Velocity Receives Positive Metallurgical Results at Rozino Gold Project, Southeast Bulgaria Comprehensive Test Work Supports Low Cost Metrics for Input into Upcoming Preliminary Economic Assessment

Economic Studies Metallurgy & Processing

1

NR18-15 August 29, 2018

Velocity Receives Positive Metallurgical Results

at Rozino Gold Project, Southeast Bulgaria

Comprehensive Test Work Supports Low Cost Metrics

for Input into Upcoming Preliminary Economic Assessment

Vancouver, British Columbia – Velocity Minerals Ltd . ( TSXV: VLC) (“ Velocity” or the “ Company”)

announces that it has received positive results from comminution, flotation & gravity recovery, and leach

test work on a bulk sample representative of the entire Rozino gold project (“ Rozino” or the “Project”),

located in southeast Bulgaria.

Results of this work will be incorporated into the Rozino NI 43 -101 Preliminary Economic Assessment

(“PEA”), which is in progress with results expected to be released in September 2018. Delivery of the PEA

is the mechanism by which Velocity will earn a 70% interest in the Rozino gold deposit.

“Comprehensive metallurgical test work has provided us with positive results for inclusion into the Rozino

PEA. The results included here provide Velocity with a mechanism to produce a 30 g/t gold concentrate,

which is amenable to processing at the nearby Gorubso carbon-in-leach plant,” stated Keith Henderson,

Velocity’s President & CEO. “The flotation test work has demonstrated that the process delivers a high -

quality concentrate for input to the existing CIL plant. With extremely low sulphide contents, low carbon

contents and negligible deleterious elements , this low -volume, high -grade concentrate should

complement the development options being considered in the PEA.”

Highlights of Results

• >98% of sulphide recoverable to produce a gold concentrate using standard flotation

• Low-volume, high-grade concentrate complements PEA project development options

• Concentrate produced typically averages 30 g/t gold

• Flotation gold recoveries of approximately 91%

• Extremely simple mineralogy with negligible deleterious elements

• Low sulphide content (<1%) and low mass pull (<5%)

• Low carbon content (1.2%) minimizes pregnant solution robbing during leaching

• Environmentally benign waste tailings product

• Results based on representative bulk sample comprised of 1,600 core samples

Simple Mineralogy at Rozino

The uncomplicated nature of mineralogy at Rozino is one of the attractive features of the gold deposit.

The mineralization is very simple with gold associated with pyrite, which is the only significant sulph ide

mineral in the deposit.

NR18-15 Continued August 29, 2018

2

Flotation Test Work

The test work shows that more than 98% of the sul phide is recoverable to produce a basic g old

concentrate using standard flotation techniques, conventional flotation reagents and a grind size of 70%

passing 200 mesh. The test work c oncentrate typically averag es 30 g/t gold with recoveries of

approximately 91%. The economics of the grind sizing and the reagent scheme used in the test work have

not yet been optimized, but these results indicate that a simple metallurgical flowsheet is required, which

may be refined in the next phase of test work to further enhance the operating cost inputs.

One of the scenarios being considered in the PEA will be trucking of this concentrate to Gorubso’s CIL

facility in Kardzhali. The cost of trucking this concentrate to Velocity’s partner is not expected to be

material to the economics of the project.

Leach Test Work

Cyanidation tests were carried out on whole-rock mineralized material, at differing grind sizes, and on the

flotation concentrate described above , via 48-hour bottle roll test work. The whole rock tests were

conducted at 60% and 80% passing 200 mesh with recoveries of 70% and 83% respectively and moderate

cyanide consumptions of 2.14 and 2.23 kg/t respectively. Leach kinetics are good with leaching effectively

complete within 24 hours.

Best leach results were gained from leach tests on flotation concentrates returning optimum leach times

of 24 hours and recoveries of 87% extraction (Table 1). Finer grinding of the concentrate does not

appreciably increase the leach recovery.

Table 1 Leach results of gold concentrates from the Rozino deposit

Extraction 87.48%

Consumption of Na CN 3.1 kg/t

Added NaCN 7.3 kg/t

Consumption of NaOH 5.0 kg/t

Bulk Sample Composition

Head grade analyses of the bulk sample concurs with previous gold assay results:

Table 2 Feed analysis of the 130kg bulk sample used for metallurgical test work

Bulk

Sample

Average

Head

Grade

Gold Sulphur Carbon Silver Copper Arsenic Lead Antimony Zinc

(g/t) (%) (%) (g/t) (ppm) (ppm) (ppm) (ppm) (ppm)

1.28 0.42 1.20 2.0 48 125 28 <5 74

Mineralogical analysis of the bulk sample using X-Ray Diffraction (XRD) confirmed a very straightforward

Low Sul phidation Epithermal style of mineralization as outlined in Table 3 . Positive aspects include

extremely low sulphide contents, low carbon contents and negligible deleterious elements. The very low

carbon content will avoid any negative impact on gold recoveries through pregnant solution robbing

during cyanide leaching. The very low sulphide content together with very high recoveries of the sulphides

(>98%) results in a low mass pull concentrate (<5%) and leaves a waste tailings product that is

environmentally benign.

