Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

VIO.V ·

Vior Confirms High Grade GOLD at Belleterre and 500 Metre Depth Extension at Aubelle

Drill Results

VIOR CONFIRMS HIGH GRADE GOLD AT BELLETERRE

AND 500 METRE DEPTH EXTENSION AT AUBELLE

Montreal, Canada – December 11, 2024 – VIOR INC. (“Vior” or the “Corporation”) (TSXV: VIO, OTCQB:

VIORF , FRA: VL51) is pleased to announce the first set of assay results from its ongoing +60,000-metre

diamond drill program at its Belleterre Gold Project in Quebec's Belleterre Greenstone Belt. The drilling

has successfully intersected significant high-grade gold mineralization at both the Belleterre Vein #12

and at several Aubelle targets within the 6-kilometre long Belleterre Mine Trend. These results further

validate Vior’s geological model and underscore the potential for extensive high -grade gold

mineralization beyond the known systems.

Belleterre Area

The highlight results for the first 20 drillholes (4,053 metres of drilling) at Belleterre demonstrate both

wide intervals of gold mineralization as well as high-grade veins across a 400 metre east-west strike of

the Belleterre Vein #12. Selected high-grade intercepts (see Figure 2 and Tables 1 and 2) include:

• 15.9 g/t Au over 1.2 metres in BV24-028;

• 6.6 g/t Au over 3.0 metres including 23.5 g/t Au over 0.8 metres in BV24-033;

• 21.3 g/t Au over 0.5 metres in BV24-023; and

• 8.7 g/t Au over 0.8 metres in BV24-034

Aubelle Area

Assay results from the targets at the Aubelle deposit area confirm the continuity at depth of the high-

grade gold mineralization, more than 500 met res below the Aubelle and Conway veins. The first drill

hole at Aubelle (1,300.7metres in length) intersected multiple zones of high-grade gold mineralization

(see Figure 2 and Tables 1 and 2) including:

• 9.1 g/t Au over 0.5 metres in BV24-035;

• 10.4 g/t Au over 1.2 metres in BV24-035; and

• 6.2 g/t Au over 1.0 metres in BV24-035

"We are pleased with these initial drill results from a portion of our first two target areas at the

Belleterre Gold Project, " said Mark Fedosiewich, President and CEO of Vior. "The intersections of high-

grade gold in broad mineralized zones that extend along a 400 -metre strike length at Belleterre Vein

#12 confirm the continuity and potential for expansion for the Belleterre gold mine mineralization.

Additionally, the high-grade gold encountered in our first drill hole at Aubelle is particularly exciting, as

it demonstrates vertical extension. As we progress and advance our +60,000-metre drill program, we

are increasingly confident in the Project’s ability to deliver both scale and grade, aligning with our vision

of a high-impact gold discovery in this greenstone belt. "

Gold Mineralization Style at Belleterre and Aubelle

The gold mineralization at Belleterre Vein #12 is characterized by intervals of brecciated basalt and

quartz porphyry, often showing potassic alteration and smoky quartz veins and carbonate -quartz

veinlets. Pyrite and pyrrhotite are common, typically present in concentrations ranging from trace

amounts to 10%. Visible gold (“VG”) has been observed in several intervals.

The gold mineralization at Aubelle consists of two primary vein styles. The first vein style occurs in a

strongly schistose basalt altered by chlorite, biotite, carbonate, and quartz, often brecciated and

intruded by quartz veins containing 3-20% pyrite-pyrrhotite with trace sphalerite and chalcopyrite. The

second vein style is quartz veins injected into chloritized gabbro or potassic altered felsic intrusive,

with 3-5% pyrite, 3% chalcopyrite, 1% sphalerite, and 1% galena.

Table 1 – Drill Core Assay Results

Hole

Number

Interval

From (m)

Interval

To (m)

Interval

Width (m)

Au (g/t)

uncut Zone

BT24-019 73.0 81.2 4.4 2.1 BT Vein #12

BT24-021 155.7 156.3 0.6 3.9 BT Vein #12

BV24-023 170.4 172.0 1.6 5.4 BT Vein #12

Including 170.4 170.9 0.5 21.3 BT Vein #12

BT24-025 164.8 177.1 12.3 1.2 BT Vein #12

BV24-028 195.5 196.7 1.2 15.9 BT Vein #12

BV24-033 188.0 191.0 3.0 6.6 BT Vein #12

Including 188.0 188.8 0.8 23.5 BT Vein #12

BV24-034 180.0 181.8 1.8 3.9 BT Vein #12

Including 180.8 180.8 0.8 8.7 BT Vein #12

BV24-035 808.6 809.1 0.5 9.1 Aubelle Main

BV24-035 1078.8 1080.0 1.2 10.4 Conway South

BV24-035 1154.0 1155.0 1.0 6.2 Conway South

Table 2 – Drill Hole Collar Locations

Drill Hole

Number Azimuth (°) Dip (°) Drill Hole

Length (m)

