Resource Estimates

Velocity Reports Initial Mineral Resource

Estimate at Obichnik Gold Project, Southeast

Bulgaria

Inferred Resource at 0.3g/t gold cut-off grade 4.4Mt @ 1.1 g/t gold for 156,000 ounces

Mineralization at Obichnik Remains Open for Expansion

Vancouver, British Columbia--(Newsfile Corp. - March 16, 2021) - Velocity Minerals Ltd. (TSXV: VLC)

("

Velocity

" or the "

Company

") announces that as part of its Obichnik joint venture earn-in agreement it

has received an initial Inferred Mineral Resource estimate for the Durusu Zone on its Obichnik gold

Project ("

Obichnik

" or the "

Project

"), southeast Bulgaria (Table 1).

Highlights include:

Initial Resource

; 4.4 Mt @ 1.1 g/t gold for 156,000 ounces, at 0.3 g/t gold cut-off grade

Near-surface

; 80% of estimated resources are located within 120m of surface

Open

; The mineralized system at Obichnik remains open for expansion

Drilling

; Ongoing drilling of multiple additional targets

Under the terms of an option agreement signed with Gorubso Kardzhali A.D. ("Gorubso"), Velocity can

earn a 70% interest in the Obichnik property through delivery of a Mineral Resource estimate prepared

in accordance with

National Instrument 43-101 ("NI 43-101")

and an EIA prepared in accordance with

Chapter Six of the Bulgarian Environmental Protection Act.

The Company plans to publish an NI 43-101

Technical Report

within 45 days.

Table 1:

Obichnik Inferred Mineral Resource Estimate, effective date February 11

th

, 2021

(1)

Cut-Off Grade

(gold g/t)

Tonnage

(million tonnes)

Grade

(gold g/t)

Ounces

(gold x 1,000)

0.2

5.9

0.9

171

0.3

4.4

1.1

156

0.4

3.5

1.3

146

0.5

2.8

1.5

135

0.6

2.3

1.6

118

0.7

2.0

1.8

116

0.8

1.7

2.0

109

(1)

Mineral resources were estimated by Jonathon Abbott, a member of the Australian Institute of Geoscientists and employee of MPR Geological

Consultants Pty Ltd of Perth, Australia.

Mr. Abbott is a Qualified Person, as defined by National Instrument 43-101.

Figure 1.

Plan view of Inferred Mineral Resource extents relative to drill hole dataset

To view an enhanced version of this Figure 1, please visit:

https://orders.newsfilecorp.com/files/4368/77369_780a2dab64467bd7_002full.jpg

Figure 2.

Representative section of Mineral Resource Estimate scaled and coloured by

proportion above 0.3 g/t gold cut off grade

To view an enhanced version of Figure 2, please visit:

https://orders.newsfilecorp.com/files/4368/77369_780a2dab64467bd7_003full.jpg

Ongoing Exploration

An exploration program is currently underway, aiming to expand the Durusu mineralization to the south,

where anomalous soil geochemistry and spectrometry remains untested.

Resource Estimate Methodology and Assumptions

Recoverable resources were estimated for the Durusu Zone at Obichnik using Multiple Indicator Kriging

("MIK") with block support adjustment, a method that has been demonstrated to provide reliable

estimates of recoverable open pit resources in gold deposits of diverse geological styles.

The resource

estimates include a variance adjustment to give estimates of recoverable resources above gold cut off

grades for selective mining unit ("SMU") dimensions of 5m east by 2m north by 2m in elevation.

The

variance adjustments were applied using the direct log-normal method.

The estimates are based on data from diamond drilling undertaken by Velocity since 2019 and includes

drilling information available on the 10

th

of February 2021 comprising 37 holes for 6,820m.

Velocity's

diamond holes are inclined to the southwest at generally 50

o

at generally around 25m spacing along

generally 50 m spaced traverses with rare closer spaced holes.

Resource modelling incorporated two steeply northwest dipping mineralized domains interpreted from

2m down-hole composited gold grades and capturing intervals of greater than 0.1 g/t.

The main, northern

domain extends over approximately 380m of strike with an average width of around 80m. The subsidiary

southern domain averages around 40m wide over 320m of strike.

