Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

VLC.V ·

Velocity Commences 2019 Drill Program at Rozino Gold Deposit, Southeast Bulgaria

Exploration Programs

1

NR-19-06 March 28, 2019

Velocity Commences 2019 Drill Program at

Rozino Gold Deposit, Southeast Bulgaria

Vancouver, British Columbia – Velocity Minerals Ltd. (TSXV: VLC) (“ Velocity” or the “ Company”)

announces that drilling and exploration activities at the Rozino gold deposit (“ Rozino”), southeast

Bulgaria, have resumed and are ongoing as planned (previous news release March 1, 2019). Several drill

holes have been completed and the first results from the 2019 drill program are expected in the coming

weeks.

A total of 12,000m to 14,000m of drilling is planned to be completed at Rozino, which will include

exploration drilling to expand the resource base as well as resource definition and infill drilling. The drill

program includes both exploration drilling and infill drilling aimed at increasing the existing mineral

resource base (previous news release dated September 17, 2018) and improving resource definition.

The Rozino drill program is also intended to support additional metallurgical and comminution studies as

well as hydrogeological and geotechnical work, all of which will be carried out in parallel. Environmental

data collection is ongoing and will continue.

The Company plans to complete an additional 1,000m of drilling regionally to begin testing structural

targets located close to the Rozino deposit. It is anticipated that discoveries within several kilometres of

the Rozino deposit could potentially add value by utilizing common infrastructure.

Stock Option Grant

The Company also announces that it has granted 925,000 common share stock options (each, an

"Option") to various employees and consultants of the Company and its affiliates. The Options entitle the

holder to purchase shares at a price of $0.28 per share for a period of 24 months from the issue date.

Qualified Person

The technical content of this release has been approved for disclosure by Stuart A. Mills, BSc, MSc, CGeol,

a Qualified Person as defined by NI 43-101 and the Company’s Vice President Exploration. Mr. Mills is not

independent of the Company.

About Velocity Minerals Ltd.

Velocity is a gold exploration and development company focused on Bulgaria. The Company envisions

staged open pit mining of sa tellite deposits and processing in a central, currently operating carbon-in-

leach (“CIL”) plant. The Company’s management and board includes mining industry professionals with

combined experience spanning Europe, Asia, and the Americas as employees of major mining companies

as well as founders and senior executives of junior to mid -tier public companies. The team's experience

includes all aspects of mineral exploration, resource definition, feasibility, finance, mine construction and

mine operation as well as a track record in managing publicly listed companies.

NR-19-06 Continued March 28, 2019

2

About Rozino

Velocity began exploring and drilling at Rozino in August 2017 and completed a Preliminary Economic

Assessment in September 2018 (the “PEA”). T he PEA provides a base case assessment of developing

Rozino by open pit mining and on-site crushing, milling and simple flotation to produce a 30 g/t gold

concentrate. The concentrate would then be trucked 85km on existing roads to the currently operating

CIL plant where saleable gold doré would be produced. Mineralization remains open for expansion.

The Rozino gold deposit is located within in the Tintyava property (the “Tintyava Property”), which is one

of several exploration projects located within an Exploration and Mining Alliance between Velocity and

Gorubso-Kardzhali AD (“ Gorubso”). Velocity, through its wholly -owned subsidiary Kibela Minerals AD,

holds a 70% interest in Tintyava Explor ation EAD (“ Tintyava Exploration”), a corporate joint venture

company that holds the Prospecting and Exploration Licence for the Tintyava Property, with Gorubso

holding the remaining 30%.

About Bulgaria

Bulgaria is a member of NATO (2004) and a member of the European Union (2007). The local currency

(BGN) has been tied to the Euro since 1999 (1.956 BGN/EUR). The country is served by modern European

infrastructure including an extensive network of paved roads. Bulgaria boasts an exceptionally low

corporate tax rate of only 10%. The country’s education system is excellent with good availability of

experienced mining professionals in a favourable cost environment. Foreign mining companies are

successfully operating in Bulgaria. The country’s mining law was established in 1999 and updated in

2011. Mining royalties are low and compare favourably with more established mining countries.

On Behalf of the Board of Directors

“Keith Henderson”

President & CEO

For further information, please contact:

Keith Henderson

Phone: +1-604-484-1233

E-mail: [email protected]

Web: www.velocityminerals.com

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in policies of the TSX

Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

CAUTIONARY STATEMENT REGARDING FORWARD-LOOKING INFORMATION:

This news release includes certain “forward -looking statements” under applicable Canadian securities legislation.

Forward-looking statements include, but are not limited to, statements with respect to: future exploration and

testing carried out on the Tintyava property; use of funds; and the future business and operations of Velocity. Often,

but not always, forward looking statements can be identified by words such as “pro forma”, “plans”, “expects”,

“may”, “should”, “budget”, “scheduled”, “est imates”, “forecasts”, “intends”, “anticipates”, “believes”, “potential”

or variations of such words including negative variations thereof, and phrases that refer to certain actions, events or

results that may, could, would, might or will occur or be taken or achieved. Forward looking information involves

known and unknown risks, uncertainties and other factors which may cause the actual results, performance or

achievements of the Company to differ materially from any future results, performance or achievements expressed

or implied by the forward -looking information. Such risks and other factors include, among others, operating and

NR-19-06 Continued March 28, 2019

3

technical difficulties in connection with mineral exploration and development and mine development activities for

the Tintyava property, including the geological mapping, prospecting and sampling programs for the projects, the

fact that the Company’s interests in the Tintyava property is only an option and there is no guarantee that the

interest, if earned, will be certain, actual results of exploration activities, including the program, estimation or

realization of mineral reserves and mineral resources, the timing and amount of estimated future production, costs

of production, capital expenditures, the costs and timing of the dev elopment of new deposits, the availability of a

sufficient supply of water and other materials, requirements for additional capital to fund the Company's business

plan, future prices of precious metals, changes in general economic conditions, changes in the financial markets and

in the demand and market price for commodities, possible variations in ore grade or recovery rates, possible failures

of plants, equipment or processes to operate as anticipated, accidents, labour disputes and other risks of the mining

industry, delays in obtaining governmental and regulatory approvals (including of the TSX Venture Exchange),

permits or financing or in the completion of development or construction activities, changes in laws, regulations and

policies affecting mining operations, hedging practices, currency fluctuations, title disputes or claims limitations on

insurance coverage and the timing and possible outcome of pending litigation, environmental issues and liabilities,

risks related to joint venture operations, and risks related to the integration of acquisitions, as well as those factors

discussed under the heading. "Risk Factors" in the Company's annual management's discussion and analysis and

other filings of the Company with the Canadian Securities Authorities , copies of which can be found under the

Company's profile on the SEDAR website at www.sedar.com.

Readers are cautioned not to place undue reliance on forward looking information. The Company undertakes no

obligation to update any of the forward -looking i nformation in this news release or incorporated by reference

herein, except as otherwise required by law.

- 30 -