Financials

__________________ NEWS _________________

Vista Gold Corp. Announces Second Quarter Financial Results and Corporate Update

Denver, Colorado, July 28, 2021 – Vista Gold Corp. (NYSE American and TSX: VGZ) (“Vista” or the “Company”)

today announced its unaudited financial results for the quarter ended June 30, 2021, which were highlighted by the

approval of the Mining Management Plan, the last major permit required for the development of Vista’s 100% owned

Mt Todd gold project (“Mt Todd” or the “Project”), and reported cash and cash equivalents of $6.3 million.

Frederick H. Earnest, President and Chief Executive Officer

of Vista, commented, “During the second quarter we

achieved a number of significant milestones for Vista and

our shareholders. Most important was the approval of the Mt

Todd Mining Management Plan. Vista now holds all major

operating and environmental permits for the development of

Mt Todd. Our ongoing exploration drilling program to

identify areas where infill drilling would have the greatest

potential to add resource ounces close to our Batman deposit

continues to produce positive results. We received the final

$1.0 million payment from Prime Mining Corp. and the

approval of other permits related to the Mt Todd project.”

“Recently, we announced the start of engineering to

complete a definitive feasibility study for Mt Todd in the first quarter of 2022. This study, which will include more

detailed engineering and design, cost inputs, and economic analysis, is expected to increase the reserves and mine

life of the Project. The results of the study, together with the results of our ongoing district-scale exploration program,

are expected to further demonstrate the significant upside potential of the Project and strengthen our position with

potential development partners.”

Second Quarter Highlights and Important Recent Developments

 Received approval of the Mt Todd Mining Management Plan;

 Commenced a definitive feasibility study for Mt Todd;

 Received final $1.0 million payment from Prime Mining Corp. for the Guadalupe de los Reyes project;

 Ended 2Q 2021 with cash and cash equivalents of $6.3 million;

 Completed a $13.5 million bought deal public offering in July 2021;

 Reported positive results from ongoing exploration activities;

 Expanded the current exploration drill program to include an additional 3,000 meters of drilling;

 Received Aboriginal Areas Protection Authority Certificate; and

 Received approval of the Mt Todd Surface Water Extraction License.

7961 Shaffer Parkway

Suite 5

Littleton, CO 80127

Phone: 720-981-1185 Trading Symbol: VGZ

NYSE American and TSX Stock Exchanges

2

Summary of Q2 2021 Financial Results

On June 30, 2021, cash and cash equivalents totaled $6.3 million. We benefited during the quarter from receipt of

the final $1.0 million related to Guadalupe de los Reyes and continued control over our base expenditures. This

allowed us to commit additional funds to our ongoing drilling program.

Vista reported a net loss of $0.8 million or $0.01 per share for the three months ended June 30, 2021, compared to a

gain of $1.9 million or $0.01 per share reported for the three months ended June 30, 2020. The loss for the current

quarter was in line with management’s expectations.

All dollar amounts in this press release are in U.S. dollars.

Definitive Feasibility Study

Management recently commenced a definitive feasibility study for Mt Todd and expects to complete the report

during Q1 2022. Most of the engineering work for Mt Todd has previously been completed to feasibility study

standards and Vista is now completing the remaining feasibility engineering in the process plant (piping, electrical,

and instrumentation), updating project designs to be consistent with the recently approved Mining Management Plan,

and completing an economic evaluation using a gold price more reflective of the current market price, which is

expected to increase gold reserves and extend the mine life. We are exploring several trade-off opportunities (e.g.,

contract power generation, contract mining, and autonomous truck haulage), and we expect to incorporate

recommendations from our 2019 preliminary feasibility study and update minor parts of the Mt Todd mine design

to be consistent with the Mining Management Plan.

Recent Drilling Results

Vista continued exploration drilling at Mt Todd during the quarter ended June 30, 2021. The drilling program has

focused on identifying areas with the greatest potential for future resource growth along strike from the Batman

deposit approximately 1.9 Km north to the Golf-Tollis/Penguin targets. To date, Vista has completed 16 of 18

planned holes (5,466 of the planned 6,000 meters). Each of the holes completed has intersected mineralization

consistent with our geologic model. The most recent drill hole (VB21-011) intersected mineralization that is both

thicker and of higher grade than observed in previous drill holes in the current program. Of approximately 399 meters

drilled in VB21-011, a total of 200 meters intersected mineralization with average grade of 0.63 g Au/t, including

9.9 meters @ 2.08 g Au/t, 14.3 meters @ 1.42 g Au/t, 10.2 meters @ 1.74 g Au/t, 26.7 meters @ 0.98 g Au/t, and

14.0 meters @ 1.22 g Au/t. (For complete results of this hole and hole VB21-010, please refer to our press release

dated July 15, 2021.)