Mineralization is characterized as

structurally controlled steep epithermal replacement of the volcanic host with a large envelope of

alteration that forms part of a 2.5km by 1km wide intrusive related hydrothermal mineralizing system.

Mineral Resources are truncated at a maximum vertical depth 180m around 30m above the base of

mineralized drilling, with around 80% of estimates from depths of less than 120m and less than 5% from

below 160m.

Model blocks are categorized by oxidation zone from triangulated surfaces representing the base of

complete oxidation and top of fresh rock interpreted from geological logging of Velocity's diamond

holes.

Within the resource area the depth to the base of complete oxidation averages around 55m, with

fresh rock occurring at an average depth of around 68m.

Bulk densities of 2.30, 2.50 and 2.55 tonnes per cubic metre were assigned to completely oxidized,

transitional and fresh material respectively on the basis of 30 immersion density measurements

performed by Velocity on diamond drill core samples.

All class grades were for MIK modelling determined from bin mean grades with the exception of the

upper bins, which were reviewed on a case by case basis for each mineralized domain/oxidation zone

subset and bin grades selected on the basis of bin mean, or median with or without exclusion of high

grade composites. This approach was adopted to reduce the impact of a small number of outlier

composites.

Quality Assurance / Quality Control

The work program at Obichnik was designed and is supervised by Stuart A. Mills, CGeol, the

Company's Vice-President Exploration, who is responsible for all aspects of the work, including the

quality control/quality assurance program.

On-site personnel at the project rigorously collect and track

samples which are then security sealed and shipped to ALS Global laboratory in Romania.

Samples

were prepared and analyzed by fire assay using a 30-gram charge in compliance with industry

standards.

Field duplicate samples, blanks and independent controlled reference material (standards)

are included in every batch. An additional sample taken from each pulverized sample is shipped to ALS

Global laboratory in Ireland for aqua regia digest and silver plus multi-element analysis by Inductively

Coupled Mass Spectrometry (ICPMS).

General Notes with Respect to Technical Information

The mineral resource disclosed herein has been estimated in accordance with the Canadian Institute of

Mining, Metallurgy and Petroleum "CIM Definition Standards for Mineral Resources and Mineral

Reserves" (CIM, 2014).

Mineral resources that are not mineral reserves do not have demonstrated economic viability.

Any known legal, political, environmental, or other risks that could materially affect the potential

development of the Mineral Reserves are detailed below in the section entitled "Cautionary Statement

Regarding Forward-Looking Information".

Qualified Persons

The technical content of this news release that relates to Mineral Resource Estimates has been

approved for disclosure by Jonathon Abbott, a member of the Australian Institute of Geoscientists and

employee of MPR Geological Consultants Pty Ltd.

Mr. Abbott is a Qualified Person, as defined by

National Instrument 43-101. Mr. Abbott is independent of the Company.

The technical content of this release has been approved for disclosure by Stuart A. Mills, BSc, MSc,

CGeol, a Qualified Person as defined by NI 43-101 and the Company's Vice President Exploration.

Mr.

Mills is not independent of the Company.

About Velocity Minerals Ltd.

Velocity is a gold exploration and development company focused on southeastern Bulgaria.

Velocity's

strategy is to develop a low cost centralized "Hub and Spoke" operation whereby multiple projects within

this emerging gold district produce gold concentrates for trucking to a central processing plant for

production of doré.

The Company envisions staged open pit mining of satellite deposits and processing

in a currently operating carbon-in-leach (CIL) plant.

Velocity has a 70% interest in the Tintyava

prospecting licence, which includes the Rozino gold project, and has entered into option agreements to

earn a 70% interest in the Obichnik and Makedontsi gold projects and holds a 100% interest in the Iglika

project. Velocity's management and board includes mining industry professionals with combined

experience spanning Europe, Asia, and the Americas as employees of major mining companies as well

as founders and senior executives of junior to mid-tier public companies.

The team's experience

includes all aspects of mineral exploration, resource definition, feasibility, finance, mine construction and

mine operation as well as a track record in managing publicly listed companies.

