Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

VLC.V ·

Velocity Receives Positive Metallurgical Results at Rozino Gold Project, Southeast Bulgaria Reports Gold Recoveries Up To 92.9% Confirms Historical Gold Leach Results

Drill Results Metallurgy & Processing

1

NR‐18‐07  March 21, 2018 

Velocity Receives Positive Metallurgical Results 

at Rozino Gold Project, Southeast Bulgaria 

Reports Gold Recoveries Up To 92.9% 

Confirms Historical Gold Leach Results 

Vancouver, British Columbia – Velocity Minerals Ltd. (TSXV: VLC) (“ Velocity” or the “Company”) reports 

results of bottle roll and stirred leach tests carried out on various grades of mineralized samples from the 

Rozino gold project (“Rozino”), located in southeast Bulgaria.  The test results show gold recoveries up to 

92.9%.  Test work was completed for Velocity by Wardell Armstrong. 

Test results are comparable with historical results where gold  recoveries for similar tests were reported 

up to 93%.  In fact, results across the spectrum of grind sizes, grades and the various tests completed are 

broadly in agreement with historical results. 

“Prior to optioning the Rozino project, Velocity completed exte nsive due diligence including review of all 

historical  metallurgical  results.    While  our  review  of  historic al  metallurgy  was  positive,  there  is  no 

substitute for having our own data and we are happy to have received results which strongly corroborate 

our initial assessment of the project,” stated Keith Henderson,  Velocity’s President & CEO. “The agitated 

leach  testing  included  industry‐standard  bottle  roll  and  stirred  leach  tests  carried  out  in  Wardell’s  UK 

laboratories  to  assess  potential  gold  recoveries  for  heap  leach  and  tank  leach  processes  respectively.  

Velocity  has  initiated  more  detailed  metallurgical  assessments  which  will  feed  into  our  Preliminary 

Economic Assessment planned for later this year.” 

“These  results  confirm  that  the  mineralization  at  Rozino  is  ver y  simple  with  very  low  sulphide 

concentrations related almost entirely to iron sulphides.  The Rozino mineralization contains low levels of 

carbon, which is positive for go ld recoveries,” stated Stuart M ills, Velocity’s Vice President Exploration. 

“The results are very encouraging, and we believe that further  test work will improve recoveries further.  

The  simple  style  of  mineralization  and  very  low  sulphide  content s  a r e  a m e n a b l e  t o  t h e  a p p l i c a t i o n  o f  

modern  extraction  technologies  that  should  ultimately  reduce  op erating  costs  and  increase  the 

profitability of a potential project.” 

Details of Metallurgical Testing 

Following  geostatistical  analysis  of  gold  mineralization  at  Rozi n o ,  t h r e e  s a m p l e s  w e r e  s u b m i t t e d  f o r  

testing representing high‐grade (5.44g/t gold), medium grade (1 .18g/t gold) and low grade (0.5g/t gold) 

mineralization.  Fine agitated leach test work was carried out  on the three samples, each sample being 

milled  to  75µm  and  with  recoveries  up  to  92.9%.    Coarse  bottle r ol l t e st w ork  w as c ar r i ed ou t on t h e 

samples crushed to ‐1.7mm, returning gold recoveries up to 68.4% (Table 1).   

For the Rozino Preliminary Economic Assessment (“PEA”), the Company intends to conduct concentration 

tests aimed at producing a simple concentrate on site for transportation to the Gorubso Kardzhali A.D. CIL 

NR18‐07 Continued    March 21, 2018 

2

plant for vat leaching and gold recovery (see news release NR18‐04, February 22, 2018).  The fine agitated 

leach  test  results  (Table  1)  are  representative  of  this  potential  gold  recovery  scenario.    There  are  no 

assurances  that  such  assessment  will  produce  positive  economic results  or  that  such  results,  even  if 

possible, will be included in the final PEA.   

Average 

Sample 

Grade (g/t 

Au) 

Cyanide 

Consumption 

(kg/t) 

Lime 

Consumption 

(kg/t) 

Recoveries 

(%) 

Fine Agitated Leach Test Results 

5.44  1.70  0.45  92.9 

1.18  1.42  0.28  88.0 

0.50  1.99  0.35  74.8 

Coarse Bottle Roll Test Results 

5.44  0.23  0.23  57.3 

1.18  0.26  0.27  61.1 

0.50  0.42  0.28  68.4 

Table 1  Fine Agitated Leach & Coarse Bottle Roll Leach Results 

from the Main Zone Rozino Gold Deposit, Bulgaria. 