Figure 1 below is an aerial view of the drill locations for the holes in the current program. The image is looking

south, with the Batman pit located in the upper-right corner of the image. VB21-12 is in-progress and is being co-

funded by the Northern Territory’s Geophysics and Drilling Collaborations (“GDC”) program. The GDC program

is funded by the Resourcing the Territory initiative and aims to increase the intensity of exploration drilling and

geophysics in underexplored areas of the Northern Territory. Vista was one of 15 companies receiving an award

under the current round of GDC funding.

3

Figure 1 - Aerial view of the drill locations for the holes in the current program

Mr. Earnest commented, “We are extremely pleased with our drilling results to date and believe there is opportunity

for significant resource growth and an extended life at Mt Todd. Given the success of the current drill program, Vista

recently announced additional holes for a third phase of drilling totaling approximately 3,000 meters.”

Management Conference Call

Management’s quarterly conference call to review financial results for the quarter ended June 30, 2021 and to discuss

corporate and project activities is scheduled on Friday, July 30, 2021 at 10:00 am MDT (12:00 pm EDT).

Participant Toll Free: (844) 898-8648

Participant International: (647) 689-4225

Conference ID: 7260176

This call will also be archived and available at www.vistagold.com after July 30, 2021. Audio replay will be available

for 21 days by calling toll-free in North America (855) 859-2056 or (404) 537-3406.

If you are unable to access the audio or phone-in on the day of the conference call, please email your questions to

[email protected].

For further information, please contact Pamela Solly, Vice President of Investor Relations, at (720) 981-1185.

About Vista Gold Corp.

Vista is a gold project developer. The Company’s flagship asset is the Mt Todd gold project located in the Tier 1,

mining friendly jurisdiction of Northern Territory, Australia. Situated approximately 250 km southeast of Darwin,

Mt Todd is the largest undeveloped gold project in Australia and, if developed as presently designed, would

4

potentially be Australia’s fourth largest gold producer on an annual basis, with lowest tertile in-country and global

all-in sustaining costs. All major operating and environmental permits have now been approved.

For further information, please contact Pamela Solly, Vice President of Investor Relations, at (720) 981-1185.

Forward Looking Statements

This press release contains forward-looking statements within the meaning of the U.S. Securities Act of 1933, as amended, and

U.S. Securities Exchange Act of 1934, as amended, and forward-looking information within the meaning of Canadian securities

laws. All statements, other than statements of historical facts, included in this press release that address activities, events or

developments that we expect or anticipate will or may occur in the future, including such things as our belief in us completing

the remaining feasibility engineering in the process plant (piping, electrical, and instrumentation), updating project designs to

be consistent with the recently approved Mining Management Plan, and completing an economic evaluation using a gold price

more reflective of the current market price, which is expected to increase gold reserves and extend the mine life by incorporating

a greater portion of the currently defined measured and indicated resources into the mine plan; our belief that we have been very

successful in de-risking Mt Todd and expect that our current programs will further validate the Mt Todd design and economics,

increase reserves and mine life, and demonstrate district-scale potential within the Company’s mining licenses; our expectation

to complete the feasibility study during Q1 2022; our belief that the engineering work for Mt Todd has previously been

completed to feasibility study standards; our expectation that we will incorporate recommendations from the 2019 prefeasibility

study and update minor parts of the Mt Todd mine design to be consistent with the Mining Management Plan; and our belief

that Mt Todd is the largest undeveloped gold project in Australia are forward-looking statements and forward-looking

information. The material factors and assumptions used to develop the forward-looking statements and forward-looking

information contained in this press release include the following: our approved business plans, exploration and assay results,

results of our test work for process area improvements, mineral resource and reserve estimates and results of preliminary

economic assessments, prefeasibility studies and feasibility studies on our projects, if any, our experience with regulators, and

positive changes to current economic conditions and the price of gold. When used in this press release, the words “optimistic,”