NR18-15 Continued August 29, 2018

3

Table 3 Mineralogical composition determined by XRD

Mineralogy Weight %

Quartz 61

Mica 18

Potassium Feldspar 11

Carbonate 9

Pyrite <1

All of the gravity and flotation test work was carried out on a 130kg bulk sample assembled from all of the

significant drill intercepts from the 2107 and 2018 drill programs. The sample was carefully prepared with

material from more than 1,600 core samples.

Velocity has greatly improved on the results of historical metallurgical test work carried out by previous

operators at Rozino. In part this improvement can be attributed to the quality of the bulk sample

assembled by Velocity and the extent to which it is representative of the deposit.

Gravity Test Work

Gravity test work demonstrated that no significant free gold is being lost and the test work did not improve

upon the overall results, even when integrated with the flotation test work. As a result, the gravity option

will most likely not be considered in the upcoming PEA.

Ball Mill Work Index

Initial Bond Ball Mill Work Index (“BWI”) determination was carried out on whole drill core and returned

a calculated value of 14.52. This work is preliminary in nature and further work including SAG mill test

work is required, but the results are sufficient for the initial ball mill design to be incorporated in the PEA.

The BWI results are included in Table 4. Preliminary BWI test work was carried out on whole core taken

from representative intercepts.

Table 4 Initial Bond Work Index results for the Rozino mineralization

D80 particle

size of the

feed

d80 particle

size of the end

product

End product

specific mass WG* WI**

(mm) (mm) (g/rev) (kWh/g) (kWh/t)

1.80 0.095 1.87 5.72 x 10-3 14.52

* WG -– Energy consumption per g end product

** WI -– Bond Work Index

Details of Flotation Test Work Results

Fifteen variations of flotation test work were carried out, including two lock cycle tests using a variety of

differing grind sizes and reagents and the results are included in Table 5.

The locked cycle test work was carried out on a coarser grind fraction than most of the other tests and

returned an average recovery of 91% within a concentrate grading 30 g/t using standard flotation

methodology and relatively low-cost reagents. Finer secondary grinding of the concentrate did not result

in significant improvement in recoveries indicating that there is no cost benefit to producing higher grade

concentrates using finer grind processes.

NR18-15 Continued August 29, 2018

4

Owing to the efficient recovery and low starting concentrations of pyrite the mas s pull is less than 5%

resulting in a low-volume concentrate with high gold recoveries.

Table 5 Summary of flotation test work on the Rozino bulk metallurgical sample

Test

Grind

% -75

micron

Reagents Recoveries

Na2CO3

(g/t)

KIBK

(g/t)

Aero

242

(g/t)

BM

(g/t)

Au

(g/t)

Au

(%)

1 80 850 25 25 100 23.35 89.17

2 50/80 850 50 * 10 27.71 85.10

3 90 850 25 25 50 17.0 88.19

4 50 850 25 25 25 19.80 60.65

5 Ex grav

2 850 25 25 25 37.50 53.75

6 80 850 25 25 50 16.37 87.67

7 70 850 25 25 50 21.93 87.81

8 80 850 75 0 50 35.49 86.24

9 80 850 25 25 50 22.20 85.98

10 80 850 KXK

100 0 25 21.96 80.37

11

LCT# 70 850 25 25 25 36.40 90.66

12

LCT# 70 850 75 0 50 24.10 91.45

13 60 850 50 50 50 24.15 82.84

14 70 250 50 50 75 18.96 88.03

15 70 0 0 50 75 24.49 86.14

*NaHS and CuSO4 to mill.

# LCT Locked Cycle Tests

Quality Assurance / Quality Control

The metallurgical work program at Rozino was designed and is supervised by Len Holland B.Sc., C.Eng.,

FIMMM., FMES , an independent consulting metallur gist who is responsible for all aspects of the

metallurgical test work, including the quality control/quality assurance program.

The flotation, gravity and leach test work, together with gold deportment, mineralogical and laser sizing

studies were carried out by Eurotest Control EAD, Bulgaria on a homogenized bulk sample that was

assembled through splitting of 1,632 coarse reject s amples. The sample splitting was carried out by

Velocity’s staff using Jones splitters in accordance with best international practice. The bulk sample was

subsequently homogenized by Eurotest according to the Australian Standard – AS 3988 -91 - Sample

Preparation for the Determination of Gold, before being divided into 1kg aliquots using a rotary splitter.

Eurotest conducted homogenization tests including Fischer dispersion analysis and 50 chemical analyses

NR18-15 Continued August 29, 2018

5

in order to ensure that each metallurgical sample was representative of the combined mineralized

intervals from Rozino.

The Eurotest Control laboratory is certified by LRQA to ISO 9001. The company also holds a certificate of

accreditation as a testing laboratory pursuant to BDS EN ISO 17025. Analyses of materials less than 5g/t

gold were carried out by ICP-OES on Aqua Regia digest. Samples containing more than 5 g/t were analyzed

by 30g Fire Assay using an AAS finish. Specialist determinations were carried out in accordance with best

international practice, e.g. Sulphur was determined by the LECO technique. Comminution studies were

carried out by Eurote st and the University of Mining and Geology in Sofia. The preliminary BWI

determination was carried out on a 22.5kg sample of whole drill core selected to be representative of

typical mineralization from the Rozino deposit.