  High Grade  Medium 

Grade  Low Grade 

Au (g/t)  5.44  1.18  0.50 

Ag (g/t)  5.50  2.70  1.55 

As (%)  0.003  0.004  0.034 

Fe (%)  3.34  2.43  3.47 

S TOTAL (%)  0.69  0.69  0.80 

S ACID SOLUBLE(%)  0.01  0.02  0.02 

S SULPHIDES (%)  0.67  0.67  0.78 

C ORGANIC (%)  0.08  0.06  0.06 

Table 2  Rozino Main Zone Metallurgical Sulphide Samples Head Gr ade Analyses 

Cyanide and lime consumption was low, which is positive for future estimates of operating costs.  Carbon 

content  in  the  samples  was  low,  which  is  positive  as  higher  carbon  content  can  reduce  gold  recovery.  

Finally, concentrations of deleterious elements are very low (Table 2). 

NR18‐07 Continued    March 21, 2018 

3

The results indicate that the mineralization at Rozino is more  amenable to fine ore leaching, which was 

expected  based  on  previous  assessment  of  historical  results.    At  the  finer  grind  size,  the  lower  grade 

(0.5g/t gold) sample showed lower recovery indicating that a small portion of the gold may be refractory.  

Further work, consisting of diagnostic leaching is required to  better understand phase gold deportment 

in the Rozino samples.   

Quality Assurance / Quality Control 

The work program at Rozino was designed and is supervised by Stuart A. Mills, CGeol, the Company's Vice‐

President Exploration, who is responsible for all aspects of the work, including the quality control/quality 

assurance program.  The Agitated Leach and bottle rolls testing  was carried out by Wardell Armstrong 

International, UK on 3 samples taken from coarse reject samples  prepared by the ALS Global Laboratory 

in Romania.  Velocity’s on‐site personnel subset materials usin g best international work practice and the 

splits were security tagged and couriered directly to Wardell. 

The 3 samples weighed 44.1kg and were screened at 1.7mm and the  oversized stage crushed to 100% 

passing 1.7mm prior to head assay at the ALS Laboratory in the  UK. The samples were riffle split into 1kg 

aliquots prior to testing and 3‐point grind calibration was con ducted on test materials to determine the 

time required to grind material to 80% passing 75 µm for the fi ne stirred leach testing. The bottle rolls 

were sequentially analyzed 6 times during a 72hr leach period to determine leach dynamics together with 

cyanide and lime consumption. The kinetic cyanide strirred leach tests were sequentially analyzed over a 

48hr period to determine leach dynamics together with cyanide and lime consumption. 

Qualified Person 

The technical content of this release has been approved for disclosure by Stuart A. Mills, BSc, MSc, CGeol, 

a  Qualified  Person  as  defined  by  National  Instrument  43‐101  and   the  Company’s  Vice  President 

Exploration.  Mr. Mills is not independent of the Company. 

About Velocity Minerals Ltd.  

Velocity  is  a  gold  exploration  and  development  company  focused on  eastern  Europe.    The  Company’s 

management  and  board  includes  mining  industry  professionals  wit h  over  100  years  of  combined 

experience spanning Europe, Asia, and the Americas as employees  of major mining companies as well as 

founders and senior executives of junior to mid‐tier public companies.  The team's experience includes all 

aspects  of  mineral  exploration,  resource  definition,  feasibility,  finance,  mine  construction  and  mine 

operation as well as a track record in managing publicly listed companies.   

The Company’s portfolio of advanced gold exploration assets is  currently in Bulgaria, which is a member 

of the European Union (2007) and an attractive destination for mining investment.  The country’s mining 

law was established in 1999 and updated in 2011.  Mining royalties are low and compare favourably with 

more established mining countries like Canada, Peru and Chile.   Bulgaria also boasts a corporate tax rate 

of only 10%  and  the country’s education system has yielded a go od availability of  experienced  mining 

professionals in a favourable cost environment.  Foreign mining  companies are successfully operating in 

Bulgaria.   