“potential,” “indicate,” “expect,” “intend,” “hopes,” “believe,” “may,” “will,” “if,” “anticipate,” and similar expressions are

intended to identify forward-looking statements and forward-looking information. These statements involve known and

unknown risks, uncertainties and other factors which may cause the actual results, performance or achievements of the Company

to be materially different from any future results, performance or achievements expressed or implied by such statements. Such

factors include, among others, uncertainties inherent in the exploration of mineral properties, the possibility that future

exploration results will not be consistent with the Company’s expectations; there being no assurance that the exploration

program or programs of the Company will result in expanded mineral resources; uncertainty of resource and reserve estimates,

uncertainty as to the Company’s future operating costs and ability to raise capital; risks relating to cost increases for capital and

operating costs; risks of shortages and fluctuating costs of equipment or supplies; risks relating to fluctuations in the price of

gold; the inherently hazardous nature of mining-related activities; potential effects on our operations of environmental

regulations in the countries in which it operates; risks due to legal proceedings; risks relating to political and economic instability

in certain countries in which it operates; uncertainty as to the results of bulk metallurgical test work; and uncertainty as to

completion of critical milestones for Mt Todd; as well as those factors discussed under the headings “Note Regarding Forward-

Looking Statements” and “Risk Factors” in the Company’s latest Annual Report on Form 10-K as filed February 25, 2021 and

other documents filed with the U.S. Securities and Exchange Commission and Canadian securities regulatory authorities.

Although we have attempted to identify important factors that could cause actual results to differ materially from those described

in forward-looking statements and forward-looking information, there may be other factors that cause results not to be as

anticipated, estimated or intended. Except as required by law, we assume no obligation to publicly update any forward-looking

statements or forward-looking information; whether as a result of new information, future events or otherwise.

Cautionary Note to United States Investors

The United States Securities and Exchange Commission (“SEC”) limits disclosure for U.S. reporting purposes to mineral

deposits that a company can economically and legally extract or produce. The technical reports referenced in this press release

uses the terms defined in Canadian National Instrument 43-101 – Standards of Disclosure for Mineral Projects (“NI 43-101”)

and the Canadian Institute of Mining, Metallurgy and Petroleum (the “CIM”) – CIM Definition Standards on Mineral Resources

and Mineral Reserves, adopted by the CIM Council, as amended (the “CIM Definition Standards”). These standards are not the

same as reserves under the SEC’s Industry Guide 7 and may not constitute reserves or resources under the SEC’s newly adopted

disclosure rules to modernize mineral property disclosure requirements (“SEC Modernization Rules”), which became effective

February 25, 2019 and will be applicable to the Company in its annual report for the fiscal year ending December 31, 2021.

Under the currently applicable SEC Industry Guide 7 standards, a “final” or “bankable” feasibility study is required to report

reserves, the three-year historical average price is used in any reserve or cash flow analysis to designate reserves and all

5

necessary permits and government approvals must be filed with the appropriate governmental authority. Additionally, the

technical reports uses the terms “measured resources”, “indicated resources”, and “measured & indicated resources”. We advise

U.S. investors that while these terms are Canadian mining terms as defined in accordance with NI 43-101, such terms are not

recognized under SEC Industry Guide 7 and normally are not permitted to be used in reports and registration statements filed

with the SEC. Mineral resources described in the technical reports have a great amount of uncertainty as to their economic and

legal feasibility. The SEC normally only permits issuers to report mineralization that does not constitute SEC Industry Guide 7

compliant “reserves” as in-place tonnage and grade, without reference to unit measures. “Inferred resources” have a great

amount of uncertainty as to their existence, and great uncertainty as to their economic and legal feasibility. It cannot be assumed

that any or all part of an inferred resource will ever be upgraded to a higher category. U.S. Investors are cautioned not to

assume that any part or all of mineral deposits in these categories will ever be converted into SEC Industry Guide 7

reserves.

Under the SEC Modernization Rules, the definitions of “proven mineral reserves” and “probable mineral reserves” have been

amended to be substantially similar to the corresponding CIM Definition Standards and the SEC has added definitions to

recognize “measured mineral resources”, “indicated mineral resources” and “inferred mineral resources” which are also

substantially similar to the corresponding CIM Definition Standard. However there are differences between the definitions and

standards under the SEC Modernization Rules and those under the CIM Definition Standards and therefore once the Company

begins reporting under the SEC Modernization Rules there is no assurance that the Company’s mineral reserve and mineral

estimates will be the same as those reported under CIM Definition Standards as contained in the technical reports prepared under

CIM Definition Standards or that the economics for the Mt Todd project estimated in such technical reports will be the same as

those estimated in any technical report prepared by the Company under the SEC Modernization Rules in the future.