On Behalf of the Board of Directors

"Keith Henderson"

President & CEO

For further information, please contact:

Keith Henderson

Phone: +1-604-484-1233

Web:

www.velocityminerals.com

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in

policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this

release.

This news release does not constitute an offer of sale of any of the above-mentioned securities in the

United States.

None of the foregoing securities have been and will not be registered under the United

States Securities Act of 1933, as amended (the "1933 Act") or any applicable state securities laws and

may not be offered or sold in the United States or to, or for the account or benefit of, U.S. persons (as

defined in Regulation S under the 1933 Act) or persons in the United States absent registration or an

applicable exemption from such registration requirements.

This news release does not constitute an

offer to sell or the solicitation of an offer to buy nor will there be any sale of the foregoing securities in any

jurisdiction in which such offer, solicitation or sale would be unlawful.

CAUTIONARY STATEMENT REGARDING FORWARD-LOOKING INFORMATION

: This news

release includes certain "forward-looking statements" under applicable Canadian securities legislation.

Forward-looking statements include, but are not limited to, statements with respect to:

statements

related to proposed exploration and development programs at Rozino, grade and tonnage of material

and resource estimates and the Alliance.

Often, but not always, forward looking statements can be

identified by words such as "pro forma", "plans", "expects", "may", "should", "budget", "scheduled",

"estimates", "forecasts", "intends", "anticipates", "believes", "potential" or variations of such words

including negative variations thereof, and phrases that refer to certain actions, events or results that may,

could, would, might or will occur or be taken or achieved.

In making the forward-looking statements in this

news release, the Company has applied several material assumptions, including without limitation, that

market fundamentals will result in sustained gold demand and prices, the receipt of any necessary

permits, licenses and regulatory approvals in connection with the future development of Rozino in a

timely manner, the availability of financing on suitable terms for the development, construction and

continued operation of Rozino, and the Company's ability to comply with environmental, health and safety

laws.

Forward looking information involves known and unknown risks, uncertainties and other factors which

may cause the actual results, performance or achievements of the Company to differ materially from any

future results, performance or achievements expressed or implied by the forward-looking information.

Such risks and other factors include, among others, operating and technical difficulties in connection with

mineral exploration and development and mine development activities for Rozino, including the

geological mapping, prospecting and sampling programs for the project, the fact that the Company's

interests in Rozino (Tintyava property) is only an option and there is no guarantee that the interest, if

earned, will be certain, actual results of exploration activities, variations to the geological and

metallurgical assumptions (including with respect to the size, grade and recoverability of mineral

reserves and mineral resources), the timing and amount of estimated future production, costs of

production, capital expenditures, the costs and timing of the development of new deposits, the

availability of a sufficient supply of water and other materials, requirements for additional capital to fund

the Company's business plan, future prices of precious metals, changes in general economic conditions,

changes in the financial markets and in the demand and market price for commodities, possible

variations in ore grade or recovery rates, possible failures of plants, equipment or processes to operate

as anticipated, accidents, labour disputes and other risks of the mining industry, delays in obtaining

governmental and regulatory approvals (including of the TSX Venture Exchange), permits or financing or

in the completion of development or construction activities, changes in laws, regulations and policies

affecting mining operations, hedging practices, currency fluctuations, title disputes or claims limitations

on insurance coverage and the timing and possible outcome of pending litigation, environmental issues

and liabilities, risks related to joint venture operations, and risks related to the integration of acquisitions,

as well as those factors discussed under the heading "Risk Factors" in the Company's annual

management's discussion and analysis and other filings of the Company with the Canadian Securities

Authorities, copies of which can be found under the Company's profile on the SEDAR website at

www.sedar.com

.

Information concerning mineral reserve and mineral resource estimates also may be

considered forward-looking statements, as such information constitutes a prediction of what

mineralization might be found to be present if and when a project is actually developed and / or is in

production.

The actual results or performance by the Company could differ materially from those

expressed in, or implied by, any forward-looking statements relating to those matters.

Readers are cautioned not to place undue reliance on forward-looking statements.

The Company

undertakes no obligation to update any of the forward-looking statements in this news release or

incorporated by reference herein, except as otherwise required by law.

- 30 -

To view the source version of this press release, please visit

https://www.newsfilecorp.com/release/77369