Velocity Minerals has entered into an Exploration and Mining Al liance with Gorubso Kardzhali A.D., an 

established  and  respected  mining  company  in  Bulgaria.    Gorubso currently  operates  the  underground 

Chala Gold Mine (2006) and the K ardzhali Carbon In Leach (CIL)  processing plant (2011), which produces 

gold dore.  The Alliance outlines the scope of a broad partners hip that includes an option to earn a 50% 

beneficial interest in the Chala Mine, access to Gorubso’s gold processing plant in Kardzhali, and the ability 

for Velocity to option any or all of Gorubso’s exploration properties.  

NR18‐07 Continued    March 21, 2018 

4

On Behalf of the Board of Directors 

"Keith Henderson" 

President & CEO 

For further information, please contact:   Keith Henderson 

Phone: +1‐604‐484‐1233 

E‐mail: [email protected] 

Web: www.velocityminerals.com 

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in policies 

of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release. 

CAUTIONARY  STATEMENT  REGARDING  FORWARD‐LOOKING  INFORMATION:  This  news  release  includes  certain 

“forward‐looking statements” under applicable Canadian securities legislation.  Forward‐looking statements include, 

b u t  a r e  n o t  l i m i t e d  t o ,  s t a t e m e n t s  w i t h  r e s p e c t  t o :  f u t u r e  e x p loration  and  testing  carried  out  on  the  Tintyava 

property; use of funds; and the future business and operations of Velocity.   Often, but not always, forward looking 

s t a t e m e n t s  c a n  b e  i d e n t i f i e d  b y  w o r d s  s u c h  a s  “ p r o  f o r m a ” ,  “ p l ans”,  “expects”,  “may”,  “should”,  “budget”, 

“scheduled”, “estimates”, “forecasts”, “intends”, “anticipates”, “believes”, “potential” or variations of such words 

including negative variations thereof, and phrases that refer t o certain actions, events or results that may, could, 

would, might or will occur or be taken or achieved.  Forward looking information involves known and unknown risks, 

uncertainties and other factors which may cause the actual resu lts, performance or achievements of the Company 

t o  d i f f e r  m a t e r i a l l y  f r o m  a n y  f u t u r e  r e s u l t s ,  p e r f o r m a n c e  o r  a chievements  expressed  or  implied  by  the  forward‐

looking  information.    Such  risks a n d  o t h e r  f a c t o r s  i n c l u d e ,  a m ong  others,  operating  and  technical  difficulties  in 

connection with mineral exploration and development and mine de velopment activities for the Tintyava property, 

including the geological mapping, prospecting and sampling programs for the projects, the fact that the Company’s 

interests in the Tintyava proper ty is only an option and there  is no guarantee that the in terest, if earned, will be 

certain, actual results of exploration activities, including the program, estimation or realization of mineral reserves 

and  mineral  resources,  the  timing  and  amount  of  estimated  futur e  production,  costs  of  production,  capital 

expenditures, the costs and timing of the development of new deposits, the availability of a sufficient supply of water 

and  other  materials,  requirements  for  additional  capital  to  fund  the  Company's  business  plan,  future  prices  of 

precious metals, changes in general economic conditions, change s in the financial markets and in the demand and 

market  price  for  commodities,  possible  variations  in  ore  grade  or  recovery  rates,  possible  failures  of  plants, 

equipment or processes to operate as anticipated, accidents, labour disputes and other risks of the mining industry, 

delays  in  obtaining  governmental  and  regulatory  approvals  (including  of  the  TSX  Venture  Exchange),  permits  or 

financing or in the completion of development or construction a ctivities, changes in laws, regulations and policies 

affecting mining operations, hedging practices, currency fluctuations, title disputes or claims limitations on insurance 

coverage and the timing and possible outcome of pending litigation, environmental issues and liabilities, risks related 

to joint venture operations, and risks related to the integrati on of acquisitions, as well as those factors discussed 

under the heading.  "Risk Factors" in the Company's annual management's discussion and analysis and other filings 

of the Company with the Canadian Securities Authorities, copies of which can be found under the Company's profile 

on the SEDAR website at www.sedar.com. 

Readers are cautioned not to place undue reliance on forward lo oking information.  The Company undertakes no 

obligation  to  update  any  of  the  forward‐looking  information  in this  news  release  or  incorporated  by  reference 

herein, except as otherwise required by law. 

‐ 30 ‐