UTM

Easting

UTM

Northing

BV24-019 164.5 -75.2 189.4 675145 5253892

BV24-021 165 -75 300.0 675132 5254042

BV24-023 165 -55 245.5 675240 5254036

BV24-025 165 -75 297.4 675240 5254036

BV24-028 165 -55 516.0 675325 5254094

BV24-033 165 -65 251.9 675325 5254094

BV24-034 165 -75 368.9 675325 5254094

BV24-035 360 -50 1300.7 672600 5252100

Figure 1 - Plan View Map of Belleterre Gold Project Brownfield Area

Figure 2 - Plan View and Longitudinal Section of Belleterre Mine Trend Drilling Results

Next Steps

Based on these results, Vior will accelerate its drill program at Belleterre with the addition of a third drill

rig in the new year . Drilling will focus on the vertical extension of the historic Belleterre gold m ine

mineralization, targeting high-grade extensions of the gold system , extension of mineralization at the

Aubelle deposit, and testing the high priority regional drill targets.

Quality Control

True widths are estimated at 65-80% of the reported core length intervals. Assays are uncut except where

indicated. All NQ core assays reported were obtained by either 1-kg screen fire assay or standard 50 gram

fire-assaying-AA finish or gravimetric finish at ALS Laboratories in Val d’Or, Québec or Sudbury, Ontario.

The 1-kg screen assay method is used when samples contain coarse gold intervals. Selected samples

are also analyzed for multi-elements using an Aqua Regia -ICP-AES method at ALS Laboratories. Drill

program design, Quality Assurance/Quality Control (“QA/QC”), and interpretation of results is performed

by qualified persons employing a QA/QC program consistent with NI 43-101 and industry best practices.

Standards and blanks are included with every 20 samples to adhere to strict QA/QC guidelines and

protocols by the Corporation and the lab.

Qualified Person

The technical content disclosed in this press release was reviewed and approved by Christian Blanchet,

Operations Manager at Vior, Qualified Person as per NI 43-101.

About Vior Inc.

Vior is a junior mineral exploration corporation based in the province of Quebec, Canada, whose

corporate strategy is to generate, explore, and develop high -quality mineral projects in the proven and

favourable mining jurisdiction of Quebec. Through the ye ars, Vior’s management and technical teams

have demonstrated their ability to discover several gold deposits and many high-quality mineral projects.

Vior is rapidly advancing its flagship Belleterre Gold Project with the strategic support of Osisko Mining

Inc. (now Windfall Mining Group Inc.). The Belleterre Gold Project is a promising district-scale project that

includes Quebec’s past -producing high -grade Belleterre gold mine. Vior has conducted extensive

surface and compilation exploration at the Belleterre Gold Project and is currently executing on a +60,000

metre drill program. Vior is also actively developing its promising Skyfall Project in partnership with

SOQUEM Inc., and several other projects with multi-mineral potential.

For further information, please contact:

Mark Fedosiewich

President and CEO

613-898-5052

[email protected]

www.vior.ca

SEDAR+: Vior Inc.

Neither the TSX Venture Exchange nor its regulation services provider (as that term is defined in the Policies of the

TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

Forward-Looking Statements

This news release contains forward-looking statements. All statements, other than of historical facts, that

address activities, events or developments that the Corporation believes, expects or anticipates will or

may occur in the future including, without limitation, the planned exploration program on the Belleterre

project, the expected positive exploration results, the timing of the exploration results, the ability of the

Corporation to continue with the exploration program, the availability of the requir ed funds to continue

with the exploration program, and the approval from the Ministère des Ressources naturelles et des

Forêts (“MRNF”) for the request for abandonment of the two mining concessions originally filed by 9293-

0122 Québec Inc. (the previous owner of the two mining concessions). Forward-looking statements are

generally identifiable by use of the words “will” , “should” , “continue” , “expect” , “anticipate” , “estimate” ,

“believe” , “intend” , “to earn” , “to have’ , “plan” or “project” or the negative of these words or other

variations on these words or comparable terminology. Forward -looking statements are subject to a

number of risks and uncertainties, many of which are beyond the Corporation’s ability to control or

predict, that may cause the actual results of the Corporation to differ materially from those discussed in

the forward-looking statements. Factors that could cause actual results or events to differ materially from

current expectations include, among other things, failure to meet expected, estimated or planned

exploration expenditures, the possibility that future exploration results will not be consistent with the

Corporation’s expectations, general business and economic conditions, changes in world gold markets,

sufficient labour and equipm ent being available, changes in laws and permitting requirements,

unanticipated weather changes, title disputes and claims, environmental risks, the refusal by the MRNF

to approve the request for abandonment of the two mining concessions held by the Corporation, as well

as those risks identified in the Corporation’s Management’s Discussion and Analysis for the fiscal year

ended June 30, 2024, and those risks set out in the Corporation’s public documents filed on SEDAR+ at

www.sedarplus.ca. Should one or more of these risks or uncertainties materialize, or should assumptions

underlying the forward-looking statements prove incorrect, actual results may vary materially from those

described and accordingly, readers should not place undue reliance on forward -looking statements.

Although the Corporation has attempted to identify important risks, uncertainties and factors that could

cause actual results to differ materially, there may be others that cause results not to be as anticipated,

estimated or intended. The Corporation does not intend, and does not assume any obligation, to update

these forward-looking statements except as otherwise required by applicable law.