder or regulatory approvals; and the ability of the Company to execute and achieve its business objectives. There can be no

assurance that the forward-looking statements will prove to be accurate, as actual results and future events could differ materially from those

anticipated in such statements. Accordingly, readers should not place undue reliance on forward-looking statements. The Company disclaims any

intention or obligation to update or revise any forward-looking statements, whether as a result of new information, future events or otherwise,

except as required by law.

SOURCE

ABE Resources Inc.

View original content: http://www.newswire.ca/en/releases/archive/January2018/05/c1881.html

%SEDAR: 00003760E

For further information:

on the Company, please visit our website at www.aberesources.ca or contact us at [email protected]. For

additional information, please contact: ABE Resources Inc., Yves Rougerie, President and CEO, Tel: 819-874-6200, Email:

[email protected]

CO: ABE Resources Inc.

CNW 06:00e 05-JAN-18