Qualified Person

The technical content of this release has been approved for disclosure by Len Holland, a Qualified Person

as defined by National Instrument 43-101. Mr. Holland is independent of the Company.

About the Rozino Gold Project

Velocity has been exploring and drilling at Rozino since August 2017, publishing a maiden Inferred Mineral

Resource Estimate in Q1 2018; 17Mt @ 1.15g/t gold for 629,000 ounces at 0.5g/t cut-off grade with 8.2Mt

@ 1.68g/t gold for 443,000 ounces at 0.8g/t cut-off grade. Approximately 90% of estimated resources at

depths of less than 110m from surface and less than 1% below 150m from surface. Mineralization remains

open for expansion. The Company has completed the 2018 drill program with a view to publishing an

updated mineral resource e stimate and PEA before year end. On completion of the PEA, the Company

will exercise its option for a 70% interest in the project and will move forward in joint venture with its

Bulgarian partner.

About Velocity Minerals Ltd.

Velocity is a gold explorati on and development company focused on eastern Europe. The Company’s

management and board includes mining industry professionals with combined experience spanning

Europe, Asia, and the Americas as employees of major mining companies as well as founders and senior

executives of junior to mid-tier public companies. The team's experience includes all aspects of mineral

exploration, resource definition, feasibility, finance, mine construction and mine operation as well as a

track record in managing publicly listed companies.

About Bulgaria

Bulgaria is a member of NATO (2004) and a member of the European Union (2007). The local currency

(BGN) has been tied to the Euro since 1999 (1.956 BGN/EUR). The country is served by modern European

infrastructure including an extensive network of paved roads. Bulgaria boasts an exceptionally low

corporate tax rate of only 10%. The country’s education system is excellent with good availability of

experienced mining professionals in a favourable cost environment. Foreign m ining companies are

successfully operating in Bulgaria. The country’s mining law was established in 1999 and updated in

2011. Mining royalties are low and compare favourably with more established mining countries.

On Behalf of the Board of Directors

"Keith Henderson"

President & CEO

For further information, please contact:

NR18-15 Continued August 29, 2018

6

Keith Henderson

Phone: +1-604-484-1233

E-mail: [email protected]

Web: www.velocityminerals.com

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in policies

of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

CAUTIONARY STATEMENT REGAR DING FORWARD -LOOKING INFORMATION: This news release includes certain

“forward-looking statements” under applicable Canadian securities legislation. Forward-looking statements include,

but are not limited to, statements with respect to: future exploration and testing carried out on the Tintyava

property; use of funds; and the future business and operations of Velocity. Often, but not always, forward looking

statements can be identified by words such as “pro forma”, “plans”, “expects”, “may”, “should”, “bu dget”,

“scheduled”, “estimates”, “forecasts”, “intends”, “anticipates”, “believes”, “potential” or variations of such words

including negative variations thereof, and phrases that refer to certain actions, events or results that may, could,

would, might or will occur or be taken or achieved. Forward looking information involves known and unknown risks,

uncertainties and other factors which may cause the actual results, performance or achievements of the Company

to differ materially from any future results, performance or achievements expressed or implied by the forward -

looking information. Such risks and other factors include, among others, operating and technical difficulties in

connection with mineral exploration and development and mine development acti vities for the Tintyava property,

including the geological mapping, prospecting and sampling programs for the projects, the fact that the Company’s

interests in the Tintyava property is only an option and there is no guarantee that the interest, if earned, will be

certain, actual results of exploration activities, including the program, estimation or realization of mineral reserves

and mineral resources, the timing and amount of estimated future production, costs of production, capital

expenditures, the costs and timing of the development of new deposits, the availability of a sufficient supply of water

and other materials, requirements for additional capital to fund the Company's business plan, future prices of

precious metals, changes in general economic conditions, changes in the financial markets and in the demand and

market price for commodities, possible variations in ore grade or recovery rates, possible failures of plants,

equipment or processes to operate as anticipated, accidents, labour disputes and other risks of the mining industry,

delays in obtaining governmental and regulatory approvals (including of the TSX Venture Exchange), permits or

financing or in the completion of development or construction activities, changes in laws, regulations and p olicies

affecting mining operations, hedging practices, currency fluctuations, title disputes or claims limitations on insurance

coverage and the timing and possible outcome of pending litigation, environmental issues and liabilities, risks related

to joint venture operations, and risks related to the integration of acquisitions, as well as those factors discussed

under the heading. "Risk Factors" in the Company's annual management's discussion and analysis and other filings

of the Company with the Canadian Securities Authorities, copies of which can be found under the Company's profile

on the SEDAR website at www.sedar.com.

Readers are cautioned not to place undue reliance on forward looking information. The Company undertakes no

obligation to update any of the forward -looking information in this news release or incorporated by reference

herein, except as otherwise required by law.